A Practical Training and Industrial Visit Report On CHHABRA THERMAL POWER PLANT” Submitted Partial Fulfilment for the award of the degree of Bachelor of Technology In Civil Engineering 2016-2017 (1 June 2016 – 25 July 2016) Submitted to:- Submitted by:- Mr Gori Shankar Soni Chandra Mohan Lodha Head of Department Roll No. : 13EAOCE016 Page 6AIETM/CE/2016-17/P.T.I.V.

Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Embed Size (px)

Citation preview

Page 1: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

APractical Training and Industrial Visit Report

OnCHHABRA THERMAL POWER PLANT”

Submitted Partial Fulfilment for the award of the degree of

Bachelor of TechnologyIn

Civil Engineering

2016-2017(1 June 2016 – 25 July 2016)

Submitted to:- Submitted by:-Mr Gori Shankar Soni Chandra Mohan Lodha

Head of Department Roll No. : 13EAOCE016Department of Civil Engineering Class: 4th year(7th sem.)

DEPARTMENT OF CIVIL ENGINEERING

ARYA INSTITUTE OF ENGINEERING TECHNOLOGY & MANAGEMENT

Page 6AIETM/CE/2016-17/P.T.I.V.

Page 2: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

OMAXE CITY, AJMER ROAD, JAIPUR, RAJASTHAN

RAJSTHAN TECHNICAL UNIVERSITY, KOTA

Page 7AIETM/CE/2016-17/P.T.I.V.

Page 3: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

ARYA INSTITUTE OF ENGINEERING TECHNOLOGY &MANAGEMENT

CERTIFICATE

(Session 2016- 2017)

This is to certify that the work, which is being presented in the project on “Thermal Power Plant Ash Dyke” submitted by Mr ChandraMohanLodha(13EAOCE016), a student of fourth year (7th Sem.) B. Tech. in Civil Engineering inpartial fulfilment for the award of degree of Bachelor of Technology is a record of student’swork carried out and found satisfactory for submission.

Mr Gori Shankar Soni Ms Geetanjali Ganguly

Head of department Seminar Co-ordinator

Department of Civil Engineering Department of Civil Engineering

Page 8AIETM/CE/2016-17/P.T.I.V.

Page 4: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

ACKNOWLEDGEMENT

I wish to express my deep of gratitude to Mr. Ram Avatar Meena “AEN in CTPP

POWERPLANT”, Who give me opportunity to do Internship at this one of the best

construction site of DMRC.

I would like to first of all express my thanks to Yogesh Momaya Pm Of Radix Infra Projects

and his Team to provide me a friendly and learning environment around the site and with helpful

nature they share whole knowledge of construction site.

I would like to express sincere thanks to Dr. I.C. Sharma Sir, Principal of AIETM who always

Inspired me by his kind cooperation and extendible support.

Words are inadequate in offering my thanks to Mr. Gori Shankar Soni Sir, HOD of Civil

Engg. Department whose helping and polite nature always help to Improve Knowledge and

Skills.

I also like to express my thanks to All Vigorous Civil Engg. Department Faculties, who always

dedicated to improvements of students.

Page 9AIETM/CE/2016-17/P.T.I.V.

Page 5: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

PREFACE

The summer training of an engineering student plays an important role in development as a well

groomed professional. It allows a student to give theoretical concepts a practical stand. The

training at “CHHABRA THERMAL POWER PLANT MOTIPURA RAJASTHAN” was a great

experience. An opening experience to the concepts of engineering, which help me lot in

understanding the concepts that are applied in the organisation. This organisation since its

inception has progress a lot and is walking on the guidelines the success. As the organisation is

marching with the tenacious speed towards the horizon.

In a period of 60 days exposer to corporate environment, I got a learning of organisational

structure, its protocols, etc. Real learning places its worth only when it gives sweet fruits in

future. Summer training is one way to learn at work. I enjoyed the interesting experience and

every part of it.

The report dealt with the practical knowledge of general theory and technical details of

equipment, materials, which I have gained during the training period at CHHABRA THERMAL

POWER PLANT Ash Dyke Construction.

Page 10AIETM/CE/2016-17/P.T.I.V.

Page 6: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CONTENTS

Project Introduction 9Details Of Project Work 9

Description of work 9

Location 10

Purpose of this project 10

Some Unique concepts 10

Installation of soldier pile 12Purpose 12

Scope of work 12

List of major equipment’s 12

Materials 13

Design 14

Procedure 14

Pilling and installation of retrievable anchors 17Introduction 17

Scope of work 18

Activity under piling 18

Page 11AIETM/CE/2016-17/P.T.I.V.

Page 7: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fixing of timber lagging and waller beam 19

Installation of retrievable anchors 19

Method for rock bolting 22Introduction 22

Scope of work 22

Machinery or Equipments 23

Work procedure 23

Methodology for rock bolting 24

Excavation work by bottom-up method 26Purpose 26

Scope of work 26

List of measure equipments 27

Materials 27

Work procedure 28

Method of shotcreting 35Introduction 35

Scope of work 35

Machinery and equipments 35

Material Specification 36

Work procedure 36

Concreting of slab 43Introduction 43

Scope of works 43

Machinery and equipments 44

Work procedure 46

Method statement for waterproofing treatment 50Introduction 50

Purpose 50

Scope of work 51

Page 12AIETM/CE/2016-17/P.T.I.V.

Page 8: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

General 51

Work procedure 51

Safety training 61Introduction 61

Employee’s responsibilities 62

Basic rules for safety 63

Conclusion 64

References 65

LIST OF FIGURES

Fig. No. D e s c r i p t i o n P a g e N o .1 . 1 P l a n D r a w i n g 9

1 . 2 I n v e r t e d B e a m 1 1

2 . 1 Soldier Pile with Steel H- Beam and Wooden Lagging 1 3

2 . 2 B o r i n g o f s o l d i e r p i l e b y D T H m a c h i n e 1 6

2 . 3 S o l d i e r p i l e 1 6

3 . 1 R e t r i e v a b l e A n c h o r s 1 7

4 . 1 C r o s s - S e c t i o n o f R o c k B o l t 2 2

4 . 2 R o c k b o l t o n S h o t c r e t e f a c i n g 2 5

5 . 1 E x c a v a t i o n b y B o t t o m - U p m e t h o d 2 6

5 . 2 E x c a v a t e d a r e a o n s i t e 2 9

5 . 3 S u r v e y o f e x c a v a t i o n w o r k 3 0

6 . 1 S h o t c r e t i n g o n w a l l 3 5

Page 13AIETM/CE/2016-17/P.T.I.V.

