    SF6 Portable Recovery System D-310-R005

    Recover Even the Smallest Amounts of SF6 Gas

    Application

    The MINI series is a complete SF6gas-reclaiming unit designed to recover SF6 Gas from the smallest volumeSF6insulated equipment. The D-310-R005 combines portability and affordability with the professional craftsmanshipyou expect from DILO, the world leader in SF6reclamation.

    The MINI uses our newest direct-drive, high-pressure, oil less compressor MPC-04 to transfer and store SF6intosuitable storage. This is a full featured reclaimer that is not only easy to operate, and portable (one person can easilycarry the reclaimer and accessories) but also user friendly. All functions can be performed without supervision. Ouroilles and hermetically sealed DC-05 compressor generates sufficient pressure to liquefy SF6directly into cylinders,allowing for complete cylinder consolidation (imagine the dollars saved when cylinders are returned empty!).

    An optional vacuum module is also available to dry SF6compartments prior to refilling. All are backed by the world-renowned DILO name.

    Characteristics

    DILO DN08 SF6 Valves standard

    Improved reliability

    Easy one valve operation

    New improved modular design

    Custom case included

    True high-pressure (725 PSIG) SF6 liquefaction

    Complete SF6processing - Removal-Storage-Filtering-Refilling

    Lightweight less than 50 lbs.!

    230V/50-60Hz * 100% Oil less design

    Easy change moisture and decomposition products filter

    Safe, pressure regulated refilling

    Cylinder consolidation

    Functions

    The MINI can perform all functions necessary to reclaim and purify SF6gas to near new condition. Optional storagetank stores liquid SF6during processing.

    Removal and liquid storage of SF6.

    Direct high-pressure liquefaction of SF6into SF6cylinders.

    Double filtering of the SF6 automatically during removal and again during filling.

    Refilling with reclaimed or new SF6using built-in pressure regulator.

  • 5/21/2018 New Microsoft Office Word Document

    2

    Dear Sh Prakash Ji

    Pl negotiate and release the work order for 132 KV Breaker Over hauling at Ras

    Sub: Service Engineer charges for servicing, overhauling and problem rectification of 145 KV, LTBD1 ,

    BLK222 Circuit breaker

    Time duration : 4 Days (3 Days for O/H and One day for Travelling)

    Scope of Work:

    1. Dismantling of complete breaker assembly

    2. Overhauling of drive mechanism.

    3. Overhauling of pole assemblies.

    4. Assembling of breaker poles and their alignment.

    5. SF6 gas filling.6. Gas Leakage testing

    7. Final inspection & testing of breaker

    8. All the test shall be witnessed by our engineer.

    Terms & Conditions:

    1. Specialized tools & tackles as gas filling kit, vacuum pump etc. will be arranged by you.

    2. Normal consumables, required spares, crane/lifting equipment, unskilled Man-power and

    shutdown will be provided by SCL.

    3. SF6 gas cylinder for filling will be provided by SCL.

    4. All applicable taxes will be paid by SCL as per applicable rules.

    5. During your stay at site, we will provide Lodging, Boarding & Local conveyance free.

    6. To and Fro charges for 2ndAC/Bus fair will be paid on submission of actual proof.

    7. Payment will be made within 15 days after submission of invoice.

    Attachment: Offer from M/s ABB

  • 5/21/2018 New Microsoft Office Word Document

    3

    Manoj Maheshwari

    Shree Power, Ras

    M-09214337166

    From:Manoj Maheshwari [mailto:maheshwarim@shreecementltd.com]

    Sent:Thursday, March 20, 2014 10:32 AM

    To:'M M Rathi'

    Cc:'Ram Kumar'

    Subject:Apprval Note for Ras-BWR Line 132 KV CB Over Hauling

    Dated: - 19/03/14

    VP (PP)

    Sub.:- Requirement of 132kV RASBWR line Circuit breaker overhauling

    We require overhauling of 145 kV, 1250 Amps ABB make circuit breaker installed on 132

    kV Ras-Beawar line.

