ProblemProblem
•• Declining defense spending over the last decade has caused theDeclining defense spending over the last decade has caused theaverage age of military systems to increaseaverage age of military systems to increase–– Average age of U.S. military aircraft is 29 yearsAverage age of U.S. military aircraft is 29 years
•• Emphasis on COTS has produced a consolidation of the defenseEmphasis on COTS has produced a consolidation of the defenseindustrial baseindustrial base–– Suppliers have shifted focus to commercial marketsSuppliers have shifted focus to commercial markets
–– Diminishing manufacturing sources (DMS) and out of productionDiminishing manufacturing sources (DMS) and out of productionparts (OP) is now a big problem for the parts (OP) is now a big problem for the DoDDoD
•• Technology refresh cycle for COTS is typically 18 monthsTechnology refresh cycle for COTS is typically 18 months–– Life cycles for military systems are measured in decadesLife cycles for military systems are measured in decades
•• DoD DoD now requiring the prime contractor be responsible fornow requiring the prime contractor be responsible formanaging technology refreshmanaging technology refresh–– F-22 program budgets more than $50M a year for technology refreshF-22 program budgets more than $50M a year for technology refresh
–– DMS/OP costs are projected to reach $1B each on F-15, F-22, and U2DMS/OP costs are projected to reach $1B each on F-15, F-22, and U2
3
ObjectivesObjectives
•• TTechnology echnology REREfresh fresh for for NNavy avy TTransformation (TRENT) willransformation (TRENT) willimprove the readiness, mission capability, and life cycleimprove the readiness, mission capability, and life cycleaffordability of Navy weapon systems by developing anaffordability of Navy weapon systems by developing anenterprise wide strategy for proactively managing technologyenterprise wide strategy for proactively managing technologyobsolescence across the supply chainobsolescence across the supply chain–– Reduce cycle time for introducing new technologies and enhancedReduce cycle time for introducing new technologies and enhanced
capabilitiescapabilities
–– Reduce operations and support (O&S) costsReduce operations and support (O&S) costs
–– Avoid unnecessary refresh actions based onAvoid unnecessary refresh actions based on•• Adequate spares/inventoryAdequate spares/inventory
•• Planned redesignPlanned redesign
•• Force reductionForce reduction
•• Other factorsOther factors
4
What Will TRENT Program Do?What Will TRENT Program Do?
•• Generate a Generate a technology refreshtechnology refresh processprocess that can be applied to that can be applied todifferent large weapon platform programsdifferent large weapon platform programs–– Develop a Technology Management GuidebookDevelop a Technology Management Guidebook
•• Identify existing tools and information sources that can beIdentify existing tools and information sources that can beapplied to the Technology Refresh processapplied to the Technology Refresh process–– Identify gapsIdentify gaps in tool functionality in tool functionality
•• Provide an Provide an open architecture frameworkopen architecture framework for a collaborative for a collaborativeworkspace that integrates a heterogeneous set of toolworkspace that integrates a heterogeneous set of toolcapabilities that are presented to the user through a single portalcapabilities that are presented to the user through a single portaland accommodates the translation and movement of informationand accommodates the translation and movement of informationbetween the tools and the processbetween the tools and the process
•• Stand up a strong Stand up a strong Stakeholder CouncilStakeholder Council–– Represent industry and Represent industry and DoDDoD–– Provide broad set of user requirementsProvide broad set of user requirements–– Vet TRENT solutionVet TRENT solution
5
TRENT TeamTRENT Team
•• Multiple-phase program that is funded byMultiple-phase program that is funded by–– SPANS (Supply-chain Practices for Affordable Navy Systems)SPANS (Supply-chain Practices for Affordable Navy Systems)
–– TMTI (Transformational Manufacturing Technology Initiative)TMTI (Transformational Manufacturing Technology Initiative)
•• TRENT teamTRENT team–– Advanced Technology Institute (ATI)Advanced Technology Institute (ATI)
•• Program Management, Stakeholder Council, Business CaseProgram Management, Stakeholder Council, Business Case
–– Altarum Altarum InstituteInstitute•• Business Process and RequirementsBusiness Process and Requirements
