EDISON LOCAL SCHOOL DISTRICT

Your Levy Funds at Work

Class graduation pictures are being reformatted and will be

rehung.

Modernized Buildings

■ An estimated $6.2 million has been spent over the past three years to modernizeEdison High School, Stanton Elementary and John Gregg Elementary Schools.

■ Students are working in updated classrooms with state-of-the-art technology to bringtheir education into the 21st Century.

■ Funding from a 5.9-mill operating levy which passed in May of 2014 and a 2.1-millemergency measure approved in 2015 has helped make these projects a reality.The 5.9-mill renewal levy is currently on the Nov. 6 general election ballot for voters’consideration.

Projects Completed at EHS in 2015-2016

■ LED lighting in gymnasium

■ EHS library replaced with new computer lab for online learning

■ New asphalt in parking lot

Gym Lighting

New LED lighting was added inthe high school gym and not onlyenhances illumination but alsohelps the district go green byreducing utility costs.

Computer Lab

The high school library wasreplaced with a computer labfilled with current technology forstudents to conduct researchusing endless online resources,as well as to completeassignments and assessmentsusing a keyboard and the click ofa mouse.

Project Cost for 2015-16:

$160,500

Projects Completed in 2016-2017

■ Electrical upgrade at EHS

■ Windows and doors at EHS

■ New doors at Stanton

■ Vo Ag building gains new roof

■ New restrooms at EHS

■ New lockers at EHS

■ LED sign at EHS

■ Press box renovation at Cartwright Stadium

■ Heating, cooling upgrade at EHS

■ Classroom renovations in 1939 building at EHS

Electrical Upgrade at EHS

Electrical upgrades were madeto meet the demands to moveforward with the HVAC/Classroomrenovations at the high school.

Windows & Doors at Stanton, EHS

Vo Ag BuildingGains New Roof

The Vo Ag building received anew roof and the site now housesa classroom and woodshop, whilea new welding shop is underconstruction. Other improvementsincluded a new barn/storagebuilding behind the FFAgreenhouse.

Bathroom Upgrades at EHS

New Lockers at EHS

Students have a new place tostore their coats and books afterbrand-new lockers were installedat the high school for a fresherlook.

Sign of the Times

A state-of-the-art LED signwelcomes students, staff and thepublic to Wildcat Country andkeeps people informed ofupcoming activities.

Press Box Renovation

The press box at CartwrightMemorial Stadium underwent amakeover, including paint work,an electrical upgrade, newwindows and remodelded interiorand a new roof.

Heating, Cooling Updates at EHS

Classroom Renovations at

EHS

Classrooms at EHS havereceived new lighting, drywall,drop ceilings and a coat of paint,as well whiteboard paint thatallows our teachers to writedirectly on the wall with a dryerase marker.

Total Project Cost for 2016-17

$4,304,948

Projects for 2017-18

■ Vo Ag Building and Addition

■ Band Room at EHS

■ New Chemistry Lab at EHS

■ New Front Entrance at EHS

■ LED Lighting in EHS 1963 Wing/Auditorium

■ Windows in EHS 1963 Wing & Gymnasium

■ Entrance Doors at EHS

■ New Flooring in 1939 Basement

■ Guidance/Administrative Offices

Vo Ag Building and Addition

Making Music

Band Room Storage Area

Chemistry LabThe chemistry lab has new amenities

with new storage units for chemicals and lab equipment.

The storage unit pictured will soon be refaced.

Enter Here

The newly remodeled front entrance is equipped with a new handicap ramp.

This new entrance will also serve as the area where visitors will enter the building, as part of our continued focus on school safety.

Let There Be Light

LED lighting in the 1963 wing, now has the entire building to have upgraded and more efficient.

Windows on the World

Doorway to Education

On the Floor

The entire basement floor of the 1939 building received new flooring, which includes the classrooms and hallway.

New plaster on the walls of the 2nd and 3rd floor hallways of the 1939 building.

Projects still in the works:- Completion of the new entrance

and vestibule area.

- Installation of handrail, cement caps, and entrance doors.

- Windows on the backside of the 1963 wing, gymnasium and bandroom.

- Addition of VoAg metal shop

- Refacing of cabinets in Chemistry Lab.

Total Project Cost for 2017-18:

$1,767,572

Overall Project Cost:

$6,233,020

Projects for Consideration in 2020

■ New Boilers at John Gregg and Stanton

■ New Windows at John Gregg and Stanton

■ New Doors at John Gregg and Stanton

■ Other projects identified over the next two year period

New Boilers at John Gregg & Stanton

New Windows at John Gregg & Stanton

New Doors at John Gregg & Stanton

FYI

Information available today

- Postcard with directions for district survey.

- Levy window signs

- School calendars

- Wildcat Pride signs

QUESTIONS????