1996OA229-01DRILLING HISTORY (Nov. 26, 1996 - June 22, 1997) - Genoil et al., Saint-Léonard No. 1
BISSETT RESOURCE CONSULTANTS LTD.
200, 840 - 6 AVENUE S.W. CALGARY, ALBERTA T2P 3E5
(403) 294-1888 (24-hour)
(403) 263-0073 (Fax)
[email protected] (e-mail)
www.bissettres.com (website)
GENOIL INC.
GENOIL et al ST. LAT. 46°04'32.84",
LEONARD NO LONG. 72°23
. 1 '13.92"
DRILLING HISTORY NOVEMBER 26, 1996 TO JUNE 22, 1997
aBISSETT RESOURCE CONSULTANTS LTD.
CONTENTS
Item/Description Tab Page No.
I. DRILLING HISTORY 1
General Well Data Summary 1 - 17
II. SUPPORTING INFORMATION 2
Directions to Wellsite 1
Moving In and Rigging Up Checklist 2 - 5
Surface Casing Information 6
Surface Casing Pipe Tally 7
Intermediate Casing Information 8 - 9 Intermediate Casing Pipe Tally 10 - 11
Drilling Liner Casing Information 12
Drilling Liner Pipe Tally 13 - 14
Formation Leak Off Test Reports 15 - 17
Directional Survey Report 18 - 34
Directional Survey Plot Plan (Plastic Pocket) -
Deviation Surveys 35
Bit Records 36 - 41
Summary of Flow Prover Volume Calculations 42 - 45
Plug-Back and Abandonments Reports 46 - 49
Logging Record 50
Surplus Equipment Record 51
III. PROGRESS REPORTS 3
Daily Construction Reports 1 - 13
Daily Drilling Reports 14 - 232
Daily Construction Reports 233 - 260
aBISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY
DRILLING HISTORY
OPERATOR Genoil Inc.
WELL NAME & NUMBER GENOIL et al ST. LEONARD NO. 1
LOCATION Quebec Lowlands
COORDINATES Latitude: 46°04'32.84" north
. Longitude: 72°23'13.92" west
ELEVATIONS : 72.0 m GL 72.0 m CF 79.3 m KB
UNIQUE IDENTIFIER Not applicable
WELL LICENCE NUMBER : 93PG865
STATUS Exploration
FIELD Not defined
DRILLING CONTRACTOR Ressource Naturelle Ralex Inc. RIG NO. 01
TOTAL DEPTH (DRILLER) : 4029.7 m GL 4029.7 m CF 4037.0 m KB
PLUG BACK TOTAL DEPTH - m GL - m CF - m KB
INTERNAL TOTAL DEPTH - m GL - m CF - m KB
SPUD:DATE/TIME November 26, 1996: 2:00 p.m.
FINISHED DRILLING:DATE/TIME: June 11, 1997: 11:30 p.m.
RIG RELEASED:DATE/TIME • June 22, 1997: 12:00 noon
The data contained in this report has been compiled from field records
maintained by the Wellsite Drilling Supervisor(s): D. Gaboury/R. Genest/
M. Kramps/C. Creelman
DATE July 1, 1997 COMPILED BY: Gaboury/Genest/Kramps/Creelman
DATE December 1, 1997 APPROVED BY: Dick Bissett
PAGE NO. 01
I
aBISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
HOLE SIZE RECORD
CONDUCTOR : 584 mm x 30.0 m KB. SURFACE : 444 mm x 569.5 m KB.
INTERMEDIATE - mm x - m KB. INTERMEDIATE : 244.5 mm x 2040.5 m KB.
MAIN - mm x - m KB. OTHER (EXPLAIN) -
TUBULAR RECORD
CONDUCTOR PIPE 508.0 mm OD, n/a kg/m, API GRADE n/a TYPE
CONST. Welded , RGE - THD
CONNECTION Welded . LANDED @ 30.00 m KB.
CEMENTING DETAILS Cemented full length, volume
unknown.
SURFACE CASING 339.7 mm OD, 90.8 kg/m, API GRADE K55 TYPE
CONST. - , RGE 3 THD 8RD ,
CONNECTION ST&C LANDED @ 569.50 m KB.
CEMENTING DETAILS 85.6 tonnes of Class "G"
INTERMEDIATE CASING 244.5 mm OD, 79.6 kg/m, API GRADE N80 TYPE
CONST. - , RGE 3 THD 8RD ,
CONNECTION LT&C . LANDED @ 2340.50 m KB.
CEMENTING DETAILS -
INTERMEDIATE CASING - mm OD, - kg/m, API GRADE TYPE
CONST. - , RGE - THD CONNECTION - . LANDED @ - m KB.
CEMENTING DETAILS
PAGE NO. 02
J
BISSETT RESOURCE CONSULTANTS LTD. le:
GENERAL WELL DATA SUMMARY (CONTINUED)
TUBULAR RECORD (CONTINUED)
PRODUCTION LINER 177.8 mm OD, 43.2 kg/m, API GRADE L80 TYPE
CONST. - , RGE 3 THD 8RD ,
CONNECTION LT&C . LANDED @ 3494.00 m KB.
TOP LINER SET @ 2233.6 m KB. CEMENTING DETAILS:
mm OD, - kg/m, API GRADE - TYPE
CONST. - , RGE - THD
CONNECTION - . LANDED @ - m KB.
CEMENTING DETAILS
PRODUCTION CASING
REFER TO SECTION " 2 " FOR TUBULAR INFORMATION AND PIPE TALLIES.
DRILLING FLUID SUMMARY
TYPE INTERVAL USED
m KB AVERAGE PROPERTIES
DEN. VIS. W.L. PH PV YP SOLIDS
Gel chem 0 - 573 1060 55 14.0 95.0 28.0 8.0 4.00 Air 573 - 2698 Air drilling - - - - - Gel chew 573 - 2698 1350 200 5.0 9.0 85.0 35.0 15.00
Polymer 573 - 2342 1220 150 6.0 9.0 50.0 20.0 14.00
Polymer 2342 - 3495 1220 160 6.0 9.0 65.0 23.0 7.50
Air 3495 - 4037 Air drilling - - - - -
DRILLING FLUID SERVICE COMPANY : M-I Drilling Fluids Canada Inc.
PAGE NO. 03
J
aBISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
FORMATION INTEGRITY PRESSURE TEST RECORD
A FORMATION INTEGRITY TEST WAS/NRSXXOT CONDUCTED. THE SURFACE CASING SHOE WAS
SET AT 569.5 m KB, DEPTH OF HOLE WAS 579.0 m KB AND THE FLUID COLUMN
WAS 1010.0 DURING THE TEST. SURFACE APPLIED LEAK-OFF PRESSURE OF 6 700 kPa
WAS RECORDED. THE RESULTANT LEAK-OFF PRESSURE AT THE CASING SHOE WAS 21.7
kPa/m OR 12 338 kPa TOTAL PRESSURE. [NO FORMATION INTEGRITY TEST WAS RUN,
kPa/m WAS EMPLOYED TO CALCULATE "MRCP" SHOULD A KICK SITUATION ARISE.]
REMARKS:
TESTING COMPANY: Ralex Inc.
REFER TO SECTION " 2 " FOR TEST RESULTS.
BIT RECORD
Surface Intermediate Intermediate Main Other
No. Used : 2/7 2 17 8
Size - mm : 444/311 311 215.9 155.6
Remarks: -
REFER TO SECTION " 2 " FOR BIT RECORD & HYDRAULICS.
DEVIATION SURVEY RECORD
SURFACE DEVIATION RANGED FROM A MINIMUM OF 0.30 ° OFF VERTICAL AT
501 m KB TO A MAXIMUM OF 6.10 ° OFF VERTICAL AT 292 m
KB.
INTERMEDIATE DEVIATION RANGED FROM A MINIMUM OF 0.40 ° OFF VERTICAL AT
2283 m KB TO A MAXIMUM OF 2.25 ° OFF VERTICAL AT 1040 m KB.
PAGE NO. 04
BISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DEVIATION SURVEY RECORD (CONTINUED)
INTERMEDIATE DEVIATION RANGED FROM A MINIMUM OF 9.10 ° OFF
VERTICAL AT 3495.0 m KB TO A MAXIMUM OF 20.2 ° OFF
VERTICAL AT 3113.0 m KB.
MAIN : DEVIATION RANGED FROM A MINIMUM OF 3.75 ° OFF
VERTICAL AT 3880.0 m KB TO A MAXIMUM OF 10.75° OFF
VERTICAL AT 3484.0 m KB.
REMARKS Totco
REFER TO SECTION " 2 " FOR DRIFT DETAILS.
CORING RECORD
DEPTH - m KB METRES CORE NO. FROM TO FORMATION CORED REC'D REC. REMARKS
Took 9 sidewall samples at 3972 m (2), 3971 m (2), 3970 m (2), 3969 m (2) and
3968 m KB (1). Recovered 3 samples.
SERVICE COMPANY : Schlumberger of Canada
REFER TO SECTION " 2 " FOR CORING DETAILS.
PAGE NO. 05
J
aBISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DRILL STEM TEST RECORD
DST INTERVAL - m KB NO. FROM TO FORMATION
RECOVERY & REMARKS
No DSTs were run. However, the gas flow was measured using a critical flow
prover when the main hole was being drilled. A 3-hour test was run, well was
flowing 3941.0 m3/d at 570 kPa flowing pressure which was not stabilized.
TESTING COMPANY : Wellsite Personnel
REFER TO SECTION " 2 " FOR TESTING DETAILS.
WIRELINE SURVEY RECORD
RUN NO. TYPE DEPTH - m KB
SCALES FROM TO
01 Phasor-Induction 2472.0 569.7 240/600
01 BHCSL 2460.0 569.7 240/600
02 Multi-Fingered Caliper 2285.0 6.0 240
02 DISFL 4028.0 3489.0 240/600
02 DSI 4008.0 2450.0 240/600
02 CNL-LDT 4036.0 2981.0 240/600
LOGGING COMPANY : Schlumberger of Canada
REFER TO SECTION " 2 " FOR LOGGING DETAILS.
PAGE NO. 06
BISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
CEMENT PLUG RECORD
PLUG NO.
DEPTH - m KB CEMENT REMARKS FROM TO TONNES TYPE
1 3930.0 4037.0 4.8 "G" Felt at 3931 m KB. 2 3444.0 3544.0 5.3 "G" Felt at 3420 m KB.
3 2175.0 2275.0 4.6 "G" Felt at 2165 m KB. 4 600.0 650.0 3.7 "G" Felt at 600 m KB.
10.0 19.0 0.5 "G" -
REFER TO SECTION " 2 " FOR PLUG DETAILS.
MISCELLANEOUS DRILLING DETAILS
Remarks (Describe situations/problems/successes/etc. that were unique to drilling operations):
PAGE NO. 07
CI BISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
96 11 26 Spudding 30 Spudded at 14:00.
96 11 27 Drilling 65 Drilled a 311 mm pilot hole.
96 11 28 Drilling 215 Drilled a 311 mm pilot hole.
96 11 29 Drilling 297 Drilled a 311 mm pilot hole.
96 11 30 Drilling 368 Drilled a 311 mm hole.
96 12 01 Drilling 418 Drilled a 311 mm hole.
96 12 02 Drilling 444 Drilled a 311 mm hole.
96 12 03 Drilling 476 Abrupt increase in hole angle to 7°.
96 12 04 Drilling 520 Drilled a_311 mm hole.
96 12 05 Waiting On 535 Plugged back from 535 m to 289 m KB.
Cement
96 12 06 Drilling 312 Polished off cement plug to 312 m KB.
Cement
96 12 07 Drilling 342 Ran mud motor to kick-off plug.
96 12 08 Drilling 377 Attempted to kick off plug.
96 12 09 Drilling 400 Kicked off plug, 95% formation at
400 m KB.
96 12 10 Tripping 426 Surveyed, drilled and tripped.
96 12 11 Drilling 496 Tripped, drilled and surveyed.
96 12 12 Tripping 534 Drilled and tripped. Drilled and tripped.
96 12 13 Tripping 94 Tripped. Picked up hole opener and opened
hole.
96 12 14 Open Hole 247 Tripped, plugged nozzle, opened hole and
tripped.
96 12 15 Open Hole 387 Opened hole.
96 12 16 Open Hole 416 Tripped, reamed and opened hole.
96 12 17 Stuck 492 Opened hole, tripped, changed hole opener.
Opened hole. Stuck drill string.
96 12 18 Tripping 547 Work drill string free. Tripped, ran
311 mm bit, reamed and tripped.
96 12 19 Tripping 547 Tripped, circulated. Tripped. Cemented and
tripped.
PAGE NO. 08
1
CI BISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
96 12 20 Circulating 485 Tripped, circulated, surveyed, drilled
cement and circulate d.
96 12 21 Tripping 485 Circulated, tripped, reamed, circulated
and tripped.
96 12 22 Drilling 493 Tripped, ran 311 mm bit with motor.
Drilled.
96 12 23 Tripping 499 Drilled, surveyed, tripped, drilled and
tripped.
96 12 24 Tripping 507 Tripped, surveyed, drilled and surveyed.
96 12 25 Drilling 557 Drilled and surveyed.
96 12 26 Under Reaming 410 Drilled, surveyed, tripped, underreamed.
96 12 27 Open Hole 410 Underreamed, tripped and tripped.
96 12 28 Fishing 573 Opened hole, fished, tripped.
96 12 29 Tripping 555 Opened hole to 555 m KB. Tripped and
changed cutters.
96 12 30 Tripping 571 Tripped, opened hole to 571 m KB.
Circulated, tripped.
96 12 31 Waiting On 571 Tripped, ran casing, cemented, waited on
Cement cement.
97 01 01 Nippling Up 571 Waited on cement, headed up.
97 01 02 Nippling Up 571 Headed up BOPs.
97 01 03 Nippling Up 571 Headed up and pressure tested.
97 01 04 Drilling 582 Drilled out, drilled to 582 m KB. Unloaded
hole.
97 01 05 Drilling 642 Tripped for air drilling. Drilled.
97 01 06 Drilling 775 Drilled.
97 01 07 Drilling 944 Drilled.
97 01 08 Drilling 1140 Drilled.
97 01 09 Drilling 1339 Drilled and cleaned BOPs.
97 01 10 Drilling 1470 Tripped and drilled.
97 01 11 Drilling 1650 Drilled.
PAGE NO.
aBISSETT RESOURCE CONSULTANTS LTD.
J
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
97 01 12 Drilling 1850 Drilled and cleaned BOPs.
97 01 13 Drilling 1952 Drilled.
97 01 14 Drilling 2081 Drilled, wiper trip and surveyed.
97 01 15 Drilling 2270 Drilled and surveyed.
97 01 16 Drilling 2352 Jet BOPs, tripped and drilled.
97 01 17 Drilling 2491 Drilled and surveyed.
97 01 18 Surveying 2678 Drilled and surveyed.
97 01 19 Filling With 2698 Tripped, cleaned hole and filled with mud.
Mud
97 01 20 Tripping 2698 Mixed mud, filled hole in stages and
tripped.
97 01 21 Tripping 2698 Tripped, circulated, worked pipe and
tripped.
97 01 22 Tripping 2698 Tripped and mixed mud.
97 01 23 Tripping 2698 Tripped and reamed.
97 01 24 Mixing Mud 2698 Mixed mud and reamed.
97 01 25 Reaming 2698 Reamed and circulated.
97 01 26 Stuck Pipe 2698 Reamed and stuck pipe.
97 01 27 Stuck Pipe 2698 Worked stuck pipe.
97 01 28 Stuck Pipe 2698 Ran free point.
97 01 29 Tripping 2698 Tripped.
97 01 30 Reaming 2698 Picked up BHA. Tripped and mixed mud.
97 01 31 Reaming 2698 Reamed and tripped. 97 02 01 Reaming 2698 Reamed.
97 02 02 Reaming 2698 Reamed.
97 02 03 Tripping 2698 Reamed and tripped. 97 02 04 Reaming 2698 Tripped, reamed, circulated and repaired
rig.
97 02 05 Reaming 2698 Tripped and reamed. 97 02 06 Circulating 2698 Reamed, repaired rig and circulated. 97 02 07 Tripping 2698 Tripped, reamed, rag open hole logs.
PAGE NO. 10
BISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
97 02 08 Tripping 2698 Tripped, reamed, circulated and ran
drillpipe open-ended.
97 02 09 Laying Down 2698 Tripped, circulated, cemented, tripped,
circulated and laid down drillpipe.
97 02 10 Tripping 2698 Tripped, circulated, tripped.
97 02 11 Circulating 2340 Tripped, repaired pumps, polished plug.
Circulated.
97 02 12 Circulating 2342 Circulated and made dummy trip.
97 02 13 Circulating 2342 Circulated and made dummy trip.
97 02 14 Circulating 2342 Circulated and made dummy trip.
97 02 15 Circulating 2342 Circulated, laid down drillpipe and ran
casing.
97 02 16 Circulating 2342 Ran casing and circulated.
97 02 17 Nippling Up 2342 Ran casing, circulated, cemented and
headed up.
97 02 18 Nippling Up 2342 Headed up, repaired rig and cleaned rig.
97 02 19 Pressure 2342 Headed up, repaired rig and pressure
Testing tested BOPs.
97 02 20 Tripping In 2342 Pressure tested BOPs. Ran BHA and drill-
pipe.
97 02 21 Blow Hole 2342 Ran drillpipe. Drilled out. Ran leak-off
test. Blew hole with air.
97 02 22 Blow Hole 2441 Drilled.
97 02 23 Tripping 2450 Drilled. Tripped for mud motor. Tripped
out. 97 02 24 Blow Hole 2504 Picked up new mud motor. Tripped. Drilled.
97 02 25 Drilling 2572 Plugged bit, tripped out. Laid down mud
motor. Tripped and drilled.
97 02 26 Working Stuck 2684 Drilled. Drill string stuck.
Pipe
97 02 27 Tripping 2684 Worked stuck pipe, mechanical back off.
PAGE NO. 11
aBISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
97 02 27 Tripping (Cont'd) Tripped.
97 02 28 Working Stuck 2684 Ran free point, backed off. Could not pull
Pipe free.
97 03 01 Cementing_ 2684 Reran string shot, tripped and ran cement
plug.
97 03 02 Circulating 2360 Tripped, drilled out cement and
conditioned mud.
97 03 03 Tripping 2360 Conditioned mud, waited on cement and
tripped out.
97 03 04 Conditioning 2360 Cleaned tanks, mixed new mud. Ran
Mud directional tools.
97 03 05 Drilling 2416 Tripped. Directionally drilled kick-off
plug. Displaced hole and drilled.
97 03 06 Drilling 2445 Directionally drilled. Tripped.
97 03 07 Drilling 2475 Tripped. Directionally drilled.
97 03 08 Drilling 2513 Directionally drilled.
97 03 09 Drilling 2540 Drilled, tripped. Drilled.
97 03 10 Drilling 2610 Directionally drilled.
97 03 11 Drilling 2651 Directionally drilled. Dummy trip.
Drilled.
97 03 12 Drilling 2695 Directionally drilled.
97 03 13 Drilling 2713 Directionally drilled. Dummy trip.
Tripped.
97 03 14 Drilling 2727 Accumulator test. Drilled. Tripped 15
stands for washout. Hit crown.
Directionally drilled.
97 03 15 Drilling 2773 Directionally drilled.
97 03 16 Drilling 2807 Dummy trip. Reamed. Inspected crown, okay.
97 03 17 Drilling 2860 Directionally drilled.
97 03 18 Drilling 2873 Drilled, tripped into casing. Repositioned
tools.
PAGE NO. 12
I
CI BISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
97 03 19 Wiper Trip 2922 Tripped. Drilled. Dummy tripped.
97 03 20 Wiper Trip 2979 Dummy tripped. Wiper in. Drilled.
Circulated.
97 03 21 Wiper Trip 3008 Dummy tripped. Drilled.
97 03 22 Tripping 3009 Tripped. Reamed from 2600 m to 2660 m KB.
97 03 23 Drilling 3032 Drilled. Motor failure. Tripped.
97 03 24 Tripping 3055 Tripped. Drilled.
97 03 25 Wiper Trip 3102 Dummy tripped to 2600 m KB.
97 03 26 Tripping 3125 Tripped.
97 03 27 Working Junk 3125 Tripped.
Sub
97 03 28 Drilling 3136 Motor drilled.
97 03 29 Drilling 3180 Motor drilled.
97 03 30 Reaming 3197 Dummy tripped to 2500 m KB. Reamed
bridges.
97 03 31 Tripping 3218 Tripped.
97 04 01 Drilling 3231 Motor drilled.
97 04 02 Drilling 3273 Motor drilled.
97 04 03 Reaming 3285 Dummy tripped to shoe. Cleaned bridges.
97 04 04 Drilling 3321 Motor drilled.
97 04 05 Tripping 3343 Tripped.
97 04 06 Circulating 3343 Wash-out occurred. Tripped. Dropped
single.