Page 9: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

6 . 3 S p r a y i n g o f s h o t c r e t e 4 0

7 . 1 C o n c r e t i n g w o r k w i t h t h e h e l p o f b o o m p l a c e r 4 3

7 . 2 T r a n s p o r t i n g v e h i c l e s 4 5

7 . 3 C r a n e 4 5

7 . 4 B a t c h M i x i n g 4 5

7 . 5 B o o m P l a c e r 4 5

7 . 6 I n s t a l l a t i o n o f R e b a r ’ s 4 8

7 . 7 C o m p a c t i o n o f c o n c r e t e b y n e e d l e v i b r a t o r 4 8

7 . 8 C u r i n g o f c o n c r e t e s l a b 4 9

8 . 1 W a t e r p r o o f i n g m a t e r i a l s 4 9

8 . 3 D i a p h r a g m W a l l 5 2

8 . 5 C o n c o u r s e s l a b 5 6

8 . 6 A n c i l l a r y B u i l d i n g 5 9

8 . 7 S t a t i o n w a l l w i t h r a i l w a y t r a c k l a y o u t 5 9

8 . 8 T u n n e l s e g m e n t a n d j o i n t s 6 0

9 . 1 S a f e t y T r a i n i n g 6 1

CHAPTER 1 : PROJECT INTRODUCTION

ITD Cementation India Limited (ITD Cem), is a subsidiary of the Thailand-based Italian-Thai

Development Public Company Limited. This Company established its operations in India in 1931

as a branch of The Cementation Company Ltd.

Engaged in the construction of marine structures, highways, bridges & flyovers, metros, airports,

hydro-tunnelling, dams & canals, water & wastewater segment, industrial structures, buildings

and specialist foundation engineering projects.

Page 14AIETM/CE/2016-17/P.T.I.V.

Page 10: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

ITD-ITD CEM JV, Is one of the best construction company in the world. The joint venture of

ITD-ITD CEM has working on almost all metro projects in India. This company already

completed almost 27 metro projects in India at Kolkata, Delhi, Mumbai, Jaipur, etc.

1.1Details of project works:-

Fig.1.1 Plan Drawing

1.2Description of works: Design and Construction of a Tunnel by Shield Tunnel Boring Machine (TBM), There is 4

underground floors will constructed base floor will used for electrical wiring and 2nd& 3rd

floor will used for metro running and passenger’s passing and last 4th floor will used

for ticket checking and security purpose used for the Palam Station and the I.G.D. Airport

underground stations constructed by the cut & cover method.

C O S T O F P R O J E C T ( A p p ) I N R 1 5 0 0 C R O R E S

COMPLETION PERIOD(Expected) 4 8 M O N T H S

TEND ER S ECU R ITY A MOU N T I N R 1 5 . 0 0 C R O R E S

Page 15AIETM/CE/2016-17/P.T.I.V.

Page 11: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

T E N D E R I N G A G E N C Y D M R C

T E N D E R G I V E N T O I T D - I T D C E M - J V

Q u o t e d P r i c e & F i n a l P r i c e 1 3 0 0

R E S

1.3 Location:Palam station, IGD Airport, Janakpuri West-Kalindi Kunj Corridor under Delhi MRTS

Project of Phase-III

1.4Purpose of this project:This project is planned for suitability of metro for IGD Domestic Airport’s passengers and

for local persons, who daily use that traffic. This project is also a part of development of

DMRC. Overall investment from DMRC related to this project are approx.4300 cr. Whose

approx. 30% of cost are use on underground metro station and others are used for connecting

by elevated root and tunnel roots.

1.5Some unique concepts:

A lot of things I have seen on site that are very new for me because, I did not seen their

concept in any books for example I have seen a unique concept of beam that is inverted

beam, that is unique because of their construction, I have seen first time beam is upper side

the roof, and that beam is properly distribute and resist load of roof. The inverted beam is use

for clearance of roof for using ducting, lighting, etc.

Page 16AIETM/CE/2016-17/P.T.I.V.

Page 12: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fig.1.2 Inverted beam

NOTE:-

Above given chapter : 1, is an example of report’s chapters

And last of the report use conclusion and prefece

Page 17AIETM/CE/2016-17/P.T.I.V.

Page 13: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CONCLUSION

A lot of things that I have learn during these 55days on site that are very innovative for me

because, I did not seen their concept in any books for example I have seen a unique concept of

civil engg. Construction that is very different to theoretical study, that is unique because of their

construction, as follows:

I have seen first time beam is upper side the roof, and that beam is properly distribute and resist

load of roof. That is called inverted beam. The inverted beam is use for clearance of roof for

using ducting, lighting, etc. under station hall

I have learn modern techniques of waterproofing on site by spraying and covering by polyester

sheets and using rich quality of concretes and PCC.

It is also an important that, How to excavate the site without disturbance of nearby area using

soldier pile, anchors, wooden laggings, waler beam, etc. are I have learn on site that is most

useful to retain falling of soils and earth walls.

Shotcreting is an important part of construction site who always help to retain fallings of earth

wall and by shotcreting the surface of earth wall get harden and improve strength of wall to do

not disturb construction work by earth material fallings.

As an engineer I have learn handling of labours and materials and making schedule of next

construction work that is important for all new engineers for best performance on site and saving

time and money.

Page 18AIETM/CE/2016-17/P.T.I.V.

Page 14: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

REFRENCES

1. ITD-ITD CEM JV project’s documents follows as:

Plan drawing

Structures drawing

ITD-ITD CEM JV working procedure file

Planning file

2. Parbin Singh, Civil Engg. Materials, Publisher S. K. Kataria & Sons, Edition 2013

3. M.S. Shetty, Concrete Technology, Publisher S. Chand & Company PVT. LTD. Edition

2015

Page 19AIETM/CE/2016-17/P.T.I.V.

Page 15: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

ARYA INSTITUTE OF ENGINEERING TECHNOLOGY &MANAGEMENT

CERTIFICATE

(Session 2016- 2017)

This is to certify that the work, which is being presented in the project on “Thermal Power Plant Ash Dyke” submitted by Mr ChandraMohanLodha(13EAOCE016), a student of fourth year (7th Sem.) B. Tech. in Civil Engineering inpartial fulfilment for the award of degree of Bachelor of Technology is a record of student’swork carried out and found satisfactory for submission.

Mr Gori Shankar Soni Ms Geetanjali Ganguly

Head of department Seminar Co-ordinator

Department of Civil Engineering Department of Civil Engineering

Page 20AIETM/CE/2016-17/P.T.I.V.

Page 16: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Page 21AIETM/CE/2016-17/P.T.I.V.

Page 17: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CONTENTS

1. Power plant 10

1.1 Introduction 11

1.2 Purpose of power plant 12

2. Ash Dyke/pond 13

2.1 Introduction 14

2.2 Purpose 16

2.3 Ash pond layout 16

3. Construction of ash dyke 17

3.1 Machinery used in construction 17

3.2 Material used in construction 17

3.3 Preparation of base 17

3.4 Maintenance of ash pond 17

3.5 Construction of trench beam 19

3.6 Construction of sloping walls 20

3.7 Construction of bad 21

3.8 Construction of bund 22

3.8.1 Upstream construction method 23

3.8.2 Downstream construction method 24

4. Construction of drainage system 25

4.1 Drain 25

4.2 Water drainage tank 27

5. Fly ash 29

5.1 Introduction 29

Page 22AIETM/CE/2016-17/P.T.I.V.

