64
Lean London Forum 21 March 2012 Royal College of Surgeons For more information, please email [email protected] or telephone 0207 824 8448

Leanlondon mar12 presentation

Embed Size (px)

Citation preview

Page 1: Leanlondon mar12 presentation

Lean London Forum

21 March 2012Royal College of Surgeons

For more information, please email [email protected] or telephone 0207 824 8448

Page 2: Leanlondon mar12 presentation

- 2 -

Confidential not to be used without consent

We have some broad aims of the forum

• Create the environment where Lean Solutions in the NHSare shared, discussed and acted upon by practitioners inthe health service

• Engage in a debate about strengths and weakness oflean in the current NHS climate– The QIPP agenda in reducing costs across the health system

– Clinical Commissioning Groups that will redefine ‘end to end’ health systemsprocesses

• To network with colleagues and friends

Page 3: Leanlondon mar12 presentation

- 3 -

Confidential not to be used without consent

Agenda

• 1800 - 1810 Welcome and introductions

• 1810 - 1835 The Path-ology to Lean Thinking - Dr Mathew Diggle &Suzanne Horobin

• 1835 - 1900 Pre-operative health evaluation - engagement with PrimaryCare - Dr Ahmed Chekairi, Whittington Hospital

• 1900 - 1930 Hot seat session

• 1930 - 2000 Networking and drinks

Page 4: Leanlondon mar12 presentation

- 4 -

Confidential not to be used without consent

Introductions

• Your Name

• Your Role

• The one thing relating toLean you are curious about?

Page 5: Leanlondon mar12 presentation

- 5 -

Confidential not to be used without consent

• Focus on Value from a Customer (Patient) point of view on every

step of process

• Obsession on removing waste within the ‘whole system’

• Bottom up approach in identifying value and waste – assumption

that much of waste and value is hidden

• A true lean system would “flow” and need little command and

control

Recap – What is Lean?

Page 6: Leanlondon mar12 presentation

Path-ology

LeanThinking

StaringDr Mathew Diggle &Suzanne Horobin

Page 7: Leanlondon mar12 presentation

Background

• Diagnostic service: 24/7, 365 days per year

• Population served: >2.5 million

• Workload: 970,000 pa

• Isolation, identification and detection of

medically important bacteria,

viruses and parasites.

Page 8: Leanlondon mar12 presentation

• Screening and specialist service:expertise in biological agentdetection

• Clinical advice -on the diagnosis,management & treatment ofinfections, with regular ward roundson intensive care etc.

• Infection control- MRSA isolation andClostridium difficile toxin screening

Background

Page 9: Leanlondon mar12 presentation

What is Lean?

Page 10: Leanlondon mar12 presentation

LEAN• Perfected by Toyota – from 1928

• ‘Lean’ coined by Jones & Womack in 1990s

• Lean is about improving flow and eliminating waste• getting the right things to the right place,

• at the right time,• in the right quantities,

• while minimising waste and being flexible and open to change.

• Customer at heart of the process• Driver for Quality and Safety

Page 11: Leanlondon mar12 presentation

LEAN?

Page 12: Leanlondon mar12 presentation

CHANGE

Page 13: Leanlondon mar12 presentation

DANGER!

Page 14: Leanlondon mar12 presentation

FEAR

Page 15: Leanlondon mar12 presentation

RESISTANCE

Page 16: Leanlondon mar12 presentation

LEAN

Microbiology

Page 17: Leanlondon mar12 presentation

The Path-ology

Page 18: Leanlondon mar12 presentation

The Path-ology

• High Volume testing – Urines and MRSA screening

• Highly visible – Reception area

• Highly productive – What matters to me!

• Highly effective!