97 04 07 Fishing 3343 Fished.
97 04 08 Fishing 3343 Fished. Reamed.
97 04 09 Wiper Trip 3343 Fished.
97 04 10 Fishing 3343 Fished.
97 04 11 Fishing 3343 Fished. Conditioned mud and hole.
97 04 12 Fishing 3343 Fished. No recovery.
97 04 13 Fishing 3343 Fished. No recovery.
97 04 14 Fishing 3343 Fished.
PAGE NO. 13
CI BISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
97 04 15 Fishing 3343 Fished.
97 04 16 Fishing 3343 Fished and ran bit.
97 04 17 Fishing 3343 Fished. Recovered single.
97 04 18 Fishing 3343 Fished. Clean-out run with bit.
97 04 19 Fishing 3343 Fished. Tripped and laid down fish.
97 04 20 Repairs 3343 Changed out shakers, installed top drive.
97 04 21 Repairs 3343 Installed top drive.
97 04 22 c/o Pipe 3343 Picked up drillpipe and directional
equipment.
97 04 23 Circulating 3343 Tripped, reamed bridges and conditioned
hole.
97 04 24 Drilling 3349 Drilled.
97 04 25 Clean-Out 3367 Pipe parted. Tripped. Cleaned to top of
fish.
97 04 26 Tripping 3367 Tripped out and recovered fish.
97 04 27 Tripping 3367 Ran in hole with tooth bit and cleaned to
bottom.
97 04 28 Circulating 3367 Circulated to condition mud and hole.
97 04 29 Tripping 3367 Circulated and tripped out.
97 04 30 Waiting 3367 Rigged to lay down drillpipe. Waited on
drillpipe inspector.
97 05 01 Circulating 3367 Circulated and waited on pipe inspector.
Tripped and inspected.
97 05 02 Inspection 3367 Inspected drillpipe.
97 05 03 Circulating 3367 Circulated, tripped, pulled out of hole
and inspected drillpipe.
97 05 04 Tripping 3367 Tripped, ran casing inspection log,
tripped in with directional tools.
97 05 05 Wiper Trip 3400 Dummy trip to shoe. Directionally drilled.
97 05 06 Circulating 3448 Drilled, increased mud density.
Sample
PAGE NO. 14
CBISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
97 05 07 Wiper Trip 3495 Circulated sample, dummy tripped, drilled.
97 05 08 Tripping Out 3495 Dummy tripped, circulated to condition mud
and hole. Tripped out to run casing.
97 05 09 Running Liner 3495 Ran drilling liner.
97 05 10 Waiting On 3495 Cemented liner and waited on cement.
Cement
97 05 11 Running In 3495 Waited on cement. Tripped in to liner top.
Hole Tripped out.
97 05 12 Tripping, 3495 Ran 89 mm drillpipe. Drilled out cement.
Drilling Out
97 05 13 Circulating 3495 Circulated casing, waited on liner packer.
97 05 14 Running 3495 Made up and ran packer sealing assembly.
97 05 15 Pressure Test 3499 Set packer and pressure tested liner and
seal assembly, okay. Tripped in with bit.
Drilled out. Ran formation integrity test.
Made up bit, tripped in to 600 m KB. Blew
holé with air at 200-m intervals. Drilled.
97 05 17 Waiting On 3532 Air drilled. Air booster broke down.
Booster Tripped out and waited on repairs.
97 05 18 Waiting 3532 Waited on repairs.
97 05 19 Waiting 3532 Waited on repairs.
97 05 20 Waiting On 3532 Waited on repairs.
Mechanic
97 05 21 Waiting 3532 Waited on repairs.
97 05 22 Waiting 3532 Repaired air compressor. Tripped and air
drilled.
97 05 23 Surveying 3549 Tripped. Air drilled.
97 05 24 Surveying 3549 Attempted to achieve directional surveys.
No progress.
97 05 25 Surveying 3558 Surveyed, drilled and surveyed.
97 05 26 Running In 3606 Surveyed, drilled, surveyed, tripped. Hole
PAGE NO. 15
J
Cli BISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
97 05 27 Running In 3606 Tripped in. Survey line broke.
Hole
97 05 28 Repairing 3607 Drilled.
Hole
97 05 29 Waiting On 3614 Drilled, compressor failure.
Parts
97 05 30 Surveying 3633 Repaired compressor. Drilled.
97 05 31 Drilling 3657 Drilled.
97 06 01 Tripping 3667 Tripped.
97 06 02 Tripping 3695 Tripped.
97 06 03 Waiting On 3695 Twisted off, fished and inspected BHA.
Inspector
97 06 04 Drilling 3698 Drilled.
97 06 05 Drilling 3704 Drilled, tripped out and picked up hammer.
97 06 06 Tripping 3754 Drilled. Tripped out plugged drill string.
97 06 07 Drilling 3805 Tripped and drilled.
97 06 08 Blow Hole 3888 Drilled.
97 06 09 Working Stuck 3889 Tripped out. Tripped in. Stuck drill
Pipe string.
97 06 10 Drilling 3896 Worked pipe free. Tripped.
97 06 11 Drilling 3992 Drilled.
97 06 12 Shutting In 4037 Drilled. Tripped out. Shut in well for
Well gas readings.
97 06 13 Displacing 4037 Read and recorded gas. Tripped in and
displaced to mud.
97 06 14 Circulating 4037 Circulated to condition mud and hole.
97 06 15 Running In 4037 Tripped, loggers broker down.
Hole
97 06 16 Logging 4037 Clean-out trip.
Hole
97 06 17 Logging 4037 Ran open hole logs.
PAGE NO. 16
i
aBISSETT RESOURCE CONSULTANTS LTD.
GENERAL WELL DATA SUMMARY (CONTINUED)
DAILY CHRONOLOGICAL DRILLING HISTORY
DATE 08:00
REMARKS STATUS DEPTH
97 06 18 Running In 4039 Tripped in.
Hole
97 06 19 Waiting on 4039 Ran plugs 1 and 2, waited on cement.
Cement
97 06 20 Waiting 4039 Waited on cement. Ran plugs 3 and 4. 97 06 21 Waiting 4039 Waited on cement. Ran plug 5. Tore out
BOPs.
97 06 22 Welding Cap 4039 Cut off casing and welded on cap. Tearing
out.
97 06 23 Rig Released 4037 Released rig.
PAGE NO. 17
Saint-Leonard D-Astol
Approximately 5.0 km from location l o
H U po.
Approximately 10.0 km from location
Notre-Dame-du-Bon-Conseil 125.0 km to Montreal
Wellsite Supervisor: Calder H. Creelman Date: 96 08 17
PAGE NO. 01
Cli BISSETT RESOURCE CONSULTANTS LTD.
DIRECTIONS TO WELLSITE
Well: GENOIL et al ST. LEONARD NO. 1
Location: Quebec Lowlands
Below find sketch of route, kilometreage, informational signs and other directional indicators from the nearest city, town, or village to the wellsite.
Approximately 110.0 km to Quebec City
zyte
WELL: Quebec Lowlands GENOIL ST. LEONARD NO. 1 LOCATION:
CONTRACTOR:
RIG MANAGER:
RIG NO.: 01
Gerry Ouimet/Leslie Turriff
Ralex Inc.
Consultants This summary is to be completed and forwarded to Bissett Resource Ltd.'s office when the contractor is rigging up to spud.
1. CAMP
(a)
(b)
(c)
(d)
(e)
(f)
Drilling supervisor, geologist, rig manager
Yes
Distance of camp from rig (m)
Located up-wind to the prevailing wind?
Located on the access road. If no, where?
Located to prevent drainage from wellsite?
Who, if anyone, has living quarters on the well location Sample of drinking water sent away for analysis?
(a)
(b)
(c)
(d)
(e)
Type and make of drawworks
Type of brake
If brake is water cooled, is line hooked up?
Type and make of mast
Size of drilling line
BISSETT RESOURCE CONSULTANTS LTD.
MOVING IN AND RIGGING UP CHECKLIST
2. DRILLING EQUIPMENT
(f) Mud Pumps: Number
Make
Size of liners in stock
Pop valves safe?
Outlet on suction to allow for tie-in of water or oil for displacement? Size
(g) Mud Tanks: Number
Capacity (m3 in each)
Bypass for tank cleaning
Mud Guns
Two
National 9-P-1000
159 mm and 140 mm
Yes
Yes
Three
165.0 Yes
Yes
PAGE NO. 02
Brewster N75A
Parkersburg 46SR
n/a
LC Moore, 41.5 m
32 mm
n/a
94 kW
Diesel
Automatic
861 kPa
861 kPa
Good
96 10
45.0
n/a 114 mm, "E"/114 mm,
Prespud/prespud
114XH/114XH
BISSETT RESOURCE CONSULTANTS LTD. 414,
(h) Fuel Storage: Capacity 17 000 litres
Distance from wellhead (m) 7.0
Cut-off valve for fuel supply Yes
(i) Water Supply Source: Storage Capacity
(j) Boiler: Capacity
Type of Fuel
Automatic or Manual
Pressure Rating
Pop Discharge Pressure
Condition
Date of Last Inspection
Distance from well (m)
(k) Drill Pipe: Number of Joints
Size and Grade
Inspection Date
Thread Description
Condition (good, fair, poor) Premium
(1) Pipe Racks: Number Three sets
Condition Good
Footing Adequate
(m) Drill Collars: Number OD x ID
Yes
6 - 229 mm, 21 - 171 mm
Thread Description
(n) Overshot: Make
Size Range
(o) Substructure: Clearance from ground (m)
Condition of substructure
Matting considered adequate
(p) Shale Shakers: Size
Condition
Condition of Motor and Electrical Connections
177H90 and 127H90
Rental item
114 mm to 229 mm
7.15
Good
Yes
Two Brandt Tandem
Fair
Okay
PAGE NO. 03
J
Okay
22.0 m
Okay
Yes
Yes
Yes
Yes
Yes/chain
Yes
n/a
8 - 14 kg Ansul, ABC 96 11 30 Boiler, toolhouse, dog
house, light plan, ac-
mulator shack
2 - doghouse and trailer
Yes
MSA - Six
Six extra bottles
Yes
Yes
Yes
aBISSETT RESOURCE CONSULTANTS LTD.
(q) Rig Lighting: Condition of Wiring
Distance of Light Plant from Well
Lighting considered adequate
All lights vapor-proof
3. SAFETY OF PERSONNEL AND PROPERTY
(a) All guards in place on V-belts and chains
(b) Crown blocks and monkey boards accurately fastened
(c) Safety escape line installed
(d) Kelly hose tied with wire rope at both ends
(e) Safety line on tongs in good condition and counter weights suspended below floor or safely chained
(f) Number of Fire Extinguishers
Size and Type
Date of Last Inspection
Where located
(g) Number of first aid kits and location
Considered adequate for location
(h) Number of air packs on hand
Type of air packs
(i) Floor and catwalk clear of loose objects, unsecured boards, protruding nails, etc.
All safety rails on floor and stairs in place
(j) Is the doghouse heater a safe installation
(k) Is the flare pit 50 m from the well and is brush cleared away so that no flares can ignite the surrounding trees? Yes
PAGE NO. 04
1
aBISSETT RESOURCE CONSULTANTS LTD.
4. MISCELLANEOUS
(a) My Mobile Number(s) (819) 472-0176
Trailer Land Line (819) 399-2484
(b) Area(s) -
(c) Channel(s) Name -
(d) Mobile in truck or trailer -
(e) Rig Manager Mobile Number(s) (819) 399-2415 Trailer
Land line
(f) Mobile in truck or trailer
(g) List name(s) of personnel with Blowout Prevention Training:
Name
Type of Ticket Expiry Date
Marcel Jacque
Raymond Berube
Mark Belanger
First Line BOP Not available
First Line BOP 99
First Line BOP Not available
Tim Astel First and Second Line BOP 96 12
Gerry Ouimet
Leslie Turriff
Doug Gaboury
Randy Genest
Mike Kramps
Second Line BOP
Second Line BOP
Second Line BOP
Second Line BOP
Second Line BOP
Not available
Not available
98 07 19 97 11 07
Not available
98 03 29 Calder Creelman Second Line BOP
5. FIELD FOREMAN'S COMMENTS
Wellsite Supervisor: Calder Creelman Date: 96 11 25
PAGE NO. 05
1
BISSETT RESOURCE CONSULTANTS LTD. Cil
CASING INFORMATION
Surface Casing OD
339.7 Intermediate Casing OD
Production Casing OD
Liner OD
mm
mm
mm
mm
GENOIL et al ST. LEONARD NO. 1 LOCATION Quebec Lowlands DATE 96 12 30
Casing Depth
Jts. On m on Weight Joints Landed m Run
Location Location _1111.2_ Grade Rge• Thread T&C Make Run m in Well
51 644.30 90.8 K55 8RD S Nippon 45 569.52 570.03
Accessories Shoe: Make Weatherford Type Float 0.50
Collar: Make Weatherford Type Float 0.35
Centralizers: Make Weatherford No. 9 Landing Joint Length (When Used)
Positions: Centre joint 1, CC2, 4, 20, Overall Length of String 570.88
25, 30, 35, 40 and 45. One solid m up from KB (Subtract) 1.36
centralizer 4 m below surface Depth Set - Driller Tally 569.52
Scratchers: Make Weatherford No. 12 Shoe Joint Overall (Subtract) 14.91
Collar Depth - Driller Tally 554.61
Positions: Evenly spaced across joints Remarks: -
1 and 2 from 569.00 to 540.99
No. of Collars Welded First two joints
Running and Cementing
Running
Power Tongs Weatherford Torque: Max. 10 090 N.m Nom. 8 070 N.m Min. 6 050 N.m
Times: Started In 10:00 Hrs On Bottom 19:45 Hrs Circulated 205 Minutes
Fill Up Points Every joint
Cementing
Cement Company Dowell Schlumberger
Types & Quantity of Cement 85.6 tonnes of Class "G"
Slurry Weight 1900 kg/m3 Flush Ahead: Type Fresh Water Amount 10.0 m3
Times: Start Mix 23:49 Hrs Finish 01:07 Hrs Start Disp. 01:10 Hrs Finish 02:15 Hrs
Calculated Displacement 44.0 m3 Pressures: Max. Pump 7 000 kPa Bump 10 000 kPa
Cement Returns Yes/NN No. of m3 10.0
Landing
Time 13:00 Hrs Date 96 12 31 Weight of Strings (less blocks) 49 000 daN
Weight Landed in Slips n/a daN Landing Bowl (size x series x type) -
Remarks: -
Wellsite Supervisor Mike Kramps
PAGE NO. 06
WELL
•
CI BISSETT RESOURCE CONSULTANTS LTD.
PIPE TALLY
DATE 96 12 30 PAGE NO 1 OF 1
WELL GENOIL et al ST. LEONARD NO. 1 LOCATION Quebec Lowlands
OPERATOR Genoil Inc. RIG Ralex 01
PIPE DESCRIPTION SIZE 339.7 mm WT 90.8 kg/m GRADE K55 RANGE 3
CPLG ST&C THREAD 8RD MFG Nippon NEW OR USED New
TYPE OP STRING Surface Casing TALLIED BY T. Meadows/C. CreelmanTHREADS: ON X OFF
Length Length Length Length Length
No. Metres Tenths No. Metres Tenths No. Metres Tenths No. Metres Tenths No. Metres Tenths
1 * 13 97 21 _ 3 59 41 41 61 81
2 12 47 22 11 89 42 13 95 62 82
3 " 13 18 23 11 48 43 12 75 63 83
4 13 6o 24 12 18 44 14 26 64 84
5 13 84 25 11 80 45 12 53 65 85
6 16 26 12 42 46 11 90 66 86
7 13 50 27 11 2_ 47 9 54 67 87
8 12 5_ 28 10 21 _ 48 * 11 64 68 88
9 14 31 29 11 79 49 * 11 51____ 69 89
10 14 16 3o 11 41 5o • 11 65 7o 90
Total Total Total Total Total
1-10 134 71 21-30 118 76 41-50 123 21 61-70 81-90
11 14 12 31 12 08 51 • 12 25 71 91
12 14 25 32 13 84 52 72 92
13 11 75 33 11 87 53 73 93
14 ____La 62 34 10 99 54 74 94
15 12 35 14 06 55 75 95
16 12 75 36 6o 56 76 96
17 12 12 37 13 11 57 77 97
18 11 966_ 38 12 22_ 58 78 98
19 12 6_ 39 14 24 59 79 99
20 11 11 40 12 75 6o 8o 100
Total Total Total Total Total
11-20 126 54_ 31-40 128 83 51-60 12 2_ 71-80 91-100
Total
Total Total Total Total
1-20 261 25 21-40 247 59 41-60 135 46 61-8o 81-100
Total 1 - 20 261 25 Grand Totals Remarks • Joints left out
Total 21 - 40 247 59 1 - 100 644 30 Length g = 74.27 m
Total 41 - 60 135 46 Grand Totals
Total 61 - 80 - - 101 -
Total 81 - 100 - - Grand Totals Total Jts on Location 51
Grand Total
Grand Total
1 - 100 644 3o 1 - loo
Wellsite Supervisor
644 30 Mike Kramps
PAGE NO. 07
J
Grade Rge.
N80 3
Casing
Jts. On m on
Weight
Location Location kg/m
193
2524.89
79.6
Running
Power Tongs Weatherford Torque: Max. 17 747 N.m Nom. 14 195 N.m Min. 10 643 N.m
thereafter. Fill Up Points Every 10 joints to shoe, every joint
Cementing First Stage
Types & Quantity of Cement Lead: 59.0 tonnes of Class "G" + 2.0% D20 + 0.5% D65 + 3 L/tonne D81.
0.3% D160 + 5 L/tonne D81. Tail: 49.0 tonnes of Class "G" + 0.75% D65 +
CrISSETT RESOURCE CONSULTANTS LTD.
CASING INFORMATION
Surface Casing OD - mm
Intermediate Casing OD 244.5 mm
Production Casing OD - mm
Liner OD - mm
WELL GENOIL et al ST. LEONARD NO. 1
Accessories
Centralizers: Make Weatherford No. 24
Positions: Ctr. jt. CC2, 4 every 100 m-
1500 m,1450 m,1400 m,590 m,550 m,500 m,
350 m,300 m,250 m,200 m,150 m,100 m,50 m
Scratchers: Make None No.
2 centralizers
Positions: 1 above stage collar and 1
below in the middle of each joint
No. of Collars Welded None
LOCATION Quebec Lowlands DATE 97 02 16
Depth
Joints Landed m Run
Thread T&C Make Run m in Well
8RD L Prud. 179 2340.50 2345.28
Shoe: Make Weatherford Type Ball 0.36
Collar: Make Weatherford Type Ball 0.47
Landing Joint Length (When Used) Stage Collar 0.80
Overall Length of String 2346.91
m up from KB (Subtract) 6.41
Depth Set - Driller Tally 2340.50
Shoe Joint Overall (Subtract) 14.48
Collar Depth - Driller Tally 2326.02
Remarks: Thread-locked first 3 joints and stage collar.
Stage collar at 626.38 m KB.
Running and Cementing
Times: Started In 21:30 Hrs On Bottom 03:30 Hrs Circulated Minutes 420
Cement Company Dowell Schlumberger
Slurry Weight 1 785/1 700 kg/m3 Flush Ahead: Type Water/CW100 Amount 4.0/6.0 m3
Times: Start Mix 13:21 Hrs Finish 14:58 Hrs Start Disp. 15:05 Ers Finish 16:55 Hrs
Calculated Displacement 85.88 m3 Pressures: Max. Pump 5-6 000 kPa Bump 24 000/15 000 kPa
Cement Returns XXX/No No. of m3 0.0
Landing
Time 01:00 Hrs Date 97 02 17 Weight of Strings (less blocks) 130 000 daN
Weight Landed in Slips 140 000 daN Landing Bowl (size x series x type) McEvoy Type 5-11
Remarks: 21 000 kPa, 346 mm slip-on weld.
Wellsite Supervisor Mike Kramps/Doug Gaboury
PAGE NO. 08
J
aBISSETT RESOURCE CONSULTANTS LTD.
CASING INFORMATION
Surface Casing OD - mm
Intermediate Casing OD 244.5 mm
Production Casing OD mm
Liner OD - mm
WELL GENOIL et al ST. LEONARD NO. 1
Accessories
Centralizers: Make Weatherford No. 24
Positions: Ctr. jt. CC2, 4 every 100 m-
1500 m,1450 m,1400 m,590 m,550 m.500 m,
350 m,300 m,250 m,200 m,150 m,100 m,50 m
Scratchers: Make None No.
2 centralizers Collar Depth
Positions: 1 above stage collar and 1
below in the middle of each joint
No. of Collars Welded None
LOCATION Quebec Lowlands DATE 97 02 16
Shoe: Make Weatherford Type Ball
Collar: Make Weatherford Type Ball
Landing Joint Length (When Used) Stage Collar
Overall Length of String
m up from KB (Subtract)
Depth Set - Driller Tally
Shoe Joint Overall (Subtract)
- Driller Tally 2326.02
Remarks: Stage collar at 626.38 m KB.
