MSc BIM & Integrated DesignBIM Model Analysis in
Multidisciplinary Perspective
Presented by:Aravindh RajendiranStudent ID: @00441255
Presented to:Dr Paul CoatesDr Jason Underwood
What is BIM?It’s All about exchanging information with in the project and collaboration between all team members.
Input
DWG
Point Clouds
It’s NOT Technology
PDFDGN
BIM Design model
OutputClash detectionExtracting BOQ4D Construction Sequencing5D Cost Scheduling6D Sustainability &Energy Analysis7D Facility managementCobie spread sheet
Process/workflow
Proposed model and available informationProject Name : Residential Apartment (Pilot Project)Location : Manchester
Project information
Geometric information
Material information
Interior details
Solar Analysis
Plans, Elevations & Schedule
Manufacturer details
• http://seek.autodesk.com/
Refer :
• http://bimobject.com/en
• http://www.nationalbimlibrary.com/manufacturers
Missing information :
Structural drawings & Reinforcement details
MEP details & coordination drawings
Inconsistent found in model:• Architectural wall & column
intersection not modeled properly• Clearance between
suspended ceiling and front door
• Room spaces are not assigned properly
Clash Detection:
Hard clashes-492Tolerance-0.01m
http://www.iglc20.sdsu.edu/papers/wp-content/uploads/2012/07/13%20P%20008.pdfhttps://www.youtube.com/watch?v=gTGquTcmScU
• refers to components that are closer than a certain distance (a minimum clearance) from one another
Soft Clash: Hard clash : two objects
occupying the same spaceNo clearance
Refer :
4D: Construction Sequencing
(Eastman, et al. 2008)
http://web.stanford.edu/~fischer/research/4DCADModeling.pdf
Refer :
• allows project stakeholders to view the planned construction of a facility over time on the screen
http://www.engr.psu.edu/ae/cic/publications/techreports/tr_051_wang_2007_4d_modeling_in_education.pdf
• Improved site use planning and coordination with ongoing operations
• Marketing purposes and publicity
Benefits:
Construction Schedule
Linking into 4d software and create selection set
4D model construction sequencing & simulation
3d model4D: Construction Sequencing
5D: Cost Estimation
http://hc-qs.com/brochure/pdf/4-5%20BiM%20modelling.pdfRefer :
(HC BIM QS) • construct a model from CAD drawings, specifications and other information available
• digitally measure geometric information to produce accurate quantities
• link the quantity information with project specific Bills of Quantities and Cost Plans
• create client specific reports
Revit model/IFC model Rib Itwo/5d model tool• Link model and BOQ
Cost estimation Report
https://gbs.autodesk.com/GBS/Run?ProjectID=pLH5tTDUbhY%3d
6D: Sustainability & Energy Analysis:
Total annual Cost & Energy usage
Energy Carbon and cost summary
Refer:
Electricity & fuel use
7D:Facility management
Autodesk FM Desktop Black board salford
Refer :https://bim.wikispaces.com/Facility+Asset+Management
• involvement at early stages to improve operational performance.
CAPEX & OPEX
Real time tracking
Mosaic
http://www.openbim.org/case-studies/university-campus-facilities-management-bim-model
7D:Facility management (Benefits)
Improved space managementIntegration with
maintenance managementRefer :
http://www.ifma-afc.org/docs/submissions/2012-04-BIM.pdf
BIM collaboration in Multi Disciplinary Perspective
MV-BIM
• Upto 15% of the cost of a project is lost because of rework and avoidable collisions between trades
• Work parallel instead of linear
• Bring visibility and control to shared Information Models
• Immediately review the design progression during development and track critical decision making
Cobie: Revit model
• Type parameters & instance parameters
1.Adding Cobie information using Revit add on CTC2.Detailed Project information for Cobie
• Classification types
Element comparison
• Adding all required cobie information to the model
• Export model into industry foundation class
• Checking all cobie data information in federated model
• Export cobie data into excel spread sheet
http://www.bimprospects.com/filelibrary/Presentations%2026%20March/6-John-Sullivan.pdf
Refer :
Current Limitations and disadvantages
• Model analysis incomplete (Structural & Light analysis etc.)
• Missing information ex: STRUCTURAL, MEP which affect the analysis workflow.
• Lack of standards.
• Current Model is incomplete in Relation to “BIM”.
• Conflicts within used software's.
Recommendations for Future Improvements• Well designed BIM model in design stage.
• Multidisciplinary teams could then collaborate successfully with their project teams.
• Proper guidance & trainings before starting project.
• Information & knowledge sharing