Residential and Commercial Developments

Project Presentation

Embed Size (px)

Citation preview

Page 1: Project Presentation

Residential and Commercial Developments

Page 2: Project Presentation

Location: Carolina, P.R.

Client: San José Lagoon Development

Contact: Mr. León Rubín Tel. (787) 370−2423

Cost ($000): $750

Completion Date: 2004A small gazebo was used to safely install telephone, cable and electrical panels.

General view of buildings one to five at Point Estates Lagoon

Project Description:

Point States Lagoon is a residential project consisting of 84 apartments in San José Bay Side in Carolina. Arequirement to obtain permits to install an electrical primary distribution, cable, telephone and intercom distribution tosupply the necessities of this project was made by the project owner who contracted our services to prepare thedesign to comply with this requirements.

Electrical In−site primary and secondary distributionPoint States Lagoon

Page 3: Project Presentation

Location: Peñuelas, P.R.

Client: Galexda Development Corp.

Contact: José E. Pérez Tel. (787) 566−0583

Cost ($000): $6,000

Completion Date: 2008

Project Description:

Complete Electrical Design for Mansiones de Puerto Galexda. The owner contracted our services to prepare the offsite and exterior electrical primary distribution, secondary distribution, telephone and cable tv drawings.

Communications, Electrical, Lighting, Primary and Secondary Distribution Design

Houses in Construction Houses in Construction

Mansiones de Puerto Galexda

Page 4: Project Presentation

Location: Various

Client: PREPA Networks

Contact: José D. Casillas Tel. (787) 625−9950

Cost ($000): $500

Completion Date: 2006

Project Description:

Complete Design for three (3) communications shelters in the metropolitan area

Communications Shelters

Finished shelter in Carolina

PREPA Network

Page 5: Project Presentation

Location: Toa Alta, P.R.

Client: JN Bracero & Associates

Contact: Erick Bracero Tel. (787) 703−3942

Cost ($000): $1,250

Completion Date: 2005

Project Description:

Paseos del Plata is a residential project consisting of 54 residences in Bo. Ortiz, Sector Bucarabones in Toa Alta. The owner contracted our services to prepare the offsite and exterior electrical primary distribution, secondary distribution, telephone and cable tv drawings.

Typical House Main Street

Electrical In−site primary and secondary distributionPaseos del Plata

Page 6: Project Presentation

Location: San Juan, P.R.

Client: Sr. Juan Arriaga

Contact: Sr. Juan Arriaga Tel. (787) 603−1913

Cost ($000): $50

Completion Date: 2002New transclosure beside faculty parking Panoramic view of Immaculate College

Project Description:

Immaculate College is a group of buildings located at Ponce de León Avenue in Santurce. These buildings havebeen served from a one phase transformer. Since the transformer was not enough to satisfy the loadnecessities, they requested our services to design and install a primary three phase substation.

Electrical design for New SubstationColegio La Inmaculada

Page 7: Project Presentation

Location: Santurce, P.R.

Client: Juan Arriaga

Contact: Sr. Juan Arriaga Tel. (787) 603−1913

Cost ($000): $50

Completion Date: 2001 Pad Mounted Transformer ˘ Installed in a platform to facilitate access to pedestrians.

Project Description:

San Vicente de Paúl College consist of a group of buildings located at Bolívar Street in Santurce. These buildings have been served from a 100 KVA /7.62 kV, one phase transformer. Since the capacity of the transformer was not enough to serve the existing and future load, they requested our services to the design a primary three phase substation. H2O also designed the platform to locate the transformer.

Electrical Design for new substation

Platform and Stair Access

San Vicente de Paul

Page 8: Project Presentation

Location: Gurabo, P.R.

Client: TICS Construction

Contact: José F. Padilla Tel. (787) 250−7400

Cost ($000): $200

Completion Date: 1999

Residential Development Entrance Other view of the poles

Project Description:

Electrical design for a new 8.32 kV distribution line to serve a residential project in Bo. Hato Nuevo in Gurabo.

New 8.32 kV Distribution LineResidential Project

Page 9: Project Presentation

Location: Caguas, P.R.

Client: Mr. Edwin Soto

Contact: Mr. Edwin Soto Tel. (787) 250−8181

Cost ($000): $ 20

Completion Date: 2001Electrical SubstationFront view of the location

Project Description:

Design of a three phase substation for the facilities of Perfect Cleaning Services.

Electrical Design for New Substation at Perfect Cleaning ServicesPerfect Cleaning Services

Page 10: Project Presentation

Location: Various, P.R.

Client: AT&T

Contact: Rafael Meléndez Tel. (787) 565−8231

Cost ($000): $50

Completion Date: 2000Proposed site Existing meter bank to be studied

AT&T Communications Sites

Project Description:

Electrical design for AT&T new cellular sites and load and demand studies of energy consumption.

