ELECTRIC ENERGYGENERATION, UTILISATION &
CONSERVATION
SUBJECT CODE : EE1451
STAFF NAME : U.T.TAMIL ARASI
STAFF CODE : EE27
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
2/45
EE1451 U.T.TAM
UNIT- I
GENERATION
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
3/45
EE1451 U.T.TAM
CONVENTIONAL METHODS
Classifcations:
a) Hydro electric power station
b) Steam power station
c) Nuclear power station
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
4/45
EE1451 U.T.TAM
HYDRO ELECTRIC O!ER
LANT
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
5/45
EE1451 U.T.TAM
Parts o Hydro electric powerstation:
Reservoir
Dam
Surge tan !alve "ouse
Penstoc
#urbine Drat tube
Power "ouse
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
6/45
EE1451 U.T.TAM
A"#$%$'():
$ater is t"e c"eapest and reliable
source
No uel transportation problem
%aintenance cost is low
Running cost is low
&ie o t"is plant is more
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
7/45EE1451 U.T.TAM
D*)$"#$%$'(): &ong time or erection
Capital cost o t"e plant is "ig"
Cost o transmission lines and
losses will be more
Depends on rain all
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
8/45EE1451 U.T.TAM
STEAM O!ER LANT
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
9/45EE1451 U.T.TAM
A"#$%$'():
'uel is t"e c"eapest source
Capital cost is low
Cost o transmission lines and
losses will be low
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
10/45EE1451 U.T.TAM
D*)$"#$%$'():
%aintenance cost o t"e plant is "ig"
Running cost is "ig"
(s" "andling is dicult
(ir is polluted
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
11/45
EE1451 U.T.TAM
Nuclear Power plant
*nergy released rom t"e
continuous nuclear fssion
Neutron rom +,-./ stries
anot"er nucleus and causes to
fssion0
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
12/45
EE1451 U.T.TAM
%ain components:
'uel : pellets o uranium ,rods
Reactor core : no0 o uel rods
%oderator : to moderate t"e
neutron velocity
1grap"ite2 "eavy and lig"t water)
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
13/45
EE1451 U.T.TAM
Coolant : to transer "eat
1water2 li3uid metals)
Control rods : Neutron
absorber 1cadmium2 boron
4 "anium)
Pressure vessel : to maintain
constant pressure0
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
14/45
EE1451 U.T.TAM
PR*SS+R56*D $(#*R R*(C#7R
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
15/45
EE1451 U.T.TAM
REACTOR
PR*SS+R56*D $(#*R
R*(C#7R
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
16/45
EE1451 U.T.TAM
875&5N9 $(#*R R*(C#7R
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
17/45
EE1451 U.T.TAM
A"#$%$'():
(mount o uel re3uired is very small
No uel transportation problem
&ess space is re3uired
&ocated at load centre
%ost economical
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
18/45
EE1451 U.T.TAM
D*)$"#$%$'():
&ong time or erection
Capital cost and maintenance
cost o t"e plant are "ig"
8y products are radio active
and cause pollution 'uel is epensive
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
19/45
EE1451 U.T.TAM
#5D(& P7$*R P&(N#
5t is a rise and all o water level
o sea
Due to t"e action o sun and
moon on t"e eart" water0
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
20/45
EE1451 U.T.TAM
C+$))*$*%):
Single basin arrangement0 Double basin arrangement0
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
21/45
EE1451 U.T.TAM
9eneral sc"eme o tidal power
plant
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
22/45
EE1451 U.T.TAM
%ain components:
a) Power "ouse
b) Dam to orm basin
c) Sluice gates
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
23/45
EE1451 U.T.TAM
O/(0$*% )*%'+( $)*%$00$%'(3(%
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
24/45
EE1451 U.T.TAM
S+*( '$() /(%, T0*%()
) 6
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
25/45
EE1451 U.T.TAM
S+*( '$() ), T0*%(
/(0$*%
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
26/45
EE1451 U.T.TAM
A"#$%$'():
a) Renewable source o energy
b) Non pollutingc) No transportation problem
d) C"eaper
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
27/45
EE1451 U.T.TAM
D*)$"#$%$'():
a) #idal energy is ;uctuating in
natureb) Noisy in operation
c) 7ver all weig"t is very "ig"
d) Not reliable
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
28/45
EE1451 U.T.TAM
%(9N*#7 H
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
29/45
EE1451 U.T.TAM
C3/%(%):
a) Combustor
b) %HD generator
c) (ir pre "eater
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
30/45
EE1451 U.T.TAM
a) Purifer
b) 5nverter
c) Seed recoveryd) Stac
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
31/45
EE1451 U.T.TAM
(D!(N#(9*S
Conversion eciency is around /=>
Capital cost is less
7ver all generation is less No moving parts
Closed cycle system producespower2 ree o pollution
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
32/45
EE1451 U.T.TAM
#"e "eat energy o interior o eart"0
Classifcations:
Direct or dry steam PP
'las" steam
8inary ;uid
9*7#H*R%(& P7$*R P&(N#
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
33/45
EE1451 U.T.TAM
C3/%(%):
a) Hot brine
b) #urbine
c) Condenser
d) Heat ec"anger
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
34/45
EE1451 U.T.TAM
FLASH STEAM POWER PLANTFLASH STEAM POWER PLANT
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
35/45
EE1451 U.T.TAM
BINARY CYCLE O!ERBINARY CYCLE O!ER
LANTLANT
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
36/45
EE1451 U.T.TAM
A"#$%$'():
!ersatile in use
C"eaper
Hig"est annual load actor
Pollution less
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
37/45
EE1451 U.T.TAM
D*)$"#$%$'():
*ciency is low Noisy drilling operation
Need large area
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
38/45
EE1451 U.T.TAM
S7&(R P7$*R P&(N#
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
39/45
EE1451 U.T.TAM
S )8)(3)
Solar energy collection system
#"ermal energy transer system #"ermal energy storage system
*nergy conversion system
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
40/45
EE1451 U.T.TAM
P(R(87&5C #HR7+9H S
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
41/45
EE1451 U.T.TAM
A"#$%$'(): 5t is ree o pollution
Re3uires little maintenance economical
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
42/45
EE1451 U.T.TAM
D*)$"#$%$'(): (vailable only by day not w"en
sun is cloudy
Not reliable &ocated at "ig" attitudes
5nitial cost is "ig"0
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
43/45
EE1451 U.T.TAM
D5S#R58+#*D 9*N*R(#57N
#"e integrated use o small generation
units directly connected to t"e system
#"ey operate on a renewable uel suc"
as sun lig"t2 wind2 gas and biomass
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
44/45
EE1451 U.T.TAM
*ample o tec"nologies used :
%icro turbines
'uel cells
P"otovoltaic cell
5nternal combustion engines
8/18/2019 Ee1451(Unit 1) BY TAMILARASI
45/45
THANK YOU