    Almost 9 years have been completed and now it has stucking problem. During breaker

    operation it is stuck up.

    A. Service Charge:- Service charges for M/s ABB service engineer for servicing of 145 kV

    LTBD1 type breaker /BLK222 driveS.

    No.Job Description

    Per day

    charges

    No. of

    daysAmount Remarks

    1 HQ to HQ Supervisory Service charges 16500 4 660003 Days Job + 1 Day E

    (Billing on actual Day

    2 Mobilization charges (Approx.) 20000 1 20000 As per actual bil

    Total Service Charges 86000 (UnNegotiated

  • 5/21/2018 New Microsoft Office Word Document

    4

    B. Material Requirements: - We have the required maintenance spares for the above

    job as given below:-Sr.

    No. Description

    Material

    Qty. Rate

    Total

    Amount Remarks

    1Breaker complete Over Hauling Kit

    (Available in Store)1 91012 91012

    Essential Requireme

    breaker O/H

    2

    Driving Unit without Motor

    (Available in Store)

    1 96067 96067Usage as per condit

    requirement

    Total Material Cost 187079

    Total Cost (Material + ABB Service Engineer) 273079

    We wants to do the Breaker over hauling job during 132 KV Ras-Beawar Line Tower

    modification job for Railway line. It may be done in the month of April/May. So,

    additional shut down will not be required.

    Total over hauling cost including material shall be Rs. 2.73 Lac

    Submitted for your kind approval, sir

    Regds

    Manoj Maheshwari Ram Kumar

    Attachments:-

    1. Servicing Offer from M/s ABB

  • 5/21/2018 New Microsoft Office Word Document

    5

    2. Last work order, placed from SP BWR (Complete the job in 5 days including travelling days)

    ----- Message from "Pankaj Joshi" on Fri, 21 Mar 2014 11:53:15 +0530 -

    ----

    To: "'Manoj Maheshwari'"

    Subject:FW: Fw: work order required for servicing of 145 kV ABB make breaker at Shree

    cement ras

    egards

    Pankaj oshi

    Asst. Manager

    SPP (Electrical)

    09251077913

    Shree Cement Ltd, Ras

    From:P C Sharma [mailto:p.c.sharma@in.abb.com]

    Sent:Thursday, March 13, 2014 12:56 PM

    To:Pankaj Joshi

    Cc:Gaurav S; Kamal Bhardwaj; Sanjeev Kumar; Pankaj Sodhiya

    Subject:Re: Fw: work order required for servicing of 145 kV ABB make breaker at Shree cement ras

    Dear Sir,

    Since the service rates has been revised,hence pl find attached our fresh offer.

  • 5/21/2018 New Microsoft Office Word Document

    6

    Best RegardsP C SHARMASERVICE MANAGERSERVICE CO-ORDINATOR (NORTH ZONE)

    ABB INDIA LIMITEDPPHV-SERVICE,14,MATHURA ROADFARIDABAD,121003,HARYANAINDIAPhone: +911292567554Telefax: +911294049073Mobile: +919810143793email:p.c.sharma@in.abb.com

    From: Pankaj Sodhiya/BAN/INABB/ABBTo: Sanjeev Kumar/INABB/ABB@ABB, "Kamal Bhardwaj" , P C Sharma/DEL/INABB/ABB@ABB,

    Cc: Gaurav S/DEL/INABB/ABB@ABB, "Pankaj Joshi" Date: 03/11/2014 12:08 PM

    Subject: Fw: work order required for servicing of 145 kV ABB make breaker at Shree cement ras

    Please confirm for following to customer:-

    (1) Confirmation for deputing of service engineer during shut down ( 3rd week of April).

    (2) Confirmation of validity of old offer or submit fresh offer.

