Transcript

ABOUT US

KS Wind & Renewables India Private Limited is a young and fastest growing company, it have the

quality certification of ISO 9001-2015, 14001-2015 & 45001-2018. Organization established in 2015 with

major focus on supporting wind and solar power project by providing EPC.

We undertake turnkey projects and provides End-to-End EPC solutions to various

energy infrastructure projects including civil and electricals. The company has extensive expertise in Civil

and Electrical networks.

We KSWRIPL have been an active member of Indian Wind Power Association.

SERVICE OFFERINGS

✓ Favourable Site identification

✓ Site Surveying & Line- Route Surveying for EHV Transmission Lines

✓Obtaining statutory approvals and sanctions from Govt bodies

✓ Land acquisition (Private, Forest or Revenue)

✓ Establishment of Civil and Electrical infrastructure

✓ Construction of Power Evacuation system Substations, EHV lines, HV lines.

✓ Load flow studies

✓ Technical due diligence

✓ PPA documentations and coordination.

OUR MISSION

OUR VISION

“The mission of organization is to full fill customer expectation both in terms quality

And time line. We aim to build our services in the renewable sector for the global

community and offer world class services”

“The company vision is to maximize the green energy production . Our

contribution is to do EPC work for global renewable energy (wind and solar)

requirement and achieve 10GW”

“No Compromise in Quality with Work Culture & Safety Parameters to be maintained at Site with

basic fundamental to implement Professional Ethics at work place”

OUR OBJECTIVE

WE ARE

Dedicated – proactive and dependable Agile – flexible and smart Measured Team – we

make carefully balanced decisions. Our core Principles Honesty and truthful.

COMPANY STRATEGY

• Purpose To be a leader in the Renewable energy industry by providing enhanced services,

relationship and profitability.

• Vision To provide quality services for the renewable sector for the global requirements.

• Mission statement To build long term relationships with our customers and clients and

provide exceptional customer services in terms of quality work and completion of the project in time

by pursuing business through innovation and advanced technology.

• Core values At the KS Group, we consciously create an environment open to new ideas,

fresh observations, innovative creativity and strong client-driven performance. Our

company culture can be summed up in three words: Empowerment. Respect. Teamwork.

• Goals To build good reputation in the field of Renewable projects and become a key EPC player

in the industry.

CORE STRENGTH

Highly experienced and dedicated strong team with rich experience in the field of Project

development and execution.

Mr. P. KumarOperation Head

Mr. K. SaravanakumarManaging Director

Mr. K. KamarajAGM – Project

Mr. Suryakant PicheTechnical Consultant

Mr. Chandrashekhar V. PatilEPC Constructions

Mr. Suresh MariProject Manager

Mr. M. AnnamalaiAGM – QHSE

Mr. L. K. Sreenuvasa RajAccounts Manager

OUR TEAM

MANAGEMENT TEAM

Managing Director

Mr. K. Saravana Kumar playing his role in KS WIND & RENEWABLES INDIA PRIVATE

LIMITED as an Managing Director have an vast experience for more than 15 Years in the field of

Business Development, Project Development and Power Evacuation and has ample experience in Project

execution, Project Management, Team Management, Material Management, Procurement & Technical

Analysis of customer requirement towards completion of entire projects within committed time duration.

A go-getter, he is known for his on time completion of projects. He has sound knowledge in System load

flow study and Design of evacuation systems.

OPERATION HEAD

Mr. P. Kumar is basically technical person having sounded knowledge in

Renewable sector with ample experience. Also, plays his vital role as an Business analyst by

understanding customers requirements and gives his maximum input in satisfying the customers needs as

per their Technical Specification and Commercial requirements. He makes his presence voluntarily in

execution activities in order to meet customers commitment against completion of project within

stipulated time duration.

ASSISTANT GENERAL MANAGER

Mr. K. Kamaraj is basically an Electrical Engineer with over 25 years of professional experience

in the areas of Textiles, Textile processing industries and power and renewable energy. Out of which he has 13

years in the field of Renewable Energy. He has worked in various capacities for Companies such as SUZLON

, RRB Energy, and REGEN POWERTECH and has vast experience in Project development, Project Execution

with his technical capability and by having excellent requirement analysis through customer co-ordination

Mr. L.K. Sreenuvasaraj Is playing his role as an Manager in Accounts department having vast

experience over 20 Years in the field of accounts and administration in Shipping Logistics sector. He is having

ample experience in dealing with logistics, streamer agents, freight forwarding, CFS (Container flight station).

MANAGER- ACCOUNTS & ADMIN

PROJECT MANAGER

Mr. Suresh Mari who delivers his best outputs towards completion of Entire Power Plant by

continuous tracking of material requirement to be provided at site for work progress day by day. He is

continuing his service in power sector for about 13 Years &have combined expertise towards completion

of EHV Substations up-to 400KV Level.

