ODRP(ODISHA DISASTER RECOVERY
PROJECT)
PREPARED BY: ASHIS KASHYAP (CIVIL ENGINEER AT GRAM VIKAS)
YEAR: 2015-16
CONTENTS
• INTRODUCTION• PROJECT HIGHLIGHTS• WORKING SITES• HOUSING FINANCE• ABBREVIATION
INTRODUCTION• Cyclone Phailin, hit Odisha during October 2013• Damages are 14,500 villages, 90,000 households & 780,000 hectares of crop• World Bank Mission visited Odisha for assessment & agreed for assistance• 30,000 disaster resilient houses have been taken up• Under odisha disaster recovery project (ODRP) within 5 km from the high tide line
(HTL) in ganjam, khordha & puri districts of odisha.• Owner Driven Construction of Houses (ODCH) approach has been adopted• The project is being implemented with 70: 30 funding from world bank & the state
govt.• A sum of Rs. 3, 00,000 is provided to each beneficiary for construction of a 294 sq.Ft.
House• House specifications are One bed room, one drawing-cum-bed room, kitchen & toilet
CONTD..
• The habitat & infrastructure development planning are being prepared by the socio technical support agency, Gram Vikas, in consultation with Project Management Unit (PMU), District Project Implementation Unit (DPIU)
PROJECT HIGHLIGHTS• Habitation planning housing construction • Well laid architecture planning• Electrification & street lights• Water supply & sanitation• Connectivity roads• Internal roads• Basic civic infrastructure• Land entitlement to beneficiaries• 1000 sq.Ft. Plot & plinth area of 254 sq. Ft.• Amenities viz. Kitchen / toilet & piped water• House rent allowance for 8 months• Multi disaster insurance for 10 years• Social & dignified living
WORKING SITESSl. No.
Name of the Block
No. of Village
In-situ
Relocation
Total Beneficiary
GANJAM1 Chatrapur 12 93 2216 23092 Khalikote 29 558 3167 37073 Ganjam 23 1056 2319 33774 Chikiti 10 55 3393 34485 Rangeilunda 33 29 4109 4140
Sub-Total 107 1791 15204 16981KHORDHA
1 Chilika 59 176 9 1852 Tangi 11 61 22 83
Sub-Total 70 237 31 268
HOUSING FINANCE
PICTURE GALLERY
ABBREVIATION
• Community Reconstruction Committee (CRC)• Project Management Unit (PMU)• District Project Implementation Unit (DPIU)• Owner Driven Construction Of Houses (ODCH)• High Tide Line (HTL)