NFTA Metro Route Restructuring Presented by: James Morrell, Manager, Service Planning, NFTA Hal Morse, Executive Director, Greater Buffalo-Niagara Region Transportation Council The Niagara Frontier Transportation Authority (NFTA) implemented a major route restructuring initiative on October 31, 2010; a plan which required extensive organizational planning and community participation. The restructuring included adjusting service levels to make the entire system more efficient and increase passenger revenues. Buses now run more frequently over the heaviest used routes, and less frequently over lesser-used portions. This presentation will outline the steps needed to restructure service to be more efficient and cost effective.

Citation preview

Page 1: NFTA Metro Route Restructuring

Regional Planning Perspectives on Transit

Restructuring

Longer Term Development and Financial Implications

Page 2: NFTA Metro Route Restructuring

James MorrellManager of Service Planning

NFTA Metro

And

Hal MorseExecutive Director

Greater Buffalo Niagara Regional Transportation Council

Page 3: NFTA Metro Route Restructuring

Decreasing Population, More Developed AreaIn the last half of the 20th century, the region’s urbanized area nearly tripled in size, expanding from 123 square miles in 1950 to 367 square miles in 2000. Over the same time period, the population has increased by only 7%..

Challenges in the Buffalo Niagara Region

Page 4: NFTA Metro Route Restructuring

Developed Area Pre-1900

Population 508,687

Page 5: NFTA Metro Route Restructuring

Developed Area to 1940

Population 1900-1940958,487 (increased 88%)

Page 6: NFTA Metro Route Restructuring

Developed Area to 1960

Population 1940-19601,306,957 (increased 36%)

Page 7: NFTA Metro Route Restructuring

Developed Area to 2000

Population 1960-20001,170,111 (decrease 10%)

Page 8: NFTA Metro Route Restructuring

•Density Declines & Disinvestment

•Areas with the greatest densities have experienced the highest rates of decline. Where the loses have been greatest, declines have resulted in lower property values and local tax revenues, eroding demand for retail and commercial services, and housing deterioration and abandonment.

•A recent study reports the following troubling statistic about regional imbalances: for every new household living in the area in the 1990s, four new homes were built.

Challenges for the Community

Page 9: NFTA Metro Route Restructuring

•Intended to provide framework for growth in Erie and Niagara Counties

•Provides good template for decisions in transportation investment

•Developed consistent with MPO LRP

•Recognizes need to grow in areas with existing infrastructure

•Longer term coordination mechanism being developed

•Smart Growth Public Policy Infrastructure Policy Act a driver in NYS spending

Erie-Niagara Regional Framework Plan

Page 10: NFTA Metro Route Restructuring

Regional Framework Basics

Align Actions and Investments to… improve livability,

promote environmental sustainability, and meet the

demands of a changing economy.ECONOMIC ECONOMIC

DEVELOPMENDEVELOPMENT STRATEGYT STRATEGY

FRAMEWORFRAMEWORKKforfor

REGIONAL REGIONAL GROWTHGROWTH

Economic Vitality

Community

Livability

Environmental Sustainability

Page 11: NFTA Metro Route Restructuring
Page 12: NFTA Metro Route Restructuring

Key Strategic Initiative:Regional Frameworkfor Growth

Transportation Investments and Regional Framework Policy Areas Are Well Aligned

Page 13: NFTA Metro Route Restructuring

Vital Centers Strategy• Promoting investment in the region’s traditional centers of commerce, industry, and education.

Early Ideas… • Priority Areas for Public Investment• Incentives for Infill and Adaptive Reuse

Framework Plan Strategies

Page 14: NFTA Metro Route Restructuring

Why is this Important?

Good density can:

•Enhance our economic competitiveness by attracting a diverse resident base

•Reduce pressure on local budgets

•Reduce commuting time

•Protect the environment

Page 15: NFTA Metro Route Restructuring

Impact on Governmental Costs

•Declining population and expanding urbanized areas equals:

Need for new infrastructureNeed to maintain new and old infrastructureLonger average trip lengths and operating costLower densities and associated inefficiencies

•Impact on Government is fewer taxpayers, cost growth

•What does this mean for Transit Authorities?