ASSISTANT GENERAL MANAGER - QHSE

Mr. M. Annamalai is a safety professional having 20+ years experiences in overseas and Indian

Civil engineering background and started carrier in 1997 with Murugappa groups, WHO Hup overseas and URC

Construction Tamilnadu. His strength is to team up & build and motivate to the target. Completed MBA safety

management and certificate course relating to the safety and Environment.

ORGANIZATIONAL CHART

Mr. K. SaravanakumarManaging Director

Mr. P. KumarHead Operations

Mr. K. KamarajAGM - Projects

Mr. M. SureshProject Manager

Mr. V. BhaskaranProject Manager

Mr. LK. SreenuvasarajManaging - Accounts

Mr. J. John MessiahAsst. Manager-Accounts

Mr. K. PraveenExec. Asst-Admin

Mr. K. DhanarajDeputy Manager-Purchase

Mr. M. PrabhuAsst. Manager-Business

Development

Mr. G. Vineeth RajAsst. Purchase Department

Mr. C.V PatilEPC Constructions

Mr. S. PicheTechnical Consultant

LIAISONING

Mr. K. MurugesanDeputy Manager

Mr. M. JegathesekumarAssistant Manager-Project

Mr. MadhavanSite Engineer-Project

Mr. SabapathiIn-Charge Resource Management

SITE EXECUTION ROWEHS/QMS

Mr. DyaneshwarSenior Engineer-Land

Mr. AshokLand

Mr. P. BalabashyamHSE-Manager

Mr. P. VelmuruganSafety Engineer

Mr. SumanSafety Engineer

Mr. R. KesavanManager

Mr. N. ManikandanSite Engineer-Project

Mr. V. EswaranSite Engineer-Project

Mr. I. UdhayakumarSite Engineer-Project

Mr. GandhirajManager

Mr. T. JeganSenior Engineer

Mr. Siva PrakashSite Engineer-Project

Mr. AmalrajSenior Engineer

Mr. M. DineshSite Engineer-Project

Mr. E. SriramSystem Administrator

STORE

Mr. HarikumarStore In-charge

Mr. C. KiranAsst. Store In-charge

Mr. E. KarthikSite Engineer-Project

Mr. M. AnnamalaiAGM - Quality

Mr. Ashok I.CSenior Engineer

OUR TEAM HAVE EXECUTED SO MANY SIGNIFICANT

PROJECTS AT VARIOUS REGION

• GUJARAT

• MADHYA PRADESH

• MAHARASHTRA

• TELANGANA

• KARNATAKA

• TAMILNADU

• KERALA

• Installation of 220KV S/C Transmission Line

on D/C Towers: 10 Kms (SEMBCORP)

• Installation of 220KV S/C EHV Transmission

Line on D/C Towers : 23 Kms for their 100MW

Wind Power Project (VESTAS)

• Installation of 110KV S/C Transmission Line:

30Kms from Nirloti to 220/110 KV Sindhanur

S/s (SIEMENS GAMESA)

• Installation of 33KV S/C Evacuation Line: 10

Kms for their Wind Power Project

(WINWIND)

• Construction of 33KV DP Yard Work: 25 Nos

of WTG’s for 100MW Wind Power Project

(VESTAS)

• Construction of 33KV (SPDC &

SPSC)Evacuation Line: 50 Kms from their

Windy Site to 220KV Pooling S/s for their

100MW (VESTAS)

• Construction of 33KV Evacuation Line (SPDC

Line :9 Kms & SPSC Line: 7 Kms) and

Construction of 66/33KV S/s for their 23 MW

(AS INFRA)

• Installation of 33KV DP & Yard Work: 20 Nos of

WTG’s (INOX)

• Installation of 33KV Transmission Line (SCOH &

DCOH): 35 Kms & Installation of 33KV DP Yard

Work: 25 Nos of WTG’s for their 50 MW (ATRIA

POWER/ GAMESA)

• Installation of Skid Mounted DP Yard Work

(CONTINUUM WIND ENERGY (I) PVT LTD)

• Installation of 132KV D/C EHV Transmission Line :

6 Kms from Gamesa S/s to Sajapur S/s (GAMESA)

• Installation of 220KV D/C EHV Transmission Line

with 4Kms Erection & 13 Kms Stringing

(GAMESA)

• Installation of 220KV D/C EHV Transmission Line :

50 Kms from Bhurad S/s to Bhachau S/s ( SIEMENS

GAMESA)

• Installation of 33KV Transmission line (SCOH &

DCOH) : 75 Kms Installation of 33KV DP & Yard

Work : 25 Nos of WTG’s (SIEMENS GAMESA)

