What Your Schedule Isn’t Telling You John Owen, Product Manager, Deltek Kim Koster, Product Marketing, Deltek GC-442

Deltek Insight 2012: What Your Schedule Isn't Telling You

  • Upload
    deltek

  • View
    226

  • Download
    1

Embed Size (px)

DESCRIPTION

Have you ever made safe assumptions on your schedule only to be halfway through the project and realize that it is not executing as planned and the resources needed to execute are not available? Join this session to learn the three things you can add to your project schedule to make them more valuable than you ever thought possible. Learn secrets from top aerospace and defense contractors as well as top IT organizations that will make your project teams more productive -- and give the project manager the critical information needed to successfully manage the project with confidence. Beginner Level.

Citation preview

Page 1: Deltek Insight 2012: What Your Schedule Isn't Telling You

What Your Schedule Isn’t Telling You

John Owen, Product Manager, DeltekKim Koster, Product Marketing, DeltekGC-442

Page 2: Deltek Insight 2012: What Your Schedule Isn't Telling You

Can we deliver on

time?

Do I have the right

information?

Is our Status Right?

Have I covered my

risks?

Can I answer my boss’s questions?

Do These Issues Keep You Awake?

2 ©2012 Deltek, Inc. All Rights Reserved

Page 3: Deltek Insight 2012: What Your Schedule Isn't Telling You

You Are Not Alone - Consistent Problems Managing Programs

3 ©2012 Deltek, Inc. All Rights Reserved

Page 4: Deltek Insight 2012: What Your Schedule Isn't Telling You

The Culprit: Siloed Systems & Disconnected Processes

4 ©2012 Deltek, Inc. All Rights Reserved

ScheduleManagement

Resource Management

Cost Management

Analytics

ERP

RIOManagement

What’s the new revenue

forecast?

Are we profitable

yet?

Deliveries are

impacted!

Customer Support

not notified of risk

Alert email sent

Schedule updated

Schedule impacted EAC

impacts - overruns

Risk identified

DisconnectedBusiness Processes

Need forExecutive-Level Reports

Disparate Systems & Components

Manual reports

generated

Page 5: Deltek Insight 2012: What Your Schedule Isn't Telling You

The Solution = Integrated Program Management (IPM)

“Provides tracking and predictive information on the status of a program or project enabling sound decision making.”

Manage Profit

Reduce Surprises

Increase Predictability

Plan Analyze MonitorOne

Integrated System

5 ©2012 Deltek, Inc. All Rights Reserved

Page 6: Deltek Insight 2012: What Your Schedule Isn't Telling You

6 ©2012 Deltek, Inc. All Rights Reserved

What is Integrated Program Management (IPM)?

Risk Management

Baseline Control

Change Control

Progress Reporting

Cost/Schedule Management

IPM

The integration and execution of complex projects or programs

Page 7: Deltek Insight 2012: What Your Schedule Isn't Telling You

7 ©2012 Deltek, Inc. All Rights Reserved

The Project Schedule is the basis for project control and visibility.

The schedule is NO longer considered a back office tool but a document that gives the PM all the needed data and information about the project.

The DOD has also recognized the importance of the schedule as many contracts have a formal DID.

Cost Schedule Integration is an ANSI 748 requirement.

Plan, Plan, Plan…Then Plan Some More

“PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2010 Permission is granted to PMI for PMI® Marketplace use only

Page 8: Deltek Insight 2012: What Your Schedule Isn't Telling You

8 ©2012 Deltek, Inc. All Rights Reserved

The Overall Architecture of Your Project Make sure your schedule is coded with the following:

Integrated Master Plan (IMP) IDs Work Breakdown Structure (WBS) Cost Breakdown Structure (CBS) Organizational Breakdown Structure (OBS) Resource Breakdown Structure (RBS)

Item #1 to Add to Your Schedule

Page 9: Deltek Insight 2012: What Your Schedule Isn't Telling You

9 ©2012 Deltek, Inc. All Rights Reserved

Increased Visibility and Control

Assures that entire scope is covered in your schedule

Gives all members of the project team as well as executives access to the data that interests them