Page 19: Leanlondon mar12 presentation

High Volume testing – Urines and MRSA screening

One piece flow

Page 20: Leanlondon mar12 presentation

Results from Urines

Oct-11Sept-11Baseline Aug-

11

Oct-11Sept-11Baseline Aug-

11

Oct-11Sept-11Baseline Aug-

11

95.786.985.977.466.158.739.239.840.9

% reported within 48hrs

% reported within 24hrs

% reported day ofreceipt

Page 21: Leanlondon mar12 presentation

Results from Reception

Negative urines from PCTs:Total time from receipt to authorisation

0.0

5.0

10.0

15.0

20.0

25.0

30.0

10:1

5

12:3

0

12:3

0

12:3

0

14:1

5

14:1

5

14:1

5

14:1

5

14:1

5

15:4

5

15:4

5

15:4

5

16:0

0

16:0

0

16:0

0

16:0

0

16:0

0

16:0

0

16:0

0

16:0

0

16:0

0

Time of receipt

Hour

s

Negative urines from hospital patients:Total time from receipt to authorisation

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

09:1

5

09:1

5

10:0

0

10:3

0

10:3

0

10:3

0

11:0

0

11:4

5

13:0

0

14:1

5

14:1

5

14:1

5

14:1

5

15:3

0

16:3

0

16:3

0

16:3

0

Time of receipt

Hour

s

Most GP specimens’ turnaround time (TAT) <5h (median=3.1h). Overnight storage resultsin TAT c. 25hMost in-patient specimens’ TAT <4h, but maybe as high as 7h (median=3.1h).

Negative urines from PCTs:time from receipt to authorisation

0.0

5.0

10.0

15.0

20.0

25.0

09:0

0

12:3

0

12:4

5

12:4

5

14:0

0

14:0

0

14:3

0

14:3

0

15:3

0

15:3

0

16:1

5

16:1

5

16:1

5

16:1

5

16:3

0

16:3

0

16:3

0

Time of receipt

Hour

s

Then

NowNegative urines from in-patients: time from receipt to

authorisation

0.0

1.0

2.0

3.0

4.0

5.0

09:0

0

09:0

0

09:4

5

10:3

0

10:3

0

10:3

0

10:3

0

11:0

0

13:0

0

14:0

0

14:0

0

14:0

0

15:0

0

16:1

5

16:3

0

Time of receipt

Hour

s

Most GP specimens’ turnaround time (TAT)< 4h (median=1.7h). Overnight storageresults in TAT c. 20h

i.e. median TAT reduced by 45%(mean TAT reduced by 29%)

Majority of in-patient specimens’ TAT<3h(median=2.4h)

i.e. median TAT reduced by 23%(mean TAT reduced by 23%)

Overall, TAT for all negative samples hasbeen reduced by 45% (median 3.1h to1.7h)Number of samples processed via UF100increased by 11% on dates sampled.

Page 22: Leanlondon mar12 presentation

Highly visible – Reception area

Page 23: Leanlondon mar12 presentation

Highly visible – Reception area

Page 24: Leanlondon mar12 presentation

Improved process

• Post-Lean, there is improved prioritisation of in-patientsamples, as the time from receipt to UF100 processinghas been reduced by 50% (median 0.8h to 0.4h) and timefrom receipt to registration has been reduced by 25%(median 0.8h to 0.6h).

• Removal of excessive checking (demo-checking) hasreduced the processing time for negative samples by 43%(from 2.3h to 1.3h).

• Positive feedback from staff as process runs moresmoothly and calmly.

Page 25: Leanlondon mar12 presentation

The Path - Key Challenges

• Maintaining momentum / energy / time

• Communication with all stakeholders

• Support laboratory staff and stakeholders

Page 26: Leanlondon mar12 presentation

Suzanne Horobin

National Improvement Lead -Diagnostics

Right First Time?The cost of poor quality

Page 27: Leanlondon mar12 presentation

Who are NHS Improvement?• DH partnership - aligned to support delivery of national strategies

and priorities - support QIPP Pathology Programme

• Key sponsors – Prof Sir Mike Richards, Prof Roger Boyle,Dr Ian Barnes, Dr Erika Denton, Prof Sue Hill

• Over 10 years improvement experience, practical knowledge and“how to” approach to improve quality and productivity

• Last 12 months – supported 240+ sites - improving Cancer,Diagnostics, Heart, Lung and Stroke services

Page 28: Leanlondon mar12 presentation

NHS Improvement - Diagnostics• Proven success in Pathology

– 95% Histopathology results in 7 days, 50% in 3 days – Whipps Cross– 100% Cytology results in 14 days, >50% in 7 days – Phase 1/2 pilot sites– 50% improvement in Phlebotomy outpatient waiting times - Doncaster– 90% reduction in Microbiology TAT – Stoke on Trent– 43% reduction in Histopathology TAT – Calderdale & Huddersfield– 62% reduction in Haematology TAT – St James Hospital– 21% reduction of inappropriate demand urines – St Helens & Knowsley

• Improvements in safety and quality• Increased capacity and space utilisation• Improved staff engagement• National Clinical Lead / Associate support

Page 29: Leanlondon mar12 presentation

Right first time?

