1 Muhammad Jabakhanji – Alpin Limited
Perspectives on UK BIM Standards & Local Adoption
Muhammad Jabakhanji Head of VDC + BIM
ALPIN Limited
2 Muhammad Jabakhanji – Alpin Limited
Agenda... • Motivation for BIM policy and adoption • Approach • The Solution: BS1192 Suite of Standards • ISO19650 Key Concepts • Food for Thought
4 Muhammad Jabakhanji – Alpin Limited
Consistent Findings
Latham Report 1994
Egan Report 1998
Never Waste A Good Crisis
2009
Accelerating Change
2002
5 Muhammad Jabakhanji – Alpin Limited
Enough is enough !
There is a detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament.
Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year.
Construction Strategy
2011
6 Muhammad Jabakhanji – Alpin Limited
Let’s set objectives… 0 - Unmanaged CAD probably 2D, with paper (or electronic paper) as the most likely data exchange mechanism. 1 - Managed CAD in 2 or 3D format using BS 1192:2007 with a collaboration tool providing a common data environment, possibly some standard data structures and formats. Commercial data managed by standalone finance and cost management packages with no integration. 2 - Managed 3D environment held in separate discipline “BIM” tools with attached data. Commercial data managed by an Enterprise Resource Planning System (ERP). Integration on the basis of proprietary interfaces or bespoke middleware could be regarded as “pBIM” (proprietary). The approach may utilise 4D Programme data and 5D cost elements. 3 - Fully open process and data integration enabled by IFC / IFD. Managed by a collaborative model server. Could be regarded as iBIM or integrated BIM potentially employing concurrent engineering processes.
7 Muhammad Jabakhanji – Alpin Limited
Core Documents
PAS1192-2:2013 PAS1192-3:2014 BS1192-4:2015
Soft Landings Classification Digital Plan of Work BIM Protocol
BS1192-2007
8 Muhammad Jabakhanji – Alpin Limited
Supporting Documentation
Post Contract Award BIM Execution Plan
CPIx BIM Assessment
CPIx IT Assessment
Pre-Contract BIM Execution Plan
9 Muhammad Jabakhanji – Alpin Limited
More Supporting Documentation
CIC Scope of Service CIC Indemnity Insurance Guide
BIM Task Group EIR Guide
10 Muhammad Jabakhanji – Alpin Limited
No more blockers for adoption!
– Need for Change – Resources for Change – Legal Implications
– Contractual Arrangements – Professional Indemnity – Ownership
– SMPs
11 Muhammad Jabakhanji – Alpin Limited
ISO19650 As a response to an International Drive for BIM level 2 ISO 19650 series is being developed “Organization of information about construction works - Information management using BIM”
17 Muhammad Jabakhanji – Alpin Limited
Image from PAS 1192-3:2014
Employer’s Information Requirements
18 Muhammad Jabakhanji – Alpin Limited
Image from PAS 1192-3:2014
Non-Graphical Model Graphical Model
What is a model?
19 Muhammad Jabakhanji – Alpin Limited
Employers Decision Points
• “When the Employer requires information to make decisions…”
• Suppliers information exchanges as required to provide information
21 Muhammad Jabakhanji – Alpin Limited
Procurement: Prequalification
• Employers Prequalification Requirements
• Pre Tender BIM Assessment • Business Certification Scheme
22 Muhammad Jabakhanji – Alpin Limited
Procurement: BEP
Pre Contract BIM Execution Plan: Is prepared by the supplier to demonstrate his proposed approach, and the capability, capacity and competence of his firm and his supply chain to meet the Employers Information Requirements.
26 Muhammad Jabakhanji – Alpin Limited
Common Data Environment (CDE)
CDE Work in Progress
WIP
Non-verified data used by one team
only
Document
Published coordinated and
validated data
Share
Verified data that can be shared
between teams
Archive
Data maintained for knowledge and
legacy
Coordinated Private Published
Production Deliverable output
Stored
Project / programme control Local control
27 Muhammad Jabakhanji – Alpin Limited
Information Management Roles
• Project Delivery Manager • Project Information Manager • Lead Designer • Task Team Manager • Task Information Manager • Task Interface Manager
30 Muhammad Jabakhanji – Alpin Limited
BIM Education & Certification Pathway
BIM International Foundation Course
STAGE 1
EDUCATION EXAM AWARD
2 days
Information Management
STAGE 2
EDUCATION EXAM AWARD
2 days
Project Delivery Management
STAGE 3
EDUCATION EXAM AWARD
1 day
BIM Level 2 / ISO19650 Certificated Professional Project/Task Information Manager
BIM Level 2 / ISO19650 Certificated Professional Project Delivery Manager
Certificated Professionals
31 Muhammad Jabakhanji – Alpin Limited
Thank You!
BIM International Foundation Course
STAGE 1
EDUCATION EXAM AWARD
2 days
BIM International 2 Day Course DECEMBER 14-15, DOHA Register on : alpinme.com/courses/ OR bre.co.uk/academy/training.jsp Enter the following code for a 15% Discount: