ABOUT US
KS Wind & Renewables India Private Limited is a young and fastest growing company, it have the
quality certification of ISO 9001-2015, 14001-2015 & 45001-2018. Organization established in 2015 with
major focus on supporting wind and solar power project by providing EPC.
We undertake turnkey projects and provides End-to-End EPC solutions to various
energy infrastructure projects including civil and electricals. The company has extensive expertise in Civil
and Electrical networks.
We KSWRIPL have been an active member of Indian Wind Power Association.
SERVICE OFFERINGS
✓ Favourable Site identification
✓ Site Surveying & Line- Route Surveying for EHV Transmission Lines
✓Obtaining statutory approvals and sanctions from Govt bodies
✓ Land acquisition (Private, Forest or Revenue)
✓ Establishment of Civil and Electrical infrastructure
✓ Construction of Power Evacuation system Substations, EHV lines, HV lines.
✓ Load flow studies
✓ Technical due diligence
✓ PPA documentations and coordination.
OUR MISSION
OUR VISION
“The mission of organization is to full fill customer expectation both in terms quality
And time line. We aim to build our services in the renewable sector for the global
community and offer world class services”
“The company vision is to maximize the green energy production . Our
contribution is to do EPC work for global renewable energy (wind and solar)
requirement and achieve 10GW”
“No Compromise in Quality with Work Culture & Safety Parameters to be maintained at Site with
basic fundamental to implement Professional Ethics at work place”
OUR OBJECTIVE
WE ARE
Dedicated – proactive and dependable Agile – flexible and smart Measured Team – we
make carefully balanced decisions. Our core Principles Honesty and truthful.
COMPANY STRATEGY
• Purpose To be a leader in the Renewable energy industry by providing enhanced services,
relationship and profitability.
• Vision To provide quality services for the renewable sector for the global requirements.
• Mission statement To build long term relationships with our customers and clients and
provide exceptional customer services in terms of quality work and completion of the project in time
by pursuing business through innovation and advanced technology.
• Core values At the KS Group, we consciously create an environment open to new ideas,
fresh observations, innovative creativity and strong client-driven performance. Our
company culture can be summed up in three words: Empowerment. Respect. Teamwork.
• Goals To build good reputation in the field of Renewable projects and become a key EPC player
in the industry.
CORE STRENGTH
Highly experienced and dedicated strong team with rich experience in the field of Project
development and execution.
Mr. P. KumarOperation Head
Mr. K. SaravanakumarManaging Director
Mr. K. KamarajAGM – Project
Mr. Suryakant PicheTechnical Consultant
Mr. Chandrashekhar V. PatilEPC Constructions
Mr. Suresh MariProject Manager
Mr. M. AnnamalaiAGM – QHSE
Mr. L. K. Sreenuvasa RajAccounts Manager
OUR TEAM
MANAGEMENT TEAM
Managing Director
Mr. K. Saravana Kumar playing his role in KS WIND & RENEWABLES INDIA PRIVATE
LIMITED as an Managing Director have an vast experience for more than 15 Years in the field of
Business Development, Project Development and Power Evacuation and has ample experience in Project
execution, Project Management, Team Management, Material Management, Procurement & Technical
Analysis of customer requirement towards completion of entire projects within committed time duration.
A go-getter, he is known for his on time completion of projects. He has sound knowledge in System load
flow study and Design of evacuation systems.
OPERATION HEAD
Mr. P. Kumar is basically technical person having sounded knowledge in
Renewable sector with ample experience. Also, plays his vital role as an Business analyst by
understanding customers requirements and gives his maximum input in satisfying the customers needs as
per their Technical Specification and Commercial requirements. He makes his presence voluntarily in
execution activities in order to meet customers commitment against completion of project within
stipulated time duration.
ASSISTANT GENERAL MANAGER
Mr. K. Kamaraj is basically an Electrical Engineer with over 25 years of professional experience
in the areas of Textiles, Textile processing industries and power and renewable energy. Out of which he has 13
years in the field of Renewable Energy. He has worked in various capacities for Companies such as SUZLON
, RRB Energy, and REGEN POWERTECH and has vast experience in Project development, Project Execution
with his technical capability and by having excellent requirement analysis through customer co-ordination
Mr. L.K. Sreenuvasaraj Is playing his role as an Manager in Accounts department having vast
experience over 20 Years in the field of accounts and administration in Shipping Logistics sector. He is having
ample experience in dealing with logistics, streamer agents, freight forwarding, CFS (Container flight station).
MANAGER- ACCOUNTS & ADMIN
PROJECT MANAGER
Mr. Suresh Mari who delivers his best outputs towards completion of Entire Power Plant by
continuous tracking of material requirement to be provided at site for work progress day by day. He is
continuing his service in power sector for about 13 Years &have combined expertise towards completion
of EHV Substations up-to 400KV Level.
ASSISTANT GENERAL MANAGER - QHSE
Mr. M. Annamalai is a safety professional having 20+ years experiences in overseas and Indian
Civil engineering background and started carrier in 1997 with Murugappa groups, WHO Hup overseas and URC
Construction Tamilnadu. His strength is to team up & build and motivate to the target. Completed MBA safety
management and certificate course relating to the safety and Environment.
ORGANIZATIONAL CHART
Mr. K. SaravanakumarManaging Director
Mr. P. KumarHead Operations
Mr. K. KamarajAGM - Projects
Mr. M. SureshProject Manager
Mr. V. BhaskaranProject Manager
Mr. LK. SreenuvasarajManaging - Accounts
Mr. J. John MessiahAsst. Manager-Accounts
Mr. K. PraveenExec. Asst-Admin
Mr. K. DhanarajDeputy Manager-Purchase
Mr. M. PrabhuAsst. Manager-Business
Development
Mr. G. Vineeth RajAsst. Purchase Department
Mr. C.V PatilEPC Constructions
Mr. S. PicheTechnical Consultant
LIAISONING
Mr. K. MurugesanDeputy Manager
Mr. M. JegathesekumarAssistant Manager-Project
Mr. MadhavanSite Engineer-Project
Mr. SabapathiIn-Charge Resource Management
SITE EXECUTION ROWEHS/QMS
Mr. DyaneshwarSenior Engineer-Land
Mr. AshokLand
Mr. P. BalabashyamHSE-Manager
Mr. P. VelmuruganSafety Engineer
Mr. SumanSafety Engineer
Mr. R. KesavanManager
Mr. N. ManikandanSite Engineer-Project
Mr. V. EswaranSite Engineer-Project
Mr. I. UdhayakumarSite Engineer-Project
Mr. GandhirajManager
Mr. T. JeganSenior Engineer
Mr. Siva PrakashSite Engineer-Project
Mr. AmalrajSenior Engineer
Mr. M. DineshSite Engineer-Project
Mr. E. SriramSystem Administrator
STORE
Mr. HarikumarStore In-charge
Mr. C. KiranAsst. Store In-charge
Mr. E. KarthikSite Engineer-Project
Mr. M. AnnamalaiAGM - Quality
Mr. Ashok I.CSenior Engineer
OUR TEAM HAVE EXECUTED SO MANY SIGNIFICANT
PROJECTS AT VARIOUS REGION
• GUJARAT
• MADHYA PRADESH
• MAHARASHTRA
• TELANGANA
• KARNATAKA
• TAMILNADU
• KERALA
• Installation of 220KV S/C Transmission Line
on D/C Towers: 10 Kms (SEMBCORP)
• Installation of 220KV S/C EHV Transmission
Line on D/C Towers : 23 Kms for their 100MW
Wind Power Project (VESTAS)
• Installation of 110KV S/C Transmission Line:
30Kms from Nirloti to 220/110 KV Sindhanur
S/s (SIEMENS GAMESA)
• Installation of 33KV S/C Evacuation Line: 10
Kms for their Wind Power Project
(WINWIND)
• Construction of 33KV DP Yard Work: 25 Nos
of WTG’s for 100MW Wind Power Project
(VESTAS)
• Construction of 33KV (SPDC &
SPSC)Evacuation Line: 50 Kms from their
Windy Site to 220KV Pooling S/s for their
100MW (VESTAS)
• Construction of 33KV Evacuation Line (SPDC
Line :9 Kms & SPSC Line: 7 Kms) and
Construction of 66/33KV S/s for their 23 MW
(AS INFRA)
• Installation of 33KV DP & Yard Work: 20 Nos of
WTG’s (INOX)
• Installation of 33KV Transmission Line (SCOH &
DCOH): 35 Kms & Installation of 33KV DP Yard
Work: 25 Nos of WTG’s for their 50 MW (ATRIA
POWER/ GAMESA)
• Installation of Skid Mounted DP Yard Work
(CONTINUUM WIND ENERGY (I) PVT LTD)
• Installation of 132KV D/C EHV Transmission Line :
6 Kms from Gamesa S/s to Sajapur S/s (GAMESA)
• Installation of 220KV D/C EHV Transmission Line
with 4Kms Erection & 13 Kms Stringing
(GAMESA)
• Installation of 220KV D/C EHV Transmission Line :
50 Kms from Bhurad S/s to Bhachau S/s ( SIEMENS
GAMESA)
• Installation of 33KV Transmission line (SCOH &
DCOH) : 75 Kms Installation of 33KV DP & Yard
Work : 25 Nos of WTG’s (SIEMENS GAMESA)
• Installation of 33KV Transmission line (SCOH &
DCOH) : 70 Kms Installation of 33KV DP & Yard
Work : 40 Nos of WTG’s (VESTAS)
• Surveying Work for 2 Nos of 220KV EHV
Transmission Line I: 43 Kms & Line II: 58 Kms at
Kutch (OSTRO)
• Installation of 220KV D/C EHV Transmission Line:
21 Kms from Sukpar S/s to Amerli S/s (UTL/ INOX)
• Construction of 33KV DP Yard Work: 11 Nos of WTG’s and Installation of 22KV Transmission Line: 4 Kms with HT Cable Laying: 1 Km,
Metering Yard : 2 Nos for their 22MW (INOX)
• Installation of 230KV S/c EHV
Transmission Line : 10 Kms from
Saravanapuram S/s to Vandalam
PGCIL S/s (VESTAS)
• Development of Road Work & Crane
Platform (REGEN)
WIND PROJECTS COMPLETED RECENTLY
• Installation of 132KV Pooling Substation at Koral site for 150
MW Wind Power Project (SIEMENS GAMESA)
SUBSTATION & TERMINAL BAYS COMPLETED
RECENTLY
• Construction of 2 Nos of 220KV Terminal
Bays at 220KV Basavanabagewadi S/s
(ATRIA)
• Construction of 1 No of 220KV Bay extension
at existing 220KV KPTCL S/s for their
100MW (VESTAS)
• Construction of 1X25MVA 132/33KV T/F at
66/33KV S/s at Turuvanuru (ATRIA)
• Construction of 1 No of 220KV Terminal Bay
at 220KV Neelagunda S/s (SEMBCORP)
• Construction of 1X25MVA T/F at 110/22KV
S/s at Palakkad (KSEB)
• Construction of 2X65MVA 132/33KV
100MW EHV S/s at Betul (ATRIA)
• Construction of 2 Nos of 132KV Terminal Bay
at Miyapur S/s at Hyderabad (TSTRANSCO)
WIND PROJECTS UNDER EXECUTION
Sr.
NoProject Details & Scope of Work Customer Name Site Details State Remarks
1Installation of 230 KV S/C EHV Transmission Line - 33KM for their Wind
Power Project ACCIONA/NORDEX Mulanur Tamilnadu Under Execution
2
Installation of 100MW Turn Key Project which includes WTG land, 230
KV Pooling substation, 230KV Terminal Bay and 230 KV EHV
Transmission line. for 600MW Wind Power Project.
MYTRAH Pollachi Tamilnadu Under Execution
3
Installation of 100MW Turn Key Project which includes WTG land, 132
KV Pooling substation, 132KV Terminal Bay and 132 KV EHV
Transmission line.
MYTRAH Jevli Maharashtra Under Execution
4Installation of 33KV Evacuation Line – 80Kms and 33KV DP Yard – 35
Nos for their Wind Power Project VESTAS Thattaparai Tamilnadu Under Execution
5Installation of 33KV Evacuation Line – 75Kms for their Wind Power
Project ACCIONA/NORDEX Mulanur Tamilnadu Under Execution
WIND PROJECTS UNDER EXECUTION
Sr.
NoProject Details & Scope of Work Customer Name Site Details State Remarks
6
31.5MW Turnkey Project (21X1.5MW) Which includes WTG Land, WTG
Foundation, 33KV DP Yard Work, 33KV Evacuation Line , Bay Extension
and Road & Crane Platform Work
LSML Ahmednagar Maharashtra Under Execution
7Construction of 220KV/33KV Substation for Wind Power Project.