–– Lockheed Martin Advanced Technology Laboratories (LM ATL)Lockheed Martin Advanced Technology Laboratories (LM ATL)•• Framework architecture design, tool evaluationsFramework architecture design, tool evaluations
•• Endorsed by JSF program (Lockheed Martin Aero)Endorsed by JSF program (Lockheed Martin Aero)–– Collaborating with LM Aero JSF Technology Management IPTCollaborating with LM Aero JSF Technology Management IPT
–– Pilot programPilot program
7
Technology Refresh ProcessTechnology Refresh ProcessDevelopmentDevelopment
•• Secure endorsement for TRENT program from Lockheed MartinSecure endorsement for TRENT program from Lockheed MartinAeronauticsAeronautics’’ (LM Aero) JSF program (LM Aero) JSF program–– TRENT team has been working closely with LM TRENT team has been working closely with LM AeroAero’’s s TechnologyTechnology
Management IPTManagement IPT
•• Interview various IPT leads and domain specialists at LM AeroInterview various IPT leads and domain specialists at LM Aeroand their supply chain contractorsand their supply chain contractors
•• Capture details of process and validate with follow upCapture details of process and validate with follow updiscussions to highlight discussions to highlight ““As-IsAs-Is”” and and ““To-BeTo-Be”” roles, events, and roles, events, andactivities involved in Technology Managementactivities involved in Technology Management–– Generalize and aggregate process so that it can be applied to otherGeneralize and aggregate process so that it can be applied to other
platformsplatforms
•• Develop technology management guidebookDevelop technology management guidebook
8
Identify Subsystem Owner
and Impacted Subsystems
Identified Stakeholders
CN 4 Action Plan
• Evaluate if Effects Own Subsystem
• Evaluate Inputs
*Evaluate Change• Choose “Accept” if System Owner
Involvement is not Required• Recommend “Proceed” if Scope is
Appropriate• Recommend “Accept” if Impact is
Minimal• Recommend “Reject if Not Willing /
Not Necessary to Make Change
XOR
Accept
Make Recommendation to System Owner
Affordability Tool
Change Recommendation
CN 4
Review Feasibility and Prioritize
Evaluate Change• Choose “Proceed” if Scope is
Appropriate• Choose “Accept” if Impact is Minimal• Choose “Reject if Not Willing / Not
Necessary to Make Change
• Verify CN• Develop Solution
Options(For Suppliers Without Previous Awareness )
CN 4
• Verify CN• Develop Solution
Options(For Suppliers Without Previous Awareness )
CN 4
CN 4
CN 4
CN 4
Technology Roadmap
Product Roadmap
Accept
XOR
Supplie rS ub-T
i er S upplie r
P roduc t IPTT
ech Mgm
t IP T
Air
Syste ms
EvaluateEvaluateInputs/SolutionsInputs/Solutions
Segment of TRENT DetailedSegment of TRENT DetailedProcess CaptureProcess Capture
9
TechnologyTechnologyAwarenessAwareness
TechnologyTechnologyIntelligenceIntelligence
Alternatives AnalysisAlternatives Analysis
RecommendRecommend
MetricsMetrics
ImplementImplement
Forecast
Evaluate
• BOM• Parts List
• Technology Trends• Market Trends
• Production Plans• Budget Constraints
• Availability Alert• Reports
• Roadmap• Contract Geometry
• Product/Technology Information
• AnalysisReports
Information Flow
Process Flow
• Components• Technologies• Architectures
• Potential Solution Alternatives• Analysis Parameters
• Component Alternatives
• Market/ Technology Information
• Metrics, Logistics, Planning
• Approved Plan
• SupplierRoadmap
• ALIS
TRENT Tech Refresh ProcessTRENT Tech Refresh ProcessExtrapolationExtrapolation
10
TechnologyManagement
Planning
Improvement
Technology & Product Roadmaps
Suppliers
Industry
GovtCustom
ers
ExceptionManagement
Information & Case Management
Metrics &Lessons Learned
Identificationand
NotificationVerification
OptionsAnalysis
Resolution/Implementation
Technology ManagementTechnology ManagementGuidebook Process CaptureGuidebook Process Capture
12
Stakeholder Council DescriptionStakeholder Council Description
•• The purpose of the TRENT Stakeholder Council is to provideThe purpose of the TRENT Stakeholder Council is to provideinsight into current practice for Technology Management and toinsight into current practice for Technology Management and todevelop generic requirements for current and future Technologydevelop generic requirements for current and future TechnologyManagement throughout the Management throughout the DoD DoD supply chain.supply chain.
•• The Council is composed of key management and technicalThe Council is composed of key management and technicalpersonnel from government, industry, and vendor organizationspersonnel from government, industry, and vendor organizationswho deal with issues of technology insertion and management,who deal with issues of technology insertion and management,including DMSMS issues.including DMSMS issues.
