Welcome to the ARISU Integrated Information Center! ARISU integrated information system ■Equipment (Unit : ea) •2008. 10 Production of working design for construction of the water operation center •2009. 6 Launch of construction of the ARISU Integrated Information Center and system •2011. 12 Completion of the nation’s first high-tech smart water grid system Production management system DMA management Scenario based Water networks overall database • Flow rate & pressure monitoring • Pipe leakage analysis • Unusual supply influx analysis • Pipe deterioration • Based on real-time reservoir level, residual chlorine conc. by SCADA system • System revision by monitored data • Simulation of burst pipe and water cut- off scenarios • Estimation of restoration time after accident • Tracking the route of pollutants • DMA information • Pipe network information • Waterdemand information • Affordable water bill information • Waterworks pipe network GIS data • Connection with DB Equipment name 6 ·Server 35 ·Web camera 15 ·Speakerphone 15 ·DVR 20 ·Firewall 19 ·Router 15 ·DSU 15 ·HUB 2 ·WS 26 ·Printer 3 ·UPS 1 ·67’ DLP cube 18 ·Integration controller ·Wall controller and two more items of equipment Type Server CCTV & VIDEO conference Communications equipment Operation equipment Centralized control system The ARISU integrated information system is designed to enable rapid decision-making based on the integration, monitoring and analysis of all operational data generated by all unit processes, ranging from water intake to water supply, in order to supply clean, fresh, potable water to Seoul citizens. Smart Water Grid 1. The next-generation water management system uses the latest information communication technology to improve the management efficiency of water resources and water and sewage. 2. The water industry platform is designed to produce tap water and optimize its supply, by taking into account real- time water demand, using supply and meteorological information. This system is used to plan the operational schedule of the intake pump in order to reduce electricity costs and to plan a reasonable production schedule for the purification centers according to systematic predictions of demand based on meteorological data and history data. Supply management system The water supply system is designed to facilitate a rapid response to emergency situations and prepare for pipe network accidents and water leakages, based on the analysis of pipe deterioration and flow rate, while minimizing public complaints about such problems as dead water or poor water supply, based on the analysis of pipe network information and influx/pressure and water quality information. e ARISU Integrated Information Center is commied to... Establishing efficient central monitoring and control based on the constructionandoperationofahigh-techsmartinformationsystem Executingcentrally-basedoperationsrangingfromthe productionto the supplyofcleanpotabletapwater Maximizingwaterconsumers’satisfactionandprovidinga customized tourenvironment forvisitors Production management system Remote monitoring system Supply management system Flux monitoring GIS/water bills Water quality/ Water Now Meteorological administraon Smart Water Grid (operation and management of waterworks with IT) Integration DB ARISU Integrated Information System • Calculation of the required amount of water consumption according to consumption estimations on every 2nd and 15th day of the month Water demand forecasting in the short and long term • Analysis of the distribution pattern based on weather data and history data Simulation of distribution pattern • Control of Intake and supply water flow rate based on inflow rate on distribution reservoir Efficient water distribution • Control of water level according to hourly variations in water discharge Reservoir operation • Planning of pump operation schedule based on hourly supply of water and number of pumps Efficient pump operation • Correction of water demand by considering the amount of special water Verification and Correction Remote monitoring of each office of waterworks Online pipe network analysis ■Location : 1st Floor, Office of Waterworks, 51 Seosomun-ro (27-1 Hap-dong), Seodaemun-gu, Seoul DMA : District Metered Area Rapid decision making Decisions on reconstruction priority Detection of unusual water flows, etc.

The ARISU Integrated Information Center

  • Upload
    simrc

  • View
    94

  • Download
    3

Embed Size (px)

Citation preview

Page 1: The ARISU Integrated Information Center

Welcome to the ARISU Integrated Information Center! ARISU integrated information system

■Equipment (Unit : ea)

•2008. 10 Production of working design for construction of the water operation center

•2009. 6 Launch of construction of the ARISU Integrated Information Center and system

•2011. 12 Completion of the nation’s first high-tech smart water grid system

Production managementsystem

DMA management Scenario based Water networks overall database

•���Flow�rate�&�pressure�monitoring•��Pipe�leakage�analysis�•���Unusual�supply�influx�analysis•��Pipe�deterioration

•���Based�on�real-time�reservoir�level,�residual�chlorine�conc.�by�SCADA�system�•����System�revision�by�monitored�data

•���Simulation�of �burst�pipe�and�water�cut-off �scenarios•��Estimation�of �restoration�time�after�accident•��Tracking�the�route�of �pollutants

•�DMA�information•�Pipe�network�information•��Water�demand��information•��Affordable�water�bill�information•��Waterworks�pipe�network�GIS�data•�Connection�with�DB

Equipment

name6

·Server 35

·Web camera 15

·Speakerphone 15

·DVR 20

·Firewall 19

·Router 15

·DSU 15

·HUB 2

·WS 26

·Printer 3

·UPS 1

· 67’ DLP cube 18

·Integration controller

· Wall controller and

two more items of

equipment

Type ServerCCTV & VIDEO

conferenceCommunications

equipmentOperation equipment

Centralized control system

The ARISU integrated information system is designed

to enable rapid decision-making based on the integration, monitoring and analysis of all operational data generated by all

unit processes, ranging from water intake to water supply, in order to supply clean, fresh, potable water to Seoul citizens.