ACCIONA/NORDEX KannivadiTamilnadu Under Execution
8Installation of 230KV D/C EHV Transmission Line - 30Kms for their
400MW Wind Power ProjectSIEMENS GAMESA Mulanur Tamilnadu Under Execution
SOLAR PROJECTS COMPLETED RECENTLY
• Installation of 66KV S/C EHV Transmission Line:
2.9 Kms from 1X20MW Solar Power Plant
Ramanagara S/s to Melehalli S/s (ADANI
GREEN ENERGY LTD)
• Installation of 66KV EHV Transmission Line: 6.47
Kms from existing Chikkagangawadi 66/11KV S/s
in Ramanagara District to 20MW Solar Power
Plant S/s (ADANI GREEN ENERGY LTD)
• Installation of 66KV EHV Transmission Line: 5.8
Kms from 1X20MW Solar Power Plant
Ramanagara to Channapatna S/s (ADANI GREEN
ENERGY LTD)
• Installation of 66KV EHV Transmission Line: 7.3
Kms from existing Talakadu 66/11KV S/s in
Mysuru District to 20MW Solar Power Plant S/s
(ADANI GREEN ENERGY LTD)
• Installation of 66KV EHV Transmission Line:
2.23Kms from existing Bandisettihalli 66/11KV in
Hassan District to the 20MW Solar Power Plant S/s
(ADANI GREEN ENERGY LTD)
• Installation of 66KV EHV Transmission Line:
0.521 Kms from Santhbachahalli 66/11KV S/s in
K.R Pet District to 20MW Solar Power Plant S/s
(ADANI GREEN ENERGY LTD)
• Installation of Modules & Pile Foundation (Solar Pv
Plant Project) (HARSHA ABAKUS)
• Installation of 110kKV S/c EHV Transmission Line
: 9Kms from 1x100 Solar Power Plant of Kamuthi
to TNED S/s (HILD ENERGY)
• Construction of 1Nos of 110KV Bay and 110KV
Substation for 100MW Solar Power Project
(HILD ENERGY)
• 10 MW Solar Power Plant Project (ACBOS ,
DCBOS & Substation Works (STERLING &
WILSON)
• 8MW Solar Power Plant Project (ACBOS &
DCBOS) (STERLING & WILSON)
• Solar Pv Plant Project (WELSPUN)
Substation & Terminal Bays Completed Recently
• Installation of 110KV AIS Switchyard (Plant end & Remote end) for
their 1X40MW Nalwar Solar Power Project (ADANI GREEN
ENERGY LTD)
SOLAR PROJECTS UNDER EXECUTION
Sr. No
Project Details & Scope of Work Customer Name Site Details State Remarks
1
Construction of 110KV S/C EHV
Transmission Line for 100MW Solar Power
Project 16Km
ENRICH ENERGY Kamuthi Tamilnadu Under Execution
2Construction of 110KV Substation for
100MW Solar Power Project.ENRICH ENERGY Kamuthi Tamilnadu Under Execution
3
Installation of 66KV D/C EHV Transmission
Line - 22Kms from Solar Power Plant to
220/66KV Chamrajnagar S/s
SIEMENS GAMESA Chamrajnagar Karnataka Under Execution
4
Installation of 66KV S/C EHV Transmission
Line - 4.5 Kms from Solar Power Plant to
66/11 KV Holavanahalli S/s
SIEMENS GAMESA Holavanahalli Karnataka Under Execution
5Installation of 1 No of 66KV Terminal Bay
at 66/11KV Holavanahalli S/sSIEMENS GAMESA Holavanahalli Karnataka Under Execution
SOLAR PROJECTS UNDER EXECUTION
Sr. No
Project Details & Scope of Work Customer Name Site Details State Remarks
6Construction of Pooling Substation for solar
Power Project. SIEMENS GAMESAHolavanahalli Karnataka Under Execution
7 Construction of 66KV Substation SIEMENS GAMESA Chamrajnagar Karnataka Under Execution
Registered OfficeNo. 6/106, Karattur, Post -
Pongamuthur, Tal -Udumalapet, Dist -Tirupur.
Corporate Office -TNNo. 40, Vishalakshi Street, Aiswarya
Garden, Goparasanallur, Poonamalle,Chennai- 56.
Branch Office -APH.No. 15-21-134, Sri Suguna Residency, Flat No. F1, Balaji
Nagar, Kukatpally, Hyderabad-500072, Telangana.
CONTACT US:
Branch Office - MHH.No. 1933/82, HippargaRoad,Lohara Taluk, OsmanabadDist.,
Maharashtra State, India -413608
Branch Office - MPVikram Hotel, Room No. 101, Gudgaon Road, Bhainsdehi,
Tehsil Bhainsdehi, Dist- Betul, Madhyapradesh- 460200.
Branch Office - KANo. 950/1/2288/A1, 12th
Ward, Stadium Road, Harapanahalli, Karnataka-
583131.
Email- [email protected] / [email protected], website: www.ksinfra.in
Branch Office - GJGhanshyam” HN – 6157, 6 –New Sagar Society, Inside of Kedar Gate, Kothariya MainRoad, Rajkot - 360002, Gujarat.