Portfolio english version

Preview:

DESCRIPTION

Personnal Work

Citation preview

Vellay Olivier5 rue Saint Isidore,69003 Lyon - France

+337 50 49 82 81olivier.vellay@laposte.net

Education.

June, 2013 : Passed the final student work. Master's thesis in progress.

June, 2011 : Architecture Bachelor's degree,

Dec. 2008 : Brevet d'Aptitude à la Formation d'Animateur. (to be « leader activity »)

June, 2008 : BAC Scientist, option : History of the arts (three years.)

Work experience.

July-Sept. 2013 : two month internship, in the ENSAL heritage modeling laboratory, Lyon.

July-Aout 2012 : two month internship, hoarding modeling (Culan Castle, Beaugency

Castle) and house extension designing, in Bruno Morel agency, Lyon.

July 2005–july 2011 : several volunteer job with the association « Club du Vieux Manoir » ;

which restores, livens up and maintenance listed buildings. Two weeks as

site director five as activity leader, ten as volunteer. Numerous sites,

among them some Unesco World Heritage : Langeais castle, Briançon

citadel.

June 2010 –June 2011 : several volunteer job, with Bruno Morel, engineer, heritage architecte,

in his own castle of Servières. (restoration of the chapel). Five weeks.

Aout 2010 : one month ands-on internship in Jamil Chammas Construction offices,

Beyrouth, Lebanon.

April 2009 : two weeks training period, Medieval castle of Arzeliers, France.Drawing of

the plans after on site measurements.

Professional skills.

Languages : english : intermediate / german : bases

Softwares : Autocad 2D and 3D / Vectorworks / Photoshop / InDesign / Sketchup

Artlantis /PowerPoint / Aurora Map/Archicad and 3ds max Design (bases)

Miscellaneous.

Sept. 2011-June 2012 : Master 1 ERASMUS Prague.

March 2012 : Exposes my semesters' work at the Jaroslav Fragner gallery, Prague,

exposition relating to the industrial rehabilitation. (Zizkov train station)

Leisure activities : theatre practice (10 years), snowboard, writing, reading.

Vellay Olivier5 rue Saint Isidore,69003 Lyon - France

+337 50 49 82 81olivier.vellay@laposte.net

Education.

June, 2013 : Passed the final student work. Master's thesis in progress.

June, 2011 : Architecture Bachelor's degree,

Dec. 2008 : Brevet d'Aptitude à la Formation d'Animateur. (to be « leader activity »)

June, 2008 : BAC Scientist, option : History of the arts (three years.)

Work experience.

July-Sept. 2013 : two month internship, in the ENSAL heritage modeling laboratory, Lyon.

July-Aout 2012 : two month internship, hoarding modeling (Culan Castle, Beaugency

Castle) and house extension designing, in Bruno Morel agency, Lyon.

July 2005–july 2011 : several volunteer job with the association « Club du Vieux Manoir » ;

which restores, livens up and maintenance listed buildings. Two weeks as

site director five as activity leader, ten as volunteer. Numerous sites,

among them some Unesco World Heritage : Langeais castle, Briançon

citadel.

June 2010 –June 2011 : several volunteer job, with Bruno Morel, engineer, heritage architecte,

in his own castle of Servières. (restoration of the chapel). Five weeks.

Aout 2010 : one month ands-on internship in Jamil Chammas Construction offices,

Beyrouth, Lebanon.

April 2009 : two weeks training period, Medieval castle of Arzeliers, France.Drawing of

the plans after on site measurements.

Professional skills.

Languages : english : intermediate / german : bases

Softwares : Autocad 2D and 3D / Vectorworks / Photoshop / InDesign / Sketchup

Artlantis /PowerPoint / Aurora Map/Archicad and 3ds max Design (bases)

Miscellaneous.

Sept. 2011-June 2012 : Master 1 ERASMUS Prague.

March 2012 : Exposes my semesters' work at the Jaroslav Fragner gallery, Prague,

exposition relating to the industrial rehabilitation. (Zizkov train station)

Leisure activities : theatre practice (10 years), snowboard, writing, reading.

The Sainte Foy balme, view from the Confluence District. Picture : Philippe Mouchet.