AT&T

Page 11: Project Presentation

Location: Carolina, P.R.

Client: Harold Hart & Assoc.

Contact: Eng. José Manota

Cost ($000): $300

Completion Date: 1999 Main entrance at Los Colobos store

Prescription Pharmacy Area at K−Mart Carolina

Project Description:

Electrical Interior Design Drawings for the Kmart pharmacy located at Los Colobos Shopping Center in Carolina.

Electrical Interior Design DrawingsKmart

Page 12: Project Presentation

Electrical High Voltage Lines Relocation

Page 13: Project Presentation

Location: Trujillo Alto P.R.

Client: Consulting Engineering Group

Contact: Javier Llavona Tel. (787) 525−6237

Cost ($000): $350

Completion Date: 1999

Poles to be relocated Area with lines relocated

Electrical Design for the relocation of various electrical lines

Project Description:

Electrical design for the relocation of 38, 13.2 and 8.32 kV aerial lines for the construction of the new Government Center in Trujillo Alto

Centro de Gobierno

Page 14: Project Presentation

Location: Trujillo Alto, P.R.

Client: Brighton Homes

Contact: Enrique López Tel. (787) 775−2200

Cost ($000): $100

Completion Date: 2001

Poles to be relocated Walk−up view

Electrical Design for the relocation of a 115 kV aerial line

Project Description:

Electrical design for the relocation of a 115 kV aerial lines for the construction of the new walk−up development, Vista Serena.

Vista Serena Development

Page 15: Project Presentation

Location: Río Piedras, P.R.

Client: EAP Group Practice

Contact: Antonio Molina Tel. (787) 753−2778

Cost ($000): $200

Completion Date: 2000

Poles to be relocated Area with lines relocated

Electrical Design for the relocation of a 115 kV aerial line

Project Description:

Electrical design for the relocation of a 115 kV aerial lines for the construction of the new residential development, Monteverde Real.

Monte Verde Real Development

Page 16: Project Presentation

Underground Electrical Design

Page 17: Project Presentation

Location: San Juan, P.R.

Client: PREPA

Contact: Eng. Florentino Pérez Tel. (787) 521−6598

Cost ($000): $8,000

Completion Date: 2006

Project Description:

PREPA contracted our services to prepare the design of the underground of all transmission and distribution lines at Fernández Juncos Ave. from the Old Naval Base at the Isla Grande up to Víctor López Street. Phase I − $3,470,299 from Old Base at Isla Grande up to Condado StreetPhase II − $3,140,172 from Hipódromo Street up to Víctor López StreetPhase III − from Víctor López Street up to Rosales Street, costs to be disclosed

Design, Supervision, Inspection and Project Management of the Underground of the electrical distribution system

Electrical Substation Primary Junction Box in Manhole

Fernández Juncos Underground

Page 18: Project Presentation

Location: San Juan, P.R.

Client: PREPA

Contact: Eng. Florentino Pérez Tel. (787) 521−6598

Cost ($000): To Be Disclosed

Completion Date: 2003

Project Description:

PREPA contracted our services to prepare the design of the underground of all transmission and distribution lines at Fernández Juncos Avenue in Hipódromo and Figueroa Street

Design, Supervision, Inspection and Project Management of the Underground of the electrical distribution system

Existing Transclosure Existing Meter Bank

Hipódromo & Figueroa Street Underground

Page 19: Project Presentation

Location: Yauco, P.R.

Client: Yauco Municipality

Contact: Hon. Abel Nazario Tel. (787) 856−1345

Cost ($000): To Be Disclosed

Completion Date: 2007

Project Description:

This is the first phase of a Master Plan that Major Abel Nazario is proposing to continue with the underground of the existing infraestructure in Yauco. The second phase will be on Santo Domingo and the 25th July Street.

Muñoz Rivera, Mejias Street Underground at La Trocha Sector, Yauco

Proposed Master Plan Existing Electrical Lines

Yauco Municipality Underground

Page 20: Project Presentation

Location: Yauco, P.R.

Client: Yauco Municipality

Contact: Hon. Abel Nazario Tel. (787) 856−1345

Cost ($000): To Be Disclosed

Completion Date: 2008

Project Description:

This is the third phase of a Master Plan that Major Abel Nazario is proposing to continue with the underground of the existing infraestructure in Yauco. This phase covers Ave. Barbosa, 25 de Julio, Santo Domingo and Vivaldi Streets.

Ave. Barbosa, 25 de Julio, Santo Domingo and Vivaldi Streets, Yauco

Proposed Master Plan Existing Electrical Lines

Yauco Municipality Underground, Phase III

Page 21: Project Presentation

Specialized Designs and Generation Projects

Page 22: Project Presentation

Location: Various, P.R.

