TEXCEL ENGINEERS PVT LTD (An ISO 9001:2008 Certified Company) O Block, #1, Ganapathy Colony, Anna Nagar East, Chennai – 600 102 [Phone: +91 44 26221841/42/43] - [Fax: +91 44 26441844] - [E-Mail : [email protected]] TEXCEL CONTRACTING L.L.C P.O. box 114634 ABUDHABI, U.A.E [Phone: +971 2 550 8509] – [Fax: +971 2 550 8519] – [E-Mail: [email protected]]

Company profile updated on 11.03.2016

Embed Size (px)

Citation preview

Page 1: Company profile updated on 11.03.2016

TEXCEL ENGINEERS PVT LTD

(An ISO 9001:2008 Certified Company)O Block, #1, Ganapathy Colony, Anna Nagar East,

Chennai – 600 102[Phone: +91 44 26221841/42/43] - [Fax: +91 44 26441844] - [E-Mail :

[email protected]]TEXCEL CONTRACTING L.L.C

P.O. box 114634 ABUDHABI, U.A.E[Phone: +971 2 550 8509] – [Fax: +971 2 550 8519] – [E-Mail:

[email protected]]

Page 2: Company profile updated on 11.03.2016
Page 3: Company profile updated on 11.03.2016
Page 4: Company profile updated on 11.03.2016

Contents About us

Organization Setup

Achievements Strong

Fundamentals Present and Future

Client List

Performance Awards

Safety Awards Work Completion

Awards

Page 5: Company profile updated on 11.03.2016

About UsTexcel Engineers – the name is synonym for Technical Excellence. Texcel Engineers has been well established in India since late 80’s and has been involved in successful completion of vast range of turnkey contracts in the infrastructure sector. By embracing innovative ideas and adapting to the ever changing industrial needs, Texcel has proved time and again their mettle to execute a vast range of turnkey contracts infrastructure sector. Texcel Engineers is managed by a Board of Directors of eminent personalities known for their education, enlightenment and integrity along with a core team of Engineers and TechniciansOur Services include:

Fabrication, supply and installation of structural steel. Erection of complete conventional or waste heat recovery boilers. Erection of equipment of power plants, chemical industry, refineries, petrochemical and gas

plants. Fabrication, erection, testing and commissioning of Power and Desalination, Oil and Gas,

Petrochemical, Cement plants. Life extension projects (renovation and repair) of existing the power and Desalination, Oil and

Gas, Petrochemical plants. Power Cycle Piping for Power Plants. Shutdowns and maintenance works of boilers, turbines, mills and rotating equipment's like fans

(ID & FD), Air Preheater for power plants and oil and gas plants. The experience and expertise of Texcel Engineers can be put at the services for execution of large and sophisticated projects to achieve the highest level of quality yet maintaining price competitiveness.

Page 6: Company profile updated on 11.03.2016

Organization Setup

Page 7: Company profile updated on 11.03.2016

Planning Engineer

Site Engineer

QA / QC Manager

Admin Manager

Accounts Manger

Stores Manager

Erection Engineer

Site Co-Ordinator

Erection Piping

Erection Structure

Erection -Equip

Foreman Foreman Foreman

MD

Secretary

Director – Finance, HR & Admin

Director - Projects

Accounts Manager

HR/Admin Manager

Purchase Manager

GM Projects

AGM Site

Const. Manager

Admin Assistant

Accounts Assistant

Stores Assistant

Accounts Officer

HR Lead Purchase OfficerHSE

Manager

Page 8: Company profile updated on 11.03.2016

•Managing Director is a Post Graduate in Economics, (Nagpur University). He has hands on experience of about 30 years in Erection, testing and commissioning of Power Projects.

M.P. SudhakaranEmail: [email protected] Ph. 044 -26221841

•BE (Mech.), MBA (London). He has worked in Field of Sales and Marketing in UK and Middle East before joining as director of the company. He is presently managing operations in India and UAE.

M.S. AbhilashEmail: [email protected] ; Ph. 044 -

26221841

• B.E Industrial Engineering from Mangalore University and MBA from Meinders School of Business, USA. 10 Years of experience in corporate America. He has joined Texcel in August 2011 as Director and oversees Finance and resource Management

Jiji T SukumarEmail : [email protected] Ph.

