Upload
dr-paul-a-rodriguez
View
118
Download
2
Tags:
Embed Size (px)
Citation preview
What is LCAP?
LCAP = Local Control Accountability PlanThe LCAP is a culmination of several years of reform
planning at the State level LCAP was developed in conjunction with the Local Control
Funding Formula (LCFF) – a complete overhaul of the school finance system A significant part of the 2013-2014 State Budget
LCAP template as developed by State has three sections Stakeholder Engagement Goals and Progress Indicators Actions, Services, and Expenditures
2
What is LCAP?
LCAP = Local Control Accountability Plan
District must develop, adopt, and annually update a three-year Local Control Accountability Plan beginning July 1, 2014. Plan to be based on 8 State-identified priorities primarily focused
on student achievement
Must align to overall District budget and to school site plans
Outside Review County Superintendents must review school district LCAPs.
LCAP may reference actions/expenditures in other plans
3
Goals and Progress Indicators
What maintenance related goals are in the plan?
All students will be provided with safe school facilities that are clean, in good repair and conducive to learning
Increase custodial and/or maintenance staff
Promote cleanliness of schools
5
Actions, Services, and Expenditures
What specific maintenance measures will be taken in supporting LCAP?Custodial
Increase total custodial staffing and calendarIncrease work year by five days (255 to 260)Increase total custodial staffing by 6.25
equivalent FTEsMaintenance
Increased maintenance staffingSkilled Trade TechnicianHVAC TechElectricianLeads Grounds WorkerGrounds Worker
6
Actions, Services, and Expenditures
What specific measures can be taken in supporting LCAP ?
Provide safe and well maintained facilities
Align with instructional program goals
Maximize operational efficiencies
7
Actions, Services, and Expenditures
Provide safe and well maintained facilitiesSite inspections
Custodial inspections using a modified FIT formDeferred maintenance plan
Employee hazardous material trainingAnnual AHERA training
2-hour asbestos awareness training2-hour lead paint awareness training
Employee personal protective equipmentHazardous material identification
3-year AHERA re-inspectionsHazardous material identification on work order
8
Actions, Services, and Expenditures
Provide safe and well maintained facilities (cont.) Example- Hazardous material identification on work orders
9
Section III - PPE (Personal Protective equipment) required to preform the specified work (e.g., eye protection, gloves,
etc.)
Section II - General hazardous material information (e.g.,
asbestos and lead paint)
Section I - General safety information (e.g., following
manufacture labeling instructions)
Section IV – Specific locations for know asbestos and lead
paint (e.g., floor tile - 960 sq. ft.
Actions, Services, and Expenditures
Align with instructional program goalsExamples include:
Revising mowing schedules for PE program expansion
Minimizing impact on instruction by expanding working hours to 7am -7 pm
Coordinating activities with schools’ testing calendar
10
Actions, Services, and Expenditures Align with instructional program goals (cont.) Example - Coordinate activities with schools’ testing calendar by providing
construction managers & contractors with the following: Red: identifies testing dates – no construction to occur Yellow: identifies after-hours – limited construction permitted Green: identifies non-session days – construction permitted Grey: weekends – construction permitted
11
Actions, Services, and Expenditures
Maximize operational efficiencies
Evaluate appropriate staffing levels
Employ accountability & productivity measures
Employ cost containment & savings measures
12
Actions, Services, and Expenditures Maximize operational efficiencies (cont.)
Evaluate appropriate staffing levels Staffing cycle - correlation between staffing and facilities conditions
district-wide Adjust staffing based on facilities’ condition (e.g., less staffing
required following modernization) More tradesman are needed as buildings age versus following a
modernization (e.g., carpenters, plumbers, etc. vs. general/skilled trade positions)
13
Sq. Ft.
Time
+
Staff ing
-
Staff ing to Sq. Ft.
