Upload
mediehuset-ingenioren-live
View
195
Download
8
Tags:
Embed Size (px)
DESCRIPTION
The intelligent datacenter DCIM – how can the functions in the datacenter be automated?
Citation preview
DCIM as a key part of energy efficient data centre strategy
David Palmer-Stevens
Channel Enablement EMEA
Technology drivers for TIA 942
TIA/EIA 568 Copper & Fiber Cabling
TIA/EIA 569 Pathways/Spaces
TIA/EIA 606Administration
TIA/EIA 607Grounding/Bonding
Uptime Institute
IEEE 1100 ITE Grounding
ASHRAECooling/HVAC
ANSI/TIA-942Telecommunications Infrastructure
Standard for Data Centers
Ashrea : 68% air by passes the IT equipmentUPTIME Institute : 55% of IT equipment failure is Thermal
CFD lets you see Airflow.
Todays Data Centers need to be built for VARIABLE LOADS
Motivation to Measure
Data Center Budget
OPEXCAPEXServices
OPEX is eating the PIE
Squeezing Margin
Squeezing Maintenance
Squeezing Services
04/09/2023
Get the basics right FIRST
The wrong Cabinet can cost you > $500 / Annum/Cabinet in OPEX
04/09/2023
Cisco and EMC pioneered Pre-configured
SwitchStorageServers
Pre-Configured Air flow
Data Center DesignLogical and Physical Dimension
Logicalto Physical
Thermal Labs
Wind Tunnel
IT equipment deployment analysed from low to max capacity to international specifications
Data Centre Deployment Proved
Containment
Hot/Cold Isle
DCIM
Best Practice deployment of Nexus , UCS and MDS
- CQSFSD79
13
• Panduit Equipment – 700mm Dynamic Cabinet with Side Panels– Shock Pallet with Ramp– Cable Management– Grounding and Bonding– Cable Kits to Support Servers, Fabric Interconnects,
Switches, Virtual Service Appliances, and Disk Controller. Includes Turn-Tell Labels
• Storage (not included)– (1) NetApp FAS3210 Disk Controller– (2) NetApp DS2246 SAS Shelves
• Cisco Unified Fabric (not included)– (2) Nexus 5548– (2) Nexus 1010 & 1000V
• Compute (not included)– (2) UCS 6120 Fabric Interconnects– (1) UCS 5108 Chassis– (2) UCS 2104 Fabric Extenders– (Up to 8) Blade Servers
Panduit Saves 10 to 20 Hours on EVERY Fulfillment
IDC Research: VCE customer results
• 5X FASTER speed to deployment– From 5 weeks to 1 week
• 4X LESS staff resource time to configure and deploy• 83X BETTER availability
– From 71 hours to 51 minutes of server downtime per year
• 3X LOWER cost per user– From $1304 to $472
*IDC White Paper, April 2012, Case Studies of 5 VCE customers
SPACE – How to get more 35%-50%
COOLING –Focused on Air flow and containment issues saving 23%-40% of cooling costs
POWER – Rack and Cabinet level
CABLING- the 1-10 - 40 -100 migration
GROUNDING – electrical assessment
PUE – Assessing and measuring
Panduit can remove Barriers
DCIM automates this physical task
04/09/2023
Data Center Automation
Asset Lifecycle Management
Chargeback and Accounting
Business Impact / Service Level Management
Smart Data Centers
Data Centre Infrastructure Management
ITIL compliancePhysical Location trackingPowerEnvironment
Line of Business
ITIL Processes
Platform
DCIM
Energy Dashboard ENV-3 Software Dashboard
Power Monitoring
Collects Power Data -- Sends to RacKMS and
Energy Management Software
Thermal MonitoringCollects Thermal &
Environmental Data & Sends to DCIM Software
GatewayCollects Data & Sends to Energy
Management Software
Low entry costNo training intuitiveNo risk non intrusive
DCIM easy start ONE Cabinet
Rack Energy Kits
New Build or Brown Field
IP LAN Connection
CL-AMP Patch Cord-Serial Data
Temperature SensorsPatch Cord
Simplicity no need for training
Zone 1: Billing Reconciliation – Monitors the building utility metering “Point of Entry”, providing power, oil, water, and gas consumption information and CO2 emissions.
6
Zone 6: Device Level Monitoring – Automated connectivity patch field management, as well as monitoring and control of per outlet or device power, within a data center or enterprise.
Zone 2: Switchboard Distribution Board - Monitors sub meters at the main distribution board for DC related equipment.
Zone 3: Plant Equipment - Distributed monitoring of supporting facility services, including individual chillers, AHU, CRAC, UPS and lighting circuits.
Zone 4: Branch Circuit Monitoring of Data Hall – Focuses on monitoring of total rack or cabinet IT loads and environmentals.
5
Zone 5: Rack & Cabinet Level Monitoring – Intelligent monitoring and control of power, environmental, and cabinet level security in addition to DCIM level asset tracking and capacity planning for the data center and enterprise.
12
3
4
Smart Zone DCIM
Toucan House last 24 hoursLast Update 29/11/2012 11:58:30
Curl HouseRedbill House Sparrow House
04/09/2023
Baltic Sea Anomaly
04/09/2023
Star Child
Cisco ConfidentialCisco Confidential 24© 2011 Cisco and/or its affiliates. All rights reserved.
building a smarter, unified business foundationwww.panduit.com