FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

FINAL PROJECT

INTRODUCTION TO THE CONSTRUCTION INDUSTRY | QSB 30105 |

REPORT | PROPOSAL OF A POTENTIAL SITE

TAN CHIN YIN | 0320080TRACE GEW YEE | 0320269

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

CONTENT

1. INTRODUCTION

2. BENEFITS & IMPACTS OF PROJECT TO THE CLIENT & THE SURROUNDING COMMUNITY USER

3. INTRODUCTION OF SITE

4. MAP

5. SITE ANALYSIS & OBSERVATION

6. SKETCHES OF PROPOSAL

7. IMAGES OF EXAMPLE OF FOOD COURT

8. AUTHORITY PROCEDURE

9. APPROVAL FORM

10. CONCLUSION

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

1. INTRODUCTION In this final project, we are required to be grouped with two members. We have to find an empty space for a small construction, but the space is limited for 30m×30m or 30m×40m big. For this project, we also have to do a report about the small construction. The report have to require some important information which are the benefit and impact of the project, introduction of site, site analysis and observation, costing, our plans of our construction and some images of our ideas. So, for our site, we have decided to construct a food court at our site. So, we have done some research about food court.

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

2. BENEFITS & IMPACTS OF PROJECT TO THE CLIENT & THE SURROUNDING COMMUNITY USER

2.1 BENEFITS:- many choices for foodsFood court is a place where shops are opened to sell different kinds of foods. So, there would be many choices in choosing what to eat or drink

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

- convenient for nearby peopleAs there are nearby residential area, supermarket and sport’s center. Hence, it is very convenient for them to stop and eat or drink at the food court. - economical pricesOther food court sold their food in economical price. In our food court, we are also going with economical prices which are affordable for everyone to buy the foods. - save fuel from travelingIt can also help in saving fuels, as some of the people can walk or cycle to the food court and they do not need to drive to the food court.

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

2.2 IMPACTS- traffic jamAs the residential area, supermarket, sport’s center and there is even a bus stop near the food court, so it would maybe cause a bit of traffic jam on the road.

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

- no enough parking placeIf the food court becomes popular, it would cause no enough parking problems.

- worrying about some accident might happenSome future accident may also happen that we should predict.

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

- Crime rates will also increase due to the crowds of people in food court.

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

3. INTRODUCTION TO THE SITE

It’s one of 30m x 40m empty land located at Puchong Utama , Puchong , Selangor .

SEMENANJUNG MALAYSIA SELANGOR, SEMENANJUNG MALAYSIA

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

MALAYSIA

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

PUCHONG UTAMA, PUCHONG, SELANGOR

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

OUR SITE

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

4. MAP

4.1 KEY PLAN

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

4.2 LOCATION PLAN

4.3 SITE PLAN ( MAP )

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

Our site

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

SITE PLAN ( SATELITE )

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

5. SITE ANALYSIS & OBSERVATION

5.1 SITE OBSERVATION

A) SURROUNDING ELEMENTS

A. AEON BIG

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

A

B

C

D D

E

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

B. KSL SPORTS CENTRE- 38 badminton court ( largest badminton court in Malaysia )-10 Futsal court (international tournament carried out at here before )- Ping Pong service- estimated crowds every night 250 people ( average )

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

B. PUCHONG UTAMA BUS STATION- the only bus station in Puchong- several bus stops around Puchong Utama

C. PUCHONG UTAMA RESIDENTIAL AREA

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

Our Site

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

- population around 50,000- Taman Mas- Taman Maju Jaya- Taman Meranti Jaya - Bandar Bukit Puchong- Kampung Seri Aman-Taman Puchong Utama(Most of the residents’ daily route are the main road which is entrance from LDP to food court )

E. Commercial area- 4 rows of commercial block- Mix offices

5.2 CIRCULATION

- 2 lane of 2 way main road to enter food court

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

Food Court

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

I. FROM SURROUNDING TO FOOD COURT

A) Local residents

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

Food Court

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

Explanation of circulation :

Local residents normal comes from the south point of Puchong Utama, because the residential areas in Puchong Utama are more further from the LDP( Lebuhraya Damansara-Puchong ) to the food court.Residents in Taman Maju Jaya normally come from the West road .The main road for Puchong Utama residents is very important,because that is the only way the can exit via main road to LDP.Therefore , our food court located right next to the main road is easily been seen by the residents.

B) Non-local residents

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

Main road

High way

Main road

N

West Road

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

Explanation of circulation :

Non-local residents normally enter from LDP(Lebuhraya Damansara-Puchong) to the main road , after that turn left into Jalan Puchong Utama 3. The food court is located on their right hand side.

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

C) Bus route

Explanation of circulation :This is the only bus staion in Puchong. This is also the end of the bus route, bus’s driver normally rest at here before starts their new journey.There are several bus route surround Puchong Utama, which is surround the food court as well.Although the bus does not stop right infront of food court , but the bus stop infront of KSL sports center and on the left of the Aeon big. People can just walk within 2 minutes from the Bus station.The buses bring their passenger pass thru food court and stops at bus station, we think the drivers and passengers from the buses will mostly visited food court , if they want to have a meal.

II. EXIT FROM FOOD COURT

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

Bus Station

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

Explanation of circulation : The exit from food court is at the back. Visitors from food court exit via the main road to their own destination.