• Installation of 33KV Transmission line (SCOH &

DCOH) : 70 Kms Installation of 33KV DP & Yard

Work : 40 Nos of WTG’s (VESTAS)

• Surveying Work for 2 Nos of 220KV EHV

Transmission Line I: 43 Kms & Line II: 58 Kms at

Kutch (OSTRO)

• Installation of 220KV D/C EHV Transmission Line:

21 Kms from Sukpar S/s to Amerli S/s (UTL/ INOX)

• Construction of 33KV DP Yard Work: 11 Nos of WTG’s and Installation of 22KV Transmission Line: 4 Kms with HT Cable Laying: 1 Km,

Metering Yard : 2 Nos for their 22MW (INOX)

• Installation of 230KV S/c EHV

Transmission Line : 10 Kms from

Saravanapuram S/s to Vandalam

PGCIL S/s (VESTAS)

• Development of Road Work & Crane

Platform (REGEN)

WIND PROJECTS COMPLETED RECENTLY

• Installation of 132KV Pooling Substation at Koral site for 150

MW Wind Power Project (SIEMENS GAMESA)

SUBSTATION & TERMINAL BAYS COMPLETED

RECENTLY

• Construction of 2 Nos of 220KV Terminal

Bays at 220KV Basavanabagewadi S/s

(ATRIA)

• Construction of 1 No of 220KV Bay extension

at existing 220KV KPTCL S/s for their

100MW (VESTAS)

• Construction of 1X25MVA 132/33KV T/F at

66/33KV S/s at Turuvanuru (ATRIA)

• Construction of 1 No of 220KV Terminal Bay

at 220KV Neelagunda S/s (SEMBCORP)

• Construction of 1X25MVA T/F at 110/22KV

S/s at Palakkad (KSEB)

• Construction of 2X65MVA 132/33KV

100MW EHV S/s at Betul (ATRIA)

• Construction of 2 Nos of 132KV Terminal Bay

at Miyapur S/s at Hyderabad (TSTRANSCO)

WIND PROJECTS UNDER EXECUTION

Sr.

NoProject Details & Scope of Work Customer Name Site Details State Remarks

1Installation of 230 KV S/C EHV Transmission Line - 33KM for their Wind

Power Project ACCIONA/NORDEX Mulanur Tamilnadu Under Execution

2

Installation of 100MW Turn Key Project which includes WTG land, 230

KV Pooling substation, 230KV Terminal Bay and 230 KV EHV

Transmission line. for 600MW Wind Power Project.

MYTRAH Pollachi Tamilnadu Under Execution

3

Installation of 100MW Turn Key Project which includes WTG land, 132

KV Pooling substation, 132KV Terminal Bay and 132 KV EHV

Transmission line.

MYTRAH Jevli Maharashtra Under Execution

4Installation of 33KV Evacuation Line – 80Kms and 33KV DP Yard – 35

Nos for their Wind Power Project VESTAS Thattaparai Tamilnadu Under Execution

5Installation of 33KV Evacuation Line – 75Kms for their Wind Power

Project ACCIONA/NORDEX Mulanur Tamilnadu Under Execution

WIND PROJECTS UNDER EXECUTION

Sr.

NoProject Details & Scope of Work Customer Name Site Details State Remarks

6

31.5MW Turnkey Project (21X1.5MW) Which includes WTG Land, WTG

Foundation, 33KV DP Yard Work, 33KV Evacuation Line , Bay Extension

and Road & Crane Platform Work

LSML Ahmednagar Maharashtra Under Execution

7Construction of 220KV/33KV Substation for Wind Power Project.

ACCIONA/NORDEX KannivadiTamilnadu Under Execution

8Installation of 230KV D/C EHV Transmission Line - 30Kms for their

400MW Wind Power ProjectSIEMENS GAMESA Mulanur Tamilnadu Under Execution

SOLAR PROJECTS COMPLETED RECENTLY

• Installation of 66KV S/C EHV Transmission Line:

2.9 Kms from 1X20MW Solar Power Plant

Ramanagara S/s to Melehalli S/s (ADANI

GREEN ENERGY LTD)

• Installation of 66KV EHV Transmission Line: 6.47

Kms from existing Chikkagangawadi 66/11KV S/s

in Ramanagara District to 20MW Solar Power

Plant S/s (ADANI GREEN ENERGY LTD)

• Installation of 66KV EHV Transmission Line: 5.8

Kms from 1X20MW Solar Power Plant

Ramanagara to Channapatna S/s (ADANI GREEN

ENERGY LTD)

• Installation of 66KV EHV Transmission Line: 7.3

Kms from existing Talakadu 66/11KV S/s in

Mysuru District to 20MW Solar Power Plant S/s

(ADANI GREEN ENERGY LTD)

