24
Situation Awareness (SA) for Project Team Members Bill O’Keefe United Space Alliance, LLC william.s.o’[email protected] (713) 725-7036 NASA Project Management Challenge 2007 Feb 6-7, 2007 Copyright Copyright © © 2006 by United Space Alliance, LLC. 2006 by United Space Alliance, LLC. These materials are sponsored by the National Aeronautics and S These materials are sponsored by the National Aeronautics and S pace pace Administration under Contract NAS9 Administration under Contract NAS9 - - 20000 and Contract NNJ06VA01C. 20000 and Contract NNJ06VA01C. The U.S. Government retains a paid The U.S. Government retains a paid - - up, nonexclusive, up, nonexclusive, irrevocable worldwide license in such materials to reproduce, pr irrevocable worldwide license in such materials to reproduce, pr epare, derivative works, distribute copies to the public, and pe epare, derivative works, distribute copies to the public, and pe rform rform publicly and display publicly, by or on behalf of the U.S. Gover publicly and display publicly, by or on behalf of the U.S. Gover nment. nment. All other rights are reserved by the copyright owner. All other rights are reserved by the copyright owner.

O'keefe william

  • Upload
    nasapmc

  • View
    13.943

  • Download
    0

Embed Size (px)

Citation preview

Page 1: O'keefe william

Situation Awareness (SA) for Project Team Members

Bill O’KeefeUnited Space Alliance, LLC

william.s.o’[email protected](713) 725-7036

NASA Project Management Challenge 2007Feb 6-7, 2007

Copyright Copyright ©© 2006 by United Space Alliance, LLC.2006 by United Space Alliance, LLC. These materials are sponsored by the National Aeronautics and SThese materials are sponsored by the National Aeronautics and Space pace Administration under Contract NAS9Administration under Contract NAS9--20000 and Contract NNJ06VA01C.20000 and Contract NNJ06VA01C. The U.S. Government retains a paidThe U.S. Government retains a paid--up, nonexclusive, up, nonexclusive,

irrevocable worldwide license in such materials to reproduce, prirrevocable worldwide license in such materials to reproduce, prepare, derivative works, distribute copies to the public, and peepare, derivative works, distribute copies to the public, and perform rform publicly and display publicly, by or on behalf of the U.S. Goverpublicly and display publicly, by or on behalf of the U.S. Government.nment. All other rights are reserved by the copyright owner.All other rights are reserved by the copyright owner.

Page 2: O'keefe william

Page 1

Is Situation Awareness (SA) Important?

Project SuccessProject Success

Project SAProject SA

Individual SAIndividual SA

Shared SAShared SA

PM SA SkillsPM SA Skills ??

Page 3: O'keefe william

Page 2

Overview• Define Individual and Team Situation

Awareness (SA) • Turn Individual SAs into Team SA• Good Team SA tools • Use the “Questioning Look”

++ ==

Page 4: O'keefe william

Page 3

Definition (from Dr. M. Endsley)

Situation Awareness is the perception of the elements in the environment within a volume of time and space, the comprehension of their meaning and the projection of their status in the near future

Perception of elements in

current situationLevel 1

Compre-hension

of currentsituationLevel 2

Projection of futureStatusLevel 3

Page 5: O'keefe william

Page 4

Situation Awareness Levels

Perception Comprehension Projection

Bottom-Up or Data Driven

Top-Down or Goal Driven

Page 6: O'keefe william

Page 5

Role of Goals & Mental Models in SA

Goal drives Mental Model

SA drives Goal

PreliminaryDesignReview (PDR)

Perception of RID Report

Compre-hensionof open

RIDs

Projection of RID

CompletionMentalModeldrives SA

Page 7: O'keefe william

Page 6

Distributed vs Shared SA

Team Shared SA

HardwareDesignTeam SA

SoftwareDesign Team SA

SE&I Team SA

Project Manager SA

Page 8: O'keefe william

Page 7

Good Teams turn individual SA…

Wall

Spear Snake Tree Fan

Rope

Page 9: O'keefe william

Page 8

…. into Team SA …

Spear Snake Tree Fan

Rope

Page 10: O'keefe william

Page 9

.. which gives context to individual SA

Body

Tusk Trunk Leg Ear

Tail

Page 11: O'keefe william

Page 10

Why so tough to get good team SA?