044- 26221841

• General Manager, Bachelor in mechanical engineering; has 32 Years’ experience in the field of construction works of power plants, ammonia plant, refinery, etc. in India and abroad.

Shaik FairozEmail: [email protected]

Ph. 044 -26221841

•Addl. General Manager-Projects, 35 Years’ experience in ESP, Boilers, Auxiliaries, Piping, etc.C.K. Sekharan

+91 9921280590, +91 9503897168

•Addl. General Manager-Projects, 22 Years’ experience in Boiler, Heavy Equipment’s, Auxiliaries, Piping, etc.Mathew Cherian

+91 8827066382, +91 8103570390

•Addl. General Manager-Projects, 20 Years’ experience in Boiler, Heavy Equipment’s, Auxiliaries, Piping, etc.Ajith Krishandev

+91 9617948272

•Construction Manager, 30 Years’ experience in Erection, Testing and commissioning of Turbines and Generators. A.Kasim

+91 8349037222,+91 9978851377

List of Key Personnel

Page 9: Company profile updated on 11.03.2016

Achievements

Texcel had a humble beginning 30 years ago by Mr. M.P. Sudhakaran with a vision to identify the power and construction sectors as central to nation building. Ever since, Texcel has an impeccable track record. Initially operating as a Sole Proprietor company, Texcel Engineers was incorporated as a Pvt. Ltd Company in 1987

Page 10: Company profile updated on 11.03.2016

TEXCEL ENGINEERS

Page 11: Company profile updated on 11.03.2016

I. IBR WORKS

SUMMARYStates No. of units

800 MWGujarat 1 No

660MWMaharashtra 1 No

600 MWChhattisgarh 2 No

500 MWTamil Nadu 1 NoMaharashtra 1 NoAndhra Pradesh 1 NoKarnataka 1 NoChhattisgarh 1 NoBihar 1 No

350 MWGujarat 1 NoKarnataka 1 NoBihar 1 No

270MWMaharashtra 2 No

210 MWRajasthan 1 NoOrissa 1 NoHaryana 1 NoUtter Pradesh 1 NoKerala 1 No

A. ERECTION OF BOILERS IN DIFFERENT STATES

Page 12: Company profile updated on 11.03.2016

B. PIPING

States No. of units685 MW

Chhattisgarh 1 No500 MW

Tamil Nadu 3 NoAndhra Pradesh 1 NoKarnataka 1 NoChhattisgarh 1 No

270MWMaharashtra 2 No

States No. of units660MW

Utter Pradesh 1 No600MW

Chhattisgarh 1 No270MW

Maharashtra 1 No150MW

Maharashtra 2 No72MW

Gujarat 1 No

II. TURBINES

Page 13: Company profile updated on 11.03.2016

III. ELECTRO STATIC PRECIPITATORS

States No. of units660MW

Utter Pradesh 1 No500MW

Bihar 1 No

States No.of units800MW

Maharashtra 1 No

IV.BUNKERS

Page 14: Company profile updated on 11.03.2016

Strong Fundamentals

LIST OF MACHINERY, MAJOR TOOLS AND PLANTSHeavy Cranes150 Ton Fuwa Hydraulic Crawler Crane 1100 Ton Kobelco Crawler Crane 180 Ton Fuwa Hydraulic Crawler Crane 275 Ton Tata TFC Crawler Crane 345 Ton NCK 41 B Crawler Crane 340 Ton Tyre Mounted TIL Crane 235 Ton P & H 655 Crawler Crane 225 Ton Tata TFC – 75 Crawler Crane 320 Ton Tata P & H 320 Crawler Crane 218 Ton Tata 320 Crawler Crane 4All the pool of machines and equipment's are well maintained and equipped in order to make them work at any point of time for which we have dedicated team of well qualified and experienced machines / technicians

