Sample Projects Portfolio

July 2012

Karen Van Winkle Abu Dhabi, UAE

• $712M Mixed use development on a 1.2 km site

• Incorporates elements of Arabic design, culture and lifestyle

• Site contains a total of 138,000 m2 of gross floor area with an

additional 3,000m2 of ancillary building space

Responsible for:

• Extensive VO negotiations with contractor and consultants

• Code evaluation and compliance assurance

• Troubleshooting and value engineering in construction

• Re-design of restaurants and retail areas

• Apartment re-design and coordination

• Hotel facade redesign and spa coordination

Energy Center Luxury Hotel Marina Chandlery

50 Apartments

Gym and pool

224 keys

Thai Restaurant

All Day Dining

3 Club Lounges

Rooftop Bar

92 Apartments

Gym and pool

14 Retail spaces

Seafood Restaurant

77 Apartments

Gym and pool

• 377 luxurious guest rooms and suites • 11 food and beverage outlets • 3,300 sf Ballroom / conference space. • St. Regis-branded 259 apartments and 32

residential villas.

Responsible for: • Quality closeout control • Code compliance assistance

Saadiyat Island is situated 500 meters off the coast of Abu Dhabi, one of the world’s most rapidly expanding economies. A world-class master plan, providing modern infrastructure, creates a commercially strong proposition within an environmentally sustainable, resident focused development. This precinct will be an important low-density, urban environment that serves as the backdrop for the main cultural facilities, including the Sheikh Zayed National Museum designed by Norman Foster, the Guggenheim Abu Dhabi Museum designed by Frank O. Gehry, the Louvre Abu Dhabi Museum designed by Jean Nouvel and the Performing Arts Centre designed by Zaha Hadid. A range of cultural buildings, including art galleries, will showcase local artisans alongside international artists showing at the main cultural facilities.

Abu Dhabi, UAE

• Project Budget: $4.3 B • 10.5M sq ft of mixed use development

(residential, office, retail and 5 hotels) • 535 residential units in Phase 1 over

four distinct product types.

Responsible for: • Schematic Design and coordination

of residential, retail and F&B products within Phase 1

• Coordination between five world class architectural firms

• Product identification and differentiation

San Diego, CA USA

160 Unit mixed-use building 6 stories over 2 levels of parking Concrete and Steel construction Responsible for: •Design Development •Re-work from 4 story wood to 6 story steel •Extensive value engineering •Construction Documents from beginning to end •Full coordination of all disciplines including over 500 columns per floor •Construction administration and quality control •Specification and product selection

Los Angeles, CA USA

• Phase One of two phases, 580

total units

• $189M total construction cost

• 264 units – 825 sf average

• 4 story wood structure

surrounding 6 story garage

Responsible for:

• Construction Document

Management/Coordination

• Full coordination of all

disciplines

• Construction administration

and quality control

• Specification and product

selection

• Value Engineering

Del Mar, CA

Santa Clara, CA USA

833 Unit, Multi product Master Plan (2) 4-story Wrap Apartment Buildings - 583 units

3-story Cluster Townhomes – 152 for sale units 3-story Row Townhomes – 73 for sale units Alley loaded single family – 25 units

Responsible for: Full Product Development

Design Development Entitlement negotiations with City of Santa Clara and neighborhood outreach.

Feasibility studies Model review and supervision Green Building Elements

Color and Specification Selection

Karen Van Winkle La Mesa, CA USA

• Phase One of two phases - 527 total unit mixed use,

LEED Silver project with 100kw solar and 45k sf retail

• $141M total construction cost

• 338 units – 895 sf average

• 325,000 rentable sf – 933 parking stalls

• 3 and 4 story wood structures over 2 level concrete

parking garage/podium

Responsible for:

• Extensive value engineering

• Construction Document Management/Coordination

• Full coordination of all disciplines

• Construction administration and quality control

• Specification and product selection

• LEED Retrofit Supervision and Coordination

Performing Arts Center

Library

Sports facility refurbish

Chula Vista, CA USA

CVM

10,842 square feet. Additionally,

a brand new 3,500 square foot,

one

New classrooms 8,690 sf

Modernization 20,695 sf

• Library

• Locker facilities

• Administration

Imperial Beach, CA USA

Science classrooms 16,147sf

Industrial technology building 5,896sf

Replace 4 classroom buildings 8,690sf

Chula Vista, CA USA