    Regards

    Pankaj SodhiyaBranch Manager

    ABB India LimitedC-116 Alaknanda302015, Jaipur, Rajasthan, INDIAPhone: +91 141 2744023Telefax: +91 141-2744027Mobile: +91 9001890209email:pankaj.sodhiya@in.abb.com

    ----- Forwarded by Pankaj Sodhiya/BAN/INABB/ABB on 03/11/2014 11:26 AM -----

    From: "Pankaj Joshi" To: Tarun Singhal/BAN/INABB/ABB@ABB, Gaurav S/DEL/INABB/ABB@ABB,

    Cc: Pankaj Sodhiya/BAN/INABB/ABB@ABB, "'Manoj Maheshwari'" , "'U S Sharma'"

    , "'Deepak Rathor'" , "'Anurag'" Date: 03/11/2014 10:57 AMSubject: FW: work order required for servicing of 145 kV ABB make breaker

    mailto:p.c.sharma@in.abb.commailto:p.c.sharma@in.abb.commailto:p.c.sharma@in.abb.commailto:pankaj.sodhiya@in.abb.commailto:pankaj.sodhiya@in.abb.commailto:pankaj.sodhiya@in.abb.commailto:pankaj.sodhiya@in.abb.commailto:p.c.sharma@in.abb.com
  • 5/21/2018 New Microsoft Office Word Document

    7

    Kind Attn. - Mr. Tarun Singhal / Mr. Gaurav Sharma

    We requires servicing/ overhauling of one 145 kV breaker (Type-LTBD1 type / BLK222 drive) ABB make.

    For that we had taken the offer from M/s ABB Limited, Faridabad. through offer no. - RNS PPHV S 2013

    062 on dated 25.05.2013. & finalized the rate with waiving off the advance payment terms. But due to

    non-availability of shutdown of the breaker, we wasnt perform the required job.

    Now in second or third week of April-2014 we are planning to go for shutdown of 132 kV Ras-Beawar

    line, so that we are able to club the breaker maintenance job in that shutdown.

    So you are requested to kindly confirm that the given offer will be same or you will revise the offer & if

    the offer will be revised, send us at the earliest.

    Enclosed: - Offer from M/s ABB Ltd.

    egards

    Pankaj oshi

    Asst. Manager

    SPP (Electrical)

    09251077913

    Shree Cement Ltd, Ras

    From:Navneet K Sharma [mailto:navneet.k.sharma@in.abb.com]

    Sent:Friday, July 19, 2013 11:23 AM

    To:Rohit Bhatnagar

    Cc:Gaurav Sharma Unit I; Kamal Kishore Randar; pankajj@shreecementltd.com; Sanjeev Kumar

    Subject:Re: Fw: work order required for servicing of 145 kV ABB make breaker

    Dear Sir,

    This has been reference to our service offer. We here with confirm that we are waive off the advance in

    payment terms.

    Other Terms & Conditions are remain same.

    Kindly issue PO incorporating changes.

    With Regards

    mailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.com
  • 5/21/2018 New Microsoft Office Word Document

    8

    Navneet K SharmaABB LimitedC-116 Alaknanda302015, Jaipur, Rajasthan, INDIAPhone: +911412744024Mobile: +919829362961email: navneet.k.sharma@in.abb.com

    From: "Rohit Bhatnagar" To: Navneet K Sharma/DEL/INABB/ABB@ABB,Cc: "Kamal Kishore Randar" , "Gaurav Sharma Unit I" Date: 07/15/2013 03:45 PMSubject: Fw: work order required for servicing of 145 kV ABB make breaker

    Attn-Mr.Navneet sharma ji

    Sir,

    We have been procuring spares & equipment from ABB on regular basis

    The services of engineer for for various job being availed for various modification /repairing &

    commissioning jobs but

    in none of cases advance have been released.Kindly mail your acceptance for with drawl of condition of

    advance.

    regards

    Rohit Bhatnagar

    Dy.G.M(Pur)

    ----- Forwarded by Rohit Bhatnagar/scl on 07/15/2013 03:36 PM -----

    From: "Kamal Randar"

    To: "'SH. ROHIT BHATNAGAR'" ,

    Date: 07/11/2013 05:57 PM

    Subject: Fw: work order required for servicing of 145 kV ABB make breaker

    mailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.com
  • 5/21/2018 New Microsoft Office Word Document

    9

    ----- Original Message -----

    From:Gaurav Sharma

    To:Pankajj@shreecementltd.com

    Cc:'Kamal Kishore Randar';'Deepak Rathor'; 'U S Sharma' ; 'Anurag Pugalia'

    Sent:Thursday, July 04, 2013 2:33 PM

    Subject:Re: work order required for servicing of 145 kV ABB make breaker

    Sir,

    Quoted prices for service engineer by ABB are firm & final.

