SIA "VEGA 1" offers economic and technological wastewater treatment plant design, construction, SCADA and service maintenance.
SIA “ VEGA 1” manufactures, assembles and installs SBR type wastewater treatment plants with own SCADA system for:• hotels and guesthouses;• villages and towns;• Industries;• sites with with a large imbalance of wastewater flow and pollution.
Wastewater biological treatment is the most effective and optimal way of wastewater treatment. One of the most efficient technologies in this field, at the moment, is SBR (sequencing batch reactor). Unlike traditional treatment methods where wastewater flows through several, different meaning tanks, in sequencing batch reactor all wastewater treatment processes take place in a single tank. Such reactors are effective in wastewater treatment for a single private houses, villages and towns. Depending on the volume of wastewater flow, SBR wastewater treatment plant may consist of a different number of tanks and configurations. It should be noted that it is able to use existing tanks for an SBR processes. In the very simple way SBR plant consists of a wastewater buffer tank and the reactor.
Operating principles of SBR
CONSTRUCTIONWATERREFRIGERATION ENERGYINSTALLATIONS
1. Reactor is ready for use. Approximately 40% of the volume is filled with activated sludge. Wastewater is pumped from the buffer tank to the rector. After filling the reactor, with repeated, short term effective aeration sludge is mixed with wastewater. Wastewater treatment process (denitrification) under anaerobic (oxygen-free) conditions is taking place.
2. Periodic and long aeration is taking place. Wastewater treatment is running under aerobic (oxygen-saturated) conditions (nitrification).
3. Aeration is stopped and the settling process takes place
4. In this step decanting of the treated wastewater and removing of the excess sludge is taking place.
Project Mechanical and biological wastewater treamtment plant for slaughterhouse and meat processing factory
Costumer «Kurzemes Gaļsaimnieks» Ltd.
Location «Pūpoli», Virgas pagasts, Priekules novads, LV 3433, Latvija
Wastewater inflow 120 m3/day (4000 PE)
Contract value 695 977 EURO
Construction year 2011-2012
Installation of combined pretreament equipment for treatment of mechanical contamination, incl. sand, grease and fat removalDesign, construction and installation of SBR biological wastewater treatment reactorInflow wastewater quality: COD = 4 000 mg/l, BOD = 2000 mg/l, Ntot.. = 367 mg/l, Ptot.. = 60 mg/l Outflow water quality: COD = 90 mg/l, BOD = 20 mg/l, Ntot.. = 18 mg/l, Ptot.. = 10 mg/l
«Kurzemes Gaļsaimnieks» Ltd. mechanical and biological wastewater treamtment plant
Project Wastewater pretreatment equipment for slaughterhouse
Costumer «AIBI» Ltd.
Location «Kleivēni», Inešu pagasts, Vecpiebalgas novads
Wastewater inflow 20 m3/day (1842 PE)
Contract value 44 973 EURO
Construction year 2014-2015
Installation of wastewater pretreament equipment – fine rotary screen for seperation of mechanical contaminants.Installation of dissolved air flotation (DAF) equipment for total wastewater contamination reduction. Reduction efficiency – 70%.
«AIBI» Ltd. Mechanical wastewater pretreatment equipment
Project Biological wastewater treatment plant
Costumer «ŠĶIETNIEKI IS» Ltd.
Location «Šķietnieki», Dobeles novads, Zebrenes pagasts
Wastewater inflow 10 m3/day (921 PE)
Contract value 55 068 EURO
Construction year 2014
Design, manufacture and installation of biological wastewater treatment plant
«ŠĶIETNIEKI IS» Ltd. biological wastewater treatment plant
Project Pre-treatment unit improvement in Liepaja city Waste Water Plant
Customer «Liepājas Ūdens» Ltd.
Location Liepāja
Average capacity 36 000 m3 of municipal waste water per day
Contract value 1 197 454 EURO
Construction year 2008-2009
Example of innovative technology implementation in municipal waste water treatment plant.Target of the project – to reduce amount of hydrogen sulphide.Benefits of the project:- Improvement in biological and chemical processes of waste water treatment plant- Reduction of chemical effect to mechanical parts ot the plant, thus prolonging life
cycle of the parts.