Page 16: NFTA Metro Route Restructuring

Typical Operating Fund Sources for Authorities

Revenues and Assistance-Fees and services-Farebox-Rental income-Concessions

Local Sources-Sales Tax-Mortgage tax-88c-Local Government

State SourcesFederal Sources

Page 17: NFTA Metro Route Restructuring

Operating Revenue Sources in NFTA Budget

Page 18: NFTA Metro Route Restructuring

Urban City of Buffalo is a rich transit environment with many good corridors. More focus given to improving these corridors, attracting more choice riders. Key Improvements include: service frequencies, travel times, fleet, and facilities.

Linking city residents with suburban jobs is important for regional economyMost transit trips are for work or school/college.Need to simplify service to suburban job corridors and educational centers May require some more flexible transit options better matched to travel volumes.

Network connectivity needs to be improved. Key steps include:Improving service frequencies, use of consistent memory headways.Providing more direct links to key suburban hubs.Enhancing transfer stop facilities.

The Strategic Assessment Longer Term Region Building

Page 19: NFTA Metro Route Restructuring

•Implement ridership estimation and basic feasibility and cost benefit analysis of three high quality transit corridors that emerged as strong candidates for future major transit investment as follows: 

Airport/BroadwayAmherst/UB North CampusDelaware Avenue/Elmwood Avenue

•Initiate studies to consider various corridor transportation improvement options:

Improvements to existing, Light Rail Transit (LRT), Bus Rapid Transit (BRT), Rapid Bus, Streetcar, Commuter Rail

Next Steps in Building the Region and Transit Role

Page 20: NFTA Metro Route Restructuring
Page 21: NFTA Metro Route Restructuring

Strategic Framework Stronger Economy Stronger Authority

An updated transit service model:

•Provides structured approach to allocation of available resources to maximize system effectiveness.

•Positions transit for a greater share of overall travel demand.

•Creates a market focused network that provides services to meet the various travel needs of the community.

•Responds to both short and long term funding levels.

•Identifies key corridors as priorities for transit investment.

Page 22: NFTA Metro Route Restructuring

Beyond The Service Plan

What were other positive outcomes of the study?

•A redefinition of transit’s role in regional mobility and economic development

•Reposition transit in “city-building” and regional development

•Future proofing: preparing the region for rising fuel prices and environmental initiatives

•Develop closer links between NFTA and the community: build advocacy and ownership

Page 23: NFTA Metro Route Restructuring

Service Area

Service Type AreaService Level

Role

Core Network

Core urban area; major suburban corridors destinations

Most frequent, highest speed

Core Corridors; competitive with private vehicles

Local Transit

Core urban area; selected suburban destinations

Moderate frequencies and spans

Network coverage

Community Transit

Suburban and rural areas

Oriented to specific travel market needs

Focus on access

Page 24: NFTA Metro Route Restructuring

Buffalo Service AreaPrimary Network•Highest frequency & speed.

•Major urban corridors going to major suburban destinations.

•Key corridors w/potential for investment in additional transit service and infrastructure.

•Market focused connections between suburban centers and urban core, e.g. express services w/park& ride, reverse commute w/ last mile connections.

Page 25: NFTA Metro Route Restructuring

Buffalo Service AreaSecondary NetworkNetwork of well used local bus services augmenting the Core network.

Clock-face frequency and improved speed.

Good coordination for transfers and connections.

Page 26: NFTA Metro Route Restructuring

Buffalo Service AreaCommunity ConnectorsCommunity Circulators – Metro Link and Paratransit Service (demand response).

Special local markets (school, seniors) – “service routes” providing special trips on special routes at special times.

Reverse Commuters – “last mile” connections to dispersed destinations with hub-based van pools, employer shuttles, service routes.