Page 30: Leanlondon mar12 presentation

What’s the problem?• University Hospitals Coventry and Warwick Cytology – 47%

forms missing sender code

• Hull and East Yorkshire Hospitals NHS Trust – 154 cytologysamples in 2 weeks received with errors

• Taunton & Somerset NHS Foundation Trust – MusgrovePark Histopathology – 28% specimen receipt / data entryerrors

• Nottingham University Hospital NHS Trust – 8941microbiology samples rejected due to defects (12.8%)

Page 31: Leanlondon mar12 presentation

How do we know?

Page 32: Leanlondon mar12 presentation
Page 33: Leanlondon mar12 presentation

Sample SortingSTAR

T

Patient Referral

Cycle time =

Batch Size =

Defects =

Trigger=

Insert the measurements - Gather real data- this is your chance to really understand

what’s happening.

Defects – Whatpercentage is notright first time andrequires furtherwork?

Page 34: Leanlondon mar12 presentation

• Manual data collection• One week• Tick every error that occurs• Capturing lab number will enable root

cause analysis later• Errors as a % of total workload for the

week

Page 35: Leanlondon mar12 presentation

So what?

Page 36: Leanlondon mar12 presentation

Result for patient?• Repeat testing

• Delayed diagnosis

• Potential for incorrect diagnosis /treatment

Page 37: Leanlondon mar12 presentation

Result for department?

Cost of poor quality - COPQ

Page 38: Leanlondon mar12 presentation

Cost of poor quality - COPQIdeal – every case is booked in RIGHT FIRST TIME

•Dealing with a typical error requires a 5 minute search of the current laboratorydatabase followed by a 5 minute telephone call to find the correct information = 10mins per error•5% of cases have errors requiring this rework•5% of annual workload of 50,000 samples = 2500•Handling time 2500 samples x 10 minutes = 25000 minutes•Or 416 hours•Or 55.5 WORKING DAYS•At midpoint Band 3 = £5170.88

This is the cost of poor quality

Page 39: Leanlondon mar12 presentation

What do we do about it?

Page 40: Leanlondon mar12 presentation

“ALL USERS” email

Page 41: Leanlondon mar12 presentation

DOESN’T WORK!!!how many emails do you get every day?

Page 42: Leanlondon mar12 presentation

GET MORE DATA

Page 43: Leanlondon mar12 presentation

A weeks worth of data tells youenough

Page 44: Leanlondon mar12 presentation

GO SEE

Page 45: Leanlondon mar12 presentation

Now we’re getting there!

Page 46: Leanlondon mar12 presentation
Page 47: Leanlondon mar12 presentation

Future work

Page 48: Leanlondon mar12 presentation

Visual Aid

Page 49: Leanlondon mar12 presentation

Does it really work?• University Hospitals Coventry and Warwick Cytology – reduction in

errors reduced booking in time saving 1789 hours of office time perannum (240 working days)

• Hull and East Yorkshire Hospitals NHS Trust – reduction in returnedsamples freed up 10 hours per month

• Taunton & Somerset NHS Foundation Trust – Musgrove ParkHistopathology – errors down from 29% to 8% so far

• Nottingham University Hospital NHS Trust – 8941 microbiology samplesrejected due to defects (12.8%) – work in progress!

Page 50: Leanlondon mar12 presentation
Page 51: Leanlondon mar12 presentation

Lean LondonThe Royal College of Surgeons

21 March 2012

Dr Ahmed CHEKAIRIMD, FRCA, PGDip

Consultant Anaesthetist

Whittington Health, London

Pre-Operative CareAssessment at Primary Care

Page 52: Leanlondon mar12 presentation

Old Paradigm

• Pre-operative assessment is the process by whichpatients who are booked in for an elective surgicalprocedure undergo an anaesthetic assessment to

evaluate their fitness for surgery

Page 53: Leanlondon mar12 presentation
Page 54: Leanlondon mar12 presentation
Page 55: Leanlondon mar12 presentation

Reversible Causes

• Blood pressure

• Diabetes

• Infections

• Weight??