(IM)MOBILITY : create links by the contemplative break - Master’s project - spring 2013. LedécloisonnementdeConfluence. In Lyon recently began the second phase of a project which could be considered as one of the most ambitious French real estate project of these last years : the complete reorganization of the Confluence district, on it peninsula, situated in the South of the city center.

However, this new district developed more quickly than the adequate transport infrastructures, and it suf-fers from a situation of «cul-de-sac»; at least for the soft modes and the public transport. The second phase of the works develops an awa-

-reness of the difficulties and sketched some interes-ting ideas, in particular a footbridge crossing the Saône river, drawn by Herzog and of Meuron. Footbridge ending however at the foot of an impassable hill, cal-led « Balme of Sainte-Foy », locked by numerous private grounds.

My group and myself then decided to open up this balme, to connect it to the Sainte-Foy plateau and to the district of Confluence. As a matter of fact, we tried to « extend » the Herzog and de Meuron act. Four projects are all different (a wine storehouse, the rehabili-tation of a fort,

some houses of entertainment like the «Folies» of B.Tschumi, a station of cable railway and its adjacent place) but work all in the same direction : making the balme accessible from Confluence District and from the plateau ; and create a real urban park.

I’m responsible for connecting the Confluence District and the plateau, in a fast mechanic way. This fast connection take the form of a cable railway, and more exactly a bi-cable railway, made by Leitner (Austria), capable of long ranges and allows an ex-cellent wind stability, made necessary by the violents lateral winds following the Rhône valley.

Two transit lines are envisaged. A short line, connecting the top of the balme with Confluence, then crossing the Rhône river to create a link with the metro network. The interest is local but mixed : jobs, population pool, leisure areas. Concerning Sainte-Foy village, the terminus is situated « esplanade Lichfield ».

A long line is also envisaged, to open up the plateau. The line will connect the railroad station of Francheville with the railroad station of Confluence in only 22 minutes, against 45 actually. The line obtain in this way a regional role, capable of assuring its atten-dance in all time (and profitability.)

Areaunderinfluence The terminus of the short line, situated « Espla-nade Lichfield », is at the crossroads of a comple-tely particular urban zone : the village, the plateau, the balme, and finally the esplanade itself.

The «short line»

The alternative.

The balme

The plateau

The esplanade

The village

A lack of social and geographical «links»

Thedisappearanceofthepublicplace. These spaces are essentially formed by low den-sity builded areas. It results from it a lack of public trans-portation, thus a strong car presence. In the village, squares - which are a traditionnal way to keep toge-ther the citizens - were invaded by the automobile. There is not gathering anymore, communication and contact between inhabitants.

The station of cable railway is situated in an inter-face between these very different and divided urban areas. Its actually a «point of contact» between these areas.

It is advisable to transform the space surrounding the station to provide for inhabitants a better quality space, allowing the gathering. This space has several purposes : allow the meeting, allow the contemplation, and emphasise the view. I tried to create links, no mat-ter there are social or physical. (both are important.)

All the public esplanade has to behave as the last piece of a puzzle, returning its integrity to the space sur-rounding.

An esplanade with some qualities.Shops & parkings.

An esplanade with some qualities.A splendid view.

A special geographical position.

Act !To develop the pedestrian network.

Act !to develop the others way of transportation.

Esplanade East/West section. South view.

Some views of the main model, 1/200.

A «global projetc» north/south section.

A view of the station and car park.

create links ///by the use of topography.

create links ///By earth coverings.principes.

create links ///By the revegetation.principes.

Create Links ?

The human «links» are supported by the esplanade. This one also tries to make link : urbanistic, geographical.

The « esplanade vocabulary of grounds « actually quite poor would gain to be inspired by the close environment, to be made for supporting the human social activities.

The treatment of the vegetation looks to reflect the very clas-sic change of influence from the most vegetal part ( the balme) and urban area. (the plateau.)

Furniture and built elements give to the whole esplanade a stylistic coherence, but reflecting however always the urban and vegetable influences in the middle of which the esplanade is situa-ted.

create links /// By the built: to unit the balme and plateau by a common identity.

create links /// By the built.

create links /// by the street furniture.

create links /// By the street furniture : to unit the balme and plateau by a common identity.

Stages of conception of the station and its secondary functions.

The station.