The Port of Abidjan presented expansion plans for the port and information about its recent performance Feb. 22, 2013, at the second annual conference of the Borderless Alliance, "Borderless 2013: Connecting Markets," in Accra, Ghana.
Citation preview
PORT AUTONOME D’ABIDJAN
Une référence internationale
PORT OF ABIDJAN
A TOOL IN SERVICE OF
SUB-REGIONAL INTEGRATION
PRESENTATION:
Mr Sery D. Leandre
Commercial and Marketing Director
PORT AUTONOME D’ABIDJAN
Une référence internationale
Port of Abidjan Traffic (2008 - 2012)
PORT AUTONOME D’ABIDJAN
Une référence internationale
At the Port:
o Time
o Cost
o Security
o Administration
o Storage space
Road access:
o State of the road network and means of transport
o State of the rail network and means of transport
o Transit corridor efficiency
CHALLENGES
PORT AUTONOME D’ABIDJAN
Une référence internationale
PORT AUTONOME D’ABIDJAN
Une référence internationale
DES PROJETS POUR REPONDRE AUX ATTENTES DES PARTENAIRES
PORT AUTONOME D’ABIDJAN
Une référence internationale
EXISTING INFRASTRUCTURE AT THE PORT OF ABIDJAN Commercial Port: 5 km of berthing quay 33 posts ; 16 berths ; 16 inner harbor moorings.
Fruit Terminal
1
1
Vridi Container Terminals
2
2
Fishing Port: 280 000 m2 of total space 1 520 mètres of berthing quay 3 berths on quay.
5
5
Petrol Posts
4
4
ROLO Terminal
3
3
Planned location of Container Terminal 2
6
6
PORT AUTONOME D’ABIDJAN
Une référence internationale
CONSTRUCTION OF A SECOND CONTAINER TERMINAL
A second modern container terminal will allow access for large container ships
1
Will improve the competitiveness of the port by reducing dwell times
2
Will grow container traffic, particularly transhipment
3
EXPECTED RESULTS
PORT AUTONOME D’ABIDJAN
Une référence internationale
MONDERNIZATION OF THE FISHING PORT
Very old infrastructure 1
Lack of space for industrials 4
Equipped with a modern fishing port 1
Able to welcome ships with 8 to 10 m draft 2
15 hectares of added industrial space 3
PROBLEMS
High maintenance costs (avg 350 million CFA anually) 2
Shallow draft (7m) 3
EXPECTED RESULTS
Creation of more than 1,000 direct jobs 4
PORT AUTONOME D’ABIDJAN
Une référence internationale
CONSTRUCTION OF A CEREALS PORT
Construction of a 400 m quay 1
Allow berthing of large ships 1
Possibility for large ships (13.5 m draft) to berth 2
PROJECT DESCRIPTION
Creation of approximately 10 hectares of land by filling the lagoon
2
Construction of warehouses 3
PROJECT OBJECTIVES
PORT AUTONOME D’ABIDJAN
Une référence internationale
CONSTRUCTION OF A MINERALS TERMINAL
Construction of 550 m quay 1
Allow reception of bulk carriers 1
2
PROJECT DESCRIPTION
Creation of approximately 23 hectares of land by filling the lagoon
2
PROJECT OBJECTIVES
Ability to accommodate vessels with a draft of 13.5 m
PORT AUTONOME D’ABIDJAN
Une référence internationale
DEVELOPMENT OF THE VRIDI-BIETRY BAY: 1 COMPONENT : PONT VRIDI – BIÉTRY
Congestion of the port area and peri port 1
Decongest the port area and the peri port area 1
PROBLEMS
Circulation problem: transport costs, delivery delays, accidents, etc.
2
EXPECTED RESULTS
PORT AUTONOME D’ABIDJAN
Une référence internationale
Loss of job creation investment
COMPONENT 2 : DEVELOPMENT OF THE HARBOR PORT – VRIDI-BIETRY
Lack of industrial port space 1
Availiability of more than 200 hectares of industrial port space
1
Welcome industry and investment to induce traffic and job creation
2
PROBLEMS
Lack of capacity to satisfy demand 2
EXPECTED RESULTS
3
PORT AUTONOME D’ABIDJAN
Une référence internationale
Zones à remblayer
Traitement des déchets
Nouveau Terminal à
Conteneurs
Quais de pêche
Elargissement et
approfondissement du Canal
de Vridi
Quais Vrac solide
Pont de Vridi-Biétry
CARREFOUR
SOLIBRA
THE PORT OF TOMORROW
PORT AUTONOME D’ABIDJAN
Une référence internationale
THANK YOU
Recommended