Casing
Jts. On m on
Weight
Location Location k m Grade Rge• Thread T&C
193 2524.89
79.6 N80
8RD L
Depth
Joints
Landed m Run
Make Run m
in Well
Prud. 179 2340.50 2345.28
0.36
0.47
0.80
2346. 91
6.41
2340.50
14.48
Running and Cementing
Running
Power Tongs Weatherford Torque: Max. 17 747 N.m Nom. 14 195 N.m Min. 10 643 N.m
Times: Started In 21:30 Hrs On Bottom
03:30 Hrs Circulated 420 Minutes
Fill Up Points Every 10 joints to shoe, every joint thereafter.
Cementing
Second Stage
Cement Company Dowell Schlumberger
Types & Quantity of Cement 28.0 tonnes of Class "G" + 2.0% D20 + 0.5% D65 + 3 L/tonne D81.
Slurry Weight 1 895 kg/m3 Flush Ahead: Type
Times: Start Mix 18:13 Hrs Finish 18:59
Water Amount 1.0 m3
Hrs Start Disp. 19:06 Hrs Finish 19:58 Hrs
5-6 000 kPa Bump 15 000 kPa Calculated Displacement 23.0 m3 Pressures: Max. Pump
Cement Returns Yes/MN No. of m3 2.0
Landing
Time 01:00 Hrs Date 97 02 17 Weight of Strings (less blocks) 130 000 daN
Weight Landed in Slips 140 000 daN Landing Bowl (size x series x type) -
Remarks: -
Wellsite Supervisor Mike Kramps/Doug Gaboury
PAGE NO. 09
1
aBISSETT RESOURCE CONSULTANTS LTD.
PIPE TALLY
DATE
WELL
OPERATOR
GENOIL et al ST. LEONARD NO. 1
Genoil Inc.
LOCATION
RIG
PIPE DESCRIPTION SIZE 244.5 mm WT 79.6 kg/m GRADE N80 RANGE 3
CPLG LT&C THREAD 8RD MFG Prudential NEW OR USED New
TYPE OF STRING Intermediate Casing TALLIED BY M. Kramps/D. Gaboury THREADS: ON OFF X
Length Length Length Length Length
No. Metres Tenths No. Metres Tenths No. Metres Tenths No. Metres Tenths No. Metres Tenths
1 13 65 21 12 $7 41 13 54 61 13 30 81 21
2 12 91 22 12 88 42 13 02 62 13 20 82 13 15
3 12 L5_____ 23 12 7_ 43 12 84 63 13 2.5 83 13 24 4 13 11 24 12 911_ 44 13 06 64 13 28 84 12 89 5 12 88 25 13 29 45 13 02 65 13 0_ 85 13 18 6 13 35 26 01 46 ____La 13 35 66 12 86 86 12 93
7 13 42_ 27 28 47 13 30 67 13 08 87 12 70 8 25 28 12 83 48 13 10 68 12 85 88 12 84 9 13 67 29 12 92 49 13 00 69 12 98 89 13 2_ 10 13 27 30 13 6 50 13 55 70 10 90 12 79 Total Total Total Total Total
1-10 132 23 21-30 129 96 41-5o 131 78 61-70 13o 75 81-90 130 16 11 13 5_ 31 12 97 51 13 0_ 71 13 005 91 12 88 12 12 6o 32 13 22____ 52 13 20 72 1 92 13 14 13 12 24 33 13 14 53 12 62 73 12 9_ 93 13 31 14 13 o6 34 13 77 54 13 00 74 _13 35 94 12 90
15 13, 26 35 13 4i 55 13 04 75 13 4- 95 12 97 16 13 36 12 61 56 13 30 76 12 112____ 96 12 79 17 12 62 37 13 51 57 3_ 77 13 24 97 12 97 18 13 04 38 13 20 58 12 94 78 01 ____La 98 13 35 19 13 26 39 13 10 59 12 89 79 13 08 99 12 95 20 13 16 40 13 44 6o 1 17 80 13 10 100 13 22
Total Total Total Total Total
11-20 130 25 31-40 132 48 51-60 131 49_ 71-80 131 28 91-100 130 48
Total Total Total Total Total
1-20 262 48 21-40 262 44 41-60 263 27 61-80 262 03 81-100 26o 64
Total 1 - 20 262 48 Grand Totals Remarks Left out 14 joints
Total 21 - 4o 262 44 1 - 100 1310 86 Float - 0.47
Total 41 - 60 263 27 Grand Totals Shoe - 0.36
Total 61 - 80 262 03 101 - _ - - Stage Collar - 0.80
Total 81 - 100 260 64 Grand Totals Total Jts on Location 193
Grand Total Wellsite Supervisor Grand Total
1 - 100 1310 86 1 - loo 1310 86 Mike Kramps/Doug Gaboury
PAGE NO. 10
1
PAGE NO 1 OF 2 97 02 14 Quebec Lowlands
Ralex 01
BISSETT RESOURCE CONSULTANTS LTD. ~+
PIPE TALLY
DATE 97 02 14 PAGE NO 2 OF 2
WELL GENOIL et al ST. LEONARD NO. 1 LOCATION Quebec Lowlands
OPERATOR Genoil Inc. RIG Ralex 01
PIPE DESCRIPTION SIZE 244.5 mm WT 79.6 kg/m GRADE N80 RANGE 3
CPLG LT&C THREAD 8RD MFG Prudential NEW OR USED New
TYPE OF STRING Intermediate Casing TALLIED BY M. Kramps/D. Gaboury THREADS: ON OFF X
Length Length Length Length Length
No. Metres Tenths No. Metres Tenths No. Metres Tenths No. Metres Tenths No. Metres Tenths
1 55 21 __la 13 02 41 13 21 61 12 85 81
2 13 12 22 13 05 42 12 67 62 12 6_____ 82 3 13 05 23 13 o6 43 _13 67 63 13 57 83 4 08 24 ____La 13 07 44 13, 10 64 12 88 84 5 12 22 25 12 71 45 13 17 65 13 17 85
6 13 49 26 12 78 46 12 75 66 13 26 86 7 12 11 27 12 83 47 13 1Z__ 67 22__ 87 8 13 05 28 12 82 48 13 3_ 68 12 9_ 88
9 13 33 29 12 78 49 12 93 69 13 21 89 10 12 87 30 13 19_ 5o 13 16 70 13 31 90 Total Total Total Total Total
1-10 131 37 21-30 129 31 41-50 131 28 61-70 131 04 81-90 11 13 3_ 31 13 31 51 12 70 71 3 02 _ 91 12 07 32 __la 15 21 52 ____11 10 72 13 06 92 13 ____La 01 33 12 93 53 ____13 13 73 13 26 93 14 13 06 34 13 42 54 13 01 74 3 3_ _ 94 15 12 9_ 35 12 86 55 12 73 75 5_ ____12 95 16 13 6o 36 12 68 56 3 _ 36 76 13 18 96
17 ____11 42 37 12 2_ 57 12 90 77 13 16 97 18 12 82 38 13 01 58 13 06 78 3 2 3 _ 98 19 13 38 39 13 9 59 13 20 79 12 97 99 20 12 82 4o 13 2— 6o 1'3 26 8o 100 Total Total Total Total Total 11-20 131 52 31-40 130 75 51-60 130 45 71-80 118 70 91-100
Total Total Total Total Total 1-20 262 89 21-40 26o 06 41-60 261 73 61-8o 249 74 81-loo
Total 1 - 20 262 89 Grand Totals Remarks Left out 14 joints
Total 21 - 4o 26o 06 1 - loo 1310 86
Total 41 60 261 73 Grand Totals
Total 61 - 80 249 74 101 - 200 1034 42
Total 81 - 100 - - Grand Totals Total Jts on Location 193
Grand Total Grand Total Wellsite Supervisor
1 - 100 1034 42 1 - 200 2345 28 Mike Kramps/Doug Gaboury
PAGE NO. 11
aBISSETT RESOURCE CONSULTANTS LTD.
CASING INFORMATION
Surface Casing OD - mm
Intermediate Casing OD - mm
Production Casing OD - mm
Liner OD 177.8 mm
WELL GENOIL et al ST. LEONARD NO. 1 LOCATION Quebec Lowlands DATE 97 05 09
Casing Depth
Jts. On m on Weight Joints Landed m Run
Location Location kg/m Grade Rge. Thread T&C Make Run m in Well
112 1459.12 43.2 L80 3 8RD L Algoma 96 3494.00 1254.08
Ball CATC HC1 0.36
Liner hanger tieback 5.17
Accessories Shoe: Make Weatherford Type Guide 0.37
Collar: Make Weatherford Type Float 0.42
Centralizers: Make Weatherford No0 85 Landing Joint Length (When Used) 2235.40
Positions: Stand off every collar Overall Length of String 3495.80
m up from KB (Subtract) 1.80
Depth Set - Driller Tally 3494.00
Scratchers: Make None No. Shoe Joint Overall (Subtract) 14.59
Collar Depth - Driller Tally 3479.41
Positions: Remarks: Thread-locked three joints. Landing joint
consisted of 1231.78 m of 127 mm drillpipe, 1000.85 m
of 114 mm drillpipe and 2.77 m of ball catch and liner
No. of Collars Welded None hanger. Top of tieback at 2233.60 m KB.
Running and Cementing
Running
Power Tongs Weatherford Torque: Max. 10 110 N.m Nom. 8 090 N.m Min. 6 070 N.m
Times: Started In 13:30 Hrs On Bottom 12:15 Hrs Circulated 390 Minutes
Fill Up Points Every 10 joints.
Cementing
Cement Company Dowell Schlumberger
Types & Quantity of Cement 46.5 tonnes of Class "G" + 10.5% D81 + 0.5% D65 + 0.7% D160 FL +
0.61% Antifoam
Slurry Weight 1 900 kg/m3 Flush Ahead: Type Water/Mud Push Amount 0.5/3.0 m3
Times: Start Mix 20:00 Hrs Finish 21:00 Hrs Start Disp. 21:10 Hrs Finish 22:05 Hrs
Calculated Displacement 42.2 m3 Pressures: Max. Pump 19 000 kPa Bump 22 700 kPa
Cement Returns XXX/No No. of m3
Landing
Time 22:05 Hrs Date 97 05 09 Weight of Strings (less blocks) 95 000 daN
Weight Landed in Slips 40 000 daN Landing Bowl (size x series x type) n/a
Remarks: Cement job went very well.
Wellsite Supervisor Randy Genest/Doug Gaboury
PAGE NO. 12
Cli BISSETT RESOURCE CONSULTANTS LTD.
PIPE TALLY
DATE 97 05 08 PAGE NO 1 OF 2
WELL GENOIL et al ST. LEONARD NO. 1 LOCATION Quebec Lowlands
OPERATOR Genoil Inc. RIG Ralex 01
PIPE DESCRIPTION SIZE 177.8 mm WT 43.2 kg/m GRADE L80 RANGE 3
CPLG LT&C THREAD 8RD MPG Algoma NEW OR USED New
TYPE OF STRING Drilling Liner TALLIED BY Doug Gaboury THREADS: ON OFF X
Length Length Length Length Length
No. Metres Tenths No. Metres Tenths No• Metres Tenths No. Metres Tenths No. Metres Tenths
1 13 8o 21 _ 13 2.7___ 41 12 56 61 13 16 81 13 20
2 12 75 22 13 00_ 42 13 06 62 13 03 82 13 18
3 13 6o 23 13 04 43 12 56 63 12 26 83 13 19
4 13 15 24 13 27 44 12 89 64 13 18 84 13 02
5 13 18 25 13 /2____ 45 13 18 65 13 04 85 12 66
6 13 42 26 13 20 46 13 19 66 13 07 86 13 07
7 13 2_ 27 13 50 47 13 06 67 12 78 87 13 03
8 13 45 28 12 95 48 13 07 68 13 17 88 13 04
9 13 17 29 12 63 49 13 06 69 13 18 89 13 19
10 13 17 3o 13 04 5o 13 18 7o ____11 20 90 13 20
Total Total Total Total Total
1-10 132 92 21-30 131 45 41-50 129 81 61-70 130 07 _ 81-90 130 78
11 13 08 31 13 17 51 13 22 71 13 06 91 13 19
12 13 08 32 13 18 52 13. 06 72 17 92 13 08
13 13 08 33 13 20 53 13 08 73 13 19 _ 93 13 08
14 13 06 34 13 08 54 13 05 74 13 17 94 13 18
15 13 15____ 35 13 20 55 13 18 75 13 95 13 08
16 _ 13 19 36 13 06 56 13 16 76 13 16 96 11 95
17 _ 13, 3.1____ 37 10 93 57 12 43 77 13 06 97 12 6o
18 13 18 38 13 05 58 12 90 78 13 19 98 13 28
19 12 69 39 13. 17 59 12 61 79 13 04 99 12 13
20 _ 13 18 4o 13 11 6o 13 80 13 17 100 12 01 Total Total Total Total Total 11-20 _ 131 10 31-40 129 15 51-60 129 86 71-80 131 38 91-100 127 58
Total Total Total Total Total 1-20 - 264 02 21-40 260 6o 41-6o 259 67 61-80 261 45 81-100 . 258 36
Total 1 - 20 264 02 Grand Totals
Total 21 - 4o 26o 6o 1 - loo
Total 41 - 6o 259 67 Grand Totals
Total 61 - 80 261 45 101
Total 81 - 100 258 36 Grand Totals
Remarks -
1304 10
Total Jts on Location 112
Grand Total Grand Total Wellsite Supervisor
1 - 100 1304 10 1 - 100 1304 10 Randy Genest
PAGE NO. 13
J
1 12 91____ 21 41
2 13 17 22 42
3 13 16 23 43
4 13 06 24 44
5 13 02 25 45
6 12 L__ 26 46
7 12 93 27 47
8 13 14 28 48
9 12 14 29 49
10 13 11 30 50
Total Total Total
1-10 129 41 21-30 41-50
11 12 46 31 51
12 13 32 52
13 33 53
14 34 54
15 35 55
16 36 56
17 37 57
18 38 58
19 39 59
20 4o 60
Total Total Total Total Total
11-20 25 61 31-40 51-60 71-80 91-100
Total Total Total Total Total
1-20 155 02 21-40 41-60 61-80 81-100
Total 1 - 20 155 02 Grand Totals Remarks
61 81 62 82 63 83 64 84 65 85
66 86
67 87 68 88 69 89 70 90
Total
61-70
Total
81-90
71 91 72 92
73 93 74 94
75 95 76 96
77 97 78 98
79 99 80 100
Cil BISSETT RESOURCE CONSULTANTS LTD. 40.
PIPE TALLY
DATE 97 02 14
PAGE NO 2 OF 2
WELL
GENOIL et al ST. LEONARD NO. 1
LOCATION
Quebec Lowlands
OPERATOR Genoil Inc. RIG
Ralex 01
PIPE DESCRIPTION SIZE 177.8 mm WT 43.2 kg/m GRADE L80 RANGE 3
CPLG LT&C THREAD 8RD MFG Algoma NEW OR USED New
TYPE OF STRING Drilling Liner TALLIED BY Doug Gaboury THREADS: ON OFF X
Length Length Length Length Length
No. Metres Tenths No. Metres Tenths No. Metres Tenths No. Metres Tenths No. Metres Tenths
Total 21 40 - - 1 - 100
Total 41 - 60 - - Grand Totals
Total 61 - 80 - - 101 - 200
Total 81 - 100 - - Grand Totals
1304 10
155, 02
Total Jts on Location 112
Supervisor Wellsite
1459 12 Randy Genest
PAGE NO. 14
Grand Total
Grand Total
1 - 100 155 02
1 - 200
J
aBISSETT RESOURCE CONSULTANTS LTD.
FORMATION LEAK-OFF TEST
DATE: 97 01 04
WELL
OPERATOR
TESTING COMPANY
TEST CONDUCTED BY : (Title)
SIZE OF PUMP AND PUMPING RATE .
GENOIL et al ST. LEONARD NO. 1
Genoil Inc.
Ralex 01
Mike Kramps, Wellsite Supervisor
1.
2.
Depth Drilled Out
Surface Casing Setting Depth
579.00 m
569.50 m
3. Gradient of Fluid in Hole During Test 9.90 kPa/m
4. Hydrostatic Pressure at Casing Shoe (2 x 3) 5 638 kPa
5. Leak-Off Pressure (Surface) 6 700 kPa
6. Total Pressure at Shoe (4 + 5) 12 338 kPa
7. Leak-Off Pressure Gradient (6/2) 21.70 kPa/m
Projected Total Depth 4058.00 m
Depth of Intermediate Casing (If Applicable) 2700.00 m
Maximum BHP Gradient Expected - kPa/m
Zone and Depth Where Encountered - m
Gradient of Drilling Fluid to be Used When Penetrating Hydrocarbon Bearing Strata Air kPa/m
Wellsite Supervisor: Mike Kramps
PAGE NO. 15
J
GENOIL et al ST. LEONARD NO. 1
■N■■■■■■■N■B■Y■■
mnnml J HhHHHHhIIIIHL
IIIInE1lnitn
NENIMMIIMMIIMMIENIIWIMMINEMIIMEMEIMINNEEMINIMMINOIM
_ maimmisipeammtemmen
L
111111110101 IN 111111011
7.0
MUM ■N■■■u■■ EM■NN
nninin 111/11111111111111101111111111111111111N11111 nniimmimiiimmmuimmrn
Ali 4111111 11 mIIni11111/1111nliiinninninl111M EMI=
n11n11111► IIIn11111111i11nN~n1lninllnnll N~~I ~
~H ■■■■■■■■■■■ ■■..~ki~■_.■■■■■■■
3.0
2.0
1.0
0.5
ü■■■■■■■■M
■■■N■N■C111CC11:~■ pi■■i
11111
■■■
5 6 7 8 9 1
,
0 11 12 13 14 •
1 3
9.0
8.0
10.0
CUMULATIVE VOLUME PUMPED - LITRES PAGE NO. 16
aBISSETT RESOURCE CONSULTANTS LTD.
FORMATION LEAK-OFF TEST
DATE: 97 02 18
WELL
OPERATOR
TESTING COMPANY
TEST CONDUCTED BY : (Title)
SIZE OF PUMP AND PUMPING RATE
GENOIL et al ST. LEONARD NO. 1
Genoil Inc.
Ralex 01
Mike Kramps, Wellsite Supervisor
1.
2.
Depth Drilled Out
Surface Casing Setting Depth
2342.00 m
2340.50 m
3. Gradient of Fluid in Hole During Test 9.90 kPa/m
4. Hydrostatic Pressure at Casing Shoe (2 x 3) 23 185 kPa
5. Leak-Off Pressure (Surface) 23 000 kPa
6. Total Pressure at Shoe (4 + 5) 46 185 kPa
7. Leak-Off Pressure Gradient (6/2) 19.73 kPa/m
Projected Total Depth
Depth of Intermediate Casing (If Applicable)
Maximum BHP Gradient Expected
Zone and Depth Where Encountered
Gradient of Drilling Fluid to be Used When Penetrating Hydrocarbon Bearing Strata
Wellsite Supervisor:
4058.00 m
2340.50 m
12.85 kPa/m
: Potsdam,3958.00 m
Air kPa/m
Mike Kramps
PAGE NO. 17
i
GENOIL GENOIL ET AL ST. LEONARD #1
NO#1 ST. LEONARD
QUEBEC
SURVEY LISTING
Well name :
Your ref : CORRECTION RUN Our ref.: svy3052
Date printed : 24-Jun-97 Date created : 9-Dec-96 Last revised : 24-Dec-96
Field is centred on 0.000.0.000.0.000
Structure is centred on n46 4 32.840.w72 23 13.920.0.000
PAGE NO. 18
GENOIL SURVEY LISTING Page 1 GENOIL ET AL ST. LEONARD #1 ,NO#1 Your ref : CORRECTION RUN
ST. LEONARD,QUEBEC Last revised : 24-Dec•96
Measured Inclin. Azimuth True Vert. RECTANGULAR Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/30m Sect
0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 21.00 1.00 0.00 21.00 0.18 N 0.00 E 1.43 0.17 30.00 1.00 0.00 30.00 0.34 N 0.00 E 0.00 0.32 45.00 1.50 6.00 44.99 0.67 N 0.02 E 1.03 0.63 66.00 1.20 130.00 65.99 0.80 N 0.22 E 3.41 0.83
77.00 0.50 85.00 76.99 0.73 N 0.35 E 2.50 0.81 118.00 0.50 253.00 117.99 0.69 N 0.36 E 0.73 0.77 148.00 0.80 88.00 147.99 0.66 N 0.45 E 1.29 0.77 174.00 0.50 25.00 173.99 0.77 N 0.67 E 0.84 0.95 210.00 1.00 25.00 209.98 1.20 N 0.87 E 0.42 1.42
220.00 1.50 10.00 219.98 1.41 N 0.93 E 1.78 1.64 235.00 1.20 10.00 234.98 1.75 N 0.99 E 0.60 1.99 271.00 2.00 7.00 270.96 2.75 N 1.14 E 0.67 2.97 298.00 2.12 13.00 297.95 3.70 N 1.31 E 0.27 3.93 310.00 2.20 349.00 309.94 4.14 N 1.31 E 2.25 4.34
319.00 2.40 355.00 318.93 4.50 N 1.26 E 1.04 4.66 329.00 2.20 355.00 328.92 4.90 N 1.23 E 0.60 5.03 338.00 2.00 358.00 337.92 5.23 N 1.21 E 0.76 5.33 367.00 3.60 339.00 366.88 6.59 N 0.86 E 1.89 6.49 376.00 3.20 340.00 375.87 7.09 N 0.68 E 1.35 6.90
385.00 3.10 344.00 384.85 7.56 N 0.52 E 0.80 7.29 394.00 3.20 353.00 393.84 8.04 N 0.43 E 1.68 7.71 403.00 3.40 355.00 402.82 8.55 N 0.37 E 0.77 8.18 413.00 5.40 355.00 412.79 9.32 N 0.30 E 6.00 8.87 422.00 5.70 3.00 421.75 10.19 N 0.29 E 2.76 9.69
432.00 4.20 10.00 431.71 11.04 N 0.38 E 4.84 10.52 441.00 2.30 2.30 440.70 11.55 N 0.45 E 6.48 11.02 451.00 1.20 347.00 450.69 11.85 N 0.43 E 3.56 11.30 460.00 1.20 287.00 459.69 11.97 N 0.32 E 4.00 11.38 470.00 1.75 276.00 469.69 12.02 N 0.07 E 1.85 11.33
480.00 2.60 279.00 479.68 12.07 N 0.31 W 2.57 11.26 489.00 3.75 275.00 488.67 12.13 N 0.80 W 3.90 11.14 499.00 5.00 287.00 498.64 12.28 N 1.55 W 4.63 11.04 506.00 6.10 292.00 505.61 12.51 N 2.18 W 5.15 11.04 517.00 5.70 289.00 516.55 12.91 N 3.24 W 1.38 11.06
526.00 6.20 297.00 525.50 13.27 N 4.10 W 3.22 11.11
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 19.73 degrees. Calculation uses the minimum curvature method.