Page 18: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

5.2 Generation of fly ash 30

5.3 Composition of fly ash 32

5.4 Properties of fly ash 33

5.4.1 Physical 33

5.4.2 Chemical 34

5.5 Classification fly ash 35

5.5.1 Class c fly ash 35

5.5.2 Class f fly ash 36

5.6 Fly ash hazardous 36

5.7 Management of fly ash 37

5.7.1 Recycling of fly ash 38

5.7.2 Difficulties in handling of fly ash 38

5.7.3 Problems associated with fly ash disposal 39

6. Handling/Collection of Fly Ash 406.1 Introduction 41

6.2 Collection system 42

6.3 Dumping process of dry fly ash 43

6.4 Dumping process of wet fly ash 45

6.5 Bottom ash handling system 46

7. Special features 47

Conclusion 48

Reference 49

Page 23AIETM/CE/2016-17/P.T.I.V.

Page 19: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

LIST OF FIGURE

SR.NO. NAME PAGE NO.

1.1 Chhabra Thermal Power Plant 11

2.1 Ash pond Plan 13

2.3 Ash Pond Layout 15

3.3 Preparation of Base 17

3.5 Plan of Trench Bem 19

3.6.A Cutting of Sloping Wall 20

3.6 B Construction of Sloping Wall 21

3.7 Construction of bed 22

3.8.1 Upstream Construction Method 23

3.8.2 Down Stream Construction Method 24

4.1.A Drain Plan 26

4.1.B Construction of Drain 27

4.2 Water Drainage tank 28

5.2 Production of Fly Ash In dry bottom

utility

31

5.3 Ash Generation from Coal Fired Boiler 32

5.4.1 Class c Fly ash 35

5.4.2 Class f fly ash 36

6.2.1 Fly ash slurry system 42

6.3.A Dumping Process 43

6.3.B Fly Ash Vessel 44

6.3.C Fly Ash Silo 45

Page 24AIETM/CE/2016-17/P.T.I.V.

Page 20: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

SR. NO. NAME PAGE NO.

5.2 Fly Ash utilization Statics 31

5.4.1 Engg. Properties of Fly Ash 33

5.7.1 Fly Ash Construction Related

Application

38

LIST OF TABLES

Page 25AIETM/CE/2016-17/P.T.I.V.

Page 21: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CHAPTER 1. POWER PLANT

1.1 Introduction

Chhabra Thermal Power Plant is one of Rajasthan coal fired power plant. It is located at

Chowki Motipura (Village) of tehsil Chhabra in Rajasthan Baran district.

The planned capacity of power plant is 2650MW at the end of 12th Five year plan.

The first and 2nd unit at Chhabra super thermal power plant was set up at a cost of Rs2,350

crore. Chhabra is all set to become a power generation hub in the state as in the second phase two

more units with a capacity of 250 MW each will be installed.

Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUN) has been entrusted with the job of

development of power projects under state sector, in the state along with operation &

maintenance of state owned power stations. Government of Rajasthan constituted the Rajasthan

Rajya Vidyut Utpadan Nigam Ltd. (RVUN) under Companies Act-1956 on 19th July, 2000. The

Nigam is since playing lead role in giving highest priority to the power generation for manifold

and rapid development of the state.

The generating Stations of RVUN have acquired a distinctive reputation in the country for their

efficient and economic power generation.

Chhabra Thermal Power Station is a 1000-megawatt (MW) coal-fired power station in

Rajasthan state, India.

A 1320 MW expansion of the power station is under construction.

Installed capacity

Unit 1 - 250 MW - Operating (commissioned October 30, 2009)

Unit 2 - 250 MW - Operating (commissioned May 4, 2010)

Unit 3 - 250 MW - Operating (commissioned September 14, 2013)

Unit 4 - 250 MW - Operating (commissioned 30 June 2014)

Unit 5 - 660 MW - Construction

Unit 6 - 660 MW - Construction

Page 26AIETM/CE/2016-17/P.T.I.V.

Page 22: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

1.2Purpose of power plant

In thermal power stations, mechanical power is produced by a heat engine , which transforms

Thermal Energy, often from Combustion of a fuel into rotational energy. Most thermal power

stations produce steam, and these are sometimes called steam power stations. About 86% of all

electric power is generated by use of steam turbines. Not all thermal energy can be transformed

to mechanical power, according to the second law of thermodynamic.

Therefore, there is always heat lost to the environment. If this loss is employed as useful heat, for

industrial processes or district heating, the power plant is referred to as a cogeneration power

plant or CHP (combined heat-and-power) plant. In countries where district heating is common,

there are dedicated heat plants called heat-only boiler stations. An important class of power

stations in the Middle East uses by product heat for desalination of water.

Fig.1.1 Chhabra Thermal Power Plant

Page 27AIETM/CE/2016-17/P.T.I.V.

Page 23: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CHAPTER 2ASH DYKE2.1 Introduction Fly ash is a very fine material produced by burning of pulverized coal in a thermal power

plant, and is carried by the flue gas and is collected by the electrostatic precipitators or

cyclones. The high temperatures of burning coal turns the clay minerals present in the coal

powder into fused fine particles mainly comprising aluminum silicate. Fly ash produced thus

possesses both ceramic and pozzolanic properties. The problem with fly ash lies in the fact

that not only does its disposal requires large quantities of land, water and energy, its fine

particles, if not managed well, by virtue of their weightlessness, can become air-borne.

Currently, 100 million tons of fly ash being generated annually in India, with 65000 acres of

land being occupied by ash ponds. Such a huge quantity does pose challenging problems, in

the form of land usage, health hazards, and environmental dangers. Both in disposal, as well

as in utilization, utmost care has to be taken, to safeguard the interest of human life, wild life

and environment.The physical, geotechnical and chemical parameters to characterize fly ash

are the same as those for natural soils. The properties of ash are a function of several

variables such as coal source, degree of pulverization, design of boiler unit, loading and

firing conditions, handling and storing methods. A change in any of the above factors can

result in detectable changes in the properties of ash produced. The procedures for the

determination of these parameters are also similar to those for soils.An ash pond is an

engineered structure for the disposal of bottom ash and fly ash. The wet disposal of ash into

ash ponds is the most common ash disposal method, but other methods include dry disposal

in landfills. Dry-handled ash is often recycled into useful building materials. Wet disposal

has been preferred due to economic reasons, but increasing environmental concerns

regarding leachate from ponds has decreased the popularity of wet disposal. The wet method

consists of constructing a large "pond" and filling it with fly ash slurry, allowing the water to

drain and evaporate from the fly ash over time. Ash ponds are generally formed using a

ring embankment to enclose the disposal site. The embankments are designed using similar

design parameters as embankment dams, including zoned construction with clay cores.The

design process is primarily focused on handling seepage and ensuring slope stability.

Page 28AIETM/CE/2016-17/P.T.I.V.

Page 24: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fig.2.1 Ash pond plan

2.2 Purpose of ash pond

Fly, a waste of thermal power plants, has its production per annum having crossed the 100

million tones limit is causing several challenges. The thermal power plants do not always pay

much attention towards the maintenance of ash ponds because of it being a waste. There are

various ways for disposing off the fly ash produced in thermal power plants. Out of these ways

disposing the fly ash in ash ponds in the form of slurry with water is one of the best alternatives.

