Upload
abm
View
354
Download
1
Tags:
Embed Size (px)
Citation preview
Providing Financial Solutions to the
Technical Needs of Public Schools
Helping K-12 Schools overcome Budget
Constraints and Aging Facilities
Challenges & Trends Facing K-12 Schools
Deferred
Systems
& Maintenance
Issues
Reduced
Funding
-Asked to do
More with Less Increased
Focus
on Outsourcing
Increasing
Complexity
of
Buildings/Systems
Budgeting
Unpredictable
Costs
Aging Facilities &
Infrastructure
Rising Energy
Costs
& Market Volatility
Sustainability &
Green Initiatives
Changing
Demand/
New Work Styles
Today more than ever, schools face greater pressures on
their General Fund and Fund Balance
2
Supporting the Capital Funding Needs of
America’s Schools
3
Financial solutions to the
technical needs of K-12
schools are now available for
schools across the United
States. K-12 schools can
benefit from programs that
convert guaranteed energy
and operational savings into
long-term capital funding to
help eliminate deferred
maintenance that enhances
the educational environment.
K-12 Schools Benefit from Financial and
Technical Solutions
4
Harris County School District
Hamilton, Georgia
Altar Valley School District
Pima County, Arizona
Orange County Public Schools
Orange County, Virginia
Hitchcock Independent School
District Hitchcock, Texas
Murray County Schools
Chatsworth, Georgia
Butler Area School District
Butler, Pennsylvania
School districts across the United States have received millions of dollars in capital
funding for their facilities with little to no budget impact or tax increases!
Check out this sampling of success stories.
Harris County School District
Hamilton, Georgia
Altar Valley School District
Pima County, Arizona
5
CHALLENGE • To improve aging mechanical infrastructure,
while staying within a very limited budget.
SOLUTION • New HVAC equipment with state-of-the-art
systems • High-efficiency LED lighting • Occupancy and energy management control
systems • Water consumption device retrofits
BOTTOM LINE
• More than $10 million in total guaranteed energy and operating savings
• Improved indoor environmental quality and lighting levels
• Reduced amount of water and energy consumed
CHALLENGE
• To fund HVAC system upgrades and lower utility
costs while maintaining the existing budget
without the need for program budget reductions.
SOLUTION
• Implemented energy-efficient HVAC upgrades
• Returned abandoned well to serve as new
irrigation system
• Installed web-based, automated energy system
BOTTOM LINE
• Guaranteed $732,000 in energy and operating
costs
• Improved facilities’ climate control in areas where
outside temperatures commonly surpass 100°F
• Saving $23,000 annually on fire suppression
services and campus irrigation produced by new
irrigation system
Orange County Public Schools
Orange County, Virginia
Hitchcock Independent School District
Hitchcock, Texas
6
CHALLENGE
• To make critical infrastructure upgrades to
reduce operating costs and improve overall
efficiency without taxpayer burden
SOLUTION
• Division-wide lighting upgrades
• New HVAC systems with upgraded facility
controls
• High-efficiency boilers, water heaters, air
handlers, circulating pumps and air cooled
chiller
BOTTOM LINE
• $9.3 million in guaranteed energy and
operating savings over 15 years
• Improved indoor environmental quality
including comfort conditions, lighting levels and
increased fresh air supply
CHALLENGE
• To improve aging and ocean weathered HVAC
systems to lower operating costs and improve
overall comfort conditions for students and staff
SOLUTION
• Installed energy-efficient upgrades, control
systems and water conservation measures
• Performed district-wide, high-efficiency lighting
upgrades
BOTTOM LINE
• Guaranteed energy savings of $3.4 million over
15 years
• Created holistic, self-funding solution with no
upfront costs, immediate savings and leftover
budget to renovate unused cafeteria into a
modern culinary center
Murray County Schools
Chatsworth, Georgia
Butler Area School District
Butler, Pennsylvania
7
CHALLENGE • To eliminate major deferred maintenance
issues and increase comfort while reducing
utility costs with little to no special funding
SOLUTION
• New state-of-the-art controls and energy
recovery units installed for proper air quality
• New mechanical systems, HVAC units, and
curbing for rooftops units and ongoing HVAC
maintenance
BOTTOM LINE
• Multi-phase project with guaranteed energy
and operating savings of more than $8 million
over the course of 10 years
• Self-funded program with no upfront costs and
immediate savings
CHALLENGE • To reduce operating expenses and find an
affordable, self-funding solution to increase comfort/indoor air quality of school administration building
SOLUTION
• Installed new AC system, high-efficiency boilers, building automation system and energy efficient lighting
• Esthetic improvements including interior paint, thermal pan windows, carpeting, roofing and new ceilings
BOTTOM LINE
• More than $900,000 in guaranteed energy and operating savings over 15 years; savings have exceeded projections every year since project completion
• Project required no taxpayer burden & provided additional money for reinvestment to address other district needs
Program Success Highlights
8
• Created $32.3 million in total guaranteed energy savings for these
6 schools (millions more for others across the U.S.)
• Funded critical upgrades to HVAC, lighting, energy management control systems, windows, as well as water conservation measures
• Produced:
Improved indoor environmental quality and lighting levels
Reduced amount of water and energy consumed
No additional tax burden or impact to each school’s existing
budget!
Like many other schools across the nation, ABM’s Bundled Energy Solutions
program provided financial solutions to the technical needs of these six schools.
Video: Providing Facility & Financial
Solutions for K-12 Schools Watch this video to see how ABM helps schools meet their facility needs without
increasing taxpayer burden, decreasing staff or cutting educational programs.
9
Call 866-678-0783 to learn more about how ABM can help you fund facility improvements with zero budget impact, or:
Visit us at info.abm.com/K12-SuccessStories.html to read more success stories.
10
Contact us Today!