Client: PREPA

Contact: Eng. Dolores Reyes Tel. (787) 521−6448

Cost ($000): $150,000

Completion Date: 2008Tower Transportation

Project Description:

In conjunction with POWER Engineers, Inc. (POWER) we were contracted by PREPA to prepare the design of the new 230 kV transmission line from Costa Sur Generating Plant to Aguas Buenas Transmission Center. We created a team which includes John Chance Land Surveyors, Aerofoto International, Agr. Julio Soto and APRO.

Complete design

Tower Installation

230 kV Transmission Line from Costa Sur to Aguas Buenas

Page 23: Project Presentation

Project Description:

Design of control and protection system and full system integration services. Amgen awarded us a contract to prepare the design of their new 115kV GIS Substation at Juncos. The design included complete specifications, diagrams, grounding system and protection and control system.

Location: Juncos, PR

Client: AMGEN

Contact: Eng. Luis F. Riollano

Cost ($000): $4,700

Completion Date: 2009

Full design of control and protection system. Full system integration services

Aerial Site Photo

AMGEN GIS

Page 24: Project Presentation

Inspection and Project Management

Page 25: Project Presentation

Location: Various, P.R.

Client: PREPA

Contact: Iván Cepeda Tel. (787) 521−6553

Completion Date: 2008

Project Description:

With the support of POWER Engineers, Inc. (POWER) we assists PREPA on the administration, engineering,safety monitoring, inspection, testing and commissioning required for managing the six (6) stages of the 115kV underground loop.

Project and Construction Management, Administration and Engineering Services115 kV Underground Loop

Page 26: Project Presentation

Phase I − Monacillos Transmission Center to Hato Rey Transmission CenterContractor − Bermúdez & LongoApproximately Costs − $25,307,652

Directional Drilling Installation Trench Installation

Page 27: Project Presentation

Phase IIA, IIB ˘ Hato Rey Transmission Center−Martin Peña GIS − Viaducto Transmission CenterContractor ˘ Lord ElectricApproximately Costs − $16,316,318

Concrete Pouring

GIS Substation

Page 28: Project Presentation

Phase IIC, IID ˘ Viaducto Transmission Center−Isla Grande GIS− San Juan Steam PlantContractor ˘ Lord ElectricApproximately Costs − $29,098,870

San Juan Steam Plant backfilling and compaction of trench at the entrance

38 kV Cables Cutting

Page 29: Project Presentation

Phase IIIA − San Juan Steam Plant to Palo SecoContractor ˘ Lord ElectricApproximately Costs − $14,007,944

Trench Installation Manhole Installation

Page 30: Project Presentation

Phase IIIB ˘ Palo Seco to Bayamón Transmission CenterContractor ˘ Lord ElectricApproximately Costs − $18,168,870

Reactors Conduit Installation

Duct Installation

Page 31: Project Presentation

Phase IV ˘ Bayamón Transmission Center to Monacillos Transmission CenterContractor ˘ Bermúdez & LongoApproximately Costs − $31,500,600

GIS Substation Splices Installation

Page 32: Project Presentation

Location: San Juan, P.R.

Client: PREPA

Contact: Eng. Iván Cepeda Tel. (787) 521−6553

Cost ($000s): $8,000

Completion Date: 2006

Conduit installation Manhole installation

Project Description:

PREPA contracted us to provide the inspection and construction management for the Underground of all the transmission and distribution lines at Fernández Juncos Ave. From the old Naval Base at the Isla Grande up to Del Parque Street. PREPA awarded the project to contractor Bermúdez & Longo.

Supervision, Inspection and Project Management of the Underground of the electrical distribution systemFernández Juncos Underground

Page 33: Project Presentation

Location: Ponce, P.R.

Client: PREPA

Contact: Iván Cepeda Tel. (787) 521−6553

Cost ($000): $20,970

Completion Date: 2007

Project Description:

We assisted PREPA on the administration, engineering, safety monitoring inspection required for managing thefirst phase of the Ponce en Marcha underground. This project has sanitary, water, telephone, cable tv andelectrical infrastructure.

Water meter connections Conduits installation

Project and Construction Management, Administration and Engineering ServicesPonce en Marcha

Page 34: Project Presentation

Location: Ponce, P.R.

Client: PREPA

Contact: Iván Cepeda Tel. (787) 521−6553

Cost ($000): $17,925

Completion Date: 2010

Project Description:

We assisted PREPA on the administration, engineering, safety monitoring inspection required for managing thesecond phase of the Ponce en Marcha underground. This project has sanitary, water, telephone, cable tv andelectrical infrastructure.

Conduits installation in Victoria Street

Vacuum Switch in Molina Street

Project and Construction Management, Administration and Engineering ServicesPonce en Marcha−Phase II

Page 35: Project Presentation

Location: San Juan, P.R.