Fly ash form the electrostatic precipitator and bottom ash from the bottom of the boiler are

mixedtogether and is subsequently mixed with water in a ratio varying from 1 part ash and 4 to

Page 29AIETM/CE/2016-17/P.T.I.V.

Page 25: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

20 parts of water. The slurry is then pumped into the ash ponds which are located within or

outsidethe

thermal power plant. Depending on the distance and elevation difference, energy required for

pumping is very high and requires booster pumps at intermediate locations.

No well design procedure or codal provision exists for the ash pond construction and

maintenance. There are several examples of failures in ash ponds which resulted in leakage of fly

ash-water slurry into the surrounding areas including water bodies and creating environmental

hazard. The ash pond is designed economically and proper procedures are adopted to avoid any

kind of leakage from the ash ponds. Hydrostatic pressure over the full height of the bund is

minimized by decanting the water which travel away from the bund forming a sloping beech and

only the ash being settled close to the bund.

2.3 Ash pond layout

Following points should be considered while selecting the location and layout of an ash pond:-

The ash pond area should be close enough to the thermal power plant to reduce the

Pumpingcost.

Provisions for vertical and horizontal expansions should be made considering the life of

the power plant.

The area should be far away from any water bodies like river, lake etc. to avoid

environmental hazard due to any leakage of fly ash-water slurry.

In coastal areas where the ground water is already saline, the water form ash pond should

be preferably drained through the bottom of the ash pond and this type of pond has

greater stability.

In interior areas, it is preferable to have a fairly impervious stratum to prevent migration of ash

water into the ground water to prevent its pollution.

In hilly terrain region, a suitable valley can be identified for forming the ash pond. In such case

the hill slopes will serve as the dyke for the pond and the cost would be less for construction.

Page 30AIETM/CE/2016-17/P.T.I.V.

Page 26: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

In most of the ash ponds, the total area can be divided into compartments and while one is

operational other can be evacuated off the deposited ash for reuse.

The deposited fly ash can be used to increase the height of the embankment which ultimately

increases the amount of fly ash slurry containing capacity of the pond. If the area consists of a

single pond, it is not possible to increase the height while the pond is in operation. Each pond

should have a minimum area to ensure that there is adequate time available for settlement of ash

particles while the slurry travels from the discharge point to the outlet. This distance should be a

minimum of 200m to ensure that only clear water accumulates near the outlet point.

Fig.2.3 Ash pond layout

Page 31AIETM/CE/2016-17/P.T.I.V.

Page 27: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CHAPTER 3 CONSTRUCTION OF ASH POND

3.1 Machinery used in construction

There are following machineries are used in construction

Hydra(jcb)

Poke land

Vibration roller

Trucks

Dozer

Grader

3.2 Material used in construction

Soil

Cement

Concrete ( grade M15,M7.5 )

LDPE ( 75micron thick membrane )

Black cotton ( black soil )

3.3 Preparation of base

The preparation of base for the ash pond construction is simplest process. Firstly survey of the all

area and test of field like soil test, ground water level of area .marked the area required for the

ash pond construction . After that dig the depth about 12meter depth all area by machinery used.

Finished the base surface clearly with 0 degree angles. The ash pond all sides having width 12 to

15 meter for vehicle travelling and transportation. The ash pond all walls having slope 60 degree.

Page 32AIETM/CE/2016-17/P.T.I.V.

Page 28: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Cutting the all walls with 60 degree slope and finish properly. Around the ash pond drainage

system must required so drainage base also cut by machines.Now base is complete for the ash

pond design process.

Fig. 3.3 Preparation of base

3.4 Maintenance of ash dyke

The following guidelines should be followed for the proper maintenance of the ash pond:-

1) Method of slurry discharge:-

For ash ponds, it is most important that the discharge points are uniformly distributed

over the entire perimeter of the ash dyke. The coarser particles settle near the discharge

point whereas the finer particles get carried away from the discharge point. Uniformly

distributing discharge points provides adequate bearing capacity to the dykebeing

constructed on the existing segment of the ash pond. It is better that the discharge shall be

simultaneously made from all the discharge points formore uniform beachformationalong

Page 33AIETM/CE/2016-17/P.T.I.V.

Page 29: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

the perimeter. When the freeboard in the reservoir is less than 0.5m, then further

discharge should be diverted to the other pond which should be ready. A minimum of

50m beach should be formed to maintain the stability of the downstream slope.

2) Decanting system:-

The quality of the decanted water should be satisfactory with total suspended solids less than

100 ppm. If the elevation of the outlet is low, then the suspended solids will increase.

A delay in raising the outlet elevation will result in high concentration of ash. On the other

hand, early raising will result in increased area of decanted water pond and reduce the beach

length.

3) Raising of ash dyke:-

The pond already filled up with ash should be allowed to dry without any further discharge of

slurry for minimum 1 month till the construction work for raising the height of the dyke

hasn’t begun. This type of pond should be provided with water sprinklers at regular intervals

to prevent dust pollution. Too much of water spraying makes the surface of the ash pond

swampy.

4) Maintenance of ash dyke:-

Following aspects should be considered for maintenance of the ash dyke:-

Wet patches on the downstream slope formed due to inadequate beach length or

choked drain should be prevented.

Gulley formation on the slope due to rain should be prevented.

Rat or animal holes should be covered.

Growth of plants should be plugged.

If the free board gets reduced due to erosion, then additional earth fill is provided on

the top of the dyke.

5) Other general recommendations:-

The area of the ash dyke should be provided with fencing and unauthorized entry should be

prohibited.

Page 34AIETM/CE/2016-17/P.T.I.V.

Page 30: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

The entire dyke perimeter should have accessible roads.A site office should be

constructed with a full time engineer responsible for inspection and monitoring of the

dyke.

3.5 Construction of anchor trenchThe construction of trench beam is located in the bottom of the ash dyke along the sloping walls.

The design of trench beam according to the drawing all the measurements used according to the

drawing. The trench beam located nearly the sloping wall base point. The beam having size

500mm height, 230 mm width (500*230)mm and concrete grade M7.5 used in the construction.

This is typically used for landfills and reservoirs. The geomembrane comes up from the side

slope and then runs over the top for a short distance. It then terminates vertically down into a

trench dug by a backhoe or trenching machine.

Page 35AIETM/CE/2016-17/P.T.I.V.

Page 31: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fig.3.5 Plan of trench beam

3.6 Construction of sloping wallsFirstly sloping wall of the ash dyke properly cut by the machineries with proper angle.

After cut the walls with proper angle the wall upper surface leveled with the 75mm soil. And soil

covered bythe 150 micron thin black LDPE.

The design of sloping walls of ash dyke required technical specifications. Design according to

the given drawing.

The concrete used in the sloping wall construction is M15.Construction of sloping walls is as

follows given dimensions.Length 9m, width 3m, thickness 75mm.

The water cement ratio in the M15 grade concrete is using different because sloping wall so the

water is less used in the concrete.

Page 36AIETM/CE/2016-17/P.T.I.V.

Page 32: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fig.3.6 a. Cutting of sloping wall

Page 37AIETM/CE/2016-17/P.T.I.V.