13
All GroupsAll Groups
•• Critical need: Bill of materialsCritical need: Bill of materials•• Need to conduct trend analysisNeed to conduct trend analysis•• Roadmapping sharing/standardsRoadmapping sharing/standards•• TrainingTraining•• Data sharingData sharing
Two GroupsTwo Groups
•• Mandates through policyMandates through policy•• Configuration management to theConfiguration management to the
level of level of effectivityeffectivity•• Design for technology insertionDesign for technology insertion•• Business processes not in placeBusiness processes not in place•• Database location/ownershipDatabase location/ownership•• COTS data visibility/storageCOTS data visibility/storage•• Inter-service data knowledgeInter-service data knowledge•• History/traceabilityHistory/traceability•• Need standard DoD metricsNeed standard DoD metrics•• Policy requiring data deliveryPolicy requiring data delivery
One Group
•• Tool vendor view of requirementsTool vendor view of requirements•• Data miningData mining•• Improve BCA/ROI decision toolsImprove BCA/ROI decision tools•• Bridging legacy and futureBridging legacy and future
systemssystems•• Industry leverages governmentIndustry leverages government
facilities/DLAfacilities/DLA•• Color of moneyColor of money•• Cost/schedule lockdownCost/schedule lockdown•• Stochastic Considerations:Stochastic Considerations:
Confidence interval andConfidence interval anduncertaintyuncertainty
Issues Identified at FirstIssues Identified at FirstStakeholder CouncilStakeholder Council
15
TRENTTRENTIntegratedIntegrated
ToolsetToolsetArchitectureArchitecture
Roles
Functions
Tools
AccessControl
TMTMProcessProcess
ForecastForecastAnalyzeAnalyze
RecommendRecommendImplementImplementFeedbackFeedback
RoadmapsContract GeometryIntegrated Tool AccessAnalysis Management
Events
ChangeManagement
ConfigurationManagement
ProcessControl
TRENT Process Support SystemTRENT Process Support System
16
IPTIPTRolesRoles
Change ManagementChange Management
ObsolescenceObsolescenceTrackingTracking
PlanningPlanning
RoadmappingRoadmapping
TrendTrendAnalysisAnalysis
DecisionDecisionMakingMaking
QualitativeQualitativeAnalysisAnalysis
QuantitativeQuantitativeAnalysisAnalysis
CostCostAnalysisAnalysis
TM Tool FunctionalityTM Tool Functionality
LocalLocalFilesFiles
LocalLocalDatabaseDatabase
Tool-SpecificTool-SpecificFiles & DatabasesFiles & Databases
TRENTTRENTDatabaseDatabase
Common TMCommon TMRepositoryRepository
Co
nfi
gu
rati
on
Co
nfi
gu
rati
on
Man
agem
ent
Man
agem
ent
En
terp
rise
Acc
ess
Co
ntr
ol
En
terp
rise
Acc
ess
Co
ntr
ol
SupplySupplyChainChain
ProgramProgramManagementManagement
…… IT S
ecu
rity
IT S
ecu
rity
Inte
rnet
Inte
rnet
InternetInternet
ToolToolDatabaseDatabase
TM Process ControlTM Process Control
Dat
a F
low
In
teg
rati
on
Dat
a F
low
In
teg
rati
on
TRENT Integrated ToolsetTRENT Integrated ToolsetFunctional ArchitectureFunctional Architecture
TRENT Phase II FunctionalTRENT Phase II FunctionalArchitecture ImplementationArchitecture Implementation
18
TRENT Phase II Pilot ArchitectureTRENT Phase II Pilot ArchitectureImplementation (1)Implementation (1)
•• Focus on process control, data management of analysis tools,Focus on process control, data management of analysis tools,and supply chain collaborationand supply chain collaboration
•• Implement current architecture definition using Implement current architecture definition using WindchillWindchillPDMLinkPDMLink–– Implementation capabilities includeImplementation capabilities include
•• Project (experiment) container that is used to control data associatedProject (experiment) container that is used to control data associatedwith tech refresh analysiswith tech refresh analysis
•• Process control implemented using Process control implemented using Windchill Windchill workflow capabilityworkflow capability
•• Supply chain access using Supply chain access using Windchill Windchill role-based access controlrole-based access control
•• Supply chain notifications using Supply chain notifications using Windchill Windchill capabilitiescapabilities
•• Parts managementParts management
19
ClientClient
ServerServer
ProcessManagement
DatabaseDatabase
TRENTRepository (Oracle)
HTTPWebServer
HTTPGateway
ServerManager
UserAuthentication
DatabaseTransactions
ClientCommunications
