AREVA and the EPR:

Meeting the Challenge of the Nuclear Revival

NUSIM 2008 – Casta-Papiernicka: April 24, 2008

Ruediger LEVERENZDirector Marketing New Plants – AREVA NP GmbH

3 3AREVA AREVA property - confidential

An integrated offer serving energy professionals

OTHER SOURCES OF ELECTRIC POWER

Transmission

Renewable energiesReactors

Fuel fabrication

Enrichment

Chemistry

Mining

Used fuel treatment

RecyclingMOX fuel fabrication

Services

Front End Division

Reactors and Services Division

Back End Division

Transmission & Distribution Divison

Distribution

4 4AREVA AREVA property - confidential

AREVA’s 2030 scenario: construction or life extension of more than 500 GWe of nuclear power

2006 2030

833 : WEO - 2007 Stabilization 450ppm

731 : WNA - 2007 Upper

691 : IAEA - 2007 High

529 : WNA - 2007 Reference

525 : WEO - 2007 Alternative

447 : IAEA - 2007 Low

415 : WEO - 2007 Reference

438 : DOE EIA - 2006

International institutions

GWe net installed

Theoretical end of life

Life extension

Newconstruction

267

186

635

372

344AREVA

Scenario

5 5AREVA AREVA property - confidential

Installed nuclear generating capacity set to increase worldwide

Rising demand and tight market in the front-end

Nuclear plant construction set to accelerate after 2010Replacement: ~100 reactors / Additional : ~35-300 reactors

Closed cycle to become the standard in the back-end

IAEA 2006 - HauteIAEA 2006 - Basse

WNA 2005 - Hyp. hauteWNA 2005 – Hyp. moy.

IEA-2006 – AlternativeIEA-2006 – Réf.

DOE-EIA 2006 – Réf.

200

300

400

500

600

700

800

2005 2010 2015 2020 2025 2030

740

679

524

414368

+ 13%

+ 101%

416438519

400 reactors to be built

135 reactors to be built

Installed nuclear generating capacity - Forecasts (net GWe)

6 6AREVA AREVA property - confidential

AREVA seeks to deploy its 3rd generation reactor

New installed nuclear generating capacity after 2006by geographic area

(2007 - 2030)

0

50

100

150

200

250

300

350

400

2007 2009 2011 2013 2015 2017 2019 2021 2023 2025 2027 2029

GWe Net

0

50

100

150

200

250

300

350

400

Europe 27 + CEI Amériques Asie Afrique MONDEEurope 27 + CIS N. & S. America

Asia Africa World

7 7AREVA AREVA property - confidential

Our goals

We will

Manage several large projects on an international scale

Meet new market requirements

Satisfy demand from our customers

“We expect to deliver 30 to 40 new power plants worldwide by 2020”

AREVA

… Can it be done ?

0

100

200

300

400

500

1955 1960 1965 1970 1975 1980 1985 1990

8 Units0.4 GWe

71 Units12.5

164 Units111.3 GWe

226 Units206.9 GWe

Units connected

GWe connected

Source: www.iaea.org

9 9AREVA AREVA property - confidential

An integrated manufacturing approach

Continuous quality deliveries of products and integrated processimprovements for existing plants and new build projects

AREVA is building an industry not just plants

Chalon Saint Marcel 30 years of operationsWorkshop: 39 000 m²Reactor Pressure Vessels,Steam Generators, Pressurizers,Safety Injection Accumulators

JSPM (Jeumont)Start of operation: 1898Workshop: 13 000 m²Reactor Coolant Pumpsand Motors, Control Rod DriveMechanisms

Sfarsteel (Creusot)Heavy forging and machiningWorkshops: 85 000 m² (4 sites)

2900m² Extension in 2006

1200m² Ext. by 20122 new production lines by 2011

In AREVAsince 2006

10 10AREVA AREVA property - confidential

An integrated supply approach

Guaranteeing quality, delivery and support

Direct from AREVA’s integrated plants

Primary pipes

EPR critical components

Worldwide industrial equipment manufacturing platform

AREVA NP Inc Lynchburg, VA

(USA)

NUCLEPRio de Janeiro

(Brazil)(Partnership)

SOMANU Maubeuge (France) AREVA NP

Chalon sur Saône(France)

Chengdu & Shenzhen Plants (China) (Partnership)

JSPMJeumont (France)

BWXTLynchburg, VA

(USA)(Partnership)

Pressurizer Control Rod Drive Mechanisms

Reactor Coolant Pumps / Motors

Reactor PressureVessel Head

Steam Generators

Complete I&C for Nuclear Island

AREVA NPGmbH

(Germany)

11 11AREVA AREVA property - confidential

Scope of subcontracted equipment and services that can be localized

Auxiliary Mechanical ComponentsHVAC-EquipmentPipingCivil WorksElectrical EquipmentI&C Equipment (partly)Site Services and Other EquipmentConstruction and Erection ServicesEngineering Services

for the nuclear island, conventional island and BoP systemsand this concerns not only new build projects, but also backfitting activities to attain life time extension

12 12AREVA AREVA property - confidential

A global supply chain approach

Insuring resource availability by building industrial supply schemes

C S 3 -1

Simulator from Canada

Main Generator from North Carolina

Containment Liner from Poland

Separators/Reheaters from Korea & Indonesia

Pumps from Brazil

Fuel HandlingI&C/ElectricalComponents (Forgings & Manufacturing)Services (A/E, QA, Inspection, Erection)