Page 27: NFTA Metro Route Restructuring

Public Informational Workshop - June 9, 2009,

Public Information Meetings- March 15, 2010,- March 16, 2010- March 17, 2010- March 18, 2010- March 24, 2010

NFTA Advisory Committee on the Disabled Stakeholder Meeting - April 1, 2010 Public Hearings

- May 24, 2010- May 25, 2010- May 26, 2010- May 27, 2010

 Study information and opportunity to comment was on NFTA website throughout the study. All public workshops, information meetings and hearings were advertised in newspapers, Metro rider alerts, NFTA website and news releases

The Restructuring ProposalsCommunity Review

Page 28: NFTA Metro Route Restructuring

Metro Service Restructuring –Summary of 300 Public Comments

Primary topics of comments received from public after restructuring.

 Overcrowding during morning peak on several routes.

Reduced span of service, i.e., fewer early morning/late night trips primarily on weekends impacts ability to get to or from work.

Inconvenient connections or trip times and more transfers required.

Discontinued evening and weekend service , primarily in Cheektowaga(Route 1-William) and Lancaster(Routes 6/46 Sycamore). – Service discontinued based on low ridership and high cost/passenger..

 Discontinued service on some route segments, e.g. Route 24P-Genesee and 8B-Main.

 Positive reaction to regular frequent headways on some routes.

Page 29: NFTA Metro Route Restructuring

Metro Rail: One 6-mile corridor

Metro Bus:

• Local Bus: 42 routes

• Express Bus: 17 routes

• Metro Link Shuttles: 8 routes

Today’s System

Page 30: NFTA Metro Route Restructuring

Today’s System Metro Rail: One 6-mile corridor

Metro Bus:

• Local Bus: 42 routes

• Express Bus: 17 routes

• Metro Link Shuttles: 8 routes

Over 80 % of boardings occur in Urban Core

Page 31: NFTA Metro Route Restructuring

Study Methodologies

New network plan developed from market and service findings

•Market assessment included review of population and employment, demographics, existing rider profiles, travel patterns

•Service review included evaluation of existing system effectiveness and efficiency including detailed ridership analysis

•Both reviews identify opportunities and challenges in guiding restructuring efforts to enhance the system

Page 32: NFTA Metro Route Restructuring

Key Components of Plan

Page 33: NFTA Metro Route Restructuring

Match Services to Markets

•The urban core is an area of proven transit success

•Transit potential limited to market based services and community connectors in suburban and rural communities where private car usage is most common

The plan places great emphasis on investing in the urban core

Page 34: NFTA Metro Route Restructuring

•Significant complexity resulted from the maintenance of historic service patterns and attempting to serve too many origins and destinations in suburban and rural areas•Urban network relatively well structured, required minimal restructuring•Suburban/rural routes characterized by multiple complex route patterns with significant resources serving very low ridership•Fare structure was complicated by zone fares and transfer fees

Simplify the Network

The urban system needs to be marketed on its own strong merits

Page 35: NFTA Metro Route Restructuring

Create Spontaneous Use

Service frequencies were universally uneven, primarily for efficiency and operational reasons making system very unpredictable Even many of the strongest Metro routes had 15-minute headways only in peak periods, but they can also support 15 minute off-peak frequenciesUneven frequencies limited customer ability to use system as a network

Plan recommended developing spontaneous use frequencies in the urban network

Page 36: NFTA Metro Route Restructuring

Improve Service SpeedsSystem can increase operating speed by reducing unnecessary delay. Plan recommended investment in key corridors:

• Continue working with City of Buffalo and other municipalities to update local traffic signal systems, and add transit signal priority

• Transit priority measures at congestion points• Refine bus stop locations and spacing

Express services not very “express” (long routes, many stops)• Plan recommended intercepting passengers at expressway Park

and Rides (Next Implementation Phase)

Plan recommended developing fast & frequent transit network

Page 37: NFTA Metro Route Restructuring

Focus of improvements is on the urban core area

Metro Rail retains existing weekday service levels & expand Sunday service

15 key bus corridors upgraded to operate at 15 minute frequency during peak demand.