MaintainsLoadDistribution
Commercial Web-based Enterprise Information Management System
WebServices
CORBAInterface
Java RMIInterface
Method Server
OtherAPIs
Gov. CustomerSubcontractor SuppliersHTML PagesJava Applets
InternetInternet
HTML PagesJava Applets
InternetInternet
Prime Contractor
AffordabilityAnalysis
ObsAwareness
ProgramManagement
Planning
Roadmapping
InternetInternet
TrendAnalysis
TRENT Phase II Pilot ArchitectureTRENT Phase II Pilot ArchitectureImplementation (2)Implementation (2)
20
(Product Structure)weapon platform
Project: Sys A RefreshTool #1
Tool #2
Tool #3Modeling Parameters
InputsResultsInformation Domain
Documents
Roadmaps
Studies/Tests
ContractualInformation
eBOMs
AssessmentReports
Access Controlled
Project Access Controlled
eBOM
Action Plans
Data/Reports/Studies
Sys ASys B
SubSys 1
SubSys 2
Sys C
SubSys 3
Comp aComp b
Data Control Approach UsingData Control Approach UsingWindchillWindchill
22
Metadata Registration Metadata Registration Metadata Subscription Metadata Subscription Import Import Export Export
Overview• Provides a loosely-coupled integration service to facilitate the sharing of
heterogeneous data between a portfolio of COTS, GOTS, and LMCO tools.• Native format storage eliminates the inbound integration burden.
Dynamic CONOPsAnalysis
WHAT
CDR
GoalsGoals
ObjectivesObjectives
CapabilitiesCapabilities
Architectures
Architectures
PlansPlans
Assessments
Assessments
Measures
Measures
ValueValue--Based
BasedDecision Framework
Decision Framework
GoalsGoals
ObjectivesObjectives
CapabilitiesCapabilities
Architectures
Architectures
PlansPlans
Assessments
Assessments
Measures
Measures
ValueValue--Based
BasedDecision Framework
Decision Framework
DecisionAnalysis
Cost Analysis
EffectsBased
Analysis
IntegratedArchitecture
The CDR manages data that tools in the OMEGA suite
utilize to support defensible analysis
Benefits• Facilitates Configuration Management of Trade Study information• Loosely-coupled interfaces provide tool flexibility• Leverages a Generalized Database Structure
HOWLeverage the CDR’s UI or built-in Web Services to
configuration manage and integrate data between tools
Register
Subscribe
Export
Register tool information and metadata
Subscribe to metadata
Leverage existing data toensure analyticalconsistency between tools
Import
Publish information to the CDR
Collaborative Data Repository Collaborative Data Repository ––LM IS&SLM IS&S
23
•• Use of increased number of COTSUse of increased number of COTScomponents in components in DoD DoD programsprogramsincreases the complexity andincreases the complexity andcriticality of configurationcriticality of configurationmanagementmanagement
•• RTSS is a System for management ofRTSS is a System for management of““AS-BUILTAS-BUILT”” product configuration product configurationthat integrates with design systemsthat integrates with design systemsand maintenance support devices;and maintenance support devices;enables an integrated view ofenables an integrated view ofproduct data across the lifecycleproduct data across the lifecycle
•• Master configuration works withMaster configuration works withmultiple field maintenance devicesmultiple field maintenance devices
–– Status Button Writers/ ReadersStatus Button Writers/ Readers
–– Handheld devices: Palm/Handheld devices: Palm/NotepadNotepad
•• Interoperable with developmentInteroperable with developmentsystems for relevant designsystems for relevant designinformation (large attribute sets)information (large attribute sets)through XML based interfacesthrough XML based interfaces
RTSS Graphic RTSS Graphic goes heregoes here
ShipShipShip ShipShipShip
Functional ViewFunctional ViewFunctional View Physical ViewPhysical ViewPhysical View
SubsystemSubsystem22
SubsystemSubsystem1p1p..
..
..
ComponentComponent2121
ComponentComponent2222
ComponentComponent2323..
..
..
. . .. . .P1P1 P2P2 P3P3 PnPn Pn+1Pn+1
TraceabilityTraceability
SystemSystem11
SystemSystem22
SystemSystemmm
..
..
..
CompartmentCompartment11
CompartmentCompartment22
CompartmentCompartmentnn..
..
..SubsystemSubsystem11
RTSS enables a closed loop process formanaging field maintenance and support data
in the context of design configuration
Real-Time Supportability SystemReal-Time Supportability System–– LM ATL LM ATL
Recommended