    Pls. issue work order accordingly.

    Thanks & Regards,For Shree Cement Ltd.

    Gaurav Sharma

    09214037539

    WLL : 01462-663601

    gauravsharmap@shreecementltd.com

    ----- Original Message -----

    From:Pankaj Joshi

    To:gauravsharmap@shreecementltd.comCc:'Kamal Kishore Randar';'Deepak Rathor'; 'U S Sharma' ; 'Anurag Pugalia'

    Sent:Monday, July 01, 2013 2:36 PM

    Subject:FW: work order required for servicing of 145 kV ABB make breaker

    Dear Gaurav Ji,

    As per our telephonic talk kindly find offer for M/s ABB Limited for 145 kV SF6 circuit breaker maintenance.

    egards

    Pankaj Joshi

    SPP (Electrical)

    09251077913

    Shree Cement Ltd, Ras

    From:Pankaj Joshi [mailto:Pankajj@shreecementltd.com]

    Sent:Friday, June 21, 2013 4:37 PM

    To:'bhatnagarr@shreecementltd.com'

    mailto:gauravsharmap@shreecementltd.commailto:gauravsharmap@shreecementltd.commailto:gauravsharmap@shreecementltd.commailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:RandarKK@shreecementltd.commailto:RandarKK@shreecementltd.commailto:RandarKK@shreecementltd.commailto:RathorD@shreecementltd.commailto:RathorD@shreecementltd.commailto:RathorD@shreecementltd.commailto:gauravsharmap@shreecementltd.commailto:gauravsharmap@shreecementltd.commailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:gauravsharmap@shreecementltd.commailto:gauravsharmap@shreecementltd.commailto:gauravsharmap@shreecementltd.commailto:RandarKK@shreecementltd.commailto:RandarKK@shreecementltd.commailto:RandarKK@shreecementltd.commailto:RathorD@shreecementltd.commailto:RathorD@shreecementltd.commailto:RathorD@shreecementltd.commailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:'bhatnagarr@shreecementltd.com'mailto:'bhatnagarr@shreecementltd.com'mailto:'bhatnagarr@shreecementltd.com'mailto:'bhatnagarr@shreecementltd.com'mailto:Pankajj@shreecementltd.commailto:RathorD@shreecementltd.commailto:RandarKK@shreecementltd.commailto:gauravsharmap@shreecementltd.commailto:Pankajj@shreecementltd.commailto:gauravsharmap@shreecementltd.commailto:RathorD@shreecementltd.commailto:RandarKK@shreecementltd.commailto:Pankajj@shreecementltd.commailto:gauravsharmap@shreecementltd.com
  • 5/21/2018 New Microsoft Office Word Document

    1

    Cc:'Kamal Kishore Randar'; 'Deepak Rathor'; 'U S Sharma'; 'Anurag Pugalia'

    Subject:work order required for servicing of 145 kV ABB make breaker

    Sir,

    We have to done servicing/ overhauling of 5 nos of 145 kV LTBD1 type breakers / BLK222 drive ABB

    make breakers. For that we took offer from M/s ABB Limited, Firidabad.

    So you are requested to kindly finalized the offer (RNS PPHV S 2013 062 on dated 25.05.2013) so that

    we can make work order through contract cell.

    egards

    Pankaj Joshi

    SPP (Electrical)

    09251077913

    Shree Cement Ltd, Ras

    From:Navneet K Sharma [mailto:navneet.k.sharma@in.abb.com]

    Sent:Friday, June 14, 2013 12:43 PM

    To:pankajj@shreecementltd.com

    Cc:M.K.Engineers Beawar;k.bhardwajptpm@gmail.com

    Subject:Fw: Submission of offer no. 138 dated 30-5-2013 of 132 KV breaker spares

    Dear Sir,

    Please find enclosed MK Engineer offer with supporting ABB Offer.

