Upload
sahraahmedali
View
133
Download
0
Tags:
Embed Size (px)
DESCRIPTION
A2 Media Studies
Citation preview
PLAN FOR SECOND DAY OF SHOOTING
Halfwit Productions
GENERAL
Date: Tuesday 1st July 2014
Start time: 11:00 am
Shooting crew: Sahra Ahmed – Director,
Camerawoman
Cast crew: Jordan Hewitt & Arran Sharma
Transport/ chauffeur: Train
Equipment: Camera, tripod, SD card, extra battery
PRE-SHOOTING PLAN
In school:
Pick up the camera from Mr Brown, call sheet has already been filled in and booked for the 1st July
2014.
Before we leave we must make sure that the battery is fully charged and that I have a spare battery
as well as the charger.
Once all the equipment is gathered, it is to be taken home to be practiced with by the
camerawoman so that she is ready for Tuesday.
Once at the locations to film:
Once shooting:
Walk in park scene
Play twister
Ice-Cream in face
Pontoon Dock
CONTINUED
Photo shoot for pictures for the magazine
Location pictures taken
Costume pictures
Also, try to re-film Toms split screen scenes.
- End of filming session 2