22
2007 Fall Simulation Interoperability Workshop VV&A Forum GMV&V PDG Status Overview Ad van Lier / Manfred Roza 1

4 Pdg Gmvv Vv&A Forum Status Update New

Embed Size (px)

Citation preview

Page 1: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

VV&A ForumGMV&V PDG Status Overview

Ad van Lier / Manfred Roza

1

Page 2: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Outline

1. A brief peek on SISO BPDSP and GMV&V

2. GMV&V current status

3. PDG organisation

4. Product development schedule and status

5. Product scope

Page 3: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

SISO Product Types

• Balloted Products

• Standards

• Guidance

• Non-balloted Products

• Reference

• Administrative

What we want to produce

3

Page 4: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

ProductNomination

ActivityApproved

ProductDevelopment

ProductBalloting

ProductApproval

Interpretation ,Distribution &ConfigurationManagement

PeriodicReview

Input Process Output

Sponsor

Approved Product Nomination

1. PDG Infrastructure2. Draft Product

1. Balloting Group2. Balloting Results3. Balloted Product

1. EXCOM Approval2. SISO Product3. PSG TOR

1. Interpretations2. Problem /Change DB3. Product Support

1. Product Nomination2. Product Reaffirmed3. Product Withdrawn

Product Development Group Product Support Group

BPDSP Six Step Process

Step 2:

We Are Here!

4

Page 5: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

BPDSP Step 2: Product Development

• Launch development activity

• PDG elects Chair, Vice Chair, Secretary

• Establish Drafting Group

• Establish and maintain development schedule

• Produce the product or product component• Reference Manual (1st draft available for comment)

• Users Manual (1st draft available for comment)

• Technical Notes (DG in concept)

• Recommended Practice Guides (DG in concept)

• Monitor & control PDG activities

• Submit draft product to SAC and EXCOM for 'Approval to Ballot’

Spring 07meeting

5

Fall 07Fall 07meetingmeeting

Page 6: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

SG - PDG present state

• SG PN submitted Fall 06

• EXCOM / SAC approved PDG status March 07

• Spring 07 SIW kick-off meeting

• Kick-off used to assign roles and responsibilities for PDG officers and DG

• Elected officers/assigned roles:

• Chair : Ad VAN LIER

• Vice Chair : Simone YOUNGBLOOD

• Secretary : Tony MASYS

• Chair DG (E) : Rene JACQUART

• SAC TAD : Bob ELLIOTT

6

Page 7: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Present Drafting Group member

• Newly volunteered Spring 07:

• Scott HARMON

• Mike METZ

• Marcy STUTZMAN

• Simone YOUNGBLOOD

• Previously submitted names:

• Pierre BOUC

• Colin BRAIN

• Stephane CHAIGNEAU

• Lars HORN

• Rene JACQUART

• Tony MASYS

• Jorgen MOTH

• Sten-Ake NILSSON

• Manfred ROZA

• Pernilla SVAN

• Martijn VAN EMMERIK

• Edwin VAN VELDHOVEN

• Jeroen VOOGD

7

Page 8: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Drafting Group Organisation

ODD

WP 1

WP 2

WP 3

WP 4

WP 5

WE 2.1

WE 2.2

GMV&V Draft Evaluation

2006 2008/9

REVVA

DG’s

Draft submitted

SISO Community

8

Page 9: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

PDG Organization

• Complies to the SISO Operating Principles, documented in the Policies & Procedures document, section 5

• Dedicated DG’s delegated to the DGE for each baseline document (who does what?)