Page 33: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fig.3.6 b. Construction of sloping wall

3.7 Construction of bed The construction of ash dyke bed is similar process as like dams bad process.

The width of bad is equal to 15metere with flat surface. It is also used for transportation in the

construction time. It is increase the depth of dyke.

It is made up of sand with compaction; compaction should be completed by the vibration roller.

The length of bad is depends upon the size of dyke.

Page 38AIETM/CE/2016-17/P.T.I.V.

Page 34: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fig.3.7 Construction of bed

3.8 Construction of bundThe cost of construction of a single ash pond is generally high. But this cost can be reduced by

constructing the ash pond in stages by various methods like

a) Upstream construction method,

b) Downstream construction method

c) Centre line construction method

Each stage has an increasing or incrementing height of 7-9m. The above methods are described

in brief and their advantages & disadvantages:-

Page 39AIETM/CE/2016-17/P.T.I.V.

Page 35: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

3.8. 1 upstream construction method

This is the best design of raising the height of the dyke since it involves the least earthwork

quantity. The above construction method has the minimum cost involved in it.

Fig.3.8.1 upstream construction method

Following are the disadvantages of upstream construction method:-

Since the total weight of the new construction is supported by the deposited ash, the ash

deposition should be perfect in order to have adequate load bearing capacity.

As the height of the pond increases, the area of the ash pond goes on decreasing and

beyond certain stage; it becomes uneconomical to raise further height of the dyke.

The drain at the upstream face should be well connected to the drain of the earlier

segment; else ineffective drainage can result in reducing the stability of the slope.

The ash pond cannot be operational while raising the height of the dyke by this method of

construction. The pond needs to be dried to initiate the construction work.

Page 40AIETM/CE/2016-17/P.T.I.V.

Page 36: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

3.8.2 Downstream construction method

After the pond gets filled up to the first stage, the pond height is increased by depositing the fly

ash or earth on the downstream face of the dyke as shown in the figure. The advantage of this

method of construction of ash pond is that the height of the dyke can be raised even if the pond

is operational.

Fig.3.8.2 Downstream construction method

After the pond gets filled up to the first stage, the pond height is increased by depositing the fly

ash or earth on the downstream face of the dyke as shown in the figure. The advantage of this

method of construction of ash pond is that the height of the dyke can be raised even if the pond

is operational.

Disadvantage of this method is that it involves approximately the same cost and amount of

construction as in single stage construction.

Page 41AIETM/CE/2016-17/P.T.I.V.

Page 37: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CHAPTER 4 CONSTRUCTION OF DRAINAGE SYSTEM

The construction of drainage system for the side water disposal which comes by the rain and

present around the ash dyke. So protect the ash pond walls from the rain water the proper

drainage system must be required.

4.1 Drain

Drain a fixture that provides an exit-point for waste water or water that is to be re-circulated.

Drainage, the natural or artificial removal of surface and sub-surface water from a given

area.

Storm drain, a system of collecting and disposing of rain water in an urban area.

The drainage system of ash dyke is outer side of the dyke. The construction of ash dyke with

special supervision and according to the given drawing.The drainage system base completed by

using of concrete M7.5 and walls having dimensions height 800mm, width 350mm and length

depends upon the drain length.The slope between starting point of wall and end point of wall is

1:0.5.The drain walls constructed by the cement, sand, bricks with proper ratio of cement sand

and water.

The ancient Indus of sewerage and drainage that were developed and used in cities

throughout the civilization were far more advanced than any found in contemporary urban cities

in the Middle East and even more efficient than those in some areas of the Indian Subcontinent

today.

The civil engineer is responsible for drainage in construction projects. They set out from the

plans all the roads, street gutters, drainage, culverts and sewers involved

in construction operations. During the construction process he/she will set out all the necessary

levels for each of the previously mentioned factors.

Civil engineers and construction managers work alongside architects and supervisors,

planners, quantity surveyors, the general workforce, as well assubcontractors.

Page 42AIETM/CE/2016-17/P.T.I.V.

Page 38: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Typically,mostjurisdictions have somebody of drainage law to govern to what degree a

landowner can alter the drainage from his parcel.

Drainage options for the construction industry include:

Point drainage, which intercepts water at gullies (points). Gullies connect to drainage pipes

beneath the ground surface and deep excavation is required to facilitate this system.

Support for deep trenches is required in the shape of planking, strutting or shoring.

Channel drainage, which intercepts water along the entire run of the channel. Channel

drainage is typically manufactured from concrete, steel, polymer or composites. The

interception rate of channel drainage is greater than point drainage and the excavation

required is usually much less deep .

Fig. 4.1.a Drain plan

Page 43AIETM/CE/2016-17/P.T.I.V.

Page 39: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fig.4.1.b Construction of drain

4.2 Water drainage tank

The water drainage tank is located near the outside of ash dyke which collect the drain water and

the disposal of collected water. The drainage tank collect the rain water from drain 1,2,3 and

another tank is collect the rain water from drain 4,5,6.

A water tank is a container for storing liquid. The need for a water tank is as old as civilization,

to provide storage of water for use in many

Page 44AIETM/CE/2016-17/P.T.I.V.

Page 40: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

applications, drinkingwater, irrigate agriculture, fire suppression, agricultural farming, both for

plants and livestock, chemicalmanufacturing, food preparation as well as many other

uses. Water tank parameters include the general design of the tank, and choice of construction

materials, linings. Various materials are used for making a water

tank: plastics (polyethylene, polypropylene), fiberglass, concrete, and stone, steel (welded or

bolted, carbon, or stainless). Earthen pots also function as water storages. Water tanks are an

efficient way to help developing countries to store clean water.

Fig. 4.2 Water drainage tank

Page 45AIETM/CE/2016-17/P.T.I.V.

Page 41: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CHAPTER 5 FLY ASH

5.1 Introduction

Fly ash is a very fine material produced by burning of pulverized coal in a thermal power plant,

and is carried by the flue gas and is collected by the electrostatic precipitators or cyclones. The

high temperatures of burning coal turns the clay minerals present in the coal powder into fused

fine particles mainly comprising aluminum silicate. Fly ash produced thus possesses both

ceramic and pozzolanic properties. The problem with fly ash lies in the fact that not only does its

disposal requires large quantities of land, water and energy, its fine particles, if not managed

well, by virtue of their weightlessness, can become air-borne. Currently, 100 million tons of fly

ash being generated annually in India, with 65000 acres of land being occupied by ash ponds.

Such a huge quantity does pose challenging problems, in the form of land usage, health hazards,

and environmental dangers. Both in disposal, as well as in utilization, utmost care has to be

taken, to safeguard the interest of human life, wild life and environment.

The World Bank has cautioned India that by 2015, disposal of coal ash would require 1000

square kilometers or 1 square meter of land per person. Since coal currently accounts for 75% of

power production in the country, the bank has highlighted the need for new and innovative

methods for reducing impact on the environment.

The physical, geotechnical and chemical parameters to characterize fly ash are the same as those

for natural soils, e.g., specific gravity, grain size, atterberge limits, compaction characteristics,

permeability coefficients, shear strength parameters and consolidation parameters. The properties

of ash are a function of several variables such as coal source, degree of pulverization, design of

boiler unit, loading and firing conditions, handling and storing methods. A change in any of the

above factors can result in detectable changes in the properties of ash produced. The procedures

for the determination of these parameters are also similar to those for soils.