Modernizat ionModernization
Actions, Services, and Expenditures
Maximize operational efficiencies (cont.) Evaluate appropriate staffing levels
Example - School district staffing comparison study
14
Comparis
on Gro
up
SCHOOL DIS
TRICT
ENROLLMENT
SQ. F
OOTAGE
TOTAL S
CHOOLS
ENROLLMENT/S
CHOOL
TL SUPPORT F
ACILIT
IES
HVAC
A/V CARPENTERS
ELECTRICIA
NS
PLUMBERS
GEN. MAIN
T. WORKER/S
KILLED W
ORKERS
IRRIG
ATION T
ECHS
LOCKSM
ITHS
VEHICLE M
ECHANICS
ENVIRO
NMENTAL T
ECHS
MOW
CREW
GROUNDS WORKERS
MOW
ER/EQ
UIPM
ENT REPAIR
TECH
PAINTERS
OTHER
UTILIT
Y/HARDSCAPE/F
ENCING
WO
RKERS
TL M
AINTE
NANCE CREW
STA
FFING
TOTAL C
USTODIA
NS
TOTAL C
LERICAL S
TAFF
TOTAL MANAG
ERS
STAFF/MANAGERS
STUDENTS/MAIN
TENACE CREW
STAFFIN
G
STUDENTS/T
OTAL C
USTODIA
NS
STUDENTS/CLERIC
AL STAFF
STUDENTS/MANAG
ERS
TL S
Q. FT.
/MAIN
TENANCE CREW
STAFFIN
G
TL S
Q. FT./T
OTAL C
USTODIANS
TL S
Q. FT./C
LERICAL S
TAFF
TL SQ. F
T./MANAGERS
Uni
fied
and
Smal
l Ele
men
tary
Dis
tric
ts
ALTA LOMA* 6,091 652,350 10 609 1 1 0 1 1 1 1 0 0.5 0 0 2 2 0 0.5 0 0 10 24 1 1 35 609 254 6,091 6,091 65,235 27,181 652,350 652,350
CENTAL* 4,781 480,600 7 683 2 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 10 18 2 1 30 478 266 3,187 4,781 48,060 26,700 320,400 480,600
CHINO USD 29,774 2,668,953 34 876 3 4 0 1 3 3 4 2 2 0 1 4 12 0 2 3 2 43 115 5 8 20 692 259 5,955 3,722 62,069 23,208 533,791 333,619
COLTON JUSD 23,192 2,051,830 28 828 4 6 4 0 0 0 23 0 0 0 0 0 18 0 0 0 0 51 84 2 6 23 455 276 11,596 3,865 40,232 24,427 1,025,915 341,972
CUCAMONGA* 2,629 315,259 4 657 1 0 0 0 0 0 2.4 0 0 0 0 0 2 0 0 0 0 4 9.4 1 1 15 598 279 2,629 2,629 71,650 33,405 315,259 315,259
ETIWANDA* ^ 13,031 977,364 16 814 3 0 0 0 0 0 6 0 0 0 0 0 7 0 0 0 0 13 20 1 1 34 1,002 652 13,031 13,031 75,182 48,868 977,364 977,364
FONTANA USD 40,592 3,900,000 44 923 3 6 0 4 5 3 13 5 3 9 0 8 12 1 9 5 1 84 178 3 10 27 483 228 13,531 4,059 46,429 21,910 1,300,000 390,000
MOUNTAIN VIEW 2,867 323,917 4 717 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 1 4 3 N/A 319 2,867 717 N/A 35,991 323,917 80,979
RIALTO USD 26,764 2,546,661 28 956 4 3 6 3 4 3 9 3 2 0 0 5 15 1 5 0 8 67 100 3 10 17 399 268 8,921 2,676 38,010 25,467 848,887 254,666
UPLAND USD* 11,116 869,017 14 794 1 2 0 0 1 0 3 0 1 0 0 0 6 0 0 0 0 13 40 1 1 54 855 278 11,116 11,116 66,847 21,725 869,017 869,017
ANAHEIM CITY 19,200 1,255,301 24 800 3 2 0 6 2 2 2 2 1 0 0 3 4 0 2 0 2 28 59 4 5 18 686 325 4,800 3,840 44,832 21,276 313,825 251,060
BAKERSFIELD CITY 28,142 2,217,654 42 670 3 3 2 2 2 2 10 2 1 6 0 6 0 0 1 0 2 39 112 4 5 31 722 251 7,036 5,628 56,863 19,800 554,414 443,531
CHULA VISTA* 28,041 2,548,609 44 637 2 3 2 2 3 1 7 3 1 6 0 2 15 2 3 0 0 50 118 2 2 85 561 238 14,021 14,021 50,972 21,598 1,274,305 1,274,305
ESCONDIDO 18,209 1,579,807 24 759 0 2 2 2 2 2 12 2 1 1 1 1 10 0 3 0 1 42 81 4 3 42 434 225 4,552 6,070 37,614 19,504 394,952 526,602
PALMDALE 22,648 1,857,682 25 906 1 3 0 0 3 0 14 0 2 0 0 2 8 0 1 0 0 33 70 3 4 27 686 324 7,549 5,662 56,293 26,538 619,227 464,421
OM
SD
OMSD (Current) 22,703 1,628,698 33 688 3 4 0 2 2 2 7 3 1 1 2 1 6 1 3 0 3 38 88.9 3 4 32 597 255 7,568 5,676 42,860 18,325 542,899 407,175
Notes* District does not utilize centralized custodial services; Rank with all comparison districts - current staffing level 6th 8th 12th 7th 6th 11th 16th 10th 9th
principals are in charge of custodians. Rank with all comparison districts - level 1 staffing reduction plan 5th 5th 6th 7th 4th 9th 14th 10th 5thRank with all comparison districts - level 2 staffing reduction plan 4th 2nd 2nd 7th 4th 5th 9th 9th 5th
^ Etiwanda contracts-out custodial night service and mowing.Rank with comparable elementary districts only - current staffing level 3rd 4th 3rd 2nd 2nd 5th 6th 4th 5thRank with comparable elementary districts only - level 1 staffing reduction plan 3rd 2nd 3rd 2nd 2nd 4th 4th 4th 3rdRank with comparable elementary districts only - level 2 staffing reduction plan 3rd 1st 1st 2nd 2nd 1st 2nd 3rd 3rd
Uni
fied
and
Smal
l Ele
men
tary
Dis
tric
tsCo
mpa
rabl
e El
em. D
istr
icts
Actions, Services, and ExpendituresMaximize operational efficiencies (cont.)
Employ accountability & productivity measures Example - Staff performance evaluation criteria
15
Description/Performance Rating
Excellent MeetsExpectation
Below Expectation
Unsat.
Attendance 0 – 6occurrences
7 –11occurrences
12 – 24occurrences
24+Occurrences
or 2 evals. w/ >12 occurrences
Unsafe Practices 0occurrences
1occurrences
2 occurrences
3Occurrences
or 2 evals. w/ >2 occurrences
Reported Work Order Hours
7.5 – 6.5 Hours per day
6.4 – 5.5 Hours per day
5.4 – 4.5 Hours per day
<4.4 Hours per day
Actions, Services, and ExpendituresMaximize operational efficiencies (cont.)
Cost containment & savings measures (cont.) Example – Standards Board
16
How Maintenance & Operations Can Support the LCAP for Schools?
Contact Information
Dr. Paul A. Rodriguez
Cellular: 909.519.2777
Email: [email protected]
Website: www.par913edu.com
19