FRP Pictures

Preview:

DESCRIPTION

FRP installation guide line

Citation preview

User
Callout
FRP grating needed here for this void. 82" x 14-3/4"
User
Callout
We need 3 of these connector pieces not including Pump Station #1.
User
Line
User
Line
User
Callout
We need (6) total connector pieces for both pump stations.
User
Text Box
See next page...
User
Callout
24" wide x 81" long, "flat smooth stock", approx 1/4" thick... Essentially it is a "trough" for the wires to lay on. AKA cable tray. It will just bolt to the bottom of the beams in the picture.
User
Text Box
See previous page...
User
Callout
How is this supposed to fasten to the edge of the concrete? These little "A1" brackets were found, but is this the correct way to install? This is PS #3 valve vault.
User
Callout
How is this supposed to fasten to the edge of the concrete? These little "A1" brackets were found, but is this the correct way to install? This is PS #3 wet well.
User
Callout
Misaligned railing holes vs. predrilled.
User
Callout
Misaligned railing holes vs. predrilled.
User
Callout
Need 13-3/4" x 30" piece of grating to fill this void.
User
Callout
Need 14" x 21" piece of grating to fill this void.
User
Callout
How do we attach this piece to the wet well? the slab is approximately 12" thick, so if a "L" bracket of some sort like an "A1" could be built that pokes down at least 16", that should work.
User
Callout
Current measurement from edge of valve vault to center of railing shown above is approximately 6'-8", it should be at 7'-3" to be able to attach to the beam. As shown above it is unable to attach. This is PS #3.
User
Callout
Another misaligned railing holes vs. predrilled.