Page 46AIETM/CE/2016-17/P.T.I.V.

Page 42: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

5.2 Generation of fly ash

Fly ash is produced as a by-product in coal fired thermal power plants. Pulverized coal, when

blown into the boiler, it is ignited and generates heat and is self converted to a molten residue.

The heat is then extracted by the tubes of the boiler and the molten residue is thus cooled to form

ash. The finer ash particles are carried away by the flue gas to the electrostatic precipitators and

are referred as fly ash, whereas the heavier ash particles fall to the bottom of the boiler and are

called as bottom ash. Different types of coal fired boilers are (a) Dry bottom boilers, (b) Wet

bottom boilers and (c) Cyclone furnaces. Dry bottom boilers produce 80% ash as fly ash and

20% as bottom ash. Wet bottom boilers produce 50% each as fly ash and bottom ash

respectively. Lastly, cyclone furnaces produce 20% as fly ash and 80% as bottom ash. In India

coal/lignite based thermal power plants account for more than 55% of the electricity installed

capacity and 65% of electricity generation. The ash content of the coal used at the thermal power

plants ranges from 30-40%, with the average ash content around 38%. Since low ash, high grade

coal is reserved for metallurgical industries. The thermal power plants have to use high ash, low

grade coal. The thermal power plants ash generation has increased from about 40 million tons

during 1993-94, to 120 million tons during 2005-06, and is expected to be in the range of 175

million tons per year by 2012.

Page 47AIETM/CE/2016-17/P.T.I.V.

Page 43: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fig.5.2Production of fly ash in a dry bottom utility boiler with electrostatic precipitator.

Table 5.2 fly ash generation and utilization statistics

Page 48AIETM/CE/2016-17/P.T.I.V.

Page 44: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

5.3 Composition of fly ash

Depending upon the source and makeup of the coal being burnt, the composition of fly ash and

bottom ash vary considerably. Fly ash includes substantial amounts of silicon dioxide and

calcium oxide which are the main ingredients of many coal bearing rocks.

Toxic constituents of fly ash depend upon the specific coal bed makeup, but may include one or

more of the following elements in quantities or trace amounts to varying percentages: Arsenic,

molybdenum, selenium, cadmium, boron, chromium, lead, manganese, mercury, strontium,

thallium, vanadium, beryllium along with dioxins. Fly ash is a fine, glass powder recovered from

the gases of burning coal during the production of electricity.

The micron-sized earth elements consist of primarily of silica, alumina and iron. When mixed

with lime and water, the fly ash forms a cementious compound with properties very similar to

that of Portland cement.

Properties of fly ash are like SiO2, Al2O3, Fe2O3, CaO.

Fig. 5.3 Ash generation from coal fired boiler

Page 49AIETM/CE/2016-17/P.T.I.V.

Page 45: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

5.4 Properties of fly ash

5.4.1 Physical properties

Fly ash consists of fine, powdery particles that are predominantly spherical in shape, either solid

or hollow, and mostly glassy (amorphous) in nature.

The carbonaceous material in fly ash is composed of angular particles.

The particle size distribution of most bituminous coal fly ashes is generally similar to that of silt

(less than a 0.075 mm or No. 200 sieve). Although sub bituminous coal fly ashes are also silt-

sized, they are generally slightly coarser than bituminous coal fly ashes. The particle size

distribution of raw fly ash is very often fluctuating constantly, due to changing performance of

the coal mills and the boiler performance.

The specific gravity of fly ash usually ranges from 2.1 to 3.0, while its specific surface area

(measured by the Blaine air permeability method) may range from 170 to 1000 m2/kg.

Table 5.4.1 Engineering properties of fly ash parameter

Page 50AIETM/CE/2016-17/P.T.I.V.

Page 46: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

The color of fly ash can vary from tan to gray to black, depending on the amount of unburned

carbon in the ash. The lighter the color, the lower the carbon content. Lignite or sub bituminous

fly ashes are usually light tan to buff in color, indicating relatively low amounts of carbon as well

as the presence of some lime or calcium. Bituminous fly ashes are usually some shade of gray,

with the lighter shades of gray generally indicating a higher quality of ash.

5.4.2 Physical properties

The chemical properties of fly ash are influenced to a great extent by those of the coal burned

and the techniques used for handling and storage. There are basically four types, or ranks, of

coal, each of which varies in terms of its heating value, its chemical composition, ash content,

and geological origin. The four types, or ranks, of coal are anthracite, bituminous, sub

bituminous, and lignite. In addition to being handled in a dry, conditioned, or wet form, fly ash is

also sometimes classified according to the type of coal from which the ash was derived.

The principal components of bituminous coal fly ash are silica, alumina, iron oxide, and calcium,

with varying amounts of carbon, as measured by the loss on ignition (LOI). The LOI for fly ash

should be less than 6 %. Lignite and sub bituminous coal fly ashes are characterized by higher

concentrations of calcium and magnesium oxide and reduced percentages of silica and iron

oxide, as well as lower carbon content, compared with bituminous coal fly ash. Very little

anthracite coal is burned in utility boilers, so there are only small amounts of anthracite coal fly

ash.

They consist mostly of silicon dioxide (SiO2), which is present in two forms: amorphous, which

is rounded and smooth, and crystalline, which is sharp, pointed and hazardous;

Aluminum oxide (Al2O3) and iron oxide (Fe2O3) Chemical composition of fly ash is as

follows: SiO2, 59.38; Fe2O3, 6.11; CaO, 1.94; MgO, 0.97; SO3, 0.76; alkalis, 1.41; and unburnt

sulphur and moisture, 3.74%. Fly ash contain following toxic metals Hg, 1; Cd, Ga, Sb, Se, Ti

and V, 1-10; As, Cr, La, Mo, Ni, Pb, Th, U and Zn, 10-100; and B, Ba, Cu, Mn and Sr, 100-1000

mg/kg. Heavy metals like (As, Mo, Mn and Fe) show leaching with concentration above

permissible limits.

Page 51AIETM/CE/2016-17/P.T.I.V.

Page 47: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

5.4 Classification of fly ash

Two classes of fly ash are defined by ASTM C618: Class F fly ash and Class C fly ash. The

chief difference between these classes is the amount of calcium, silica, alumina, and iron content

in the ash. The chemical properties of the fly ash are largely influenced by the chemical content

of the coal burned (i.e., anthracite, bituminous, and lignite).

5.4.1 Class c fly ash

Fly ash produced from the burning of younger lignite or sub bituminous coal, in addition to

having pozzolanic properties, also has some self-cementing properties.

Fig.5.4.1 Class C fly ash

In the presence of water, Class C fly ash will harden and gain strength over time. Class C fly ash

generally contains more than 20% lime (CaO). Unlike Class F, self-cementing Class C fly ash

does not require an activator. Alkali and sulfate (SO4) contents are generally higher in Class C

fly ashes. Class C fly ash can be identified from its light brownish color.