Page 15: Company profile updated on 11.03.2016

Mobile Cranes18 Ton Hydra 4

14 Ton Hydra 6

12 Ton Hydra 13

11 Ton Hydra 2

10 Ton Hydra 3

08 Ton Hydra 3

Transport VehicleTractor Hindustan, HMT 6

Trailer Ashok Leyland 9

Trailer with Horse 5

Mini Bus 4Pick Van/Load King/Tata Ace 5Jeep (Sumo, Bolero, Etc.) 13

Omini Ambulance 1

Heavy Equipments

Page 16: Company profile updated on 11.03.2016

Lifting Equipment’sRack & Pinion Elevator PC 130-7 (Passenger Lift) 3Electrical Winches (1 Ton-15 Ton) 80Chain Pulley Blocks (1 Ton-25 Ton) 786Max Puller (Hook Chucks (1.6 Ton-5Ton)) 81Lathe Machine 1Surface Grinder 1Wire Rope Sling 90 MM X 16 Mtrs 2Wire Rope Sling 80 MM X 18 Mtrs 6Wire Rope Sling 80 MM X 16 Mtrs 6Wire Rope Pulley 5 Sheave 50 Ton 12Wire Rope Pulley 4/5 Sheave 25 Ton 24Beam Lifting Clamps (3Ton- 10 Ton) 25Scaffolding MaterialsPipes (assorted Lift) 6000Right angle Couples 8000Scaffolding Platform 1000Beam Brackets 500Swivel Couples 3000

Page 17: Company profile updated on 11.03.2016

Other Major Equipment’sPipe Bending Machine Heavy Duty 6Tube Bending Machine 4Hydraulic Test Pumps Heavy Duty 4Air Compressors 3Electrode Backing Oven 21High Intensity Illuminator 5Impact Wrench GDS 30 8MS Rail 33Plasma Cutting Machine 4Torque Wrench Assorted (750 LBS-2400 LBS) 44Steel Containers (20 Ft-40 Ft with Furnished) 46

Welding & NDT Equipment’sWelding Generators (K-320/45) 66

Welding Rectifier 450/600A 321

Welding Transformer 400/6A 25

Diesel Power Generator 3

SR Panel Board 12

Temperature Recorder 19

Theodolite with stand 5

Hardness Tester 2

Induction Heat Machine ( Miller ) 3 Texcel Engineers

Page 18: Company profile updated on 11.03.2016

Present

Future

and

Page 19: Company profile updated on 11.03.2016

List of Current Projects Under Execution

S.no Client Location Capacity Area Scope of work Date of AwardContract

Value(INR)

Present Status

1 Rattan India Nasik Power Ltd Nasik, Maharashtra 5X270MW STG

Receipt of Materials form BHEL/Storage yard, Handling at stores, site of work, Erection, Testing & commissioning of Steam Turbine and Auxiliaries etc Including bought items of 5x270MW, Nasik Thermal Power Project, Nasik, Maharashtra.

19-02-16 3,97,40,000 Under Mobilization

2 Rattan India Nasik Power Ltd Nasik, Maharashtra 5X270MW

Boiler,Piping,

ESP

Handling collection of Materials at BHEL/client's storage yard/ stores, Transportation to site Erection, testing & assistance for commissioning, trail operation and handing over of boiler and its auxiliaries, APH, ducts dampers, Fuel piping, boiler integral piping & associated valves, ESP, fans, power cycle piping, Coal mills & coal feeders, insulation ,final painting etc of Unit #4 of 5X270MW Nasik TPS

25-01-16 22,12,95,045 10% Completed

3 Gujrat State Electrity Corporation Wanakbori, Gujrat 1x800MW Boiler

Collection of Materials at BHEL/client's storage yard/stores, Transportation to site, Erection, testing & assistance for commissioning, trail operation and handing over of boiler and its auxilliaries,APH,ducts&dampers,Fuel piping, boiler integral piping & associated valves SP,fans,power cycle piping, Coal mills & coal feeders,Insulation,final painting etc

17-12-15 47,93,11,352 Under Mobilization

4 Lanco Wardha,Maharashtra 2x660MW

Boiler,Piping,

ESP

Erection, Testing, Commissioning of 2X660MW (Unit 1&2) Boiler & Auxiliaries at Lanco vidharbha Thermal Power Project, Mandhva village, wardha dist. Maharashtra.

