It is important for buildings to be designed with end-users in mind. All too often, buildings end up being over-complicated and occupants don't fully understand how to operate them; how to get the best performance from their property; and don't fully appreciate the importance of scheduling proper maintenance of technologies and systems.

Citation preview

Page 1: Getting technical installations, operations and maintenance

Getting Technical Installations, Operations and Maintenance

Right

Ian Orme

01344 465620

Page 2: Getting technical installations, operations and maintenance

2Making buildings better

Getting Technical Installations, Operations and Maintenance Right

• Design Intent– Energy Strategy

• Innovative Systems– Complexity

• Controls– Usability

• Commissioning and handover• Recommendations

– Soft Landings principles

Page 3: Getting technical installations, operations and maintenance

3Making buildings better

Design Intent

• Energy Strategy– Planning requirements; CSH standards inform targets– Should inform construction methods; materials and systems

selected– Design process should integrate fabric performance;

building services and operation– Controls for heating, hot water and ventilation systems

should be part of the detailed design process– Strategy should be documented to enable communication

Page 4: Getting technical installations, operations and maintenance

4Making buildings better

Innovative Systems

• Energy assessment can be complex and limited by assessment processes

• Challenging energy targets can drive complexity of systems• Procurement processes may not fully establish capability of

supply chain– Limited way to demonstrate expertise and experience

• Expectation of performance based on component testing rather than system performance

• Documentation of design and integration of systems

Page 5: Getting technical installations, operations and maintenance

5Making buildings better

System Controls• Accessibility• Usability

– Clarity of purpose– Intuitive switching– Usefulness of labelling and

annotation– Ease of use– Indication of system

response– Degree of fine control

• Check lists for design

Page 6: Getting technical installations, operations and maintenance

6Making buildings better

Commissioning• Procedures

– Integration of operation of systems• Limited experience in domestic sector, but much greater

experience in the non-domestic sector– Installer experience

• Documentation of processes and results– Requirements for Building Control and As-built SAP

calculations• TSB Building Performance Evaluation findings highlight

difficulties particularly around innovative systems

Page 7: Getting technical installations, operations and maintenance

7Making buildings better

Handover

• Provide specific instructions, not manufacturers installation guidance

• Guidance provided often too technical and complex• Focus on illustrations and ‘plain English’• Face-to-face demonstrations with follow up visit

– Occupant demonstration of controls use– Training of advisors

• Include guidance on maintenance and energy efficient operation– MVHR filters

Page 8: Getting technical installations, operations and maintenance

8Making buildings better

Soft Landings Framework

Five stage Process:• Stage 1: Inception and briefing Clarify operational outcomes

in the client’s requirements Stage 2: Design development & construction Review past

experience, agree performance metrics, agree design targets, regularly reality-check

Stage 3: Pre-handover Prepare for occupation, train FM staff, demonstrate control systems, review monitoring strategy of occupants and energy use

Page 9: Getting technical installations, operations and maintenance

9Making buildings better

Soft Landings Framework

Stage 4: Initial aftercare Support staff in first few weeks of occupation, be resident on site to respond to queries and react to emerging issues

Stage 5: Long term aftercare Monitor, review, fine-tune, and perform periodic feedback studies for up to three years to reach performance targets

Page 10: Getting technical installations, operations and maintenance

10Making buildings better

Moving Forward• Develop an energy strategy to meet agreed energy

targets• Establish who is responsible for the energy

performance• Consider utilising a Soft Landings approach• Integration of fabric and building services design• Commission systems and document the findings

Page 11: Getting technical installations, operations and maintenance

11Making buildings better

Moving Forward

• Prepare for handover– Prepare early draft of guidance, review with building

users– Work with occupants, face-to-face plus follow up visits

• Feedback experience