5.4.2 Class f fly ash

The burning of harder, older anthracite and bituminous coal typically produces Class F fly ash.

This fly ash is pozzolanic in nature, and contains less than 10%lime (CaO).

Page 52AIETM/CE/2016-17/P.T.I.V.

Page 48: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Possessingpozzolanic properties, the glassy silica and alumina of Class F fly ash requires a

cementing agent, such as Portland cement, quicklime, or hydrated lime, with the presence of

water in order to react and produce cementitious compounds. Alternatively, the additions of a

chemical activator such as sodium silicate (water glass) to a Class F ash can lead to the formation

of a geopolymer. Class F fly ash can be identified by its dark brownish color.

Fig. 5.4.2 Class F fly ash

5.6 Fly ash hazardous

Fly ash is a very fine powder and tends to travel far in the air. When not properly disposed, it is

known to pollute air and water, and causes respiratory problems when inhaled. When it settles on

leaves and crops in fields around the power plant, it lowers the yield. The conventional method

used to dispose off both fly ash and bottom ash is to convert them into slurry for impounding in

ash ponds around the thermal plants. This method entails long term problems.

The severe problems that arise from such dumping are:-

Page 53AIETM/CE/2016-17/P.T.I.V.

Page 49: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

The construction of ash ponds requires vast tracts of land. This depletes land available

for agriculture over a period of time.

When one ash pond fills up, another has to be built, at great cost and further loss of

agricultural land.

Huge quantities of water are required to convert ash into slurry.

During rains, numerous salts and metallic contents in the slurry can leach down to the ground

water and contaminate it.

5.7 Management of fly ash

5.7.1 Recycling of fly ash

In 1996, approximately 14.6 million metric tons (16.2 million tons) of fly ash were used. Of this

total, 11.85 million metric tons (13.3 million tons), or approximately 22 percent of the total

quantity of fly ash produced, were used in construction-related applications.

Between 1985 and 1995, fly ash usage has fluctuated between approximately 8.0 and 11.9

million metric tons (8.8 and 13.6 million tons) per year, averaging 10.2 million metric tons (11.3

million tons) per year.

Fly ash is useful in many applications because it is a pozzolan, meaning it is a siliceous or

alumino-siliceous material that, when in a finely divided form and in the presence of water, will

combine with calcium hydroxide (from lime, Portland cement, or kiln dust) to form cementious

compounds.

Page 54AIETM/CE/2016-17/P.T.I.V.

Page 50: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Table 5.7.1 Fly ash construction related applications (recycling)

5.7.2 Difficulties in handling of fly ash

Many challenges are to be faced in the handling and utilization of fly ash. Some of these

Difficulties include:-

The composition of fly ash depends on the quality of coal utilizers. So the costumer

cannot be sure of the quality of fly ash available form a particular source.

The unavailability of testing, labeling & packing facilities of fly ash results in

unnecessary expenses to the costumers.

The location of thermal power plants in remote areas creates difficulties in transportation

and lifting for the user industries.

Page 55AIETM/CE/2016-17/P.T.I.V.

Page 51: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

5.7.3Problem associated with fly ash disposal

Primarily, the fly ash is disposed of using either dry or wet disposal schemes. In dry disposal, the

fly ash is transported by truck, chute, or conveyor at the site and disposed of by constructing a

dry embankment (dyke). In wet disposal, the fly ash is transported as slurry through pipe and

disposed off in impoundment called “ash pond”. Most of the power plants in India use wet

disposal system and when the lagoons are full, four basic options are available:-

Constructing new lagoons using conventional construction material.

Hauling of fly ash from the existing lagoons to another disposal site.

Raising the existing dyke using conventional construction material and

Raising the dyke using fly ash excavated from the lagoon (ash dyke).

The option of raising the existing dyke is very cost effective because any fly ash used for

constructing dyke would, in addition to saving the earth filling cost, enhance disposal capacity of

the lagoon.

An important aspect of design of ash dyke is the internal drainage system. The seepage discharge

from the internal surfaces must be controlled with filters that permit water to escape freely and

also to hold particles in place and the peizometric surface on the downstream of the dyke. The

internal drainage system consists of construction of rock toe, 0.5 meter thick sand blanket and

sand chimney. After completion of the final section including earth cover the turfing is

developed from sod on the downstream slope.

Page 56AIETM/CE/2016-17/P.T.I.V.

Page 52: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CHAPTER 6 HANDLING/COLLECTION OF FLY ASH

6.1 Introduction

The sample collection of different types of ashes such as fly ash, bottom ash and pond ash has

different procedures. The fly ash and the bottom ashes are generated at the power plant and can

be collected directly from the discharge points. In most of the power plants sampling pipes are

provided at places near the discharge point or near the storage point for collection of ash

samples. The sample can be directly collected into a bucket or any other container and can be

suitably packed for transportation. The sample used in this study was fly ash collected from the

bottom of the electrostatic precipitator of NTPC Kaniha, Talcher, Orissa.

When the Coal combustion takes place in the boiler, some part of the coal remains unburnt and that un-burnt particles are called the Ash, which is approximately 26% to 40% of the total coal undergoing combustion. Basically this is nothing but the residual part of the coal. This ash will be extracted out in the form of Bottom Ash & Fly Ash according to the places of collection after the combustion.

If we calculate the ash percentage in any plant, then it will be as following:

Total Ash = 40% of the coal combusted Bottom ash = 20% of the total ash Fly ash = 80% of the total ash

Below mentioned values are the ash consumption in a 135 MW Sub-critical Boiler in terms of Metric Tons (MT). The coal consumption in a 135 MW Sub-critical boiler is around 2000 MT (Approx.) and compared to that the ash generation will be as follows.

For a 135 MW Bottom Ash Disposal (in 24 Hours) 134 MT (Approx.)

For a 135 MW Fly Ash Disposal (in 24 Hours) 537 MT(Approx.)

So whatever the Ash generated during the combustion process has to be sent out of the plant as it

is of no use in the plant processes. Also Now-a-days the Government Norms are very strict as far

as the environmental issues are concerned. So we have to handle the Ash in a proper manner in

Page 57AIETM/CE/2016-17/P.T.I.V.

Page 53: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

order to avoid any environmental issues. Generally most of the power plants have a tie-up with

the Cement making companies and the power plants supply the Fly Ash to those Cement making

companies for making cement from the Fly ash and coming to the bottom ash, which is not

having any fine particles as compared to the Fly Ash. So we use it for road filling and for making

Fly Ash bricks.

6.2 Collection system

Ash Handling System mainly consists of the transportation of Fly ash and Bottom ash from boiler to the respective storing points and the system adopts transporting methods such as

Systems for Bottom Ash:

Bottom Ash Transportation with SSC (Submersed Scrapper Conveyor)

Bottom Ash Transportation with High Pressure Water or Jet Pumps

Systems for Fly Ash:

Fly Ash Slurry Transportation with the bottom ash

Fly Ash Dry Pneumatic Transportation 

In Fly Ash Handling System, the major objective is to collect and transport the fly ash from the ash hoppers of the ESP to the Fly ash silo or to the Ash Slurry making tank. Generally the power plants prefer Dry Fly ash Disposal instead of making Ash Slurry from the Fly ash and the reason is that the fly ash collected from the ESP Bottom Hopper is very fine and suitable for Cement making, if we are making slurry of it then it will not be suitable for Cement making and economically also it is very good if you are selling the Ash to the Cement Plants. So these are the reasons why most of the plants are going for Fly ash Disposal instead of Slurry Disposal (Ash Water).