PAGE NO. 19
GENOIL
SURVEY LISTING Page 2 GENOIL ET AL ST. LEONARD #1 .NO#1
Your ref : CORRECTION RUN ST. LEONARD.QUEBEC
Last revised : 24•Dec•96
Targets associated with this wellpath
Target name
Position T.U.D. Local rectangular coords. Date revised
TARGET
not specified 3927.30 169.92N 60.46E 4•Dec•96
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVOs are from wellhead.
Vertical section is from wellhead on azimuth 19.73 degrees. Calculation uses the minimum curvature method.
PAGE NO.20
GENOIL GENOIL ET AL ST. LEONARD #1
NO#1 ST. LEONARD
QUEBEC
SURVEY LISTING
Well name :
Your ref : ORIGINAL SURVEYS Our ref : svy3017
Date printed : 24-Jun-97 Date created : 4-Dec-96 Last revised : 23-May-97
Field is centred on 0.000,0.000,0.000
Structure is centred on n46 4 32.840,w72 23 13.920,0.000
PAGE NO. 21
GENOIL SURVEY LISTING Page 1 GENOIL ET AL ST. LEONARD #1 ,N0#1 Your ref : ORIGINAL SURVEYS
ST. LEONARD, QUEBEC Last revised : 23-May-97
Measured Inclin. Azimuth True Vert. RECTANGULAR Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/30m Sect
0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 21.00 1.00 0.00 21.00 0.18 N 0.00 E 1.43 0.18 30.00 1.00 0.00 30.00 0.34 N 0.00 E 0.00 0.34 45.00 1.50 6.00 44.99 0.67 N 0.02 E 1.03 0.66 66.00 1.20 130.00 65.99 0.80 N 0.22 E 3.41 0.76
77.00 0.50 85.00 76.99 0.73 N 0.35 E 2.50 0.68 118.00 0.50 253.00 117.99 0.69 N 0.36 E 0.73 0.64 148.00 0.80 88.00 147.99 0.66 N 0.45 E 1.29 0.60 174.00 0.50 25.00 173.99 0.77 N 0.67 E 0.84 0.67 210.00 1.00 25.00 209.98 1.20 N 0.87 E 0.42 1.07
220.00 1.50 10.00 219.98 1.41 N 0.93 E 1.78 1.27 235.00 1.20 10.00 234.98 1.75 N 0.99 E 0.60 1.61 271.00 2.00 7.00 270.96 2.75 N 1.14 E 0.67 2.57 298.00 2.10 13.00 297.95 3.70 N 1.31 E 0.26 3.49 310.00 2.20 349.00 309.94 4.14 N 1.31 E 2.25 3.93
319.00 2.40 355.00 318.93 4.50 N 1.26 E 1.04 4.29 329.00 2.20 355.00 328.92 4.90 N 1.23 E 0.60 4.69 338.00 2.00 358.00 337.92 5.22 N 1.21 E 0.76 5.02 367.00 3.60 339.00 366.88 6.58 N 0.86 E 1.89 6.41 376.00 3.20 340.00 375.87 7.08 N 0.67 E 1.35 6.93
385.00 3.10 344.00 384.85 7.55 N 0.52 E 0.80 7.41 394.00 3.20 353.00 393.84 8.03 N 0.42 E 1.68 7.91 403.00 3.80 356.10 402.82 8.58 N 0.37 E 2.10 8.45 413.00 4.40 356.80 412.80 9.29 N 0.33 E 1.81 9.17 422.00 4.30 2.30 421.77 9.98 N 0.32 E 1.43 9.84
432.00 3.40 5.60 431.75 10.65 N 0.37 E 2.78 10.50 441.00 2.30 9.00 440.74 11.09 N 0.42 E 3.71 10.93 451.00 1.30 341.00 450.73 11.39 N 0.42 E 3.91 11.24 460.00 1.00 306.80 459.73 11.54 N 0.32 E 2.45 11.39 467.00 1.30 296.00 466.73 11.61 N 0.20 E 1.58 11.48
479.00 0.90 289.20 478.73 11.70 N 0.01 W 1.05 11.60 489.00 0.31 263.20 488.73 11.72 N 0.11 W 1.91 11.63 501.00 0.30 177.80 500.73 11.69 N 0.14 W 1.03 11.60 582.00 1.30 324.00 581.72 12.22 N 0.68 W 0.58 12.20 590.00 1.30 324.50 589.72 12.37 N 0.78 W 0.04 12.36
630.00 1.75 338.00 629.70 13.30 N 1.27 W 0.43 13.35 658.00 1.90 343.00 657.69 14.14 N 1.57 W 0.23 14.23 667.00 1.75 344.00 666.68 14.42 N 1.65 W 0.51 14.51 686.00 1.75 343.00 685.68 14.97 N 1.82 W 0.05 15.08 715.00 2.00 337.00 714.66 15.86 N 2.14 W 0.33 16.01
735.00 1.80 338.00 734.65 16.48 N 2.40 W 0.30 16.65 790.00 1.75 339.00 789.62 18.06 N 3.02 W 0.03 18.30 800.00 1.40 345.00 799.62 18.32 N 3.11 W 1.16 18.57 863.00 1.50 353.00 862.60 19.88 N 3.41 W 0.11 20.16 927.00 1.75 348.00 926.57 21.67 N 3.71 W 0.13 21.97
1040.00 2.25 353.00 1039.50 25.56 N 4.34 W 0.14 25.91 1163.00 2.00 349.00 1162.42 30.06 N 5.05 W 0.07 30.47 1314.00 1.75 349.00 1313.34 34.91 N 5.99 W 0.05 35.40 1496.00 1.30 353.00 1495.27 39.69 N 6.77 W 0.08 40.24 1600.00 0.75 11.00 1599.26 41.53 N 6.78 W 0.18 42.06
1677.00 1.35 345.00 1676.24 42.90 N 6.92 W 0.29 43.44 1773.00 1.35 13.00 1772.22 45.09 N 6.96 W 0.20 45.62 1820.00 1.50 28.00 1819.20 46.18 N 6.55 W 0.26 46.64
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 352.36 degrees. Calculation uses the minimum curvature method.
PAGE NO. 22
GENOIL SURVEY LISTING Page 2 GENOIL ET AL ST. LEONARD #1 ,N0#1 Your ref : ORIGINAL SURVEYS
ST. LEONARD.QUEBEC Last revised : 23-May-97
Measured Depth
Inclin. Azimuth Degrees Degrees
True Vert. Depth
RECTANGULAR Dogleg C O O R D I N A T E S Deg/30m
Vert Sect
1971.00 1.75 313.00 1970.16 49.49 N 7.31 W 0.40 50.03 2097.00 1.50 313.00 2096.11 51.93 N 9.92 W 0.06 52.79 2179.00 1.10 8.00 2178.09 53.44 N 10.60 W 0.46 54.38 2283.00 0.40 318.00 2282.08 54.70 N 10.70 W 0.26 55.64 2385.00 0.50 33.00 2384.08 55.34 N 10.70 W 0.16 56.27
2499.00 0.75 48.00 2498.07 56.26 N 9.87 W 0.08 57.07 2612.00 1.25 38.00 2611.05 57.72 N 8.56 W 0.14 58.35 2678.00 1.25 73.00 2677.04 58.50 N 7.43 W 0.34 58.97
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 352.36 degrees. Calculation uses the minimum curvature method.
PAGE NO. 23
GENOIL SURVEY LISTING Page 3 GENOIL ET AL ST. LEONARD #1 ,NO#1 Your ref : ORIGINAL SURVEYS
ST. LEONARD.QUEBEC Last revised : 23•May-97
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 352.36 degrees. Calculation uses the minimum curvature method.
PAGE NO. 24
GENOIL GENOIL ET AL ST. LEONARD #1
NO#1 ST. LEONARD
QUEBEC
SURVEY LISTING
Well name :
Your ref : SIDETRACK #1 Our ref : svy3160
Date printed : 24•Jun-97 Date created : 19-Dec•96 Last revised : 15-Apr-97
Field is centred on 0.000,0.000.0.000
Structure is centred on n46 4 32.840,w72 23 13.920.0.000
PAGE NO. 25
GENOIL SURVEY LISTING Page 1 GENOIL ET AL ST. LEONARD #1 ,NO#1 Your ref : SIDETRACK #1
ST. LEONARD.QUEBEC Last revised : 15-Apr-97
Measured Inclin. Azimuth True Vert. RECTANGULAR Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/30m Sect
0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 21.00 1.00 0.00 21.00 0.18 N 0.00 E 1.43 0.17 30.00 1.00 0.00 30.00 0.34 N 0.00 E 0.00 0.32 45.00 1.50 6.00 44.99 0.67 N 0.02 E 1.03 0.63 66.00 1.20 130.00 65.99 0.80 N 0.22 E 3.41 0.83
77.00 0.50 85.00 76.99 0.73 N 0.35 E 2.50 0.81 118.00 0.50 253.00 117.99 0.69 N 0.36 E 0.73 0.77 148.00 0.80 88.00 147.99 0.66 N 0.45 E 1.29 0.77 174.00 0.50 25.00 173.99 0.77 N 0.67 E 0.84 0.95 210.00 1.00 25.00 209.98 1.20 N 0.87 E 0.42 1.42
220.00 1.50 10.00 219.98 1.41 N 0.93 E 1.78 1.64 235.00 1.20 10.00 234.98 1.75 N 0.99 E 0.60 1.99 271.00 2.00 7.00 270.96 2.75 N 1.14 E 0.67 2.97 298.00 2.12 13.00 297.95 3.70 N 1.31 E 0.27 3.93 310.00 2.20 349.00 309.94 4.14 N 1.31 E 2.25 4.34
319.00 2.40 355.00 318.93 4.50 N 1.26 E 1.04 4.66 329.00 2.20 355.00 328.92 4.90 N 1.23 E 0.60 5.03 338.00 2.00 358.00 337.92 5.23 N 1.21 E 0.76 5.33 367.00 3.60 339.00 366.88 6.59 N 0.86 E 1.89 6.49 376.00 3.20 340.00 375.87 7.09 N 0.68 E 1.35 6.90
385.00 3.10 344.00 384.85 7.56 N 0.52 E 0.80 7.29 394.00 3.20 353.00 393.84 8.04 N 0.43 E 1.68 7.71 403.00 3.80 356.10 402.82 8.59 N 0.37 E 2.10 8.21 413.00 4.40 356.80 412.80 9.30 N 0.33 E 1.81 8.87 422.00 4.30 2.30 421.77 9.98 N 0.32 E 1.43 9.51
432.00 3.40 5.60 431.75 10.65 N 0.37 E 2.78 10.15 441.00 2.30 9.00 440.74 11.10 N 0.42 E 3.71 10.59 451.00 1.30 341.00 450.73 11.40 N 0.42 E 3.91 10.87 460.00 1.00 306.80 459.73 11.54 N 0.32 E 2.45 10.98 467.00 1.30 296.00 466.73 11.62 N 0.20 E 1.58 11.00
479.00 0.90 289.20 478.73 11.71 N 0.01 W 1.05 11.02 489.00 0.31 263.20 488.72 11.73 N 0.11 W 1.91 11.00 501.00 0.30 177.80 500.72 11.69 N 0.14 W 1.03 10.96 582.00 1.30 324.00 581.72 12.23 N 0.67 W 0.58 11.28 590.00 1.30 324.50 589.72 12.37 N 0.78 W 0.04 11.38
630.00 1.75 338.00 629.70 13.31 N 1.27 W 0.43 12.10 658.00 1.90 343.00 657.69 14.15 N 1.57 W 0.23 12.79 667.00 1.75 344.00 666.68 14.42 N 1.65 W 0.51 13.02 686.00 1.75 343.00 685.68 14.98 N 1.81 W 0.05 13.49 715.00 2.00 337.00 714.66 15.87 N 2.14 W 0.33 14.21
735.00 1.80 338.00 734.65 16.48 N 2.40 W 0.30 14.71 790.00 1.75 339.00 789.62 18.07 N 3.02 W 0.03 15.99 800.00 1.40 345.00 799.62 18.33 N 3.11 W 1.16 16.20 863.00 1.50 353.00 862.60 19.89 N 3.41 W 0.11 17.57 927.00 1.75 348.00 926.57 21.68 N 3.71 W 0.13 19.15
1040.00 2.25 353.00 1039.50 25.57 N 4.34 W 0.14 22.60 1163.00 2.00 349.00 1162.42 30.07 N 5.04 W 0.07 26.60 1314.00 1.75 349.00 1313.34 34.92 N 5.99 W 0.05 30.85 1496.00 1.30 353.00 1495.27 39.70 N 6.77 W 0.08 35.08 1600.00 0.75 11.00 1599.26 41.54 N 6.78 W 0.18 36.81
1677.00 1.35 345.00 1676.24 42.91 N 6.92 W 0.29 38.05 1773.00 1.35 13.00 1772.22 45.10 N 6.96 W 0.20 40.10 1820.00 1.50 28.00 1819.20 46.18 N 6.55 W 0.26 41.26
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 19.73 degrees. Calculation uses the minimum curvature method.
PAGE NO. 26
GENOIL SURVEY LISTING Page 2 GENOIL ET AL ST. LEONARD #1 .NO#1 Your ref : SIDETRACK #1
ST. LEONARD,QUEBEC Last revised : 15-Apr-97
Measured Inclin. Azimuth True Vert. RECTANGULAR Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/30m Sect
1971.00 1.75 313.00 1970.16 49.50 N 7.31 W 0.40 44.13 2097.00 1.50 313.00 2096.11 51.94 N 9.92 W 0.06 45.54 2179.00 1.10 8.00 2178.09 53.45 N 10.59 W 0.46 46.73 2283.00 0.40 318.00 2282.08 54.71 N 10.70 W 0.26 47.88 2348.00 0.75 73.00 2347.08 55.00 N 10.44 W 0.46 48.25
2376.00 0.50 355.00 2375.08 55.18 N 10.28 W 0.87 48.47 2405.00 1.00 25.00 2404.07 55.53 N 10.18 W 0.64 48.83 2436.00 0.50 65.00 2435.07 55.83 N 9.95 W 0.67 49.20 2476.00 2.50 105.00 2475.06 55.68 N 8.94 W 1.61 49.39 2489.00 4.65 86.00 2488.03 55.65 N 8.14 W 5.60 49.63
2499.00 4.35 85.00 2498.00 55.71 N 7.36 W 0.93 49.95 2526.00 3.20 60.00 2524.94 56.17 N 5.69 W 2.20 50.95 2576.00 1.50 21.00 2574.90 57.48 N 4.25 W 1.35 52.67
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 19.73 degrees. Calculation uses the minimum curvature method. PAGE NO. 27
GENOIL GENOIL ET AL ST. LEONARD #1 .NO#1
ST. LEONARD.OUEBEC
SURVEY LISTING Page 3 Your ref : SIDETRACK #1
Last revised : 15-Apr-97
Targets associated with this wellpath
Target name
Position T.V.D. Local rectangular coords. Date revised
TARGET
not specified 3927.30 169.92N 60.46E 4-Dec•96
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 19.73 degrees. Calculation uses the minimum curvature method.
PAGE NO. 28
GENOIL GENOIL ET AL ST. LEONARD #1
NO#1 ST. LEONARD
QUEBEC
SURVEY LISTING
Well name :
Your ref : SIDETRACK #2 Our ref : svy3185
Date printed : 24-Jun-97 Date created : 24-Dec-96 Last revised : 23-May-97
Field is centred on 0.000.0.000.0.000
Structure is centred on n46 4 32.840.w72 23 13.920,0.000
PAGE NO. 29
GENOIL SURVEY LISTING Page 1 GENOIL ET AL ST. LEONARD #1 ,N0#1 Your ref : SIDETRACK #2
ST. LEONARD.QUEBEC Last revised : 23-May-97
Measured Inclin. Azimuth True Vert. RECTANGULAR Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/30m Sect
0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 21.00 1.00 0.00 21.00 0.18 N 0.00 E 1.43 0.17 30.00 1.00 0.00 30.00 0.34 N 0.00 E 0.00 0.31 45.00 1.50 6.00 44.99 0.67 N 0.02 E 1.03 0.60 66.00 1.20 130.00 65.99 0.80 N 0.22 E 3.41 0.65
77.00 0.50 85.00 76.99 0.73 N 0.35 E 2.50 0.53 118.00 0.50 253.00 117.99 0.69 N 0.36 E 0.73 0.49 148.00 0.80 88.00 147.99 0.66 N 0.45 E 1.29 0.43 174.00 0.50 25.00 173.99 0.77 N 0.67 E 0.84 0.44 210.00 1.00 25.00 209.98 1.20 N 0.87 E 0.42 0.76
220.00 1.50 10.00 219.98 1.41 N 0.93 E 1.78 0.92 235.00 1.20 10.00 234.98 1.75 N 0.99 E 0.60 1.22 271.00 2.00 7.00 270.96 2.75 N 1.14 E 0.67 2.08 298.00 2.12 13.00 297.95 3.70 N 1.31 E 0.27 2.89 310.00 2.20 349.00 309.94 4.14 N 1.31 E 2.25 3.29
319.00 2.40 355.00 318.93 4.50 N 1.26 E 1.04 3.64 329.00 2.20 355.00 328.92 4.90 N 1.23 E 0.60 4.02 338.00 2.00 358.00 337.92 5.23 N 1.21 E 0.76 4.33 367.00 3.60 339.00 366.88 6.59 N 0.86 E 1.89 5.72 376.00 3.20 340.00 375.87 7.09 N 0.68 E 1.35 6.25
385.00 3.10 344.00 384.85 7.56 N 0.52 E 0.80 6.74 394.00 3.20 353.00 393.84 8.04 N 0.43 E 1.68 7.22 403.00 3.80 356.10 402.82 8.59 N 0.37 E 2.10 7.75 413.00 4.40 356.80 412.80 9.30 N 0.33 E 1.81 8.42 422.00 4.30 2.30 421.77 9.98 N 0.32 E 1.43 9.05
432.00 3.40 5.60 431.75 10.65 N 0.37 E 2.78 9.65 441.00 2.30 9.00 440.74 11.10 N 0.42 E 3.71 10.03 451.00 1.30 341.00 450.73 11.40 N 0.42 E 3.91 10.32 460.00 1.00 306.80 459.73 11.54 N 0.32 E 2.45 10.49 467.00 1.30 296.00 466.73 11.62 N 0.20 E 1.58 10.60
479.00 0.90 289.20 478.73 11.71 N 0.01 W 1.05 10.77 489.00 0.30 263.20 488.72 11.73 N 0.11 W 1.93 10.83 501.00 0.30 177.80 500.72 11.69 N 0.14 W 1.02 10.81 527.00 0.25 185.00 526.72 11.57 N 0.14 W 0.07 10.69 590.00 1.30 358.00 589.72 12.15 N 0.18 W 0.74 11.24
630.00 1.75 328.00 629.71 13.12 N 0.52 W 0.68 12.27 658.00 1.90 343.00 657.69 13.93 N 0.88 W 0.53 13.15 667.00 1.75 343.00 666.69 14.20 N 0.97 W 0.50 13.43 694.00 1.75 343.00 693.68 14.99 N 1.21 W 0.00 14.25 723.00 2.00 343.00 722.66 15.90 N 1.48 W 0.26 15.20
752.00 1.80 348.00 751.64 16.82 N 1.73 W 0.27 16.15 800.00 1.40 345.00 799.62 18.13 N 2.03 W 0.26 17.47 855.00 1.40 353.00 854.61 19.44 N 2.29 W 0.11 18.78 927.00 1.75 348.00 926.58 21.39 N 2.63 W 0.16 20.70 1040.00 2.25 353.00 1039.51 25.28 N 3.26 W 0.14 24.52
1163.00 2.00 349.00 1162.43 29.79 N 3.96 W 0.07 28.94 1314.00 1.75 349.00 1313.35 34.64 N 4.90 W 0.05 33.77 1496.00 1.30 353.00 1495.28 39.41 N 5.68 W 0.08 38.47 1600.00 0.75 353.00 1599.26 41.26 N 5.91 W 0.16 40.26 1677.00 1.35 345.00 1676.25 42.64 N 6.21 W 0.24 41.64
1773.00 1.35 13.00 1772.23 44.83 N 6.24 W 0.20 43.67 1820.00 1.50 28.00 1819.21 45.91 N 5.83 W 0.26 44.51 1971.00 1.75 313.00 1970.17 49.23 N 6.59 W 0.40 47.85
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 336.84 degrees. Calculation uses the minimum curvature method.