09-09-15 71,04,52,710 15% Completed

5 NTPC Gadarwara, MP 2x800MW BunkerErection Alignment & Welding, Testing, Painting and Handing over of Bunker structure, Raw coal bunkers, Transfer points, trestles and conveyer galleries and miscl, Civil Works for unit-1

13-07-15

11,76,51,858 5% Completed

6 NTPC Gadarwara, MP 2x800MW Bunker

Supply of Materials for the works of MS embedments, Doors, Windows, Glazing, Roofing / Side Cladding, Rain Water Down Take Pipes, Structural Steel Painting, Gratings, Mild Steel Bolts, High Strenth Structural Bolts, PTFE Bearings, MS Hand Railings, Concreting for Bunker Structures, Raw Coal Bunkers, Coal Handling Transfer Points for Unit-1

7,43,91,176 Under Mobilization

7 Sintex Infra Project Ltd Shindkeda, Maharashtra 2x150MW STG

Erection, Testing, Commissioning and handingover of Steam turbine, Turbo Generator, Condenser, TG Integral Piping,HP & LP Heaters, Deaerator, with associated Equipments/Tanks/Vessels, FST & Deaerator, LP Bypass system with associated platform, power cycle pumps & auxiliaries in Unit 1 & 2

26-02-14 5,18,59,128 90% completed

Page 20: Company profile updated on 11.03.2016

S.no Client Location Capacity Area Scope of work Date of Award

Contract Value(INR)

Present Status

8 NTPC Allahabad, UP 2x660MW ESP

Material handing & Unloading, Erection, Testing commissioning & final painting of ESP for 2x660Mw for MUNPL, Meja Thermal Power Project, Allahabad, UP.

18-12-13 27,37,41,000 50% Completed

9Lalitpur Power GenerationCompany Ltd

Lalitpur, UP 3x660MW STGErection, Testing, Commissioning, Trial operation and handing over of steam turbine generator and its auxiliaries & piping etc. for package-B(Unit-2)

16-12-13 13,67,49,997 95% completed

10 Krishak Bharati Cooperative Ltd Surat, Gujarat 1x72MW HRSG

Erection, Testing, Commissioning, Piping and final painting work for 1x72MW unit and Application of Thermal Insulation, Piping and Painting for 1x190 TPH Heat Recovery Generator.

03-10-12 11,35,00,000 99% Completed

11 Visa power Raigrah, Chattisgarh 2x660MW

Boiler,Piping,

ESP

Erection, Testing, & Commissioning, Trial Operation and Handing over of Boiler and its Auxiliaries including ESP, Air Pre heaters, Ducts and Dampers, Fans, Fuel Piping, Boiler Integral Piping, Power cycle piping, Chemical dozing system, Lining & Insulation, Final painting, etc of Unit 1

27-07-11 61,73,65,000 20% Completed

12 MahaGenco Maharashtra 2x500MWBoiler,Piping,

ESP

Material handling & unloading,Erection,testing & commissioning of completed boiler structures,pressure parts,ESP,fans,PCP,Coal mills & feeders insulation &final painting of Unit 9,2x500MW

23-01-10 48,94,40,923 90% completed

Page 21: Company profile updated on 11.03.2016

SL No Client and Project Location Scope of work

Contract Value (AED)

Present Status

1 Larsen & Toubro Limited, E&C Division, Borouge III, P3B Plant at Ruwais, Abu Dhabi

Fabrication & Erection of Carbon Steel and Stainless

Steel Piping at P3B Plant at Ruwais, Abu Dhabi3,384,000 Under

Execution

U.A.E

Page 22: Company profile updated on 11.03.2016

List of Major Projects Executed

Sl. No Client and Project Location Scope of Work Date of

awardContract value INR

1 Eleana Power & Infrastructure, 5x270MW, Amravati, Maharashtra.

Erection, Testing, commissioning and Handing over of Ducting, Rotating & Coal Piping of Unit – 5, 5x270MW, Amravati, Maharashtra.