6.2.1 Slurry Type Fly Ash Disposal System: 

This is one of the simplest system for ash disposal from ESP hopper to the slurry pond.High

Pressure water and fly ash is mixed below the ESP hopper and below in the diagram you can see

that tapping for mixing of water is provided.

Page 58AIETM/CE/2016-17/P.T.I.V.

Page 54: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fig.6.2.1 fly ash slurry system

6.2.2 Dry Type Fly Ash Disposal System: 

Fly Ash from the ESP Hoppers is collected in the Ash Vessels and from there it is transported to

the Fly Ash Silos by the help of Compressed air and from the Ash Silos, the ash is transported to

the Bulkers(Sealed Vessel Trucks).

Page 59AIETM/CE/2016-17/P.T.I.V.

Page 55: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

6.3 Dumping process of dry fly ash

Fig. 6.3.a Dumping process of fly ash

ESP Hopper: 

Hopper is a large conical type container used for dust or ash collection. After the field charging in ESP we go for hammering of collecting plates and the fly ash deposited on the collecting plates gets stored in the hopper. To ensure free flow of ash into the ash vessels from the hopper, the lower portions of the hoppers are provided with electric heaters. Because if the temperature of the ash falls below the ash fusion temperature then the ash will form big clusters and may choke the entire conveying system.

Dome valve: 

It is situated between the ESP hopper and Ash vessel; it is a special type of valve which is highly leak proof. It consists of a dome type structure with a rubber seal which is continuously getting supply from the compressed air.

Air Vent Line: 

To remove the trapped air from the vessel, we use vent line and due to this line air from the vessel is transported to Hopper and ash come down. It basically does two things, first of all by

Page 60AIETM/CE/2016-17/P.T.I.V.

Page 56: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

removing the air from the vessel, it is removing the back-pressure from the Vessel and simultaneously it is pressurizing the ash hopper.

Compressor: 

A compressed air station is set up in the plant. The compressed air station provides air for the pneumatic conveying system and purging of fabric filters as we already explained in ESP. After compressing the air, we have to remove all the moisture content from the air. To remove the moisture from air we use Adsorbent Air Drier (AAD) and Refrigeration Air Drier (RAD).The pressure of the compressor is depended on the system design.

Ash Vessels: 

Ash vessels are present just below the ESP hoppers with the Dome Valve assembly.They are supposed to contain the fly ash for a certain amount of time which will be carried to the fly ash silos.Their ash holding capacity is depended on the conveying capacity of the ash line to the Ash Silos.

Fig.6.3.b Fly ash vessels

Page 61AIETM/CE/2016-17/P.T.I.V.

Page 57: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Fly Ash Silo: Fly Ash Silos store the fly ash generated by the Boiler in the maximum continuous

operating conditions (BMCR).The bottom of each fly ash silo is equipped with two ash

discharging chutes. One ash discharging chute is used for discharging the comprehensively used

dry fly ash and the other one is connected with a wet mixer, discharging the wet fly ash. The wet

ash mixer is just a back-up for the dry ash disposal system. Each fly ash silo is equipped with the

bag filters and bag filter cleaning facilities with exhaust fans.

Fig.6.3.c Fly ash silo

Page 62AIETM/CE/2016-17/P.T.I.V.

Page 58: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

Air extraction fan: It is used to create a negative pressure inside the vessel of the silo and the air goes out through the bag filters.

Extractor: It is used to evacuate the Air from the Bulkers (Closed Vessel Truck), which is connected to the ash disposal chute and the discharge is connected to ash vessel.

Diverting and dump valve: If one ash silo will not work we divert the line into another silo with the help of diverting valve and to dump the ash into ash silo dump valve is used.

6.4. Dumping process of wet fly ash

Wet Fly Ash Disposal System:

Up to the hopper part it is same as that of Dry Fly Ash handling system. After the hopper instead

of going into the vessel, the ash gets mixed with a high Pressure water and this mixture goes to a

slurry tank for further pumping. The slurry formed is further pumped through a series of pumps

or a single GEVO pump for dumping in the Ash yard. For mixing of fly ash with water, a

tapping is provided for High Pressure water below the hopper.

6.5 Bottom ash handling system

The bottom ash quantity is around 20% of the total Ash generation and there are mainly two types of bottom ash disposal systems.

Dry Type Bottom Ash Disposal Wet Ash Slurry Disposal

Dry Type Bottom Ash Disposal: First of all we will discuss about the Dry type bottom ash

disposal system.

Slurry Type Bottom Ash Disposal: Here the bottom ash from the 2nd pass of the Boilers goes

to the Clinker Grinder in the 1st pass by the help of high pressure water and from the Clinker

Grinder all the ash goes to a slurry sump for further pumping.

Page 63AIETM/CE/2016-17/P.T.I.V.

Page 59: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CHAPTER 7SPECIAL FEATURE OF ASH DYKE

Use of LDPE (175 micron thick membrane) to protect underground water. Use of trench beam to

maintain black cotton (Black Soil).Use of sloping walls with concrete to protect seepage of

water.Use of proper drainage system around the ash dyke.

Low-density polyethylene (LDPE) is a thermoplastic made from the monomer ethylene. It was

the first grade of polyethylene, produced in 1933 by Imperial Chemical Industries (ICI) using a

high pressure process via free radical polymerization. Its manufacture employs the same method

today. The EPA estimates 5.7% of LDPE (recycling number 4) is recycled. Despite competition

from more modern polymers, LDPE continues to be an important plastic grade.

Use of the concrete sloping walls.

Page 64AIETM/CE/2016-17/P.T.I.V.

Page 60: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

CONCLUSION

The generation, composition, properties and classification of fly ash were studied in this report.

Different recycling methods along with the difficulties in handling and disposal problems of fly

ash were discussed which comes under the management of fly ash

The design of an ash pond involved mathematical approach towards dam construction which is

out of the scope of this report. So the aspects to be considered during layout and design of an ash

pond are provided in the report.

But the experiment conducted for the determination of optimum concentration of polymer is at

low scale and the optimum concentration determined has lesser effect on the settling of fly ash in

industrial scale. The above concentration used in the determination of settling rate signifies a

very small difference in the rate of settling as compared to the usual settling process in thermal

power plants

Page 65AIETM/CE/2016-17/P.T.I.V.

Page 61: Chhabra Thermal Power Plant Report By Chandra Mohan Lodha

REFERENCE

1. Ram AvatarMeena AEN of civil department in CTPP power plant.

2. Yogesh Momaya Project Manager in radix infra projects pvt.ltd.

3. Subhal giri & Prabhakar Singh site engineer of ash dyke in radix infra projects

pvt.ltd.during training period.

4.www.google.com/ash pond construction

5. www.google.com/fly ash