    With Regards

    Navneet K SharmaABB LimitedC-116 Alaknanda302015, Jaipur, Rajasthan, INDIAPhone: +911412744024Mobile: +919829362961email: navneet.k.sharma@in.abb.com

    ----- Forwarded by Navneet K Sharma/DEL/INABB/ABB on 06/14/2013 12:36 PM -----

    From: M.K.Engineers Beawar To: RAs Electrical ,

    mailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.commailto:pankajj@shreecementltd.commailto:pankajj@shreecementltd.commailto:pankajj@shreecementltd.commailto:k.bhardwajptpm@gmail.commailto:k.bhardwajptpm@gmail.commailto:k.bhardwajptpm@gmail.commailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.commailto:navneet.k.sharma@in.abb.commailto:k.bhardwajptpm@gmail.commailto:pankajj@shreecementltd.commailto:navneet.k.sharma@in.abb.com
  • 5/21/2018 New Microsoft Office Word Document

    1

    Cc: "RandarKK@shreecementltd.com" , UMA SHANKAR

    SHARMA , Gauravgupta G/INABB/ABB@ABB, Navneet K

    Sharma/DEL/INABB/ABB@ABBDate: 05/31/2013 12:37 AM

    Subject: Submission of offer no. 138 dated 30-5-2013 of 132 KV breaker spares

    Please find offer as per attach file.

    with regards

    A K Kothari

    M.K.Engineers

    Near Mewari gate

    Beawar-305901

    Mob no. 9414010107

    email:mkeng@live.in

    To:mkeng@live.in

    Subject: RE: Regarding 132 KV breaker spares required by M/s Shree Cement LImited , Ras

    From:gauravgupta.g@in.abb.com

    Date: Thu, 30 May 2013 15:37:02 +0530

    Rest offers shortly

    Br..

    mailto:randarkk@shreecementltd.commailto:sharmaus@shreecementltd.commailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:mkeng@live.inmailto:mkeng@live.inmailto:sharmaus@shreecementltd.commailto:randarkk@shreecementltd.com
  • 5/21/2018 New Microsoft Office Word Document

    1

    Gauravgupta GABB Limited14 Mathura Road121003, Faridabad, Haryana, INDIAPhone: +91 129 2576555Mobile: +91 9560367070email: gauravgupta.g@in.abb.com

    From: M.K.Engineers Beawar To: Gauravgupta G/INABB/ABB@ABB, RAs Electrical

    Cc: "RandarKK@shreecementltd.com" ,"rathord@shreecementltd.com", UMA SHANKAR SHARMA

    Date: 05/30/2013 01:58 PMSubject: RE: Regarding 132 KV breaker spares required by M/s Shree Cement LImited , Ras

    Now please provide offer immediately.

    with regards

    A K Kothari

    M.K.Engineers

    Near Mewari gate

    Beawar-305901

    Mob no. 9414010107

    email:mkeng@live.in

    From:Pankajj@shreecementltd.com

    To:mkeng@live.in

    mailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:randarkk@shreecementltd.commailto:rathord@shreecementltd.commailto:rathord@shreecementltd.commailto:rathord@shreecementltd.commailto:rathord@shreecementltd.commailto:sharmaus@shreecementltd.commailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:Pankajj@shreecementltd.commailto:mkeng@live.inmailto:sharmaus@shreecementltd.commailto:rathord@shreecementltd.commailto:rathord@shreecementltd.commailto:randarkk@shreecementltd.commailto:gauravgupta.g@in.abb.com
  • 5/21/2018 New Microsoft Office Word Document