30-10-2014 77,004,997

2 Eleana Power & Infrastructure, 5x270MW, Amravati, Maharashtra.

Erection, Testing, commissioning and Handing over of power cycle piping and final painting of Unit -5, 5x270MW Amravati, Maharashtra.

24-09-2014 90,465,605

3Doosan Power Systems India Private Limited,2x685 MW Chhattisgarh Thermal Power Project Near Raikheda Village, Raipur District Chhattisgarh

Critical Piping Erection, Testing and commissioning of complete and application for Units 1 and 2 of 2x685 MW Set

23.07.2012 194,757,215

4

Korba West Power Company Limited, 1X600 MW KWPCL Avanta Raigarh Project, Near Bade Bhandar Village, Raigarh District. Chhattisgarh.

Erection, Testing & Assistance for commissioning, Trial Operation and Handing over of Steam Turbine and Generator Set and its Auxiliaries, HP/LP Heater and Painting, etc., of 1 X 600 MW

06.12.2011 69,400,000

INDIA

Page 23: Company profile updated on 11.03.2016

5 Dainik Bhaskar Power Limited Unit 1 of 2x600 MW DBPL, Janjgir, Champa District. Chhattisgarh.

Erection, Testing, & Commissioning, Trial Operation and Handing over of Boiler and its Auxiliaries including ESP, Air Preheaters, Ducts and Dampers, Fans, Fuel Piping, Boiler Integral Piping, Power cycle piping, Chemical dozing system, Lining & Insulation, Final painting, etc. of Unit 1 of 2 X 600 MW

18.02.2011 571,297,500

6 NTECL Vallur Thermal Power Project Kuruvimedu Village Ponneri Taluk, Tamilnadu.

Erection, Testing, Commissioning & handing over of complete Power Cycle

piping supplied under SG&TG packages, accessories, associated

equipment’s/systems, final painting for Unit 1&2 of 2 x 500 MW

15.07.2010 216,864,000

7 NTECL Vallur Thermal Power Project Kuruvimedu Village Ponneri Taluk, Tamilnadu.

Erection, Testing, and commissioning of complete Boiler Structures, pressure parts, Non-Pressure parts , Rotating Machines including supply and Application of Final Painting for Unit # 2 of 2x500 MW set

20.05.2009 313,974,140

8 Gujarat State Energy Generation Ltd., Near Hazira, Village Mora, Dist. Surat , Gujarat .

Erection, Testing, Commissioning, Final Painting and Handing over of 1 x 292 TPH HRSG and its auxiliaries, Steel Stack, Piping etc., for 1x350 MW combined Power Plant at GSEG, Hazira ,Dist. Surat, Gujarat

18.03.2009 82,034,029

9National Thermal Power Corporation / Korba super Thermal Power Station Korba, Chhattisgarh.

Erection, Testing, Commissioning and handing over of complete Power cycle Piping including P-91 Material Piping etc., for Unit # 7 Stage III of 1 X 500 MW at Korba Super Thermal Power Station, NTPC, Korba ,Chhattisgarh.

05.01.2009 8,70,10,170

10Kakatiya Thermal, Power Project, Bhoopalapalli, Warrangal, Andhra Pradesh

Erection, Testing and Commissioning of Power Cycle Piping of Unit 1x500 MW Boiler

02.06.2008 9,87,81,800

Page 24: Company profile updated on 11.03.2016

11National Thermal Power Corporation / Korba super Thermal Power Station Korba, Chhattisgarh

Erection, Testing & Commissioning of Boiler and its auxiliaries, Rotating Machines including Mills and Fans, Duct, Fuel Piping etc., for Unit 7 of 1x 500 MW.

