Wind detectionTGV MéditerranéeFrance
Division - Name - Date - Language 2
Project TGV Méditerranée
Application :
• Develop a security system to slow down the TGV train in case of too strong wind
• 12 detection stations are installed along the railways on 300 kms
– éviter les renvois multiples qui compliquent la lecture.
• Data are transmitted to a central control room to treat the information and to elaborate orders to the TGV pilot through a graphic screen.Specialized phone lines are used.
Division - Name - Date - Language 3
Project TGV Méditerranée
Schneider solution :
• 12 redundant Premium beside each detection station
• 2 main redundant PC in the central post linked to the detection Premium through specialized phone connections
• 130 synoptics to control and manage alrms & events along the railways
Division - Name - Date - Language 4
Project TGV Méditerranée
Architecture :