• ANAEMIA

• Smoking

Page 56: Leanlondon mar12 presentation

New Pre-assessment ServiceNew Paradigm: Pre-Operative Health Evaluation and Optimisation

New Pre-assessment ServiceNew Paradigm: Pre-Operative Health Evaluation and Optimisation

New set up•One stop clinic: Health evaluation on the day decisionto operate is made•8000 travels/year less, More than 4000 patientswould go straight to surgery•Standardised documentation with traffic light system,triggers for right investigations and right referrals•Improving patients’ safety by including checklistsalerts•Criteria-based Decision making algorithms based onbest evidence and in response to National andinternational Governance bodies•Systematic risk stratification= better consent=betterplanning=appropriate use of Intensive care

Promoting good health beyond surgery

•Pre assessment is Health MOT opportunity forsurgical patients•Improving nutritional state pre-operatively andat long-term

•Ensuring good diabetes and blood pressurecontrol & promoting smoking cessation andsensible alcohol intake

Staff

•CPD programme for nurses

•Training programme for trainees•Consultant anesthetists run clinics

•Continuous measurement

Future (near future)

•Connect and cooperate with GPs

•Align peri-operative goals betweenHospital and Primary care: ‘optimise asyou refer’

Benefits•Active treatment of anaemia pre-operatively usingintra venous iron•Right investigations (more than 20% unnecessaryinvestigations last year)

•Better diagnosis and more inclusive screening (Sleepapnea and mental state screenings)

•Promoting day surgery and Enhanced Recovery Carefor all patients

•Systematic assessment of mobility = better postoperative planning

•Minimising cancellation on day

Systematic optimization of reversible conditions such asdiabetes ,HBP, infection & others

A patient story

G.H, a self-employed, attended the Preassessment service on 01/03/12. This was theday of the new pre assessment service trial.He was seen soon after surgeon told himabout the need for surgery.

Health evaluation revealed one medicalconcern that required blood tests and an ECG.These were done on the spot in POA clinic.He was also seen by a Consultant anesthetistat same visit.Patient was advised of the risks of hiscondition and the need for treatment at longtem; he was also advised to contact his GP.Then was given a suitable date for his surgery

Similar patients in the past would have beenadded to the waiting surgical list and given 2dates. One for surgery and another one for pre-assessment. Time interval between the 2 datesis variable. They may also have a 3rd date tosee an anaesthetist consultant.

G.H would have lost 3 working days as unpaidleave even before getting his operation.

Better patient’s experience, Less travels to the Hospital, Better quality of care,Less waste

[email protected] for more information

Page 57: Leanlondon mar12 presentation
Page 58: Leanlondon mar12 presentation
Page 59: Leanlondon mar12 presentation
Page 60: Leanlondon mar12 presentation

A patient storyG.H, a self-employed patient, attended the Pre assessment service on01/03/12. This was the day of the new pre assessment service trial. He was seen soonafter surgeon told him about the need for surgery.

Health evaluation revealed one medical concern that required blood tests and an ECG.These were done on the spot at POA clinic.

He was also seen by a Consultant anesthetist at same visit. Patient was advised of therisks of his condition and the need for treatment at long tem; he was also advised tocontact his GP. Then he was given a suitable date for his surgery

Similar patients in the past would have been added to the waiting surgical list and given 2dates. One for surgery and another one for pre-assessment. Time interval between the 2dates is variable. They may also have a 3rd date to see an anaesthetist consultant.

G.H would have lost 3 working days as unpaid leave before getting his operation!

Page 61: Leanlondon mar12 presentation

- 61 -

Confidential not to be used without consent

Your Questions on LeanYour Questions on Lean

What is theimpact on CCGon end to end

transformation?

Can Lean fail?,and for what

reason?

We have nobudget to start

Lean – whatcan we do?

We have lowmorale and no one

is willing tochange, what can I

do?

What the one thingthat makes the

biggestdifference?

Page 62: Leanlondon mar12 presentation

- 62 -

Confidential not to be used without consent

What’s Next?

• Today’s presentation and feedback survey sent out by email within48 hours

• The Next Lean London Forum will be held in September 2012.– Register at www.leanlondon.org.uk

– We will send out reminders to all participants from today

– We have a Lean Midland Forum on 12 June 2012 taking place in Birmingham. Registerat www.leanmidland.org.uk

– If you’d like to take up one our presentation slots, please do let us know. We are keento hear from Community Trust and GP Groups

• Find us on Linked In and Twitter - LeanNHS

Page 63: Leanlondon mar12 presentation

- 63 -

Confidential not to be used without consent

Big Thanks To Our Presenters

Suzanne Horobin

Mathew Diggle

Ahmed Chekairi

..and to you all for attending

Page 64: Leanlondon mar12 presentation

- 64 -

Confidential not to be used without consent

Thanks to Our Sponsors

Assisting with Lean Transformationsin the health sector and beyond

www.kinetik.uk.com www.leanexecutives.co.uk