Provides basis for robust reporting for CAM, IPTs, and the overall project team

The coding becomes the integration point for the cost management and resource management system

The upfront effort to code the schedule and keep it up to date will pay off in efficiency and accurate reporting

Value of Project Architecture

Page 10: Deltek Insight 2012: What Your Schedule Isn't Telling You

10 ©2012 Deltek, Inc. All Rights Reserved

Example of a Coded Report

Page 11: Deltek Insight 2012: What Your Schedule Isn't Telling You

11 ©2012 Deltek, Inc. All Rights Reserved

Load Resources Associated with Each Task Resource loading schedules is a BEST PRACTICE Load your Resource Breakdown Structure into your schedule and use

it for your: Baseline Plan

Forecasted Plan – work remaining

What-If Scenarios

Item #2 to Add to Your Schedule

Page 12: Deltek Insight 2012: What Your Schedule Isn't Telling You

12 ©2012 Deltek, Inc. All Rights Reserved

Increased efficiency – resources and coding provides basis for automated cost/schedule integration

Schedule driving the cost Cost is in the right time periods

Resource utilization visible on your project or across projects

Reports and graphs are available for all levels of the organization

What-if analysis that includes both cost and schedule

Value of Resource Loaded Schedules

Page 13: Deltek Insight 2012: What Your Schedule Isn't Telling You

13 ©2012 Deltek, Inc. All Rights Reserved

Example of Resource Loading an Activity

Page 14: Deltek Insight 2012: What Your Schedule Isn't Telling You

14 ©2012 Deltek, Inc. All Rights Reserved

Example of Resource Capacity Planning

Page 15: Deltek Insight 2012: What Your Schedule Isn't Telling You

15 ©2012 Deltek, Inc. All Rights Reserved

Example of Resource Utilization by Employee

Page 16: Deltek Insight 2012: What Your Schedule Isn't Telling You

16 ©2012 Deltek, Inc. All Rights Reserved

Example of Resource Utilization by Project

Page 17: Deltek Insight 2012: What Your Schedule Isn't Telling You

17 ©2012 Deltek, Inc. All Rights Reserved

Decide what method of resource loading is right for your project type

Basic project planning (Time) Activities and tasks are logic based Activities are tied together and adjust to update of forecasted dates Resources move in concert with the updated status Most widely used method

Item #3 to Add to Your Schedule

Page 18: Deltek Insight 2012: What Your Schedule Isn't Telling You

18 ©2012 Deltek, Inc. All Rights Reserved

Example of Project Scheduling

Activity 1

Activity 2

Activity 3

Resource 1

Resource 2

Resource 1

Time

Page 19: Deltek Insight 2012: What Your Schedule Isn't Telling You

19 ©2012 Deltek, Inc. All Rights Reserved

Resource Leveling Finite Scheduling Utilize a common resource pool Analyze resource demand (people and material) across a project or

multiple projects Tools today have algorithms that will allow the scheduling tool to

analyze and resolve resource conflicts Typically used in a manufacturing environment or a T&M contract

where resources drive the schedule.

Item #3 to Add to Your Schedule

Page 20: Deltek Insight 2012: What Your Schedule Isn't Telling You

20 ©2012 Deltek, Inc. All Rights Reserved

Example of Finite Scheduling

Resource 1

Resource 2

Resource 3

Activity 1 Activity 4 Activity 5

Time

Activity 2 Activity 3 Activity 6

Activity 7 Activity 8 Activity 9

Page 21: Deltek Insight 2012: What Your Schedule Isn't Telling You

21 ©2012 Deltek, Inc. All Rights Reserved

Basis for Cost/Schedule Integration so that your schedule and cost management system are in lock-step

Reports and graphs against all levels of the project structure allowing everyone to understand the status.

Understanding of resource planning and utilization for the project or the enterprise.

3 Things Your Schedule Should Give You