PAGE NO. 30
GENOIL SURVEY LISTING Page 2 GENOIL ET AL ST. LEONARD #1 ,NO#1 Your ref : SIDETRACK #2
ST. LEONARD.QUEBEC Last revised : 23•May•97
Measured Inclin. Azimuth True Vert. RECTANGULAR Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/30m Sect
2097.00 1.50 313.00 2096.11 51.67 N 9.20 W 0.06 51.12 2179.00 1.10 8.00 2178.10 53.18 N 9.88 W 0.46 52.78 2283.00 0.40 318.00 2282.09 54.44 N 9.98 W 0.26 53.98 2348.00 0.75 73.00 2347.09 54.73 N 9.73 W 0.46 54.14 2356.33 1.10 115.20 2355.41 54.71 N 9.60 W 2.67 54.08
2365.82 0.70 95.50 2364.90 54.67 N 9.46 W 1.58 53.98 2375.31 0.30 339.90 2374.39 54.68 N 9.41 W 2.76 53.98 2384.47 0.30 316.60 2383.55 54.72 N 9.44 W 0.40 54.03 2393.96 0.60 114.10 2393.04 54.72 N 9.41 W 2.80 54.01 2403.45 1.40 111.90 2402.53 54.66 N 9.26 W 2.53 53.89
2413.03 1.70 107.40 2412.11 54.57 N 9.01 W 1.01 53.72 2422.61 1.90 97.30 2421.68 54.51 N 8.72 W 1.17 53.55 2431.55 1.90 83.20 2430.62 54.51 N 8.43 W 1.56 53.43 2440.56 2.10 63.40 2439.62 54.60 N 8.13 W 2.38 53.40 2450.16 2.20 55.10 2449.22 54.78 N 7.82 W 1.02 53.45
2459.18 2.20 64.40 2458.23 54.96 N 7.52 W 1.19 53.49 2468.79 2.60 69.10 2467.83 55.12 N 7.15 W 1.39 53.49 2478.11 3.20 82.90 2477.14 55.22 N 6.70 W 2.95 53.41 2487.68 3.90 87.40 2486.69 55.27 N 6.11 W 2.36 53.22 2497.18 5.00 95.30 2496.16 55.25 N 5.37 W 3.97 52.91
2508.27 6.00 93.90 2507.20 55.16 N 4.31 W 2.73 52.41 2517.11 6.80 81.60 2515.99 55.21 N 3.33 W 5.37 52.07 2526.72 8.00 68.70 2525.52 55.53 N 2.15 W 6.38 51.90 2536.20 9.80 56.50 2534.88 56.22 N 0.86 W 8.22 52.03 2545.78 10.80 46.40 2544.31 57.29 N 0.47 E 6.45 52.49
2555.38 11.30 38.30 2553.73 58.65 N 1.70 E 5.09 53.25 2564.59 11.40 32.10 2562.76 60.13 N 2.75 E 3.99 54.20 2574.08 11.80 26.90 2572.06 61.79 N 3.68 E 3.54 55.36 2583.39 12.30 22.90 2581.16 63.55 N 4.50 E 3.14 56.66 2602.25 13.50 16.80 2599.55 67.51 N 5.92 E 2.88 59.74
2611.82 14.30 13.10 2608.84 69.73 N 6.51 E 3.75 61.55 2630.75 16.70 4.60 2627.08 74.72 N 7.26 E 5.23 65.84 2639.73 16.40 1.90 2635.69 77.27 N 7.40 E 2.76 68.13 2648.81 16.50 358.30 2644.40 79.84 N 7.41 E 3.38 70.49 2658.41 16.70 354.80 2653.60 82.58 N 7.24 E 3.19 73.07
2667.44 16.90 351.10 2662.24 85.17 N 6.92 E 3.61 75.58 2677.04 16.60 348.60 2671.43 87.89 N 6.43 E 2.44 78.28 2686.41 16.00 344.60 2680.43 90.45 N 5.83 E 4.07 80.87 2696.08 15.60 341.20 2689.73 92.96 N 5.05 E 3.13 83.48 2698.00 15.30 340.87 2691.58 93.45 N 4.89 E 4.93 83.99 EXTRAPOLATION
2704.66 14.25 339.60 2698.02 95.04 N 4.31 E 4.93 85.69 2713.92 14.10 337.90 2707.00 97.16 N 3.49 E 1.43 87.95 2723.42 15.40 337.00 2716.19 99.39 N 2.56 E 4.17 90.37 2732.82 16.80 335.50 2725.22 101.78 N 1.51 E 4.66 92.98 2742.47 17.50 334.50 2734.44 104.35 N 0.31 E 2.36 95.82
2752.04 18.20 332.50 2743.55 106.98 N 1.00 W 2.92 98.75 2761.76 18.40 330.50 2752.78 109.66 N 2.46 W 2.03 101.79 2771.46 17.80 329.00 2762.00 112.26 N 3.97 W 2.35 104.78 2780.89 17.10 328.40 2770.99 114.68 N 5.44 W 2.30 107.58 2790.48 17.20 327.20 2780.16 117.07 N 6.95 W 1.15 110.37
2799.40 17.60 326.30 2788.67 119.30 N 8.41 W 1.62 113.00 2809.00 18.20 325.40 2797.81 121.74 N 10.07 W 2.06 115.89 2818.45 18.10 324.50 2806.78 124.15 N 11.76 W 0.94 118.77
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 336.84 degrees. Calculation uses the minimum curvature method.
PAGE NO. 31
GENOIL SURVEY LISTING Page 3 GENOIL ET AL ST. LEONARD #1 .NO#1 Your ref : SIDETRACK #2
ST. LEONARD.QUEBEC Last revised : 23-May-97
Measured Inclin. Azimuth True Vert. RECTANGULAR Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/30m Sect
2828.06 17.80 323.70 2815.93 126.55 N 13.50 W 1.21 121.66 2837.59 17.30 321.70 2825.01 128.84 N 15.24 W 2.47 124.45 2847.20 17.10 320.70 2834.19 131.05 N 17.02 W 1.11 127.19 2856.81 17.10 321.20 2843.38 133.25 N 18.80 W 0.46 129.90 2867.54 17.30 321.20 2853.63 135.72 N 20.78 W 0.56 132.96
2877.08 16.80 321.50 2862.75 137.91 N 22.53 W 1.60 135.65 2886.68 16.40 322.80 2871.95 140.07 N 24.21 W 1.71 138.31 2895.99 16.60 321.90 2880.88 142.16 N 25.83 W 1.05 140.87 2905.61 17.20 321.40 2890.08 144.36 N 27.57 W 1.93 143.57 2914.68 17.60 321.40 2898.74 146.48 N 29.26 W 1.32 146.18
2923.97 17.40 321.40 2907.60 148.66 N 31.00 W 0.65 148.87 2933.58 16.90 321.40 2916.78 150.88 N 32.77 W 1.56 151.60 2943.21 17.00 321.90 2925.99 153.08 N 34.51 W 0.55 154.31 2952.76 17.50 322.70 2935.11 155.32 N 36.24 W 1.74 157.05 2962.31 18.50 324.00 2944.19 157.69 N 38.00 W 3.39 159.92
2971.83 18.20 324.90 2953.23 160.12 N 39.75 W 1.30 162.85 2981.39 17.90 325.70 2962.32 162.56 N 41.43 W 1.22 165.75 2991.04 17.80 326.20 2971.50 165.01 N 43.09 W 0.57 168.66 3000.06 17.90 325.80 2980.09 167.30 N 44.63 W 0.53 171.37 3009.36 18.40 325.60 2988.93 169.70 N 46.27 W 1.63 174.22
3019.72 18.90 325.90 2998.74 172.43 N 48.13 W 1.47 177.47 3029.33 19.00 325.90 3007.83 175.02 N 49.88 W 0.31 180.53 3038.97 18.50 326.00 3016.96 177.59 N 51.62 W 1.56 183.57 3048.55 17.80 325.30 3026.06 180.05 N 53.30 W 2.30 186.50 3057.39 17.70 324.60 3034.48 182.26 N 54.85 W 0.80 189.14
3066.42 17.90 323.60 3043.08 184.49 N 56.47 W 1.21 191.83 3075.97 18.30 322.20 3052.16 186.86 N 58.26 W 1.86 194.71 3085.30 18.70 322.80 3061.01 189.21 N 60.06 W 1.42 197.58 3094.67 19.70 323.50 3069.85 191.67 N 61.90 W 3.29 200.57 3104.28 20.60 324.70 3078.88 194.35 N 63.85 W 3.09 203.80
3113.69 20.20 325.70 3087.70 197.05 N 65.72 W 1.69 207.01 3123.18 19.70 325.10 3096.62 199.71 N 67.56 W 1.71 210.19 3132.78 19.30 324.80 3105.67 202.34 N 69.40 W 1.29 213.32 3142.35 18.50 324.80 3114.72 204.87 N 71.18 W 2.51 216.36 3151.28 17.70 324.60 3123.21 207.13 N 72.79 W 2.70 219.07
3160.87 17.20 324.50 3132.36 209.48 N 74.45 W 1.57 221.88 3170.37 17.00 324.70 3141.44 211.75 N 76.07 W 0.66 224.61 3180.10 17.30 324.70 3150.73 214.09 N 77.73 W 0.92 227.41 3189.51 17.70 324.20 3159.71 216.40 N 79.38 W 1.36 230.18 3199.16 18.30 323.70 3168.89 218.81 N 81.13 W 1.93 233.08
3203.55 18.60 323.50 3173.05 219.93 N 81.95 W 2.10 234.43 3213.10 18.80 323.50 3182.10 222.39 N 83.78 W 0.63 237.41 3222.43 18.20 323.80 3190.94 224.77 N 85.53 W 1.95 240.30 3232.01 18.00 323.90 3200.05 227.17 N 87.29 W 0.63 243.20 3241.58 17.90 324.30 3209.15 229.56 N 89.02 W 0.50 246.07
3250.61 17.80 326.10 3217.75 231.84 N 90.60 W 1.86 248.78 3259.44 17.60 327.00 3226.16 234.08 N 92.08 W 1.15 251.43 3268.84 17.40 327.20 3235.13 236.45 N 93.61 W 0.67 254.21 3278.32 16.70 328.10 3244.19 238.80 N 95.10 W 2.37 256.95 3287.39 16.30 329.10 3252.89 241.00 N 96.44 W 1.62 259.50
3296.97 16.60 329.60 3262.07 243.33 N 97.82 W 1.04 262.19 3306.55 17.00 330.50 3271.25 245.73 N 99.21 W 1.49 264.94 3316.10 17.00 331.00 3280.38 248.17 N 100.57 W 0.46 267.72
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 336.84 degrees. Calculation uses the minimum curvature method.
PAGE NO. 32
GENOIL SURVEY LISTING Page 4 GENOIL ET AL ST. LEONARD #1 ,NO#1 Your ref : SIDETRACK #2
ST. LEONARD.QUEBEC Last revised : 23•May•97
Measured Inclin. Azimuth True Vert. RECTANGULAR Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/30m Sect
3329.25 16.50 331.70 3292.97 251.49 N 102.39 W 1.23 271.49 3338.25 16.60 331.40 3301.60 253.74 N 103.61 W 0.44 274.04 3347.99 17.20 330.10 3310.92 256.21 N 104.99 W 2.18 276.86 3355.05 17.00 329.00 3317.66 258.00 N 106.04 W 1.62 278.92 3364.57 17.50 328.50 3326.76 260.42 N 107.51 W 1.64 281.71
3374.15 17.40 328.30 3335.90 262.86 N 109.01 W 0.37 284.56 3383.61 16.50 329.00 3344.94 265.22 N 110.45 W 2.93 287.29 3393.23 15.80 329.10 3354.19 267.51 N 111.83 W 2.18 289.94 3402.81 15.60 328.90 3363.41 269.74 N 113.16 W 0.65 292.50 3412.34 16.20 329.30 3372.57 271.98 N 114.50 W 1.92 295.09
3421.92 15.70 329.80 3381.78 274.25 N 115.84 W 1.62 297.70 3431.45 15.00 330.80 3390.97 276.44 N 117.09 W 2.36 300.21 3440.08 14.20 331.10 3399.33 278.34 N 118.14 W 2.79 302.37 3450.64 13.50 331.90 3409.58 280.56 N 119.35 W 2.06 304.89 3460.15 13.00 331.70 3418.84 282.48 N 120.38 W 1.58 307.06
3469.71 12.10 330.30 3428.17 284.30 N 121.39 W 2.98 309.13 3478.25 11.10 327.90 3436.53 285.77 N 122.27 W 3.90 310.83
All data is in metres unless otherwise stated Coordinates are from NO#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 336.84 degrees. Calculation uses the minimum curvature method.
PAGE NO. 33
GENOIL SURVEY LISTING Page 5 GENOIL ET AL ST. LEONARD #1 .NO#1 Your ref : SIDETRACK #2
ST. LEONARD,QUEBEC Last revised : 23-May-97
Comments in wellpath
MD TVD Rectangular Coords. Comment
2698.00 2691.58 93.45 N 4.89 E EXTRAPOLATION
Targets associated with this wellpath
Target name
Position T.V.D. Local rectangular coords. Date revised
TARGET
not specified 3927.30 169.92N 60.46E 4-Dec-96
All data is in metres unless otherwise stated Coordinates are from N0#1 and TVDs are from wellhead.
Vertical section is from wellhead on azimuth 336.84 degrees. Calculation uses the minimum curvature method.
PAGE NO. 34
DEPTH m KB
DEVIATION Degrees
Cr ISSETT RESOURCE CONSULTANTS LTD.
DEVIATION SURVEYS
DEPTH m KB
DEVIATION Degrees
3478 Misrun
3503 Misrun
3503 Misrun
3503 Misrun
3503 Misrun
3484 10 1/2
3513 10 1/8
3542 10 1/8
3560 10 3/4
3569 10 1/8
3579 10
3589 10
3617 10
3630 9 1/2
3648 6 1/4
3668 5 7/8
3687 4 1/4
3727 5 7/8
3794 4
3880 3 3/4
DEPTH m KB
DEVIATION Degrees
4030 7
DEPTH m KB
DEVIATION Degrees
PAGE NO. 35
Cr ISSETT RESOURCE CONSULTANTS LTD.
BIT RECORD
Page 1 of 6
WELL
LOCATION
Drill Pipe: Size OD
Size OD
GENOIL et al ST. LEONARD NO. 1
Quebec Lowlands
01
Ralex Inc. CONTRACTOR
RIG NO.
Drill Collars: No. 6 OD
No. 21 OD
No. - OD
No. - OD
DATE & TIME SPUDDED
DATE & TIME RIG RELEASED
November 26, 1996: 2:00 p.m.
June 22, 1997: 12:00 noon
114 kg/m 65.0 Type T.J. 114XH
114 kg/m 24.7 Type T.J. 114XH
229 mm ID 70 mm Type T.J. 177H90
171 mm ID 62 mm Type T.J. 127H90
- mm ID - mm Type T.J.
- mm ID - mm Type T.J.
Depth No.
Metres Hours
Cum.
Hours
of
D.C.s daN RPM
Dull
T
2
2
Cond.
B G Remarks
257 36.25 36.25 16 5-7 000 110 1 I
1/16
-
179 67.50 103.75 16 3-5 000 100/140 3 Pulled for BHA
99 53.00 156.75 16 6 000 100/140 2 1 I Pulled to plug
2
2
4
1
3
3
1
back
34 3.50 160.25 16 5 000 110 1 I Polished cement
1/16
plug
97 52.50 212.75 16 5 000 340 3 Sidetracked and
drilled ahead
105 25.50 238.25 16 7 000 340 6 1/8 Motor run
___al_ 6.00 244.25 16 6 000 340 1
8
1 Motor run.Insert
208 20.75 265.00 16 7 000 110 I Med. hard cutter
165 21.50 286.50 16 7 000 110 8
6
I Med. hard cutter
38 10.00 296.50 16 5 000 90 1/4 Side loading,in-
sert cutters
Wellsite Supervisor Calder H. Creelman
PAGE NO. 36
Out
Bit No. Size Make Type Serial No. Nozzle Sizes m
lA 311 Smith FDGH LF-8663
2A 311 Reed HP13G MM6814
3A 311 Reed MHP13G LC6017
RR1A 311 Smith FDGH LF8663
4A 311 Smith MDSH LH9115
5A 311 Smith MFDSH LH9114
6A 311 Smith MS155 LC7182
HO-1 444 Enterra ROT 25-0142
HO-2 444 Enterra ROT 25-0142
H0-3 444 Enterra ROT 25-0142
11.9x11.9x12.7 257
3 x 12.7 436
3 x 12.7 535
11.9x11.9x12.7 322
3 x 17.5 419
3 x 17.5 524
3 x 17.5 547
3x11.1, 1x25.0 238
3x11.1, 1x25.0 403
3x11.1, 1x25.0 441
J
OBISSETT RESOURCE CONSULTANTS LTD.
BIT RECORD
OD 114 kg/m 65.0 Type T.J. 114XH
OD 114 kg/m 24.7 Type T.J. 114XH
6 OD 229 mm ID 70 mm Type T.J. 177H90
21 OD 171 mm ID 62 mm Type T.J. 127H90
- OD - mm ID - mm Type T.J.
- OD - mm ID - mm Type T.J.
No.
Out Cum. of Dull Cond.
Bit No. Size Make Type Serial No. Nozzle Sizes m Metres Hours Hours D.C.s daN RPM T B G Remarks
493 52 6.50 303.00 16 6 500 110 6 6
-
1
1/4
-
I
-
0 0 0.00 0.00 16 n/a 0 - Ran in to jack
485 12 3.50 306.50 16 7 000 90 1 Drilled cement
473 m - 485 m KB
507 22 13.00 319.50 16 2 000 150 1 1
4
3
1
I Kicked off low
speed motor
499 14 5.50 325.00 16 5 000 0 100 9 / 2 I Plugged bullnose
573 66 26.25 351.75 16 5 000 100 2 I -
460 60 7.00 358.75 16 4 000 85 1 I -
467 ____5_ 2.00 360.75 16 6 000 1000 - - - Bullnose plugged
573 0 0.00 360.75 16 2 000 100 2 3 1/16 Clean-out trip,
fished
555 56 21.25 382.00 16 6 000 90 2 7 1 Open hole -499 m
571 16 8.00 390.00 13 6 000 90 2 4 1 Open hole -555 m
Wellsite Supervisor Calder H. Creelman/Mike Kramps
PAGE NO. 37
Ho-4 444 AZ Ralex - 3x19.0, 1x25.0
RR4A 311 Smith MDSH LH9115 -
7A 444 Retip S44 64028 -
8A 311 Smith MFDSH LD7277 3 x 15.9
HO-5 444 Smith - - -
RR8A 311 Smith - L07277 3 x 15.9
UR-1 558 Smith RTU 6310 1 x 30.0
HO-6 444 Enterra RDT 25-0142 3x11.1, 1x25.0
RR4A 311 Smith - LH9115 Open
HO-7 444 Smith - - 3x11.1, 1x25.0
HO-8 444 Smith 3x11.1, 1x25.0
Page 2 of 6
WELL GENOIL et al ST. LEONARD NO. 1 Drill Pipe: Size
LOCATION Quebec Lowlands Size
CONTRACTOR Ralex Inc. Drill Collars: No.