Client: PREPA

Contact: Eng. Iván Rivera Tel. (787) 485−4411

Cost ($000): $3,100

Completion Date: 2010 Site Preparation

Project Description:

On February 14, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the new underground at San Francisco and Del Cristo Street at Old San Juan This project was awarded to Edison Electrical Contractors for $3.1 million of dollars. The project begins on March 2009 due to some problems with the permits and availability from San Juan Municipality.

Supervision, Inspection and Project Management of the Underground of the electrical distribution systemUnderground at San Francisco & Del Cristo Street at Old San Juan

Page 36: Project Presentation

Location: San Juan, P.R.

Client: PREPA

Contact: Eng. Iván Rivera Tel. (787) 485−4411

Cost ($000): $3,100

Completion Date: 2010 Manhole Installation

Project Description:

On August 14, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform theAdministration, Engineering, Monitoring and Inspection Services for the Construction of the new 38 kV undergroundline from Caparra to Cachete Substation. This project was awarded to BLDM for $3.1 million of dollars.

Supervision, Inspection and Project Management of the Underground of the electrical distribution system38 kV Underground Line from Caparra to Cachete Substation

Page 37: Project Presentation

Location: San Juan, P.R.

Client: PREPA

Contact: Eng. Iván Rivera, Tel. (787) 485−4411

Cost ($000): $457.571

Completion Date: June 2009 New Fence

Project Description:

On October 2, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of a new perimeter fence at PREPA Vega Baja Office. This project was awarded to IND General Contractor Corp for $457,751.00 dollars.

Supervision, Inspection and Project Management of the Construction

Fence Construction

Perimeter Fence at PREPA Vega Baja Offices

Page 38: Project Presentation

Location: Ponce, P.R.

Client: BPPR

Contact: Arq. Sofia Marrero Tel. (787) 765−9800 x 5242

Cost ($000): $854

Completion Date: 2010Site Preparation

Project Description:

On February 14, 2008, Banco Popular of Puerto Rico awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the new underground BPPR Ponce Town Center Bank.

Supervision, Inspection and Project Management of the building constructionNew BPPR Ponce Town Center Bank

Page 39: Project Presentation

Location: San Juan, P.R.

Client: Sistema de Retiro−UPR

Contact: Sr. Willie Rosario Tel. (787) 751−4550

Cost ($000): $250

Completion Date: 2009 Existing Building BIDS

Project Description:

On October 20, 2007, Sistema de Retiro−Universidad de Puerto Rico awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the remodeling of the existing Marshall building in Río Piedras. We use BIDS magazine to open the bids process for this project. The project was show on Bids magazine, Vol. 27, No. 09 of March 10, 2008. This project was awarded on Ju1y 10, 2008 to Construction Management Consultant Group for $250,000.00.

Supervision, Inspection and Project Management of the building constructionNew UPR Retirement System Building

Page 40: Project Presentation

Location: San Juan, P.R.

Client: PREPA

Contact: Eng. Iván Rivera Tel. (787) 485−4411

Cost ($000): $2,600

Completion Date: 2008 Manhole Inspection Conduits Installation

Project Description:

On June 2007, PREPA awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of two(2) new 38 kV underground lines in San Juan Steam Plant. The project was awarded to BLDM for $2.6 million of dollars and was finished on January 2008.

Supervision, Inspection and Project Management of the Underground of the electrical distribution systemUnderground Lines 8200 & 3900 in San Juan Steam Plant

Page 41: Project Presentation

Location: San Juan, P.R.

Client: PREPA

Contact: Eng. Iván Rivera Tel. (787) 485−4411

Cost ($000): $8,675

Completion Date: 2009 Project Sign Manhole Inspection

Project Description:

On May 15, 2007, PREPA awarded us the Administration, Monitoring and Inspection Services for theconstruction of the new 38kV Underground Line from Sábana Llana TC to Carolina Pueblo Substation. Theproject was awarded to BLDM for $8.675 million of dollars and was finished on January 2009.

Supervision, Inspection and Project Management of the Underground of the electrical distribution systemUnderground Lines from Sábana Llana TC to Carolina Pueblo Substation

Page 42: Project Presentation

Location: San Juan, P.R.

Client: Lord Electric

Contact: Ing. Javier PérezTel. (787) 758−4040

Cost ($000): $9,000

Completion Date: 2010Substation

Project Description:

Lord Electric awarded us the complete design of the new 40MVA @ 38kV Electrical Substation at Ft. Buchanan. The design has to comply with the US Corps of Engineers regulations. The design was Design and Build and included the design of three(3) new distribution feeders.

Complete design of a new 38kV substationNew 40MVA @ 38kV Electrical Substation

Feeders