    1

    CC:gauravgupta.g@in.abb.com;RandarKK@shreecementltd.com; Rathord@shreecementltd.com;

    sharmaus@shreecementltd.com

    Subject: RE: Regarding 132 KV breaker spares required by M/s Shree Cement LImited , Ras

    Date: Thu, 30 May 2013 13:54:19 +0530

    Dear Kothari Ji,

    Drive Mechanism type in all breakers is BLK 222 with control supply of breakers 110 VDC.

    egards

    Pankaj Joshi

    SPP (Electrical)

    09251077913

    Shree Cement Ltd, Ras

    From:M.K.Engineers Beawar [mailto:mkeng@live.in]

    Sent:Thursday, May 30, 2013 11:46 AM

    To:RAs Electrical

    Cc:ABB Faridabad

    Subject:FW: Regarding 132 KV breaker spares required by M/s Shree Cement LImited , Ras

    Dear sir,

    As asked by Principals , please let us know that drive Mechanism is BLK 222 or FSA or BLK 152 , so that

    offer may be submitted of mechanism spares accordingly.

    Please also let us know the control supply voltage of breaker.

    with regards

    A K Kothari

    M.K.Engineers

    Near Mewari gate

    Beawar-305901

    Mob no. 9414010107

    email:mkeng@live.in

    From:mkeng@live.in

    To:gauravgupta.g@in.abb.com

    Subject: FW: Regarding 132 KV breaker spares required by M/s Shree Cement LImited , Ras

    mailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:gauravgupta.g@in.abb.commailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:gauravgupta.g@in.abb.com
  • 5/21/2018 New Microsoft Office Word Document

    1

    Date: Wed, 22 May 2013 15:16:21 +0530

    Please provide offer of list of spares required as per name plate detail of breaker available in

    attach file.

    with regards

    A K KothariM.K.Engineers

    Near Mewari gate

    Beawar-305901

    Mob no. 9414010107

    email:mkeng@live.in

    From:Pankajj@shreecementltd.com

    To:mkeng@live.inCC:RandarKK@shreecementltd.com;sharmaus@shreecementltd.com;

    pugaliaanurag@shreecementltd.com

    Subject: RE: Regarding 132 KV breaker spares

    Date: Wed, 22 May 2013 14:50:48 +0530Dear Kothari Ji,

    Kindly find enclosed 145 kV Circuit breaker specifications as per your inquiry.

    egards

    Pankaj JoshiSPP (Electrical)09251077913

    Shree Cement Ltd, Ras

    From:Kamal Randar [mailto:randarkk@shreecementltd.com]

    Sent:Wednesday, May 22, 2013 2:36 PMTo:Pankaj Joshi

    Subject:Fw: Regarding 132 KV breaker spares

    Please do needful

    kk

    ----- Original Message -----

    From:M.K.Engineers Beawar

    To:randarkk@shreecementltd.com

    Sent:Tuesday, May 21, 2013 12:52 PM

    Subject:Regarding 132 KV breaker spares

    mailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:Pankajj@shreecementltd.commailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:RandarKK@shreecementltd.commailto:RandarKK@shreecementltd.commailto:RandarKK@shreecementltd.commailto:sharmaus@shreecementltd.commailto:sharmaus@shreecementltd.commailto:sharmaus@shreecementltd.commailto:randarkk@shreecementltd.commailto:randarkk@shreecementltd.commailto:randarkk@shreecementltd.commailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:mkeng@live.inmailto:randarkk@shreecementltd.commailto:sharmaus@shreecementltd.commailto:RandarKK@shreecementltd.commailto:mkeng@live.inmailto:Pankajj@shreecementltd.commailto:mkeng@live.in
  • 5/21/2018 New Microsoft Office Word Document

    1

    Respected sir,

    Please arrange to send us the name plate detail of 132 KV Breaker , so that offer of required

    spares may be submitted.

    with regardsA K Kothari

    M.K.Engineers

    Near Mewari gate

    Beawar-305901

    Mob no. 9414010107

    email:mkeng@live.in

    --------------------------------------------------------------------------------------------------------------------