• Too little time• Too many teams • Constant change• Complexity• Stressors• “Can Do” people

Page 12: O'keefe william

Page 11

How does Individual SA become Team SA?

SW Team’sSA

Then magic Then magic happens?happens?No, then good Project Managementhappens !

HW Team’sSA

SE&I Team’sSA

BottomsBottoms--Up Data Driven CommunicationUp Data Driven Communication

TopTop--Down Goal Driven CommunicationDown Goal Driven Communication

Team MentalModel Team Goal

PM’sSA

SharedSharedTeam Team

SASA

Page 13: O'keefe william

Page 12

Low Hanging FruitYou already made sure that they have• Enough time• Well designed tools and products• Proper environment• Training• Mentoring

Page 14: O'keefe william

Page 13

Teams w/ good SA do

1. Prepare more2. Focus more on comprehending and

projecting

Page 15: O'keefe william

Page 14

Teams w/ good SA do

3. Pay attention to the actions of others4. Verbalize decisions and actions

Page 16: O'keefe william

Page 15

Teams w/ good SA do

5. Attend to more cues and seek out more information

6. Plan for distractions/ interruptions

Page 17: O'keefe william

Page 16

Teams w/ good SA do

7. “Buy time”8. Do better risk assessment, especially

as related to their skill9. Feedback

Page 18: O'keefe william

Page 17

Tool for PM to build Team SA?Maintain (Self/ Team) Situation Awareness

Prepare & Review• Set objectives for team• Not too focus-ed on one goal• Consider humanlimitations & pitfalls• Review own & team’s perform-ance in meetings

Notice and Perceive• Seek informa-tion• Pay attention to subtle changes & weak signals• Validate info by double cross-checking and applying rules of thumb

Comprehend and Interpret• Build picture ofcurrent situation• Validate picture by checking for contradictory ele-ments & applying rules of thumb• Assess whether picture of current situation conforms to desired picture

Project and ThinkAhead• Build picture of future situation• Assess whether picture of future situation conforms to planning• Set markers for

confirmation• Plan for contin-gencies

Communicate

Manage tasks/ workload and prioritize

Interact with processes

(modified from ESSAI)

Page 19: O'keefe william

Page 18

Window of Opportunity

Spear Snake Tree Fan

Rope

We arelooking at differentthings?

Page 20: O'keefe william

Page 19

Best chance to find bad team SA?This is your “window of Opportunity” !

SW Team’sSA

Then magic Then magic happens?happens?No, then good Project Managementhappens !

HW Team’sSA

SE&I Team’sSA

Team MentalModel Team Goal

PM’sSA

SharedSharedTeam SATeam SA

Page 21: O'keefe william

Page 20

Another definition of SA

Seeing how things are really going despite our expectations

Page 22: O'keefe william

Page 21

Is Situation Awareness (SA) Important?

Project SuccessProject Success

Project SAProject SA

Individual SAIndividual SA

Shared SAShared SA

PM SA SkillsPM SA Skills ??

Page 23: O'keefe william

Page 22

References• Dr. Mica Endsley/ SA Technologies:

– Theoretical Underpinnings of Situation Awareness: A Critical Review

– Training for Situation Awareness– Modeling and Measuring Situation Awareness in the Infantry

Operational Environment– Presentation to ‘Situation Awareness in Control Centers for Real-

time Operations of Power Systems and Markets’ course– Designing for Situation Awareness

• S. Banbury & S. Tremblay:

– A Cognitive Approach to Situation Awareness: Theory and Application

• Albert A. Nofi– Defining and Measuring Shared Situational Awareness” (CRM

D0002895.A1 Final, dated Nov. 2000)

Page 24: O'keefe william

Page 23

Acronyms

• HW Hardware• PM Project Manager

Project Management• RID Review Item Disposition• SA Situation Awareness• SE&I System Engineering & Integration• SW Software• USA United Space Alliance