RIG NO. 01 No.
DATE & TIME SPUDDED November 26, 1996: 2:00 p.m. No.
DATE & TIME RIG RELEASED June 22, 1997: 12:00 noon No.
Depth
J
OBISSETT RESOURCE CONSULTANTS LTD.
BIT RECORD
Page 3 of 6
WELL GENOIL et al ST. LEONARD NO. 1 Drill Pipe: Size OD 114 kg/m 65.0 Type T.J. 114XH LOCATION Quebec Lowlands Size OD 114 kg/m 24.7 Type T.J. 114XH
CONTRACTOR Ralex Inc. Drill Collars: No. 6 OD 229 mm ID 70 mm Type T.J. 177H90 RIG NO. 01 No. 21 OD 171 mm ID 62 mm Type T.J. 127H90 DATE & TIME SPUDDED November 26, 1996: 2:00 p.m. No. - OD - mm ID - mm Type T.J. DATE & TIME RIG RELEASED June 22, 1997: 12:00 noon No. - OD - mm ID - mm Type T.J. -
Bit No. Size Make Type Serial No. Nozzle Sizes
Depth
Out
m Metres Hours
Cum.
Hours
No.
of
D.C.s daN RPM
Dull Cond.
T B G Remarks
8ARR 311 Smith MFDSH LD7277 3 x 15.9 582 9 3.00 393.00 6 2 000 80 2 3 1 Drilled and
dried out hole
1 311 Smith H4532 K56931 3 x 19.0 1456 757 99.00 492.00 7 1 000 35 20% - Air drilled
2 311 Smith H4532 KJ6995 3 x 19.0 1850 511 55.00 547.00 7 1 000 35 20X - Air drilled
2RR 311 Smith H4532 KJ6995 3 x 19.0 2302 452 51.75 598.75 7 1 000 35 50% - Air drilled
1RR 311 Smith H4532 K56931 3 x 19.0 2698 396 54.75 652.50 7 1 000 35 75% - Air drilled
BARR 311 Smith MFDSH LD7279 Lost in hole
3 215.9 Reed HP13G MM6056 3 x 15.9 2450 108 10.50 10.50 - - - 2 2 1 RO intermediate
4 215.9 Reed HP34A JD1708 3 x 15.9 2515 65 11.25 21.75 - - - 2 2 1 -
5 215.9 Reed HP51H LH9671 3 x 15.9 0 169 10.75 32.50 Ran cement plug to sidetrack. Lost down hole.
4RR Polished cement plug to 2360 0 4.75 37.25 9 - - 2 2 1 -
6 215.9 Reed HP51A DM9154 3 x 15.9 2445 85 34.00 71.25 9 2-5 000 150/170 1 1 1 Rigged up dir-
ectional tools
7 215.9 Smith SUH LF8420 2x15.9, 1x11.1 2514 68 40.25 111.50 11 12-15 000 50/90 6 8 1 Tooth kickout to
6•
Wellsite Supervisor Mike Kramps/Doug Gaboury
PAGE NO. 38
f
CrISSETT RESOURCE CONSULTANTS LTD.
BIT RECORD
Page 4 of 6
WELL GENOIL et al ST. LEONARD NO. 1 Drill Pipe: Size OD 114 kg/m 65.0 Type T.J. BN
LOCATION Quebec Lowlands Size OD - kg/m - Type T.J.
CONTRACTOR Ralex Inc. Drill Collars: No. 11 OD 171 mm ID 73 mm Type T.J. 177H90
RIG NO. 01 No. - OD - mm ID - mm Type T.J.
DATE & TIME
DATE & TIME
Bit No.
SPUDDED November 26, 1996: 2:00 p.m.
RIG RELEASED
Size Make
June 22, 1997: 12:00 noon
Type Serial No.
Depth
Out
Nozzle Sizes m
6RR 215.9 Reed HP51A DM9154 2x11.1, lx14.3 2713
8 215.9 STC F2PPR LF3195 2x11.1, 1x14.3 3009
9 215.9 STC F2RD LG4774 2x11.1, lx14.3 3032
10 215.9 STC F3PP LF7298 2x11.1, lx14.3 3125
11 215.9 STC F5 LF4637 2x11.1, lx14.3 3131
12 215.9 Reed HPHA JT6152 2x11.1, 1x14.3 3218
13 215.9 STC F4P LJ6534 3 x 15.9 3343
14 215.9 Reed RP61A BX1527 3 x 15.9 3343
15 215.9 STC MFDBHL LT7510 3 x 28.0 3343
13RR 215.9 Smith F4 LT6534 2x28.0, 1x24.0 2744
16 215.9 Smith FDST LF9060 2x28.0, 1x24.0 3345
17 215.9 Smith F4 LJ7973 2x12.7, 1x14.3 3367
No.
Cum.
Metres Hours Hours
of
D.C.s daN RPM
Dull Cond.
T B G Remarks
199 86.00 197.50 11 12-16 000 50/90 5 6 1 Direct. drilled
296 117.50 315.00 11 12-16 000 50/90 7 8 U 1 mm
23 15.50 330.50 11 12-16 000 50/90 3 3 1 Motor failed
93 46.00 376.50 11 14-16 000 50/90 4 8 1 Lost nose off
cone
6 4.00 380.50 9 12-15 000 70/80 5 3 U 2 mm. Pinched
drilling iron
87 46.75 427.25 11 12-15 000 60/70 8 8 1 Direct. drilled
125 60.25 487.50 11 14-15 000 60/80 3 3 1 Direct. drilled
0 Reamed 11 - - 2 2 U Pipe parted
0 28.50 Reamed 3 2-8 000 40/70 7 6 l0U
1
Reamed to Fish 1
0 Reamed 6 5-10 000 40/70 4 4 Polished Fish 1
2 .25 487.75 9 5-10 000 50/60 3 3 1 Cleaned out
22 9.75 497.50 11 12-15 000 50/60 2 2 U2 Direct. drilled
3345 m (dropped)
No. - OD - mm ID - mm Type T.J. -
No. - OD - mm ID - mm Type T.J. -
Wellsite Supervisor Doug Gaboury
PAGE NO. 39
J
aBISSETT RESOURCE CONSULTANTS LTD.
BIT RECORD
Page 5 of 6
WELL GENOIL et al ST. LEONARD NO. 1 Drill Pipe: Size OD 114 kg/m 65.0 Type T.J. BN
LOCATION Quebec Lowlands Size OD - kg/m - Type T.J.
CONTRACTOR Ralex Inc. Drill Collars: No. 11 OD 171 mm ID 73 mm Type T.J. 177H90
RIG NO. 01 No.OD - mm ID - mm Type T.J.
DATE & TIME SPUDDED November 26, 1996: 2:00 p.m. No. - OD - mm ID - mm Type T.J.
DATE & TIME RIG RELEASED June 22, 1997: 12:00 noon No. - OD - mm ID - mm Type T.J. -
No.
Metres Hours
Cum.
Hours
of
D.C.s daN RPM
Dull Cond.
T B G Remarks
0 0.00 0.00 6 5-6 000 50/60 3 3 1 Felt fish
0 0.00 0.00 6 5-6 000 30 - - - Cleaned out
128 42.00 539.50 4 15-30 000 60/90 5 5 1 Direct. drilled
4 .50 540.00 21 3-5 000 40/50 3 3 1 Drill out liner
107 17.00 557.00 21 2-3 000 60/65 4 4 7 Air drilled
1 .50 557.50 219 1-2 000 - New -
7 2.00 559.50 21 2-3 000 60/65 2 1 1 Air drilled
50 10.50 570.00 21 3 000 50/55 2 2 1 Air drilled
10 2.25 572.25 21 2-7 000 45 1 1 1 Hammer
28 8.50 580.75 21 1-2 000 50 8 8 0 Hammer
6 4.00 584.75 21 2-3 000 40/45 2 2 1 Air drilled
187 50.75 635.50 15 1-2 000 20/25 T 4G In Hammer
2 3.25 638.75 15 2 000 25 Damaged Hammer
147 34.75 673.50 15 4-8 000 50/55 8 4 - 4 mm under air
drilling
Bit No. Size Make Type Serial No. Nozzle Sizes
Depth
Out
m
16RR 215.9 STC FDST LF9060 2x12.8, lx24.0 0
18 215.9 STC FDST LF9051 3 x 20.0 3367
19 215.9 STC F4 LF8637 2x17.5, 1x14.3 3495
20 155.6 HC J3XP N34ED 3 x 14.3 3499
21 155.6 STC MF156 LM1396 Open 3606
22 155.6 - H45R452 KJ7083 Hammer bit 3607
23 155.6 STC F37D LJ8474 Open 3614
23RR 155.6 STC F37D LJ8474 Open 3657
22RR 155.6 - H45R452 KJ7083 Hammer 3667
24 155.6 - H45R452 KJ7076 Hammer 3695
23RR 155.6 STC F37D LJ8474 Open 3701
25 155.6 - H45R452 KJ7081 Hammer 3888
26 155.6 - H45R452 KJ7084 Hammer 3890
27 155.6 STC FS LU8473 3 x 12.7 4037
Wellsite Supervisor Doug Gaboury
PAGE NO. 40
J
out to log
Cist.BISSETT RESOURCE CONSULTANTS LTD.
BIT RECORD
Drill Pipe: Size OD 114 kg/m 65.0 Type T.J. BN
Size OD kg/m - Type T.J.
Drill Collars: No. 11 OD 171 mm ID 73 mm Type T.J. 177H90
No. OD mm ID mm Type T.J.
No. OD - mm ID - mm Type T.J.
No. `OD mm ID - mm Type T.J.
Page 6 of 6
WELL
GENOIL et al ST. LEONARD NO. 1
LOCATION Quebec Lowlands
CONTRACTOR
Ralex Inc.
RIG NO. 01
DATE & TIME SPUDDED November 26, 1996: 2:00 p.m.
DATE & TIME RIG RELEASED
June 22, 1997: 12:00 noon
Depth No.
Out Cum. of Dull Cond.
Bit No. Size Make Type Serial No. Nozzle Sizes m Metres Hours Hours D.C.s daN RPM T B G Remarks
23RR 155.6 STC F37D LJ8474 Open 4037 TD - - 15 - - - - - Mudded up,clean
Wellsite Supervisor Doug Gaboury
PAGE NO. 41
SUMMARY OF FLOW PROVER VOLUME CALCULATIONS
Well Name & Number: GENOIL et al ST. LEONARD NO. 1 Location: St. Leonard D'Aston Area and Province: Lowlands. Quebec
Date
Time Depth (m KB)
Formation Name
Flowing Conditions Volume Calculations Superv. Initial
Remarks (Note flowing characteristics and any
fluid recoveries) a.m./p.m. Cumu l Mins.
Pressure (kPa)
Temp. (C)
Orifice (mm)'
Specific Gravity
Prover Factors Flow Rate
(maid) Fp ^,
Ftf Fg Fpv P
97 06 12 06:55 0 4 037 0 - - 0.60 - - - - - - LL Shut in well on pressure buildup. Testing open hole section 3 494 m to 4 037 m KB (FTD) 10:25 210 572 - - 0.60 - - - - - - LL
97 06 12 10:30 0 4 037 579 - 3.18 0.60 1.4312 - - - 680 973 LL Opened well on test through 50.8 mm flow prover.
10:35 5 585 25 3.18 0.60 - - - 686 982 LL Well flowing dry natural gas.
10:40 10 585 25 6.35 0.60 5.8736 - - - 686 4 029 LL Installed 6.35 mm orifice plate.
10:45 15 590 25 6.35 0.60 - - 691 4 059 LL
10:50 20 590 25 6.35 0.60 - - - 691 4 059 LL
10:55 35 590 25 6.35 0.60 - - - 691 4 059 LL
11:00 40 590 25 6.35 0.60 - - - 691 4 059 LL
11:05 45 590 25 6.35 0.60 - - - 691 4 059 LL
11:10 50 585 25 6.35 0.60 - - - 686 4 029 LL
11:15 45 580 25 4.76 0.60 3.2865 - - - 681 2 288 LL Installed 4.76 mm orifice plate.
11:20 50 585 25 4.76 0.60 - - - 686 2 255 LL Well flowing dry natural gas.
11:25 55 590 25 4.76 0.60 - - - 691 2 271 LL
11:30 60 590 25 4.76 0.60 - - - 691 2 271 LL
11:35 65 600 25 4.76 0.60 - - - 701 2 304 LL
NOTE: Select orifice size suitable for minimum 345 kPa or prover calculations will be inaccurate. Allow gas flows to stabilize for at least 5 minutes or maximum shutdown period of 30 minutes or as dictated by hole conditions. Submit a copy of this report weekly to Bissett's office.
PAGE NO. 42
SUMMARY OF FLOW PROVER VOLUME CALCULATIONS
Well Name & Number: GENOIL et al ST. LEONARD NO. 1 Location: St. Leonard D'Aston Area and Province: Lowlands, Quebec
Date
Time Depth (mtt8)
Formation Name
Flowing Conditions Volume Calculations Superv, Initial
Remarks (Note flowing characteristics and any fluid
recoveries) a.m.ip.m. Cumul. Mins.
Pressure (kPa)
Temp. (°C)
Orifice (mm)
Specific Gravity
Prover Factors Flow Rate
(mid) Fp Ftf Fg Fpv P
97 06 12 11:40 70 4 037 610 25 4.76 0.60 - - - 711 2 337 LL
11:45 75 610 25 6.35 0.60 5.8736 - - - 711 4 176 LL Installed 6.35 mm orifice plate.
11:50 80 610 25 6.35 0.60 - - - 711 4 176 LL
11:55 85 608 25 6.35 0.60 - - - 709 4 164 LL
12:00 90 605 25 6.35 0.60 - - - 706 4147 LL
12:05 95 603 25 6.35 0.60 - - - 704 4 135 LL
12:10 100 600 25 6.35 0.60 - - - 701 4117 LL
12:15 105 598 25 6.35 0.60 - -- 699 4 106 LL Well flowing dry natural gas
12:20 110 598 25 6.35 0.60 - -- 699 4106 LL
12:25 115 595 25 6.35 0.60 - -- 696 4 088 LL
12:30 120 590 25 6.35 0.60 - -- 691 4 059 LL
12:35 125 590 25 6.35 0.60 - - - 691 4 059 LL
12:40 130 588 25 6.35 0.60 - - - 289 4 047 LL
12:45 135 586 25 6.35 0.60 - - - 687 4 035 LL
12:50 140 585 25 6.35 0.60 - - - 686 4 029 LL
13:00 150 580 25 6.35 0.60 - - - 681 4 000 LL
13:10 160 578 25 6.35 0.60 -- - 379 3 988 LL
13:20 170 573 25 6.35 0.60 - -- 6.74 3 959 LL
13:30 180 570 25 6.35 0.60 - - - 671 3 941 LL Terminated test at 13:30, 97 06 12,
NOTE Select orifice size suitable for minimum 345 kPa or prover calculations will be inaccurate. Allow gas flows to stabilize for at least 5 minutes or maximum shutdown period of 30 minutes or as dictated by hole conditions. Submit a copy of this report weekly to Bissett's office.
PAGE NO. 43
Well Name & Number:
SUMMARY OF FLOW PROVER VOLUME CALCULATIONS
GENOIL et al ST. LEONARD NO. 1 Location: St. Leonard D'Aston Area and Province: Lowlands. Quebec
Date
Time Depth Im KG)
Formation Name
Flowing Conditions Volume Calculations Supety. Initial
Remarks (Note flowing characteristics and any fluid
recoveNes) a.m.l'" . puma Mins.
Pressure (kPa)
Temp. (°C)
Orifice tmm)
Specific Gravity
Prover Factors Flow Rate
(maid) Fp Ftf Fg Fpv P
97 06 12 06:55 0 4 037 0 LL Shut in well on pressure buildup. Air drilled. Open hole section from 3 494 m to 4 037 m KB (FTD) is open to the wellbore. 07:09 14 0
07:10 15 10
07:11 16 15
07:12 17 18
07:13 18 20
07:14 19 24
07:15 20 28
07:16 21 29
07:17 22 30
07:18 23 33
07:19 24 38
07:20 25 40
07:21 26 42
07:22 27 45
07:23 28 50
07:24 29 53
07:25 30 55
07:30 35 72
NOTE Select orifice size suitable for minimum 345 kPa or prover calculations will be inaccurate. Allow gas flows to stabilize for at least 5 minutes or maximum shutdown period of 30 minutes or as indictated by hole conditions. Submit a copy of this report weekly to Bissett's office.
PAGE NO. 44
Well Name & Number:
SUMMARY OF FLOW PROVER VOLUME CALCULATIONS
GENOIL et al ST. LEONARD NO. 1 Location: St. Leonard D'Aston Area and Province: Lowlands. Quebec
Date
Time
Depth m K8 ( )
Formation Name
Flowing Conditions Volume Calculations
Superv. Initial
Remarks (Note flowing characteristics and any fluid
recoveries} a.mlp.m. Cumul. Mins.
Pressure (kPa)
Temp. ('C)
°rifles (mm)
Specific Gravity
Prover Factors FIow~Rate
(m 2/c1) Fp Ftf Fg Fpv P
97 06 12 07:35 40 4 037 88
07:40 45 100
07:45 50 118
07:50 55 130
07:55 60 142
08:05 70 172
08:15 80 205
08:25 90 255
08:35 100 275
08:45 110 300
08:55 120 325
09:05 130 350
09:15 140 380
09:25 150 420
09:35 160 450
09:45 170 475
09:55 180 500
10:05 190 530
10:15 200 550
10:25 210 572 Open well on test through 50.8 mm flow prover.
NOTE: Select orifice size suitable for minimum 345 kPa or prover calculations will be inaccurate. Allow gas flows to stabilize for at least 5 minutes or maximum shutdown period of 30 minutes or as indictated by hole conditions. Submit a copy of this report weekly to Bissett's office.
PAGE NO. 45
aBISSETT RESOURCE CONSULTANTS LTD.
PLUG-BACK & ABANDONMENT REPORT
WELL NAME GENOIL et al ST. LEONARD NO. 1 LOCATION Quebec Lowlands
Hole Size 311 311 - - KB Elevation 79.30
Depth 325 347 - - ETD 535.00 m KB and 547.0 m KB
Top of Fluid in Hole Gel Chem
Casing in Hole Size - mm Set At - m Cement - m Plug Back String Drillpipe
Surface Casing - - Service Company Dowell Schlumberger
Production String - - Cons. Bd. Officer None
Plug #1 Plug #2 Plug #3 Plug #4 Plug #5 Plug #6
Date 96 12 05 96 12 18
Interval - Top 360 460
- Bottom 535 547
Formation - Name Quebec City Quebec City
- Depth -
Calipered Hole Size
(Average) - mm
Type of Cement
Number of Tonnes
Additives
m3 of Water Ahead
Displacement - m3 Water
- m3 Mud
Slurry Density - kg/m3
Mixing Times - Start
- Finish
Displacing Times - Start
- Finish
Felt Plug Time
Felt Plug Depth
Surface Casing Cut
311 311
"G" ''G"
26.0 15.0
2.0% CaC12 2.0% CaC12
3.3 7.3
1.0 2.8
1950 2080
00:20 21:15
00:56 21:32
00:57 21:34
01:01 21:45
01:00 22:00
288.5 273.0
m Below Ground. Surface Plug - tonnes. Plate Welded: Yes/No
CASING SALVAGE: Shot Off at m. No. of Joints Recovered -
Remarks Pulled 10 stands to 275 m dry pipe. Circulated bottoms up. Clobbered mud immediately, then
to good mud. Approximately 1.0 m3 preflush on bottoms up.
Wellsite Supervisor Calder H. Creelman
PAGE NO. 46
1
aBISSETT RESOURCE CONSULTANTS LTD.
PLUG-BACK & ABANDONMENT REPORT
WELL NAME GENOIL et al ST. LEONARD NO. 1 LOCATION Quebec Lowlands
Hole Size 311 - - - KB Elevation 79.30
Depth 2698 - - ETD 2698.00 m KB
Top of
Fluid in Hole Gel Chem
Casing in Hole Size - mm Set At - m Cement - m Plug Back String 114 mm drillpipe
Surface Casing 339.7 569.5 Surface Service Company Dowell Schlumberger
Production String 244.5 2340.5 Surface Cons. Bd. Officer None
Plug #1
Plug #2
Plug #3 Plug #4
Plug #5 Plug #6
Date 97 02 08
Interval - Top 2329
- Bottom 2494
Formation - Name Lorraine
- Depth
Calipered Hole Size
(Average) - mm
390
Type of Cement Oilwell "G"
Number of Tonnes 35.0
Additives 0.1% D81 1.0% D65
m3 of Water Ahead 3.0
Displacement - m3 Water 0.2
- m3 Mud 16.0
Slurry Density - kg/m3 2100
Mixing Times - Start 16:00
- Finish 16:54
Displacing Times - Start 16:54
- Finish 17:36
Felt Plug Time 20:30 on 97 02 10
Felt Plug Depth 2308
Surface Casing Cut - m Below Ground. Surface Plug tonnes. Plate Welded: Yes/No
CASING SALVAGE: Shot Off at - m. No. of Joints Recovered
Remarks -
Wellsite Supervisor Mike Kramps/Doug Gaboury
PAGE NO. 47
LOCATION Quebec Lowlands
KB Elevation 79.30
ETD 2684.00 m KB
Fluid in Hole Gel Chem
GENOIL et al ST. LEONARD NO. 1
Top of
215.9
2684
WELL NAME
Hole Size
Depth
Date
Interval - Top
- Bottom
Formation - Name
- Depth
Calipered Hole Size
(Average) - mm
J
Plug #1
Plug #2
Plug #3 Plug #4
Plug #5 Plug #6
97 03 01
2340.5
2684
Lorraine
2684
n/a
155.6
4037
GENOIL et al ST. LEONARD NO. 1 WELL NAME
Hole Size
Depth
LOCATION Quebec Lowlands
KB Elevation 79.30
ETD 4037.00 m KB
CI BISSETT RESOURCE CONSULTANTS LTD.