Pre-treatment unit improvement in Liepaja city Waste Water Plant treatment plant
On-site installed wastewater treatment plants for municipalities
Project Nica village
Inflow 150 m3/day (1000 PE)
Construction year 2010
Inflow quality Outflow quality
BOD – 222 mg/lCOD – 457 mg/lSS – 250 mg/l
BOD – 10,1 mg/l (95%)COD – 36,5 mg/l (92%)SS – 10 mg/l (96%)
Project Seda village
Inflow 300 m3/day (2000 PE)
Construction year 2012
Inflow quality Outflow quality
BOD – 560 mg/lCOD – 880 mg/lSS – 230 mg/l
BOD – 2,7 mg/l (99%)COD – 44 mg/l (95%)SS – 5 mg/l (98%)
Project Vilgale village
Inflow 50 m3/day (334 PE)
Construction year 2012
Inflow quality Outflow quality
BOD – 146 mg/lCOD – 249 mg/lSS – 186 mg/l
BOD – 14 mg/l (90%)COD – 37,6 mg/l (85%)SS – 13,6 mg/l (93%)
On-site installed wastewater treatment plants for municipalities
Project Lejasciems village
Inflow 90 m3/day (600 PE)
Construction year 2013
Inflow quality Outflow quality
BOD – 442 mg/lCOD – 805 mg/lSS – 272 mg/lNtot. – 144 mg/lPtot. – 13 mg/l
BOD – 6,5 mg/l (98%)COD – 57 mg/l (93%)SS – 5 mg/l (98%)Ntot. – 7 mg/l (95%)Ptot. – 7 mg/l (47%)
Project Slampe village
Inflow 120 m3/day (800 PE)
Construction year 2013
Inflow quality Outflow quality
BOD – 340 mg/lCOD – 470 mg/lSS – 160 mg/lNH4 – 57 mg/lPtot. – 5,4 mg/l
BOD – 1,4 mg/l (99%)COD – 29 mg/l (94%)SS – 1,2 mg/l (99%)Ntot. – 8,8 mg/l (85%)Ptot. – 1,54 mg/l (73%)
Project Iecava city
Inflow 1100 m3/day (7334 PE)
Construction year 2013
Inflow quality Outflow quality
BOD – 800 mg/lCOD – 400 mg/lSS – 467 mg/lNtot. – 73 mg/lPtot. – 13 mg/l
BOD – 57 mg/l (93%)COD – 6,5 mg/l (98,5%)SS – 5 mg/l (98%)Ntot. – 7 mg/l (95%)Ptot. – 7 mg/l (50%)
On-site installed wastewater treatment plants for municipalities
Project Janmuiza village
Inflow 75 m3/day (600 PE)
Construction year 2014
Inflow quality Outflow quality
BOD – 377 mg/lCOD – 600 mg/lSS – 117 mg/lNtot. – 129 mg/lPtot. – 13,1 mg/l
BOD – 7,21 mg/l (98%)COD – 34 mg/l (94%)SS – 19 mg/l (84%)Ntot. – 18,9 mg/l (85%)Ptot. – 7,57 mg/l (43%)
Pre-fabricated wastewater treatment plants for municipalities
Project Rudes village
Inflow 60 m3/day (400 PE)
Construction year 2015
Inflow quality Outflow quality
BOD – 210 mg/lCOD – 480 mg/lSS – 100 mg/lNtot. – 42 mg/lPtot. – 12,6 mg/l
BOD – 7,97 mg/l (94%)COD – 54,5 mg/l (89%)SS – 8,78 mg/l (91%)Ntot. – 7,96 mg/l (82%)Ptot. – 0,33 mg/l (97%)
Project Rubas village
Inflow 55 m3/day (367 PE)
Construction year 2015
Inflow quality Outflow quality
BOD – 205 mg/lCOD – 483 mg/lSS – 280 mg/l
BOD – 5,04 mg/l (98%)COD – 44,3 mg/l (90%)SS – 1,12 mg/l (99%)
Project Karki village
Inflow 45 m3/day (300 PE)
Construction year 2014
Inflow quality Outflow quality
BOD – 413 mg/lCOD – 766 mg/lSS – 272 mg/lNtot. – 214 mg/lPtot. – 5,4 mg/l
BOD – 3,2 mg/l (99%)COD – 35 mg/l (95%)SS – 2 mg/l (99%)Ntot. – 11,3 mg/l (95%)Ptot. – 0,72 mg/l (87%)