AREVA

…while providing new benefits with the certainty of a proven and evolutionary technology

Offer a design that incorporates the best of what came before…

The Renaissance challenge:

14 14AREVA AREVA property - confidential

EPR is an evolutionary Generation III+

O P 1 -1

Proven PWR platform

EPR enhanced characteristics

EPR benefits

Capitalizes on 87 PWR built Capitalizes on major nuclear European players experience (EDF, EON and RWE having 55% of European nuclear fleet)Design based on Konvoi and N4

• 7 units• 94 reactors year

40 years of operating lifetime

High power output (1600+ MWe) with small footprintEnhanced operational performance

• Total plant net efficiency (up to 37%)

• Higher availability• Shorter outage• Enhanced fuel

utilization and flexibility• Simplified design

Enhanced safety• Resistant to airplane

crash• Core melt retention

system• 4 fold redundancy of

safeguard systems

60 years of operating lifetime

Maximizes the power output per siteLowers operating, maintenance and fuel management costs

Actual design meets current safety requirements and integrates future trendsDesigned to avoid any significant release to the environment

Safe, reliable and proven technology Safe, reliable and

proven technologyImproved safety and

economic performance

Improved safety and economic

performanceSafe, reliable and

outstanding power generation and revenue

Safe, reliable and outstanding power

generation and revenue

15 15AREVA AREVA property - confidential

Redundant and diverse EPR safety systemsEPR is protected against:

Multiple failure while providing online maintenance flexibility

4 times redundant safeguard systems

Common cause failuressafety system diversity:

- Every system has a diversified back-up

External hazards through systematic physical separation of the safety systems

Proven evolutionary safety systems deliver high reliability levels

S R 1 -1

Four Train concept and physical separation

1

23 4

16 16AREVA AREVA property - confidential

Consequences of a severe accident are limited thanks to both passive and active safety systems

Passive System (Short term)

Reactor pit

IRWST

Spreading area

Sacrificial concrete

Active System (Long term)

1. Temporary retainment in the reactor pit (gravity and metal gate)

2. Spreading in the large surface dedicated area (metal gate melting and gravity)

3. Flooding and cooling of the spreading area using IRWST (In-containment Refueling Water Storage Tank)

1. Removal of containment heat:• Recirculation and coolant

heat exchange• Containment spray system

No need for significant off-site measures improves Public acceptanceS C 1 -1

&

17 17AREVA AREVA property - confidential

EPR aircraft hazard protection

EPR Designed to withstand impact of:

Large Commercial Jet &

At various Elevations &

Military Aircraft

From different Sides

Simply, yes, the EPR resists to commercial and military aircraft crashes.

S A 2 -1

18 18AREVA AREVA property - confidential

EPR the only Generation III+ under construction

3 years of operating experience by 2015

Olkiluoto 3, Finland Flamanville 3, France

Calvert Cliffs 3, U.S.

Under Construction

Project Preparation

C A 8-1

Taishan 1, China

19 19AREVA AREVA property - confidential

EPR design currently being licensed by other leading safety authorities

February 2005 April 2007

Licensing Launched

Submission June 2007

Submission December 2007

Construction License

AREVA supports a shorter licensing process by providing comprehensive reference documents

L L 1 -1

20 20AREVA AREVA property - confidential

The in the future … what’s next?

DC documents submitted to NRCHeavy Components orderedUSA

1. Proposal submittedSouth Africa

Generic Design Assessment on-goingUK

Baltic

Project

in preparation

United Arabian

Emiratsin preparation

21 21AREVA AREVA property - confidential

Progress in construction: activities on site

C A 3-1

22 22AREVA AREVA property - confidential

EPR the only Generation III+ under construction: Flamanville 3

First of the new EDF EPR fleetGenerating power and revenue

by 2012

C A 7 -1Copyright EDF

23 23AREVA AREVA property - confidential

Project models for new builds

Nuclear Steam Supply System (NSSS)

Nuclear Island

Turnkey projects for complete plantsWith partners for the turbine generator part

24 24AREVA AREVA property - confidential

Contracts for duplication of the Ling Ao nuclear plant (2nd Generation)

Partenariat avec Constelation « UNISTAR »Certification lancée Démarrage prévu avant 2010

Tender submitted in February 2005 for 4 EPR reactorsOfficial decision expected

Partnership with Constellation: "UNISTAR"Licensing process started Startup scheduled before 2010

2005: Preliminary design End of public debatePlanning 2006-2012

2003: Contract2005: Certification

& License

Plants: current projects and tenders

NSSSNuclear islandTurnkey plants / Consortiums Primary coolant loop

24

25 25AREVA AREVA property - confidential

Operators and owners benefit from EPR standardization

With the EPR, you are always part of a fleetMember of the owner / operator group (FROG)

With the EPR, you are always part of a fleetMember of the owner / operator group (FROG)

Therefore, you will benefit from:Shared experience

Worldwide availability of spare parts and expertise

Qualified and proven design

Therefore, you will benefit from:Shared experience

Worldwide availability of spare parts and expertise

Qualified and proven design

EPR standardization lowers risk by:Reducing engineering and construction time and risks

Reducing operating and maintenance costs

Enhancing safetyE S 1 -1

26 26AREVA AREVA property - confidential

Can the nuclear industry meet that challenge?

Yes we’re already making it happen at AREVA

It is not easy but it can be done …….