※ Smart Water Grid 1. The next-generation water management system uses the latest information communication technology to improve

the management efficiency of water resources and water and sewage. 2. The water industry platform is designed to produce tap water and optimize its supply, by taking into account real-

time water demand, using supply and meteorological information.

This system is used to plan the operational schedule of the intake pump in order

to reduce electricity costs and to plan a reasonable production schedule for the

purification centers according to systematic predictions of demand based on

meteorological data and history data.

Supply management system

The water supply system is designed to facilitate a rapid response to emergency situations and prepare

for pipe network accidents and water leakages, based on the analysis of pipe deterioration and flow

rate, while minimizing public complaints about such problems as dead water or poor water supply,

based on the analysis of pipe network information and influx/pressure and water quality information.

The ARISU Integrated Information Center is committed to...

•�Establishing�efficient�central�monitoring�and�control�based�on�the�

construction�and�operation�of�a�high-tech�smart�information�system�

•�Executing�centrally-based�operations�ranging�from�the�production�to�

the�supply�of�clean�potable�tap�water

•�Maximizing�water�consumers’�satisfaction�and�providing�a�customized�

tour�environment�for�visitors

Production management system Remote monitoring system

Supply management

system

Flux monitoring

GIS/water bills

Water quality/Water Now

Meteorological administration

Smart Water Grid(operation and management of waterworks with IT)

Integration

DB

ARISU Integrated Information System

•���Calculation�of �the�required�amount�of �water�consumption�according�to�consumption�estimations�on�every�2nd�and�15th�day�of �the�month

Water demand forecasting in the short and long term

•��Analysis�of �the�distribution�pattern�based�on�weather�data�and�history�data�

Simulation of distribution pattern

•��Control�of �Intake�and�supply�water�flow�rate�based�on�inflow�rate�on�distribution�reservoir

Efficient water distribution

•��Control�of �water�level�according�to�hourly�variations�in�water�discharge�

Reservoir operation

•��Planning�of �pump�operation�schedule�based�on�hourly�supply�of �water�and�number�of �pumps�

Efficient pump operation

•��Correction�of �water�demand�by�considering����the�amount�of �special�water

Verification and Correction

Remote monitoring of each office of waterworks

Online pipe network analysis

■Location : 1st Floor, Office of Waterworks, 51 Seosomun-ro (27-1 Hap-dong), Seodaemun-gu, Seoul ※ DMA : District Metered Area

Rapid decision making

Decisions on reconstruction

priority

Detection of unusual

water flows, etc.

Page 2: The ARISU Integrated Information Center

The Office of Waterworks, Seoul Metropolitan Government

(http://arisu.seoul.go.kr)

아리水

Public Access to Hi-tech Integrated Information Center

Open to the public and citizen analysts

Water supply cessation message sending service

Provision of SMS in the event of cessation of water supply

Connection with DASAN call center

Provision of accident information via the Seoul Call Center

Disclosure of real-time water quality information

Disclosure of water quality information via the ARISU website,

mobile and outdoor displays

Video conference

Discussion of center and each office of waterworks

Reinforcement of dual security

Dual monitoring for enhanced plant and reservoir security

• Integration of operational data

• Fundamental construction of water production and supply

• Monitoring of overall water network status

• Realization of data for pipe network analysis

• Enhancement of water treatment process

• Optimization of system with operational data history

• Construction of data warehouse

• Support for operator’s decision making

• Construction of an expert system

The remote monitoring system is designed to monitor remotely all

operational information and image data from six purification centers and eight waterworks offices and to control

production management and supply management, which are based on remote monitoring data.

System Enhancement

Step 2(~by 2015)

Decision-making SystemStep 3

(~by 2020)

System Infrastructure

Step 1 (present)

Settlement of ARISU integrated information system is for…

Future Plan

• Accident response ability become enhanced by whole central controlling system with replacing water supply and transferring of water network

• Improvement of work process efficiency with automated integration of information everyday by developed system

• Reduction of manpower about 20~30% by remote monitoring system because of locating only emergency response personnel on purification cite

• Decision making by not experts’ experience but judgment of scientific data

• Expectedly bringing down the cost about 2.5 million a year with reduction of production cost, electricity cost and greenhouse gases

We aim to provide the best and most improved service to Seoul citizens.Service for Citizens

Remote monitoring system

ARISU Integrated Management Center

(아리수통합정보센터)강서구

양천구

구로구

금천구

영등포구동작구

관악구

서초구

강남구 송파구

강동구

중랑구

광진구

용산구

중구

서대문구

은평구성북구

동대문구

성동구

마포구

Gangdong Office of Waterworks

Gangnam Office of Waterworks

Guui Water Purification Center

Ttukdo Water Purification Center

Receiving well

Coagulation basin

Mixing basin

Sedimentation basin

Filter basin

Purification basin

Purification Center

Pressure pumping

station

Distribution reservoir

Pump

Office of WaterworksDongbu Office of Waterworks

Seobu Office of Waterworks

Jungbu Office of Waterworks

Gangseo Office of Waterworks

Nambu Office of Waterworks

Bukbu Office of Waterworks

Gangbuk Water Purification Center

Amsa Water Purification Center

Gwangam Water Purification Center

Yeongdeungpo Water Purification Center