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

Food Court

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

6. SKETCH PLAN OF PROPOSAL

6.1 FLOOR PLAN

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

6.2 FRONT ELEVATION

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

6.2 SIDE ELEVATION

7. IMAGES OF EXAMPLE OF FOOD COURT

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

8. AUTHORITY PROCEDURE

PUSAT SETEMPAT (OSC)MAJLIS PERBANDARAN SUBANG JAYA (MPSJ)

Persiaran Perpaduan USJ 5,47610 Subang Jaya,

Selangor Darul Ehsan.Tel : 03 – 8026 3131Fax : 03 – 8026 3295

Web : www.mpsj.gov.my

No. Ruj. OSC : MPSJ /____ /_____No. Ruj. OSC terdahulu (jika ada) :_____________________________Tarikh Daftar : _____________________________Masa : _____________________________

Jenis permohonan yang dikemukakan :-

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

1) Permohonan Kelulusan Pelan Bangunan bagi Skim Perumahan dan Bangunan Perusahaan/ Perniagaan / Kemudahan Awam / Bangunan Ibadat Bukan Islam / Rumah Sesebuah / Rumah Berkembar.Kategori Permohonan : a) Permohonan secara Konvensional b) Permohonan Serentak (KM, KT & INFRA, PB) c) Permohonan Serentak (KT & INFRA , PB)

SENARAI SEMAK PENERIMAAN DOKUMEN BAGI PERMOHONAN PELAN BANGUNANTajuk Permohonan : ......................................................................................................................................................................... ................................................................................................................................................................................ ................................................................................................................................................................................ ................................................................................................................................................................................ ............................................................................................................................................................................... ................................................................................................................................................................................ ..............................................................................................................................................................................Pemilik / Pemaju : ..........................................................................................................................................................................Alamat Pemilik/Pemaju : .......................................................................................................................................................................... .......................................................................................................................................................................... ................................................................................................................................................................................Tel. & Fax : ..........................................................................................................................................................................Perunding : ..........................................................................................................................................................................Alamat Perunding : .......................................................................................................................................................................... ................................................................................................................................................................................. .................................................................................................................................................................................Tel. & Fax : ..........................................................................................................................................................................Nama : ..........................................................................................................................................................................

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

Perakuan Pemohon/Perunding:Saya bagi pihak Pemohon/Perunding dengan ini membuat perakuan bahawa semua dokumen-dokumen yang disertakan adalah

benar serta mematuhi keperluan permohonan pembangunan di Majlis Perbandaran Subang Jaya (MPSJ)

MAKLUMANSelaras dengan Pekeliling Ketua Setiusaha Kementerian Perumahan dan Kerajaan Tempatan bilangan 5 Tahun 2009 (rujukan

KPKT(02)799/6 Klt.8(24) – Template Seragam Senarai Semak Dokumen Dan Senarai Semak Semak Terperinci Agensi Teknikal Luaran Untuk

Proses Kelulusan Pemajuan Melalui Pusat Setempat (OSC) bertarikh 6hb Mei 2009, pemakaian template ini dikuatkuasakan penggunaannya

mulai 1hb Mei 2011. Sebarang pertanyaan dan penjelasan lanjut berhubung pekeliling ini boleh dikemukakan kepada:

KETUA PENGARAHJabatan Kerajaan Tempatan

Kementerian Perumahan & Kerajaan TempatanAras 4, Blok K, Pusat Bandara Damansara,

50782 Kuala Lumpur (u.p.: Bahagian Penyelidikan dan Perundangan Teknikal)

No. Telefon : 03-20947033 / 2087 4501No. Fax : 03-2095 5180 / 2095 3717

Sebarang pertanyaan dan penjelasan lanjut berhubung Senarai Semak dan perinciannya, sila hubungi agensi / jabatan teknikal yang berkaitan.

.......................…………………………….Nama, Tandatangan & Cop Pemohon /

Perunding.......................…………………………….

Nama, Tandatangan & Cop Pegawai OSC 1

.......................…………………………….Nama, Tandatangan & Cop Pegawai OSC 2

Tarikh : …………………… Tarikh : ……………………… Tarikh : ……………………..

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

9 . APPROVAL FORM

MPSJ.RK.KPT(OSC)-07PINDAAN: 01

TARIKH KUATKUASA : 01 MEI 2014

KERAJAAN MALAYSIAJABATAN KERAJAAN TEMPATAN

KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATANPERSIARAN PERPADUAN USJ 5,

47610 SUBANG JAYA, SELANGOR DARUL EHSAN.

TEL : 03 – 8026 3131 FAX : 03 – 8026 3295

WEB : www.mpsj.gov.myFEBRUARI 2013

HAKCIPTA TERPELIHARASENARAI SEMAK DOKUMEN DAN SENARAI

SEMAK TERPERINCI AGENSI TEKNIKAL DALAMAN DAN LUARAN

(PELAN BANGUNAN BARU/SERENTAK)

MAJLIS PERBANDARAN SUBANG JAYA(MPSJ)PERSIARAN PERPADUAN USJ 5,

47610 SUBANG JAYA, SELANGOR DARUL EHSAN.

TEL : 03 – 8026 3131 FAX : 03 – 8026 3295

WEB : www.mpsj.gov.my

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269

FNBE AUG 2014 | INTRO TO CONSTRUCTION INDUSTRY | FINAL PROJECT | SITE PROPOSAL

10. CONCLUSION

In this 40m x 30m proposal of a food court, with solemn consideration from many aspects. We can say that pros of present of this building are much more than the cons. The main reason we say so is because of the surrounding elements. With these helps from the surrounding elements , our proposal of food court is about to say 99% success of percentage out of 100% , therefore developer should accept this proposal without much hesitation.

The reason why it is still empty now, in our opinion are the landowner want to keep it or lent to others but not self develope as the landowner may have a thought of this very potential land may bring him more benefits in the future.

TAN CHIN YIN | 0320080 | TRACE GEW YEE | 0320269