• Follows a staged process where:

• DG drafts will be evaluated internally before being submitted to the SISO community

• A File library will be maintained, storing progress & and products

• SISO evaluation and feedback sessions will be documented using the reflector and

• face to face meetings during PDG sessions are held at SIW’s using mechanisms like Robert’s Rules of Order and SISO regulations such as voting rules conforming to the BSDP

• After draft completion: Start of Balloting within SISO

9

Page 10: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Drafting group core (to be completed)

• Rene JACQUART (DG Chair/DGE)

• Manfred ROZA Pierre BOUC

• Constantinos GIANNOULIS Stephane CHAIGNEAU

• Constantinos GIANNOULIS (DGE)

• Manfred ROZA

• Rene JACQUART

• Manfred ROZA (DGE)

• Edwin VAN VELDHOVEN Constantinos GIANNOULIS

• Jeroen VOOGD Tony MASYS

• Manfred ROZA (DGE)

• Edwin VAN VELDHOVEN Constantinos GIANNOULIS

• Colin BRAIN Tony MASYS

• Jeroen VOOGD

10

Page 11: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Supporting activities

• Tony MASYS (MALO case study Leader)

• Martijn VAN EMMERIK

• Colin BRAIN

• AEGIS company

• Stephane CHAIGNEAU (NBC case study leader)

• Jeroen VOOGD

• Rene JACQUART

• Sten-Ake NILSSON

• Martijn VAN EMMERIK (DGE Training Kit)

• Colin BRAIN

• Tony MASYS

• Jorgen MOTH (REVVA web master)

11

Page 12: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Planned product development schedule

SISO

Drafting group

SIWEuroSIW

SIW SIWEuroSIW

SIW SIWEuroSIW

SIW

RefMan

C

UserMan

C

RPGC

Scope,

Timeframe,

expected Outcomes

04 07

RefMan

CUserMan

C

01

Ballotingphase

Feedbackto SISOReport

RefManD2

UserManD2

TN

07

RPGD1 C

C

Report

C

RefManD2

UserMan

F

RefMan

F

UserMan

F

RPGF

RefMan

F

RPGFC

RPGD2

RefManD3

RefManDraftD3

RPGD2

03

UserManD2

C

C

UserManD3

UserManD3

C

RefManD1

UserManD1

RPGC

RefManD1

RPGD1

09 11

2007

Page 13: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Current development status

• RefMan:

• 1st draft delivered prior EURO SIW 07 (on schedule)

• UserMan:

• In concept, 1st draft delivered prior Fall SIW 07

• RPG’s:

• Identified, concept versions available

• TN’s:

• Identified, concept versions available

• Case studies:

• MALO: steady progress, expected results end of year

• NBC: specification of the ToA for one application context

• Dissemination:

• Web-site up & running

• Draft training available (presented at ITEC May 07)

Page 14: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

GMV&V Product Structure & Scope

RefMan

Why? What? For whom?

RationaleDefinitionsConceptsComponents

How? When? Who?

RolesResponsibilitiesProcessActivities

Method Basics& Architecture

Method Utilisation & Deployment

Specific Task oriented

Specific Product oriented

Method Implementation& Execution

Detailed DescriptionParticular ActivitiesParts of ProcessSpecific Roles

Product SpecificationTechniques Tools

UserMan

RPG

TN

Page 15: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Introduction

Overview

Methodology Rationale

Conceptual Tools

Methodology Components

Requirements for Compliance

Glossary

GMV&V Reference Manual Scope

Reference ManualPresentation

Reference Manual

Page 16: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Introduction

Overview

VV&A Project Issues

Organization

Activities

Tailoring

Project assessment & return on experience

GMV&V User Manual Scope

User ManualPresentation

User Manual

Page 17: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

GMV&V Technical Notes Scope

TN’s

Introduction

Product Overview

Product Specification

DIF – Template

Report Structure

Page 18: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

GMV&V RPG’s Scope

RPG’s

Introduction

High-Level Activity Overview

Sub-Task Specification

Transversal Sub-Tasks

Tailoring & Tools Guidance

Page 19: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

MALO Case study interim results

• Check here on MALO presentations

Page 20: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Results of PDG Fall 07

• 1st Draft Refman

• Comments statistics

• Etc.

• 1st draft Usersman

• Comments statistics

• Etc.

• Number of attendees

• New volunteers DG

Page 21: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Near future planning & activities

• Reschedule products

• New draft versions

• Other product release dates, etc

Page 22: 4 Pdg Gmvv Vv&A Forum Status Update New

2007 Fall Simulation Interoperability Workshop

Questions

22