Analysis of Delhi Bus rapid transit corridors

Preview:

Citation preview

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 1/41

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 2/41

Delhi BRT

Modern Low Floor CNG Buses are a bigimprovement: Lower Particulateemissions than TransMilenio

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 3/41

Grade “A” Cycling FacilitiesBike flows at peak are as high as 1200, highest in

world after China

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 4/41

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 5/41

At grade pedestrian crossing is fine andNormal

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 6/41

Central lane bus configuration is NORMAL andcritical to increasing speeds

Lanes of

mixed trafficBus express lane

Achieving high capacities with express lanes

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 7/41

The QUINTESSENTIAL BRT:

Quito EcoVia Line

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 8/41

Central lane BRT ends conflicts with bikesand peds

Delhi BRTCorridor

before BRT

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 9/41

Bike lane and central buslane configurationends bus –bike conflict

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 10/41

Issues;

Delhi HCBS allows Non-BRT Buses in the Buslane,many DETERIORATED BUSES:frequent stalls and breakdowns

Only newerbuses

regulated byDIMTS andmeeting

qualitystandard andmaintenance

should beallowed

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 11/41

Non-BRT Buses interrupt the plannedfunction of the BRT station

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 12/41

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 13/41

Station Comfort is only FAIR

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 14/41

Ahmedabad Station Design is Nicer

AHMEDABAD MUNICIPAL CORPORATION AND AHMEDABAD JANMARG LIMITED

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 15/41

TransMilenio feels like a metro station

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 16/41

TransMilenio is as comfortable as a metro station

Bogota

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 17/41

Station configuration creates very wild weavingmotions at intersections contributing to accidents

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 18/41

Sao Paulo Novo de Julio Before and Afterreconstruction to central median stationconfiguration

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 19/41

Delhi: 12,000 pphpd, 13km/hr

Passenger Volumes are Good:Speed is slow

19

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 20/41

Bus speed slow,

Mixed traffic speeds deteriorated

No effect, new road750015Beijing

TransJakarta

Quito EcoVia

Mexico City Metrobus

Curitiba Eixo Sul

Delhi

Belo HorizonteCristiano Machado

Porto Alegre AssisBrasil

São Paulo 9 de julho

Bogotá TransMilenio

Line

18

18

21

21

13

15

18

12

29

Speed KPH

4500

10,200

8500

10,640

12,000

21,100

28,000

34,910

42,000

Ridership (passengers/ hour / direction)

Deterioratedsignificantly

Improved significantly

Deteriorated a little

N.A.

DeterioratedSignificantly

N.A.

N.A.

Improved some

Improved a lot

Impact on MixedTraffic

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 21/41

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 22/41

Taipei BRT has similar bus cueing problemto Delhi

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 23/41

Delhi Bus speeds slow because of

junction/bus station interference

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 24/41

Delhi BRT is getting 13 buses/direction through the

junction on one cycle only because passengers areboarding up the road off the platform. This is the

cause of pedestrian danger, NOT the at grade crossing

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 25/41

JUNCTION DESIGN

INITIAL CONCEPT

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 26/41

JUNCTION DESIGN

FINAL DESIGN

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 27/41

TransJakarta Jammed the CorridorAlso, but for different reasons.

80% of Oldbusesremained inmixedtraffic lanes

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 28/41

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 29/41

Space for BRTsystem (stationsand runways)

Space for mixedtraffic (roadway)

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 30/41

Seoul stations have one long platform, one passinglane (consumes 3 rather than Delhi’s 4 lanes), andare far from the junction, allowing more mixed

traffic turning lanes at the junction

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 31/41

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 32/41

JUNCTION DESIGN

Fewer lanes to crossto reach BRT station

Median Station allows

for easy transfers

More space for mixed

traffic at intersection

Synchronized signals forsafe pedestrian crossing

INITIAL CONCEPTFINAL DESIGN

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 33/41

Delhi has six phase junctions,

TransMilenio has 2 or 3 phases

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 34/41

What Can Delhi do now?Making Right Turning and left turning buses enter

mixed traffic lanes would eliminate 2 signal phases

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 35/41

Local service only Add routes to simply transfers

Add limited-stop services Add express services

Local service only Add routes to simply transfers

Add limited-stop services Add express services

Simplifying the routing

structure simplifies thesignal phases

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 36/41

No turning routes simplifies intersection themost

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 37/41

Some turns allowed: a compromise betweendirectness of routing and intersection simplicity

Operational Control System helps buses

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 38/41

Operational Control System helps buses

follow schedule to avoid cueing problem

REPORTS

CONTROL CENTRE

SATELLITE

BUS GPS-GPRSCOMMUNICATIONMODULE

WIRELESS NETWORK• GPS-GPRS module on entire Bus fleet (BRT

and AMTS)

• Automatic transmission of Vehicle Locationto Central Control Center (CCC)

• CCC - Bus Driver communication for desiredLevel of Service

• Operator Performance Reports

• Automatically generated Operator PaymentAdvice. Short payment cycles.

Bus routes can be relocated or

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 39/41

Bus routes can be relocated oreliminated

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 40/41

7/30/2019 Analysis of Delhi Bus rapid transit corridors

http://slidepdf.com/reader/full/analysis-of-delhi-bus-rapid-transit-corridors 41/41

Contract out more of the system to

private sector

PublicPrivatePrivatePrivateBusProcurement

(none)PublicPublicPublicServiceStandards

PublicPublicPublicPublicSystem Design

PublicPublicPublicPublicSetting the Fare

NonePrivatePublicPublicOperational

Planning

NonePrivatePublicPublicControl Center

NonePrivatePrivatePublicTrust Fund

PublicPrivatePrivatePublicFare Collection

Public andPrivate

PrivatePrivatePrivateBus Operations

DelhiSantiago

TransSantiago

BogotaTransMilenio

Curitiba URBS

Recommended