34

Manila rivercity residences june 2012

Embed Size (px)

DESCRIPTION

Live, Love Where the River Flows

Citation preview

Page 1: Manila rivercity residences june 2012
Page 2: Manila rivercity residences june 2012

Welcometo your

New HOME

Page 3: Manila rivercity residences june 2012

Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River.

Project lot area composed of 14,000 square meters with 62 percent of the area allotted for roads, landscaped areas and amenities such as playground, swimming pool , and water-featured landscapes.

Comprised of 9 buildings ranging from 10 – 14 floors.

Page 4: Manila rivercity residences june 2012

LOCATION MAP

Page 5: Manila rivercity residences june 2012

• Along the historic and scenic banks of Pasig River in Sta. Ana, Manila

• Surrounded by the nation’s busiest economic centers of Makati, San Juan, Mandaluyong and Manila

• Close to school areas

• Accessible to public transportation

LOCATION

Page 6: Manila rivercity residences june 2012

SITE DEVELOPMENT

Page 7: Manila rivercity residences june 2012

SITE DEVELOPMENT

PROPOSED SITE DEVELOPMENT @REAR PORTION OF YANGTZE BUILDING

FRONTING PASIG RIVER

Page 8: Manila rivercity residences june 2012

AMENITIES

Page 9: Manila rivercity residences june 2012

SITE FEATURES

Proposed environment friendly features:

• Solar Panel

• Rain water catch basin

• Waste segregation• Landscaped Park• Pavillion• Water featured landscaping

Page 10: Manila rivercity residences june 2012

YANGTZE BUILDING

Page 11: Manila rivercity residences june 2012

BUILDING FEATURES

• Elevator• 1.5 meter-wide corridors• Roof deck with landing area• Service stairs• Overhead tanks with water pump• Standby generator for common areas

Page 12: Manila rivercity residences june 2012

TYPICAL FLOORPLAN

YANGTZE BUILDING

Page 13: Manila rivercity residences june 2012

TYPICAL FLOORPLAN

YANGTZE BUILDING

Page 14: Manila rivercity residences june 2012

TYPICAL FLOORPLAN

YANGTZE BUILDING

Page 15: Manila rivercity residences june 2012

UNIT FINISHES

• RESIDENTIAL AREA

A. Floor Finishes

Living, Dining & Kitchen Vinyl Planks

Bedrooms Vinyl Planks

Toilet Unglazed ceramic tiles

Utility Area Plain cement finish

B. Wall Finishes No partition walls for bedroom/s

Interior walls 1-coat paint on concrete walls

Toilet 1-coat plain cement finish above tile

Page 16: Manila rivercity residences june 2012

UNIT FINISHES

C. Ceiling Finishes

Living, Dining & Kitchen 1-coat paint on plain cement finish

Bedrooms 1-coat paint on plain cement finish

Toilet 1-coat paint on ficem board finish

D. KitchenKitchen counter top with sink & faucet. Under counter cabinet door & overhead cabinet are not included.

E. Door Entrance &

Bedroom door Solid finger jointed wood with sheet

laminated and solid wood core door

jambs plus casing

F. Windows Aluminum windows

Page 17: Manila rivercity residences june 2012

UNIT FINISHES

G. Finishing Hardware Cylindrical lockset for main

Privacy lockset for T & B door.

H. Toilet & Kitchen Fixtures

Water and Closet Lavatory Complete set of water closet and

lavatory with fittings & accessories.

Shower faucet Complete set of shower with faucet

and fittings.

I. Electricity Complete outlet and lighting devices

with circuit breaker.

Page 18: Manila rivercity residences june 2012

UNIT FINISHES

Page 19: Manila rivercity residences june 2012

TYPICAL UNIT FLOOR PLAN

Page 20: Manila rivercity residences june 2012

TYPICAL UNIT FLOOR PLAN

Page 21: Manila rivercity residences june 2012

TYPICAL UNIT FLOOR PLAN

Page 22: Manila rivercity residences june 2012

TYPICAL UNIT FLOOR PLAN

Page 23: Manila rivercity residences june 2012

TYPICAL UNIT FLOOR PLAN

Page 24: Manila rivercity residences june 2012

AFFORDABILITY

• As low as PHP 1.1M for a studio unit• As low as PHP6,000 per month• Flexible payment scheme (down payment –

payable up to 24 months; balance – payable up to 30 years through Pag-IBIG)

• Available financing through in-house, bank or Pag-IBIG

Page 25: Manila rivercity residences june 2012

CERTIFICATE & PERMIT

Page 26: Manila rivercity residences june 2012

ConstructionUpdates

Page 27: Manila rivercity residences june 2012

COLORADO TOWER

HALLWAY BEDROOM

Page 28: Manila rivercity residences june 2012

COLORADO TOWER

T&B TILING ELEVATOR KITCHEN CABINET

Page 29: Manila rivercity residences june 2012

COLORADO TOWER

STAIR RAILING

TRANSFORMER VAULT ROOM

PARKING

Page 30: Manila rivercity residences june 2012

COLORADO TOWER

PARKING ENTRANCE TRANSFORMER

Page 31: Manila rivercity residences june 2012

EUPHRATES TOWER

Tiling worksat Hallway

Painting works on walls & ceiling

Installationof Main Doors

Page 32: Manila rivercity residences june 2012

MRR PAVILLION

Painting works

Page 33: Manila rivercity residences june 2012

RHINE BUILDING

Page 34: Manila rivercity residences june 2012