PLUG-BACK & ABANDONMENT REPORT
Top of Fluid in Hole Gel Chem
Casing in Hole Size - mm Set At - m Cement - m Plug Back String Drillpipe
Surface Casing 339.7 569.5 Surface Service Company Dowell Schlumberger
Drlg. Liner String 177.8 3494.0 - Cons. Bd. Officer None
Date
Plug #1
97 06 18
Plug #2
97 06 19
Plug #3
96 06 19
Plug
97 06
#4
20
Plug #5 Plug #6
97 06 21
Interval - Top 3930 3444 2175 600 10
- Bottom 4037 3544 2275 650 19
Formation - Name Potsdam Beauharnois -
- Depth n/a n/a n/a n/a n/a
Calipered Hole Size
(Average) - mm n/a n/a n/a n/a n/a
Type of Cement "G" "G” .G. “G“ "G,'
Number of Tonnes 4.80 5.30 4.60 3.70 0.50
Additives (1) (1) (2) (3) 1.0% CaC12
m3 of Water Ahead 2.30 1.00 2.40 2.30 1.80
Displacement - m3 Water 0.26 0.26 0.26 0.26 0.10
- m3 Mud 22.64 18.04 9.30 1.54 0.00
Slurry Density - kg/m3 1900 1900 1900 1900 1900
Mixing Times - Start 18:41 08:48 23:13 14:21 00:56
- Finish 18:48 08:55 23:19 14:25 00:59
Displacing Times - Start 18:48 08:56 23:20 14:29 00:59
- Finish 19:18 09:18 23:34 14:30 01:01
Felt Plug Time 07:20 21:20 12:00 22:40 -
Felt Plug Depth 3931 3420 2165 600 -
Surface Casing Cut 1.50 m Below Ground. Surface Plug No. 5 tonnes. Plate Welded: Yes/X
CASING SALVAGE: Shot Off at n/a m. No. of Joints Recovered None
Remarks (1) 00.7% D16 + 0.5% D65 + 9L/tonne D81. (2) 0.5% D65 + 2.0 L/tonne D81.
(3) 1.0% CaC12 + 0.5% D65. Welded steel plate over 244.5 mm OD casing and 339.7 mm OD casing.
Wellsite Supervisor Doug Gaboury
PAGE NO. 49
aBISSETT RESOURCE CONSULTANTS LTD.
LOGGING RECORD
Type (Abbreviate) Date Depth Logged Run
No. Remarks From To
Phasor-Induction 97 02 07 2472.0 569.7 01 Dowell Schlumberger
BHCSL 97 02 07 2460.0 569.7 01 -
Multi-finger caliper - 2285.0 6.0 02 SOC, casing inspection
DISFL 97 06 17 4028.0 3489.0 02 Dowell Schlumberger
DSI 97 06 17 4008.0 2450.0 02 -
CNL-LDT 97 06 17 4036.0 2981.0 02 -
Sidewall Core 97 06 17 2 at 3972.0 02 -
2 at 3971.0
2 at 3970.0
2 at 3969.0
1 at 3968.0
PAGE NO. 50
Wellsite Supervisor Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
SURPLUS EQUIPMENT REPORT
Well GENOIL et al ST. LEONARD NO. 1 Date 97/12/2 Rig No. 01
Quantity Description (1) Length, m Cond.(2)
14 Joints of 244.5 mm 79.6 kg/m N80 RGE 3 LT&C 8RD new 142.70 - casing length
Returned for credit to Summit Tubulars Corporation as per instruction of Bruce Bierwagon on 97 02 20.
6 Joints of 344.0 mm 90.8 kg/m K55 RGE 3 ST&C 8RD casing 11.64 A 11.58 A 11.65 A 12.25 A 13.97 A 13.18 A
Returned to Summit Tubulars Corporation.
1 McEvoy 346.1 mm x 339.7 mm 21 000 kPa S.O. casing - C bowl with Dutchman
1 McEvoy 346.1 mm 21 000 kPa x 27.94 mm 35 000 kPa "5-11" casing spool
Returned two above items to Cooper Cameron in Edmonton.
(1) List all equipment whether Rental or Company property. Provide complete descrip- tion, date shipped from wellsite and location of surplus Company equipment.
Contractor Ressource Naturelle Ralex Inc.
(2) Conditions: A. New Condition B. Good Useable Second Hand C. Fair Second Hand - Needs
Repairing D. No Longer Useable for
Original Purpose E. Junk
PAGE NO. 51
1
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Cloudy TEMP -1 °C ROAD Good DATE 96 09 24
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-01
CONTRACTOR Claude Morin Construction STATUS Preparing location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Excavator 10.00 $60 $600
D3 Tractor 10.00 50 500
2 - Tandem Trucks 20.00 45 900 Mobilization 800 GST/QST - 400 Supervision 2.0 days - 2 800
MATERIALS USED:
TOTAL $6 000
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Surveyors previously reflagged access road and location. Conducted preassessment survey. Moved on
equipment. Started stripping and piling topsoil on southwest side of location. Location about 35% stripped. Moved on water well drillers. Started drilling water well. Hit bed rock at 8.0 m below GL. Drilling. Shut down for the night.
Estimated Cpsts: Daily $ 6 000 Cumulative $ * Supervisor: Calder Creelman
*Cumulative cost will be reported on day number PS-02. Page No. 01
J
BISSETT RESOURCE CONSULTANTS LTD.
DAILY CONSTRUCTION REPORT
WEATHER Light rain TEMP 9 °C ROAD Good DATE 96 09 25
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-02
CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Excavator 10.00 $68.40 $684
D3 Tractor 10.00 57.00 570
2 - Tandem Trucks 20.00 51.30 1 026
Water Well 4 788
Rathole/Mouse Hole 5 578 Supervision 1.0 day 925
MATERIALS USED:
TOTAL $13 571
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued stripping and piling topsoil along southwest portion of the wellsite. Topsoil is 20.5 cm to 40.5 cm in depth. About 60% complete. Finished drilling water well. Ran 168.3 mm OD casing to 67.1 m GL. Tested water well at 115 L/min. Dug and ran liners in rathole and mouse hole. Shut down for the night.
Estimated Costs: Daily $ 13 571 Cumulative $ 106 687 Supervisor: Calder Creelman
Page No. 02
CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Cloudy TEMP 8 °C ROAD Good DATE 96 09 26
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-03
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Excavator 10.00 $68.40 $684 D3 Tractor 10.00 57.00 570 2 - Tandem Gravel Trucks 20.00 51.30 1 026 Supervision 1.0 day 1 800
MATERIALS USED:
TOTAL $4 080
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued stripping and piling topsoil along southwest portion of wellsite. About 85%
complete stripping. Dug 608 mm hole to 9.0 m GL. Ran 608 mm OD liner to 9.0 m GL. Shut down for the night.
Correction to Day No. PS-02: Water well TD = 62.0 m GL. Ran 168.3 mm OD casing to 11.0 m GL.
Estimated Costs: Daily $ 4 080 Cumulative $ 110 767 Supervisor: Calder Creelman
Page No. 03
J
CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
MATERIALS USED:
WEATHER Clear TEMP 8 °C ROAD Good DATE 96 09 27 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-04
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Excavator 10.00 $68.40 $684 D3 Tractor 10.00 57.00 570 2 - Tandem Gravel Trucks 20.00 51.30 1 026 Resident Manager/Supervision 2.0 days 1 800
TOTAL $4 080
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Completed stripping and piling topsoil along southwest portion of the wellsite.
Moved excavator to sand pit. Rathole rig dug 584 mm hole to 10.5 m GL. Drove 610 mm OD liner to 9.5 m GL. Shut down for the night.
Estimated Costs: Daily $ 4 080 Cumulative $ 114 847 Supervisor: C. Creelman/M. Durette
Page No. 04
DAILY CONSTRUCTION REPORT
BISSETT RESOURCE CONSULTANTS LTD. CI
J
WEATHER Raining TEMP 11 °C ROAD Good DATE 96 09 28 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-05 CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Excavator 10.00 $68.40 $684 D3 Tractor 10.00 57.00 570 930 Loader 6.50 57.00 370 2 - Tandem Gravel Trucks 24.00 51.30 1 231 Compactor 7.00 72.40 507 Supervision 2.0 days 1 800
MATERIALS USED:
339 tonnes (0 to 2%2) gravel $8.86/tonne 3 005 864 tonnes sand, 48 loads 5, $11.40/load 547
TOTAL $8 714
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued dipping 584 mm conductor hole. Dug to 14.0 m GL (conductor rig does not work on weekends). Ran ESP into water well. Started hauling sand and gravel. Spread gravel onto access road. Started laying down and compacting ±0.30 m of sand under rig matting area and high use area on location. Started digging sump. Shut down for the night.
Estimated Costs: Daily $ 8 714 Cumulative $ 123 561 Supervisor: C. Creelman/M. Durette
Page No. 05
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
BISSETT RESOURCE CONSULTANTS LTD. a$+
DAILY CONSTRUCTION REPORT
WEATHER Cloudy TEMP 10 °C ROAD Good DATE 96 09 29 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-06
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Excavator 8.00 $68.40 $547 D3 Tractor 9.50 57.00 542 Compactor 9.00 57.00 513 Supervision 2.0 days 1 800
MATERIALS USED:
1747 tonnes (0 to 21/2) gravel $8.86/tonne 15 478 Geotextile 600 6.4 mm (steel plate) cellar cribbing 600
TOTAL $20 080
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued to haul, spread and compact gravel. Laid down geotextile over area where rig matting will be located. Installed cellar cribbing. Shut down for the night.
NOTE: Experienced intermittent rain most of the day. Heavy rain last night.
Estimated Costs: Daily $ 20 080 Cumulative $ 143 641 Supervisor: C. Creelman/M. Durette
Page No. 06
CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
57.00 171 D3 Tractor 3.00
Supervision
MATERIALS USED:
2.0 days 1 800
BISSETT RESOURCE CONSULTANTS LTD.
DAILY CONSTRUCTION REPORT
WEATHER Clear TEMP 7 °C ROAD Good DATE 96 09 30
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-07
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Excavator 9.00 $68.40 $615
TOTAL $2 586
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Cleaned out existing drainage ditch along westerly boundary of location and 150 m
beyond edge of the location to assist with proper drainage. Spread gravel in northern portion of the location. Location wet because of heavy rains on the night of 96 09 28. Shut down for the night.
Location is 65% complete.
Estimated Costs: Daily $ 2 586 Cumulative $ 146 227 Supervisor: C. Creelman/M. Durette
Page No. 07
CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Cloudy TEMP 7 °C ROAD Good DATE 96 10 01 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-08
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Excavator 10.00 $68.40 $684 D3 Tractor 10.00 57.00 570 930 Front End Loader 6.00 57.00 342 4 - Tandem Gravel Trucks 30.00 51.30 1 539 Supervision 2.0 days 1 800
MATERIALS USED: 87 tonnes (0 - 21/2) gravel at $8.86/tonne 771 161 tonnes (4-6) washed stone at $11.00/tonne 1 771
TOTAL $7 477
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued to haul and spread gravel onto the location. Dug drainage ditch from rig matting area to ditch on western side of location/filled with 10 to 15 mm stone. Continued to dig sump. Lease is wet. Rathole diggers dug conductor hole to 18.0 m GL. Shut down for the night.
Estimated Costs: Daily $ 7 477 Cumulative $ 153 704 Supervisor: C. Creelman/M. Durette
Page No. 08
J
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP 9 °C ROAD Good DATE 96 10 02 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-09 CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
Estimated Costs: Daily $ 8 741 Cumulative $ 162 445 Supervisor: C. Creelman/M. Durette
Page No. 09
J
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Excavator 10.00 $68.40 $684 D3 Tractor 9.00 57.00 513 2 - Gravel Trucks 8.00 51.30 410 Supervision 2.0 days 1 800
MATERIALS USED: 602 tonnes (0 - 272) gravel at $8.86/tonne 5 334
TOTAL $8 741
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued to dig sump, dug to 11:00 - shut down because of rain. Hauled and
spread gravel onto the location. Rathole diggers dug 584 mm conductor hole to 23.0 m GL. Location approximately 75% complete. Shut down for the night.
BISSETT RESOURCE CONSULTANTS LTD.
DAILY CONSTRUCTION REPORT
WEATHER Cloudy TEMP 9 °C ROAD Good DATE 96 10 03 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-10 CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
Estimated Costs: Daily $ 10 717 Cumulative $ 173 162 Supervisor: C. Creelman/M. Durette
Page No. 10
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Excavator 9.50 $68.40 $650 D3 Tractor 10.00 57.00 570 2 - Tandem Gravel Trucks 29.50 51.30 1 513 Front End Loader 8.50 57.00 484 Supervision 2.0 days 1 800
MATERIALS USED: 545 tonnes (0 - 21/2) qravel at $8.86/tonne 4 829 60 loads (1080 tonnes) sand at $11.40/load 684 17 tonnes (4 - 6) stone at $11/tonne 187
TOTAL $10 717
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Ran 508 mm conductor pipe to 23 m KB. Prepared to cement. Cement is expected at 08:00, 96 10 03. Continued to place and spread sand and gravel at west side of lease. Location approximately 85% complete. Shut down for the night at 17:30 P.M. because of rain.
CONTRACTOR Claude Morin Construction & LBM Inc. STATUS Preparing location
DAILY CONSTRUCTION REPORT
BISSETT RESOURCE CONSULTANTS LTD. 41I
WEATHER Clear TEMP 0 °C ROAD Good DATE 96 10 04 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-11
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Excavator 5.00 $68.40 $342 D3 Tractor 9.00 57.00 513 2 - Gravel Trucks 3.00 51.30 154 930 Loader 1.50 57.00 86 Compactor 3.00 92.00 276 Supervision 2.0 days 1 800
MATERIALS USED: Conductor pipe 18 126 1044 tonnes sand at $11.40/tonne 661 175 tonnes 9.5 mm stone at $11.13/tonne 1 948 324 tonnes (0 - 2'/2 gravel) at $8.86/tonne 2 871
TOTAL $26 777
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. (Correction Day No. PS-10/96 10 03, conductor pipe landed at 23.0 m GL). Cemented conductor pipe full length using Class "A" cement (volume unknown). Rigged out and released rathole drillers. Installed 168.3 mm x 12.2 m cellar drain. Spread and compacted 9.5 mm stone. Completed hauling and spreading sand and gravel on location. Shut down for the night.
NOTE: Rock water drains that were installed on September 30, 1996, have been continuously running water.
Estimated Costs: Daily $ 26 777 Cumulative $ 199 939 Supervisor: C. Creelman/M. Durette
Page No. 11
1
DAILY CONSTRUCTION REPORT CrISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP -1 °C ROAD Good DATE 96 10 05 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. PS-12 CONTRACTOR Claude Morin Construction STATUS Preparing location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Trucking $869
312 Excavator 19.00 $68.40 1 300
D3 Tractor 1.00 57.00 57
2 - Gravel Trucks 18.00 51.30 923
Labour 12.00 12.00 144
Supervision 2.0 days 1 800
MATERIALS USED: Fencing Material 1 124
97 tonnes (0 - 2',4) gravel at $8.86/tonne 859 32 tonnes 19.1 mm gravel at $9.20/tonne 294
TOTAL ST 370
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued to dig_ sumo. Installed fence along western extremity of the sump area. Finished hauling and spreading gravel onto the location. Shut down for the night. Location is approximately 95% complete.
NOTE: Cemented conductor pipe with ±4.0 tonnes (3.0 m3) Class "A" cement.
Estimated Costs: Daily $ 7 370 Cumulative $ 207 309 Supervisor. C. Creelman/M. Durette
Page No. 12
DAY NO. PS-13 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 WEATHER Clear TEMP -1 °C ROAD Good DATE 96 10 06
CONTRACTOR Claude Morin Construction STATUS Waiting on drilling tools
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
2 - Excavators 16.00 $68.40 $1 094
D3 Tractor 3.50 57.00 200
2 - Gravel Trucks 12.00 51.30 616
Labour 5.00 12.00 60
Supervision 2.0 days 1 800
MATERIALS USED: Cellar Drain 200
TOTAL $3 970
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Completed diming the sump. finished installing safety fence around the perimeter of the sump area. Installed gate across the access road and erected wamina signs. Released and moved equipment off location. Returned to base.
Location Preparation Complete STATUS: WO Orillina Tools
Estimated Costs: Daily $ 3 970 Cumulative $ 211 279 Supervisor. C. Creelman/M. Durette
Page No. 13
DAILY CONSTRUCTION REPORT
BISSETT RESOURCE CONSULTANTS LTD. aQ►
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
Weather Clear Temp -7 °C Road Good Date 9611 23 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. PS-14 Depth m Progress m Hole Size mm Status Rigging up Mud: Wt kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. m 1 RU & RD Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole Wt. - daN m 6 Trips r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin nn/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued rigging up drilling tools. Rigged in sump pump and pumped rain water from sump into drainage ditch. Drilling fluid materials and bits arrived on location 96 11 22. Expect Ralex engine and Genoil stabilizers to arrive on location 96 11 23. Continued rigging up drilling tools.
ESTIMATED COSTS: DAILY $ 6 410 CUMULATIVE $ 217 689 SUPERVISOR C. Creelman
Page No. 14
BISSETT RESOURCE CONSULTANTS LTD. 411
DAILY DRILLING REPORT
Weather Clear Temp -22 °C Road Good Date 9611 24
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. PS-15
Depth m Progress m Hole Size mm Status Rigging up
Mud: Wt kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS No.
SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6
RU&RD 12.00
Size - mm m Drill Actual
Type m Reaming
S.N. m Coring
Jets - mm m Cond. Hole
Wt. - daN m Trips
r/min m 7 Lubr. Rig
Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued to rig up drilling tools. Shut down for the night.
ESTIMATED COSTS: DAILY $ 16 850 CUMULATIVE $ 234 539 SUPERVISOR C. Creelman
Page No. 15
1
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Clear Temp -12 'C Road GENOIL et al ST. LEONARD NO. 1
Date 96 11 25 Rig Ralex, 1 Day No. PS-16
Weather Well
Good
Depth m Progress m Hole Size mm Status Rigging up Mud: Wt kg/m3 Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. m 1 RU & RD 12.00
Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring
Jets - mm m 5 Cond. Hole Wt. - daN m 6 Trips r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued rigging up drilling tools. Repaired and started boiler. Welded extension on to 508 mm OD conductor barrel. Installed flow line. Shut down for the night.
ESTIMATED COSTS: DAILY $ 5 740 CUMULATIVE $ 240 279 SUPERVISOR C. Creelman
Page No. 16
1
ESTIMATED COSTS: DAILY $ 106 040 CUMULATIVE $ 346 319 SUPERVISOR C. Creelman
BISSETT RESOURCE CONSULTANTS LTD. iet,..
DAILY DRILLING REPORT
Cloudy Temp -2 'C Road
GENOIL et al ST. LEONARD NO. 1
Date 96 11 26 Rig Ralex, 1 Day No. PS-17
Weather Well Depth m Progress m Hole Size mm Status Rigging up
Mud: Wt kg/m3 Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS No.
SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6
RU & RD 12.00
Size - mm m Drill Actual Type m Reaming
S.N. m Coring Jets - mm m Cond. Hole Wt. - daN m Trips r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued to rig up drilling tools. Held prespud meeting with Ralex, Dowell, MI and Genoil personnel. Finished rigging up drilling tools. Shut down for the night.
NOTE: WHMIS training was held for Ralex crews.