Additional local bus services complete urban network

Core Network – Implementation Plan

Urban• LRT• Key Enhanced

Bus Corridors (15 min. network)

• Local Bus

Page 38: NFTA Metro Route Restructuring

Core Network – Metro Rail Focus of improvements is on

the urban core area Metro Rail retains existing

weekday service levels & expand Sunday service

15 key bus corridors upgraded to operate at 15 minute frequency during peak demand

Additional local bus services complete urban network

Urban• LRT• Key Enhanced

Bus Corridors (15 min. network)

• Local Bus

Page 39: NFTA Metro Route Restructuring

Core Network – Primary Routes

Focus of improvements is on the urban core area

Metro Rail retains existing weekday service levels & expand Sunday service

15 key bus corridors upgraded to operate at 15 minute frequency during peak demand

Additional local bus services complete urban network

Urban• LRT• Key Enhanced

Bus Corridors (15 min. network)

• Local Bus

Page 40: NFTA Metro Route Restructuring

Focus of improvements is on the urban core area

Metro Rail retains existing weekday service levels & expand Sunday service

15 key bus corridors upgraded to operate at 15 minute frequency during peak demand.

Additional local bus services complete urban network

Core Network – Secondary Routes

Urban• LRT• Enhanced Bus

Corridors• Local Bus

Page 41: NFTA Metro Route Restructuring

Fare Structure Review

Fare structure easier to understand

Fare zone and zone changes eliminated

Day pass replaces bus to bus transfers

Paratransit eligible riders allowed free travel on all NFTA fixed route Metro service

Page 42: NFTA Metro Route Restructuring

Mid-Term Improvement Plan

Enhance –minute network to become 10 minute network

• Where demand warrants• Subject to increased funding

levels• Implement enhanced bus corridors

& passenger facilities at key stops

Prioritize corridors for phased implementation

Page 43: NFTA Metro Route Restructuring

Four historic major capital investment corridors and six major bus corridors reviewed for high-level transit investment, based on:

Potential future demand (population/employment)

Development potential

Comparison with peer rail or BRT system conditions

Three candidate corridor pairs emerged for detailed study

Amherst/UB North (two options)

Airport and/or Broadway

Elmwood Ave or Delaware Ave

Consider various corridor transit mode options

Light Rail Transit (LRT), Bus Rapid Transit (BRT), Rapid Bus, Streetcar, Commuter Rail

Long Term Plan (7-12yrs)

Page 44: NFTA Metro Route Restructuring

Serving the Markets: Service Hierarchy

Urban

• LRT• Enhanced Bus

Corridors• Local Bus

Suburban/Rural

• Suburban Corridors• Suburban Feeders• Partnership Routes• Employer

Shuttles/Vanpools

Page 45: NFTA Metro Route Restructuring

Was the Restructuring of Metro Service Successful?Trends, Observations and Actions

Average weekday ridership up 6.7% and productivity (riders per revenue hour) is up 7.4%.

Refinements to restructured service to improve efficiency and respond to ridership demand continues.

Improved service to suburban commercial corridors – area shopping malls. Ridership up.

Did not totally realize overall annual cost savings due to final “run” configuration.

Did not implement “ALL” recommendations due to outside forces.

Reduced ridership on express routes and productivity increased.

Customers have adjusted and/or responded to restructured service.

Page 46: NFTA Metro Route Restructuring

•Added service to alleviate overcrowding conditions on peak-period trips, late evening and early morning work trips.  

 

•Adjusted routes to make better connections.   

•Positive reaction to regular frequent headways on some routes

•Continued refinements to restructured service to improve efficiency and respond to ridership demand continues.

Customers have adjusted and/or responded to restructured service.

Was the Restructuring of Metro Service Successful?Trends, Observations and Actions

Page 47: NFTA Metro Route Restructuring

•Continue to monitor service levels and apply new service

standards to measure transit performance.•Initiate route specific marketing/awareness activities for

new service in coordination with other entities and

organizations.•Continue to grow system ridership

Next Steps