19.02.2007 17,24,93,240

12 Kakatiya Thermal Power Project, Bhoopalapalli, Warrangal, Andhra Pradesh

Erection, Testing and Commissioning of complete Boiler Structure, Pressure Parts, Boiler Auxiliaries, Electrostatic Precipitator, Rotating Equipment’s, including supply and application of final Painting for Unit 1x500 MW

05.02.2007 22,94,63,960

13 Karnataka Power Corporation Limited / Bellary Super Thermal Power Project, Karnataka.

Erection, Testing and Commissioning of Power Cycle Piping of 1x500 MW Boiler

15.08.2006 3,91,54,140

14 National Thermal Power Corporation / Kahalgaon Super Thermal Power Project, Bihar

Erection, testing & commissioning and handling over of Electrostatic Precipitator of 1 x 500 MW Unit No. 5

22.12.2004 4,34,86,652

15 Karnataka Power Corporation Limited / Bellary Super Thermal Power Project , Karnataka

Erection, Testing and Commissioning of Structures, Pressure Parts, Non-Pressure Parts, Air Pre-heaters, Ducts Boiler for 500MW

04.09.2004 11,55,30,632

16 National Thermal Power Corporation / Kahalgaon Super Thermal Power Project, Bihar

Erection, testing & commissioning and handling over of Boiler and its auxiliaries including its Rotating machines, Ducts and Fans of 1x500 MW Unit No.6

21.06.2004 21,18,15,100

17 National Thermal Power Corporation / Korba Super Thermal Power Station, Chhattisgarh

Overhauling of Boiler pressure parts, high pressure valves in Boiler area Stage-I & II & repair of Boiler tube failure and overhauling of soot Blowers of 3 x 500 MW

25.03.2004 55,09,786

Page 25: Company profile updated on 11.03.2016

18 Tamilnadu Electricity Board / Kuttalam Mayiladuthurai Taluk, Tamilnadu

Erection, testing & commissioning, application of insulation of Heat Recovery Steam Generator and its auxiliaries, Piping of 101 MW Combined Cycle

03.01.2003 1,28,39,650

19 Aditya Cement / Shambhupura Dist. Chittorgarh Rajasthan

Erection, testing & Commissioning of 1x105 TPH AFBC Boiler and its Auxiliaries including Electrostatic Precipitator and 1x23 MW Steam Generator and its Auxiliaries and Piping etc.

16.03.2002 1,36,18,098

20 National Thermal Power Corporation / Talcher Super Thermal Power Project, Orissa

Erection, testing & commissioning of Boiler for Stage II Unit – V of 4 x 500 MW

06.08.2001 11,24,40,704

21 Hasdeo Thermal Power Station, CS Electricity Board, Korba West

Overhauling of coal mills, raw coal feeders, coal bunkers, cleaning & servicing of Mill lube oil system, servicing of Mill gear box, Nitrogen Panels etc. of 2x210 MW boilers of unit no.3 & 4

16.06.2001 27,40,175

22 Hasdeo Thermal Power Station, CS Electricity Board, Korba West

Overhauling of ID, FD & PA fans of 2x210 MW ABL make boilers of Unit 3 & 4

02.06.2001 4,58,640

23 Korba Super Thermal Power Station, NTPC, Korba

Repair of boiler tubes and overhauling of soot blowers

12.03.2001 10,34,550

24 Korba Super Thermal Power Station, NTPC, Korba

Lowering of LTSH and other associated jobs in Unit VI,500 MW boiler

12.06.2000 15,04,000

25 Haryana State Electricity Board / Faridabad Combined Power Plant, Haryana

Erection, testing & commissioning, trail operation & handling over of 2x230 TPH HRSGs

15.04.1999 5,69,48,700

Page 26: Company profile updated on 11.03.2016

26 Haryana State Electricity Board / Panipat Thermal power station, Haryana

Erection, testing, commissioning of 1 x 210 MW Unit VI Boiler

24.08.1998 6,96,16,020

27 Uttar Pradesh Electricity Board / Feroze Gandhi Thermal Power Station Unchahar, Rai-barelley, U.P.

Erection, testing, commissioning & trail run of 2 x 210 MW boiler

21.01.1997 3,19,20,000

28 Hindustan Newsprints Limited / Kottayam, Kerala.

Erection, testing & commissioning of 1x140 TPD chemical recovery boiler

04.11.1996 78,02,020

29 Gujarat Electricity Board / Wanakbori Thermal Power Station, Gujarat

Erection, testing & commissioning of Boiler, Electrostatic Precipitator and their auxiliaries 1 x 210 MW boiler

17.06.1996 6,38,55,700

30 Madras Refineries Ltd., Manli, Madras Erection, Testing and commissioning of 2x20 MW TG Sets and Auxiliaries

02.09.1993 37,50,000

31 Cochin Refineries Ltd., Cochin, Kerala Fabrication & Erection of Piping & Equipments for Capacity Expansion Projects at CRL, Kerala.

