SOCIAL/ ECONOMIC DATA
GNP GROWTH
2007
2008
2009
11.2 %
8.8 %
3.0 %
POPULATION / EMPLOYMENT
3.300 MIL
1.580 MIL 48%
Republica de Panamá
CITY OF PANAMA
EMPLOYMENT 532,000
POBLACIÓN Y EMPLEO2009
331 mil hab
29 mil empleos
345 K , Popul.380 K employmnt
459 mil hab69 mil emp
429 mil hab28 mil empleos
16 mil hab25 mil empleos
Ancón Este
NORTES. Miguelito- Alcalde Díaz
ESTE
Chanis - Tocumen
OESTEChorrera-Arraiján
POPULATION
Trips per day 2.000.000
Percentages
Autobuses 30%
Particular 19%A pie 40% Taxi 11%
Total cars and buses 420.000
Average trip time 74 min
One or more transfers49% 63% from perifery (2009)
MOVILIZACION EN LA CIUDAD
CURRENT DEMAND
Source: Encuestas de Ocupación 2009, AllConsult-A. Harris, Estudio de Demanda de Transporte Público Actual, Secretaría del Metro de Panamá.
Same basic numbers for 5 to 6 am , and 7 to 8 am
Entering City: 6 – 7 a.m.
Hig Population growth High Emissions (Bus Pollution) Old buses and vans (Average life 16 and18 years old). Lack of Order – Anarchy. Competition for passengers. Non compliance with traffic laws. Traffic Jams High cost per trip Very low quality service Lack of Alternatives to the car.
Characteristics
Why Mass transportation system
METRO and METROBUS
• EL METROBUS will replace the red devils.• Will Feed Metro System• Both are good alternatives to the car (partially and depending on time and
destination)
El Metrobus will enter service in late 2010, Metro line 1 by2014
NEW SOLUTIONS
Aluminum chassis
MinimalStation
Entranceswhere
required
Sleek elevated design where possible
BASIC CONFIGURATIONS
VERTICAL
PRINCIPAL CHARACTERISTICS
DESIGN DEMAND 40.000 pphd
Initial Demand (Year 2014) 15.000 pphd
Length13.5 km. (7.0Km subt, 5.2 Km elev and 1.3
Km. Trench)
Number of Stations 13 (8 subt. And , 5 elev)
Rail Yards 1 de 10 Has. aprox.
Trains
Max. Lenght 100 m.
MinimumInterval
Aprox 90 seconds
OUR CHALLENGES
Start commercial operation by 2014Maintain Costs within budget
Good financing (by Ministry of Economy and Fin.)
Indemnizations
Minimize Public Impact
Relocation of Public Services
Project Communication
PREQUALIFICATION PROCESS
Prequalified Consortia:
A) Acciona, ICA, Mitsubishi (Train CAF)
B) Odebrecht , FCC , (Train Alstom)
C) Impregilo, Astaldi, Ghella (Train Ansaldo/Breda)
Offers expected by August 2010