• Installation of 66KV EHV Transmission Line:

2.23Kms from existing Bandisettihalli 66/11KV in

Hassan District to the 20MW Solar Power Plant S/s

(ADANI GREEN ENERGY LTD)

• Installation of 66KV EHV Transmission Line:

0.521 Kms from Santhbachahalli 66/11KV S/s in

K.R Pet District to 20MW Solar Power Plant S/s

(ADANI GREEN ENERGY LTD)

• Installation of Modules & Pile Foundation (Solar Pv

Plant Project) (HARSHA ABAKUS)

• Installation of 110kKV S/c EHV Transmission Line

: 9Kms from 1x100 Solar Power Plant of Kamuthi

to TNED S/s (HILD ENERGY)

• Construction of 1Nos of 110KV Bay and 110KV

Substation for 100MW Solar Power Project

(HILD ENERGY)

• 10 MW Solar Power Plant Project (ACBOS ,

DCBOS & Substation Works (STERLING &

WILSON)

• 8MW Solar Power Plant Project (ACBOS &

DCBOS) (STERLING & WILSON)

• Solar Pv Plant Project (WELSPUN)

Substation & Terminal Bays Completed Recently

• Installation of 110KV AIS Switchyard (Plant end & Remote end) for

their 1X40MW Nalwar Solar Power Project (ADANI GREEN

ENERGY LTD)

SOLAR PROJECTS UNDER EXECUTION

Sr. No

Project Details & Scope of Work Customer Name Site Details State Remarks

1

Construction of 110KV S/C EHV

Transmission Line for 100MW Solar Power

Project 16Km

ENRICH ENERGY Kamuthi Tamilnadu Under Execution

2Construction of 110KV Substation for

100MW Solar Power Project.ENRICH ENERGY Kamuthi Tamilnadu Under Execution

3

Installation of 66KV D/C EHV Transmission

Line - 22Kms from Solar Power Plant to

220/66KV Chamrajnagar S/s

SIEMENS GAMESA Chamrajnagar Karnataka Under Execution

4

Installation of 66KV S/C EHV Transmission

Line - 4.5 Kms from Solar Power Plant to

66/11 KV Holavanahalli S/s

SIEMENS GAMESA Holavanahalli Karnataka Under Execution

5Installation of 1 No of 66KV Terminal Bay

at 66/11KV Holavanahalli S/sSIEMENS GAMESA Holavanahalli Karnataka Under Execution

SOLAR PROJECTS UNDER EXECUTION

Sr. No

Project Details & Scope of Work Customer Name Site Details State Remarks

6Construction of Pooling Substation for solar

Power Project. SIEMENS GAMESAHolavanahalli Karnataka Under Execution

7 Construction of 66KV Substation SIEMENS GAMESA Chamrajnagar Karnataka Under Execution

SAFETY PARAMETERS MAINTAINED

QUALITY PARAMETERS MAINTAINED

WIND POWER CREDENTIALS

CONSTRUCTION OF EHV TRANSMISSION LINES

CONSTRUCTION OF EHV TRANSMISSION LINES

CONSTRUCTION OF EHV TRANSMISSION LINES

CONSTRUCTION OF EHV SUBSTATIONS

CONSTRUCTION OF EHV SUBSTATIONS

CONSTRUCTION OF OHT EVACUATION LINES

CONSTRUCTION OF DP YARD WORKS

CONSTRUCTION OF ROAD & PLATFORM WORKS

SITE OFFICE WORK STATION & STORE CONTAINERS

OUR PRESTIGIOUS CLIENTS

Registered OfficeNo. 6/106, Karattur, Post -

Pongamuthur, Tal -Udumalapet, Dist -Tirupur.

Corporate Office -TNNo. 40, Vishalakshi Street, Aiswarya

Garden, Goparasanallur, Poonamalle,Chennai- 56.

Branch Office -APH.No. 15-21-134, Sri Suguna Residency, Flat No. F1, Balaji

Nagar, Kukatpally, Hyderabad-500072, Telangana.

CONTACT US:

Branch Office - MHH.No. 1933/82, HippargaRoad,Lohara Taluk, OsmanabadDist.,

Maharashtra State, India -413608

Branch Office - MPVikram Hotel, Room No. 101, Gudgaon Road, Bhainsdehi,

Tehsil Bhainsdehi, Dist- Betul, Madhyapradesh- 460200.

Branch Office - KANo. 950/1/2288/A1, 12th

Ward, Stadium Road, Harapanahalli, Karnataka-

583131.

Email- [email protected] / [email protected], website: www.ksinfra.in

Branch Office - GJGhanshyam” HN – 6157, 6 –New Sagar Society, Inside of Kedar Gate, Kothariya MainRoad, Rajkot - 360002, Gujarat.