06.04.1993 1,36,00,000

32 Dahanu Thermal Power Project, Maharashtra, BSES, Mumbai Ltd.

Erection, testing, commissioning & completion of trial operation of Electrostatic Precipitators for 2 x 250 MW Boiler

17.04.1992 2,49,31,800

33 Talcher Super Thermal Power Project, Kaniha, NTPC

Erection, testing, commissioning & completion of trial operation of complete non-pressure parts like external structures, flue gas ducts, dampers, expansion joints in Unit I & II of 2 x 500 MW Boiler

10.04.1992 1,36,62,500

Page 27: Company profile updated on 11.03.2016

34 Talchar Super Thermal Power Project, Kaniha, NTPC

Handling at Site Stories / Storage Yard, Transportation to Site of Work, pre-assembly, erection, testing, commissioning & completion of trial operation of rotating machines and its auxiliaries for Unit I of 2x500 MW Boiler.

10.02.1992 47,63,920

35 National Aluminum Company / Angul, Orissa

Erection, testing, commissioning and completion of trial operation of Electrostatic Precipitator, Rotating machines etc.

04.10.1991 38,67,500

36 Tamil Nadu Electricity Board / North Madras Thermal Power Project, Tamil Nadu

Erection, testing and completion of trial operation of Electrostatic Precipitators and its auxiliaries, Rotating Machines, ducts, dampers for the first two units of 2 x 210 MW

06.03.1991 1,15,78,500

37 Engineers India Limited / Cochin Refineries Ltd. Kerala.

Erection, testing & commissioning of 1 x 60 T/H Heat Recovery Steam Generator including insulation of Cochin Refineries Ltd.

14.03.1990 39,07,750

38 National Thermal Power Corporation / Korba

Super Thermal Power Project, Chhattisgarh

Erection, testing & commissioning of mills, fans & other auxiliaries & fuel piping of Unit VI of 3 x 500 MW.

09.03.1988 34,76,295

39 National Thermal Power Corporation /

Ramagundam Super Thermal Power Station,

Andhra Pradesh

Erection, testing & commissioning of Electrostatics Precipitator galleries & stairways of Unit VI of 3 x 500 MW

20.11.1987 48,65,000

40 Sathavahena ISPAT Ltd. Haresamudram Village,

Anantapur, A.P.

Unloading, stacking, transportation, erection, testing & commissioning of 1 x15 TPH BF gas fired boiler.

20.09.1987 53,44,400

41 Tamil Nadu Electricity Board / Mettur Thermal Power Project, Mettur,

Tamil Nadu

Erection, testing & commissioning of Electrostatics Precipitator, Rotating machines, ducts & dampers of Unit I, II & IV of 2 x 210 MW

12.09.1984 1,09,32,916

Page 28: Company profile updated on 11.03.2016

U.A.ES.No Client and Project Location Scope of Work

Contract value(AED)

1 L&T/Naphtha Hydro Theater Plant/ U.A.E

Erection of Structures for of Compressor shed 08 &10 and associated Sheeting.

500,000.00

2 Dewa / U.A.E Supply, Fabrication and Erection of Demister Structure For L2 Power Station.

150,000.00

3 Jan De Nul /U.A.E Supply, Fabrication and Erection of Dredging Pipes

200,000.00

4 L&T / Naphtha Hydro Treater Plant/ U.A.E

Fabrication & Erection of SS and CS Piping For Naphtha Hydro Theater Plant At Enoc Refinery

250,000.00

5 L&T / Naphtha Hydro Theater Plant/ U.A.E

Erection and alignment of E.O.T Cranes for Enoc Refinery

100,000.00

6 Emaar/ District cooling plant 03 Burj Dubai/U.A.E

Fabrication & Erection of Chilled water piping for Cooling Plant 03.

