TRANSPORTATION & HANDLING

OF TRAFFIC MANAGEMENT

ORGANISED BY:

MASTER BUILDERS ASSOCIATION MALAYSIA

TOTAL ROAD ACCIDENTS BY STATES, MALAYSIA,

2016

Source: Transport Statistics Malaysia 2016 by Ministry of Transport Malaysia

Source: Transport Statistics Malaysia 2016 by Ministry of Transport Malaysia

CASUALTIES AND DEATHS CAUSED BY ROAD

ACCIDENTS, MALAYSIA, 2007-2016

Death

Severe Injuries

Minor Injuries

NEWS REPORT

Source: Sinar Harian Source: Utusan Malaysia

TRAFFIC MANAGEMENT• Field of traffic control that involves redirecting and diverting

traffic around any construction area.

• It details the specific plan to implement the project’s Traffic Management Strategy.

• To improve the traffic flow, ease congestion and at the same time, minimizing accidents or other road disruptions during construction.

• Part of precaution measures to ensure the safety of traffic management team, emergency response team, construction workers, pedestrians and drivers.

WHAT IS TRAFFIC MANAGEMENT?

DESIGN PHASE

PRE-CONSTRUCTION

PHASE

CONSTRUCTION PHASE

LANE REDUCTION

• The construction of flyover. Lanes has been reduced from 3 to 2 temporarily to accommodate the installation of column and beam

LANE WIDTH REDUCTION

• The upgrading of existing road from 2 to 4 lanes. Reduction of lane width while maintaining the number of existing lanes to accommodate the upgrading works.

ROAD DIVERSION

• Total road closure for beam launching resulting to road diversion.

WHAT IS TRAFFIC MANAGEMENT?

W.A.R.P

To protect both road users andconstruction workers

To reduce accident rates especiallyalong construction zones

To give advance warning to roadusers approaching construction area.

To avoid undesirable events withinconstruction area

THE IMPORTANCE OF TRAFFIC MANAGEMENT?

MALAYSIA

TRAFFIC MANAGEMENT AROUND THE WORLD

TRAFFIC MANAGEMENT AROUND THE WORLD

SINGAPORE

TRAFFIC MANAGEMENT AROUND THE WORLD

PHILIPPINES

TRAFFIC MANAGEMENT AROUND THE WORLD

AUSTRALIA

TRAFFIC MANAGEMENT AROUND THE WORLD

UNITED STATES

DEFINITION TRAFFIC CONTROL PLAN (TCP) WORK ZONE

TMP refers to a compiled document consisting of method statement of

Traffic Management, work programme, TCP & etc.

Shows the placement of Traffic Control Devices (TCD) according to the construction sequence

Provide information on the types of areas that

will be involved.

WHAT IS TRAFFIC MANAGEMENT PLAN (TMP)?

DESIGN PHASE

DESIGN PHASE

TCP must cover overall project site

TCP must be audited by Road Safety Auditor during the RSA Stage 3 Audit

Road Design Engineers design a conceptual TCP

The Road Authorities or the person/parties carrying out works on the road should

allocate funds for the execution of traffic management at work zones

For the purpose of costing, Consultants and Contractors are to refer to

ATJ 2C/85 (Pindaan 2017)

PRE-CONSTRUCTION

PHASE

THE DESIGNING OF TMP

ATJ 2C/85 (PINDAAN 2017)

- Urban Road

- Rural Road

MANUAL FOR TMP DESIGN

Lembaga Lebuhraya Malaysia (LLM)

- Highway Road

MANUAL FOR TMP DESIGN

SAMPLE

TRAFFIC CONTROL PLAN (TCP)

MENAIKTARAF LALUAN B49

PERSIARAN MOKHTAR DAHARI

DAERAH PETALING, SELANGOR

DARUL EHSAN

STAGE 1

STAGE 2

STAGE 3

STAGE 4

OBTAINING APPROVAL FROM AUTHORITY

CONSTRUCTION

PHASE

PERSONNEL TMT / ERT TEAM TRAFFIC CONTROL DEVICES (TCD)

Traffic ManagerTraffic Management Officer

Traffic SupervisorTraffic Controller

Flagman

The teams involved during implementation are Traffic Management Team (TMT) and Emergency Response

Team (ERT)

Temporary signboards, cones, barriers, blinkers &

etc.

THE IMPLEMENTATION OF TMP

THE IMPLEMENTATION OF TMP

02

03

04

05

• Contractors’ Representative

• Fully responsible for the safety of road users who are within the

limits of the working area

• Record of equipment deficiencies, losses and defects

• Ensure that all equipment is sufficient before work is carried out

• Patrol and check the traffic conditions and all available facilities on

the road

• Maintain all traffic equipment.

• Controls and ensures access to the project site area is in good

condition

01• Contractors’ Representative

• Responsible for the whole team

TRAFFIC MANAGEMENT PERSONNEL

Implementing the TrafficManagement Plan whichhas been duly approvedand ensured the safety ofcontractors and road usersduring construction work.

TRAFFIC MANAGEMENT TEAM (TMT)

Addressing emergencysituations such asaccidents or naturaldisasters that may occurwhen performing specificwork activities involvingclosure of roads and otherrelated traffic managementworks.

EMERGENCY RESPONSE TEAM (ERT)

TMT/ERT VEHICLE

EXAMPLE FLAGMAN SAFETY OUTFIT

TRAFFIC CONTROL DEVICES

PLASTIC BARRIER

CONCRETE BARRIER

PLASTIC HOARDING

PLASTIC CONE

TRAFFIC CONTROL DEVICES

BLINKERS STRING DELINEATOR GENSET

ARROW FLASHER SPOTLIGHT

MATERIAL FOR TEMPORARY SIGNBOARD

3M Diamond Grade Reflective Sheeting (H.I.P)

AVERY T-6000 High Intensity Prismatic

Fluorescent Orange – AVERY

Fluorescent Orange – 3M

MATERIAL FOR TEMPORARY SIGNBOARD

STANDARD SPECIFICATION FOR TCD

JKR/SPJ/2017-S19

CURRENT ISSUES

Inadequate TCD

Inappropriate signage

Lack of maintenance

Not enough workers

Lack of safety auditing of work zones

POSSIBLE SOLUTIONS

The Road Authorities and

Supervising Engineers must review TMP to

ensure best practice are

implemented and optimum materials

used

New additions to the Standard Specifications

must be strictly implemented

Constant checks to the work zones