200,000.00

7 L & T/ Enoc Refinery Expansion Modification and Rectification of Existing Pipe Rack Structures and replacement with new structure.

200,000.00

8 Al Ghurair Iron and Steel Plant / Abu Dhabi

Erection Of Equipments for acid regeneration plant.

230,000.00

9 Voltas Limited/Abu Dhabi Erection Of Equipments- Generators 92,000.00

10 Mubadala Development /Abu Dhabi Erection of steel structure 260,000.0011 SEWA /CH2MHILL Fabrication and Erection of GRP Pipes for

Desalination plant.550,000.00

Page 29: Company profile updated on 11.03.2016

OMANSl. No. Client and Project Location Scope of Work Contract value

(AED)1 Vale/steel plant/ OMAN Erection of Structures for of Steel plant . 800,000.00

2. PDO/OGS plant/OMAN Fabrication & Erection of oil piping for PDO.

 

300,000.00

3. Vale/steel plant/ OMAN Fabrication & Erection of utility piping for vale.

 

1,200,000.00

Page 30: Company profile updated on 11.03.2016

2003-2004

2004-2005

2005-2006

2006-2007

2007-2008

2008-2009

2009-2010

2010-2011

2011-2012

2012-2013

2013-2014

2014-2015

0.00

1000.00

2000.00

3000.00

4000.00

5000.00

6000.00

7000.00

8000.00

9000.00

Financial Year

Amou

nt in

Lak

hsFinancial Turnover

Page 31: Company profile updated on 11.03.2016

List of Clients

Page 32: Company profile updated on 11.03.2016

Sintex Infra Project Ltd

Aditya Cement Andhra Pradesh Power

Generation Corp Ltd

Bharat Heavy

Electricals Limited

Chhattisgarh State

Electricity Board

Chennai Petroleum

Corporation Limited

Gujarat State

Electricity Board

Cochin Refineries

Limited

Dainik Bhaskar

Power Limited

Larson & Toubro (L&T) Gujarat State

Energy Generation

Ltd

Haryana Electricity

Board

Hindustan

Newsprint Limited

Sharjah Electricity

& Water Authority

Petroleum

development of

oman

Jindal Power

Limited

Karnataka Power

Corporation Ltd

National Aluminium

Company

National Thermal

Power Corporation

Ltd

NTPC TamilNadu

Energy Company

Ltd

Masood John

Brown

Dubai Electricity &

Water Authority

Tamil Nadu

Electricity Board

Thiru Arooran Sugars

Limited

Uttar Pradesh

Electricity Board

Fisia Italimpianti.

Gruppo Impregilo

Gasco Jindal Strips

Limited

Neyveli Lignite

Corporation Limited

Maharashtra State

Power Corp. Ltd

Reliance Energy

Limited

VISA Power Avanta Power Doosan Power

Systems India Pvt Ltd

Lalitpur Power

Generation

Company Limited

KC Cottrell

Page 33: Company profile updated on 11.03.2016

Awards and Accolades

Page 34: Company profile updated on 11.03.2016

Performance Awards

Page 35: Company profile updated on 11.03.2016
Page 36: Company profile updated on 11.03.2016
Page 37: Company profile updated on 11.03.2016

Safety Awards

Page 38: Company profile updated on 11.03.2016
Page 39: Company profile updated on 11.03.2016
Page 40: Company profile updated on 11.03.2016
Page 41: Company profile updated on 11.03.2016

Work Completion certificates

Page 42: Company profile updated on 11.03.2016
Page 43: Company profile updated on 11.03.2016
Page 44: Company profile updated on 11.03.2016
Page 45: Company profile updated on 11.03.2016
Page 46: Company profile updated on 11.03.2016
Page 47: Company profile updated on 11.03.2016
Page 48: Company profile updated on 11.03.2016
Page 49: Company profile updated on 11.03.2016
Page 50: Company profile updated on 11.03.2016
Page 51: Company profile updated on 11.03.2016
Page 52: Company profile updated on 11.03.2016
Page 53: Company profile updated on 11.03.2016
Page 54: Company profile updated on 11.03.2016
Page 55: Company profile updated on 11.03.2016