Page No. 17
Good
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Clear Temp -10 'C Road Good Date 9611 27
Well
GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1 Day No. 01
Depth 65 m Progress 65 m Hole Size 311 mm Status Drilling
Mud: Wt 1040 kg/m' Visc. 45 s/L W.L. 9.0 cm3 pH 11.0 PV 23 mPa.s YP 6 Pa Gels 1/2 Pa
Methyl Blue 60.0 Solids 5.0 % Filter Cake 2.0 mm Salt 2000 mg/L Cal. 300 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. 1A 21 m 2.50
Size - mm 311.1 30 m 1.75 Type FDGH 45 m 1.50 S.N. LF8663 m
Jets - mm 2x11.9/1x12.7 m Wt. - daN 4 000 m r/min 100 m Out - m In PUMP In - m Surface Liner Length Metres 65 No. mm mm Hours 8.00 1 159 229 Condition 2 159 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 3 sxs Caustic PP Output AV 3 sxs Soda Ash kPa Umin m/min
81 sxs Gel 5 000 1 600 45
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4
RU & RD 14.00 ° Drill Actual 8.00 ° NO6E Reaming
Coring ° 5 Cond. Hole 1.00
6 Trips 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 1.00 60 11 Wireline Log 60 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
133 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Rigged to spud. Spud at 14:00, 96 11 26. Control drilling. Drilled to 65 m KB with reduced WOB to offset deviation. Drilling pilot hole at report time, ROP: 2.5 m/h.
ESTIMATED COSTS: DAILY $ 19 316 CUMULATIVE $ 365 635 SUPERVISOR C. Creelman
Page No. 18
Desilter Overflow Wt. 1100 kg/m3 Rate Centrifuge Underflow Wt. kg/m3
Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Overflow Wt. kg/m'
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -10
Well GENOIL et al ST. LEONARD NO. 1 °C Road Good
Ralex, 1 Date 96 11 28
Day No. 02 Rig
Depth 215 m Progress 150 m Hole Size 311 mm Status Drilling
Mud: Wt 1100 kg/m' Visc. 48 s/L W.L. 10.0 cm3 pH 10.0 PV 22 mPa.s YP 4 Pa Gels 1/3 Pa
Methyl Blue 56.0 Solids 6.3 % Filter Cake 2.0 mm Salt 900 mg/L Cal. 100 mg/L
Desilter Underflow Wt. 1210 kg/m3 Rate 1.0 Umin Desander Underflow Wt. kg/m3 Rate Umin
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1A 66 m 1.25 °S50E 1 RU & RD
Size - mm 311 77 m 0.50 °N85E 2 Drill Actual 21.25
Type FDGH 118 m 0.50 ° S73W 3 Reaming
S.N. LF8663 148 m 0.75 °N88E 4 Coring
Jets - mm 2x11.9/1x12.7 174 m 0.50 °N25E 5 Cond. Hole
Wt. - daN 6 000 m 6 Trips r/min 110 m ° 7 Lubr. Rig 0.25 Out - m In PUMP 8 Repair Rig 1.00 In - m Surface Liner Length 9 Cut Off D.L.
Metres 215 No. mm mm SPM 10 Dev. Survey 1.50 Hours 29.25 1 159 229 71 11 Wireline Log Condition 2 159 229 71 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
2 sxs Caustic PP Output AV Power 15 Test BOP
2 sxs Soda Ash kPa Umin m/min kW 16 DST 77 sxs Gel 7 400 1 860 12 229 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling with reduced WOB to control deviation. Hole is in good condition. On connections beginning at 24:00, 96 11 28, noticed that hole is taking fluid at ±0.20 m3 /7 mins (1.7 m3/h). Minor losses, but will continue to monitor same. Shut down to repair air hose on engine clutch. Drilling pilot hole at report time, ROP: ±7.0 m/h.
ESTIMATED COSTS: DAILY $ 19 308 CUMULATIVE $ 384 943 SUPERVISOR C. Creelman
Page No. 19
J
Date 96 11 29 Clear Temp -8 °C Road Good
aBISSETT RESOURCE CONSULTANTS LTD.
Weather Well GENOIL et al ST. LEONARD NO. 1
DAILY DRILLING REPORT
311 mm Status Drilling cm3 pH 10.0 PV 26 mPa.s YP 5.5 Pa Gels 1/6 Pa
2.0 mm Salt 700 mg/L Cal. 60 mg/L Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m' Desilter Overflow Wt. 1 140 kg/m' Rate Centrifuge Underflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1A 2A 210 m 1.00 °Totco 1 RU & RD
Size - mm 311 311 226 m 1.50 °N10E 2 Drill Actual 16.00 Type FDGH HP13G 235 m 1.25 °Totco 3 Reaming 0.50 S.N. LF8663 MM6814 271 m 2.00 °N7E 4 Coring Jets - mm 2x11.9/1x12.7 3 x 12.7 m 5 Cond. Hole 0.50 Wt. - daN 5-7000 6 000 m 6 Trips 5.00 r/min 110 110 m 7 Lubr. Rig 0.25 Out - m 257 In PUMP 8 Repair Rig 0.75 In - m Surface 257 Liner Length 9 Cut Off D.L. Metres 257 40 No. mm mm SPM 10 Dev. Survey 1.00 Hours 36.75 8.00 1 159 229 140 11 Wireline Log Condition 2-1-1 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
1 sx Caustic PP Output AV Power 15 Test BOP 1 sx Soda Ash kPa Umin m/min kW 16 DST
75 sxs Gel 6 000 1 600 10 159 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 257 m KB. Shut down to repair mud pump. Circulated to condition mud and hole. Tripped out for bit #1A. Ran bit #2k Broke circulation and washed 10 m to bottom. Drilling. Drilling with reduced WOB to control drift at report time, ROP: ±4.0 m/h.
NOTE: Pump 2 down, waiting on rod seal. Desilter only ran 4 hours, desilter/mixing pump down because of electrical problems.
ESTIMATED COSTS: DAILY $ 28 850 CUMULATIVE $ 413 793 SUPERVISOR C. Creelman
Page No. 20
Day No. 03 Rig Ralex, 1
Depth 297 m Progress Mud: Wt 1 140 kg/m' Visc. Methyl Blue 60.0 Solids Desilter Underflow Wt. 1 340
82 m Hole Size 55 s/L W.L. 10.0
8.8 % Filter Cake kg/m' Rate 1.0
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp 2 °C Road Good Date 9611 30
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 04
Depth 368 m Progress 71 m Hole Size 311 mm Status Drilling Mud: Wt 1 120 kg/m' Visc. 65 s/L W.L. 10.0 cm' pH 10.0 PV 36 mPa.s YP 12 Pa Gels 2.5/12.0Pa Methyl Blue 70.0 Solids 7.6 % Filter Cake 2.0 mm Salt 500 mg/L Cal. 40 mg/L Desilter Underflow Wt. 1 210 kg/m' Rate 5.0 Umin Desander Undertlow Wt. kg/m' Rate Umin
Desilter Overflow Wt. 1 110 kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 2A 298 m 2.125 °N12E 1 RU & RD
Size - mm 311 328 m 2.50 °N7W 2 Drill Actual 18.25
Type HP13G m ° 3 Reaming S.N. MM6814 m 4 Coring Jets - mm 3 x 12.7 m 5 Cond. Hole Wt. - daN 5 000 m ° 6 Trips
r/min 120 m 7 Lubr. Rig 0.25 Out - m In PUMP 8 Repair Rig 4.75
In - m 257 Liner Length 9 Cut Off D.L.
Metres 111 No. mm mm SPM 10 Dev. Survey 0.75
Hours 24.50 1 159 229 80 11 Wireline Log Condition 2 159 229 80 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
83 sxs Gel PP Output AV Power 15 Test BOP 3 sxs Soda Ash kPa Umin m/min kW 16 DST
9 000 2 100 12 279 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling with reduced WOB to control deviation. Drilled to 312 m KB. Repaired clutch and governor on #3 engine, repaired pump rod seal. Drilling with both mud pumps. Held safety meeting. Drilled to 368 m KB. Drilling at report time, ROP: 3.5 to 4.0 m/h.
Hole is in good condition.
ESTIMATED COSTS: DAILY $ 20 113 CUMULATIVE $ 433 906 SUPERVISOR C. Creelman
Page No. 21
J
BISSETT RESOURCE CONSULTANTS LTD. Cli
DAILY DRILLING REPORT
Cloudy Temp 5 °C Road GENOIL et al ST. LEONARD NO. 1
Date 96 12 01 Rig Ralex, 1 Day No. 05
Weather Well
Good
Depth 418 m Progress 50 m Hole Size 311 mm Status Drilling Mud: Wt 1 110 kg/m' Visc. 60 s/L W.L. 10.4 cm' pH 8.5 PV 28 mPa.s YP 8 Pa Gels 2/10.5 Pa
Methyl Blue 70.0 Solids 7.0 % Filter Cake 2.0 mm Salt 500 mg/L Cal. 40 mg/L
Desilter Underflow Wt. 1 160 kg/m' Rate 2.0 1.../min Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. 1 105 kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
°N12W
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9
RU & RD °N12W Drill Actual 22.75 °N12W Reaming
Coring Cond. Hole Trips Lubr. Rig 0.75 Repair Rig Cut Off D.L.
SPM 10 Dev. Survey 0.50 80 11 Wireline Log 80 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
366 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
No. 2A Size - mm 311 Type HP13G S.N. MM6814 Jets - mm 3 x 12.7 Wt. - daN 3 - 4 000 r/min 120/140 Out - m In In - m 257 Metres 161 Hours 49.50 Condition
BITS SURVEYS 361 m 3.25 382 m 3.50 411 m 3.75 m m m m
PUMP Liner Length
No. mm mm 1 159 229 2 159 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 42 sxs Gel PP Output AV 2 sxs Soda Ash kPa Umin m/min
10 500 2 100 14
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling with reduced WOB to control deviation. Hole in good condition. Drilling at report time, ROP: 1.8 m/h.
Held safety meeting with two crews.
ESTIMATED COSTS: DAILY $ 18 921 CUMULATIVE $ 452 827 SUPERVISOR C. Creelman
Page No. 22
J
ESTIMATED COSTS: DAILY $ 36 229 CUMULATIVE $ 489 156 SUPERVISOR C. Creelman
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Raining Temp 10 'C Road Good Date 96 12 02 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 06 Depth 444 m Progress 26 m Hole Size 311 mm Status Drilling Mud: Wt 1 100 kg/m' Visc. 72 s/L W.L. 10 cm3 pH 8.5 PV 37 mPa.s YP 13 Pa Gels 2.5/12 Pa Methyl Blue 74.0 Solids 6.3 % Filter Cake 2.0 mm Salt 500 mg/L Cal. 40 mg/L Desilter Underflow Wt. 1 100 kg/m' Rate 2.0 Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. 1 100 kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 2A 3A 424 m 4.25 °N14W 1 RU & RD Size - mm 311 311 m 0 2 Drill Actual 18.00 Type HP13G MHP13G m 3 Reaming S.N. MM6814 CL6017 m ° 4 Coring Jets - mm 3 x 12.7 3 x 12.7 m 5 Cond. Hole Wt. - daN 3 000 5 000 m 6 Trips 4.75 r/min 120 to 140 110 m ° 7 Lubr. Rig 0.25 Out - m 436 In PUMP 8 Repair Rig In - m 257 436 Liner Length 9 Cut Off D.L. Metres 179 8.00 No. mm mm SPM 10 Dev. Survey 1.00 Hours 67.50 3.25 1 159 229 75 11 Wireline Log Condition 2-3-2 2 159 229 75 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
32 sxs Gel PP Output AV Power 15 Test BOP 1 sx Soda Ash kPa Umin m/min kW 16 DST
10 000 1 970 12 328 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled with reduced WOB to control deviation. Drilled to 436 m KB. Circulated to condition mud and hole. Tripped out bit #2A. Ran bit #3A, picked up additional 2 - 311 mm stabilizers and 171 mm drilling jars. Tripped in, broke circulation and reamed 10 m to bottom, no fill. Drilled with reduced WOB to control deviation. Drilling at report time, ROP: 2.75 m/h.
Page No. 23
C BISSETT RESOURCE CONSULTANTS LTD. 4$+
DAILY DRILLING REPORT
Weather Clear Temp -2 °C Road Good Date 96 12 03 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 07 Depth 476 m Progress 32 m Hole Size 311 mm Status Drilling Mud: Wt 1 100 kg/m3 Visc. 56 s/L W.L. 10.4 cm3 pH 8.5 PV 32 mPa.s YP 9 Pa Gels 2/11 Pa Methyl Blue 70.0 Solids 6.5 % Filter Cake 2.0 mm Salt 500 mg/L Cal. 40 mg/L Desilter Underflow Wt. 1 140 kg/m3 Rate 2.0 Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. 1 095 kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS No. 3A 442 m 6.75 Size - mm 311 445 m 7.00 Type MHP13G 454 m 7.125 S.N. CL6017 m Jets - mm 3 x 12.7 m Wt. - daN 3 000 m r/min 110/120 m Out - m In PUMP In - m 436 Liner Length Metres 40 No. mm mm Hours 25.25 1 159 229 Condition 2 159 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 60 sxs Gel PP Output AV 2 sxs Soda Ash kPa Umin m/min
6 500 1 570 10.2
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
°N12W
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9
RU & RD °N14W Drill Actual 19.25 °N17W Reaming
Coring Cond. Hole Trips 2.75 Lubr. Rig 0.50 Repair Rig Cut Off D.L.
SPM 10 Dev. Survey 1.50 120 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
169 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Lost 40 m3 drilling mud during previous trip and first 2 hours drilling on bottom. Drilled with reduced WOB to control deviation. Reran survey at 442 m KB to confirm abrupt hole angle increase. Drilled to 468 m KB. Held safety meeting. Drilled with reduced WOB to control deviation. Drilling at report time, ROP: t1.5 m/h.
NOTE: Mud motor and directional tools were mobilized from Edmonton 96 12 02. ETA: 96 12 05.
ESTIMATED COSTS: DAILY $ 22 697 CUMULATIVE $ 511 853 SUPERVISOR C. Creelman
Page No. 24
J
Weather Clear Temp -8 Well GENOIL et al ST. LEONARD NO. 1
°C Road Good Date 96 12 04 Rig Ralex 1 Day No. 08
CUMULATIVE $ ESTIMATED COSTS: DAILY $ 23 976 535 829 SUPERVISOR C. Creelman
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Depth 520 m Progress 60 m Hole Size 311 mm Status Drilling
Mud: Wt 1 095 kg/m' Visc. 60 s/L W.L. 11.0 cm3 pH PV 30 mPa.s YP 8.5 Pa Gels 2/12 Pa
Methyl Blue 70.0 Solids 6.0 % Filter Cake 2.0 mm Salt 550 mg/L Cal. 40 mg/L
Desilter Underflow Wt. 1 140 kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. 1 095 kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. 1 840 kg/m3 Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 3A 463 m 7.125 °N17W 1 RU & RD
Size - mm 311 473 m 7.375 °N21W 2 Drill Actual 22.50
Type MHP13G 482 m 7.000 °N23W 3 Reaming S.N. CL6017 491 m 7.375 °N2OW 4 Coring
Jets - mm 3 x 12.7 500 m 7.375 °N26W 5 Cond. Hole
Wt. - daN 6 000 m 6 Trips r/min 110/120 m 7 Lubr. Rig
Out - m In PUMP 8 Repair Rig
In - m 436 Liner Length 9 Cut Off D.L.
Metres 520 No. mm mm SPM 10 Dev. Survey 1.50 Hours 47.75 1 159 229 80 11 Wireline Log Condition 2 159 229 80 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
52 sxs Gel PP Output AV Power 15 Test BOP 1 sx Soda Ash kPa Umin m/min kW 16 DST
9 500 1 920 12 303 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled with reduced weight on bit to control drift. Drilling at report time, ROP: 3.0 m/h.
NOTE: Slight increase in rotary torque at 495 m KB.
Page No. 25
SURVEYS 509 m 7.50 521 m 7.375 m m m m m
PUMP Liner Length
No. mm mm 1 159 229 2 159 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 23 sxs Gel 13 sxs Bicarb PP Output AV
1 sx Soda Ash kPa Umin m/min 15 sxs Lignite 4 sxs SAPP
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
No. 3A Size - mm 311 Type MHP13G S.N. CL6017 Jets - mm 3 x 12.7 Wt. - daN 6 000 r/min 110 Out - m 535 In - m 436 Metres 99 Hours 53.00 Condition 2-1-1
BITS
CI BISSETT RESOURCE CONSULTANTS LTD. $+
DAILY DRILLING REPORT
Weather Snowing Temp -4 °C Road Good Date 96 12 05
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 09
Depth 535 m Progress 15 m Hole Size 311 mm Status WOC Mud: Wt 1 090 kg/m' Visc. 50 s/L W.L. 8.0 cm3 pH 5.8 PV 32 mPa.s YP 5 Pa Gels 1/2 Pa
Methyl Blue 66 Solids 5.7 % Filter Cake 1.5 mm Salt 800 mg/L Cal. 280 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
°N22W
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9
RU & RD °N23W Drill Actual 12.50
Reaming Coring Cond. Hole 3.25 Trips 6.75 Lubr. Rig Repair Rig Cut Off D.L.
SPM 10 Dev. Survey 1.50 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 535 m KB with reduced WOB. Tripped out bit #3A, laid down stabilizers and monel drill collar. Ran 114 mm OD drillpipe open ended, landed at 534.5 m KB. Rigged in cementers. Held safety meeting. Ran plug #1, 535 m to 360 m KB with 26.0 tonnes Class "G" + 2% CaCI, at 1 950 kg/m' slurry density. Plug down at 01:01, 96 12 05. Pulled drillpipe to 275 m KB. Circulating while waiting on cement.
ESTIMATED COSTS: DAILY $ 25 573 CUMULATIVE $ 561 402 SUPERVISOR C. Creelman
Page No. 26
J
ESTIMATED COSTS: DAILY $ 53 879 CUMULATIVE $ 621 446 SUPERVISOR C. Creelman
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Cloudy Temp 4 °C Road Good Date 96 12 06 Rig Ralex, 1 Day No. 10
Weather Well GENOIL et al ST. LEONARD NO. 1 Depth 312 m Progress 13 m Hole Size 311 mm Status Polish cement plug Mud: Wt 1 060 kg/m' Visc. 38 s/L W.L. 12.0 cm' pH 10.9 PV 15 mPa.s YP 2 Pa Gels0.5/1.0 Pa
Methyl Blue 45.0 Solids 4.0 % Filter Cake 1.5 mm Salt 1 000 mg/L Cal. 100 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1A m 1 RU & RD
Size - mm 311 m 2 Drill Actual Type FDGH m 3 Reaming
S.N. LF8663 m 4 Coring
Jets - mm 2x11.4, 1x12.2 m 5 Cond. Hole 2.75
Wt. - daN 5 - 8 000 m 6 Trips 4.75 r/min 110 m 7 Lubr. Rig
Out - m In PUMP 8 Repair Rig In - m 289 Liner Length 9 Cut Off D.L. Metres 13 No. mm mm SPM 10 Dev. Survey Hours 2.00 1 159 229 80 11 Wireline Log Condition 2 159 229 80 12 Run Csg/Cmt 14.50
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
10 500 2 100 13.6 366 17 Plug Back 1.00 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Clean Tanks 1.00 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated while WOC. Tripped out open ended drillpipe. Slipped and cut line. Pumped rain water out of sump into drainage ditch. Ran bit #1A (RR) to 275 m KB. Circulated, conditioned mud and WOC. WOC 24 hours. Tagged top of plug #1 at 288.5 m KB. Drilled soft cement to 297 m KB. Drilling in firm cement beginning at 297 m KB. Drilling cement at report time, ROP 7.0 m/h.
Page No. 27
1
322 20 11.50
SURVEYS 310 m 2.25 319 m 2.50
BITS 4A 311 MDSH LH9115 3 x 17.5
m m m
1 000 m m
PUMP Liner Length
No. mm mm 1 159 229
In 340 (mm)
2 159 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 36 sxs Gel PP Output AV 6 sxs Caustic kPa Umin m/min
1 sx SAPP 7 500 1 750 11 28 sxs Bicarb
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec formation.
No. 1A (RR) Size - mm 311 Type FDGH S.N. LF8663 Jets - mm 2x11.9, 1x12.7 Wt. - daN 5 000 r/min 110 Out - m 322 In - m 289 Metres 34 Hours 3.50 Condition
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -7 °C Road Good Date 96 12 07
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
Depth 342 m Progress 30 m Hole Size 311 mm Status Drilling
Day No. 11
Mud: Wt 1 060 kg/m' Visc. 62 s/L W.L. 13.0 Methyl Blue 57.0 Solids 4.50 % Filter Cake Desilter Underflow Wt. 1 120 kg/m' Rate Desilter Overflow Wt. 1 050 kg/m' Rate Centrifuge Underflow Wt. kg/m'
cm3 pH 13.0 PV 19 mPa.s YP 14 Pa Gels 19/31 Pa
2.0 mm Salt 1 000 mg/L Cal. 100 mg/L Umin Desander Underflow Wt. kg/m' Rate Umin
Umin Desander Overflow Wt. kg/m' Rate L./min Centrifuge Overflow Wt. kg/m'
°N11W
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9
RU & RD °N5W Drill Actual 11.25
Reaming Coring Cond. Hole 4.00 Trips 7.75 Lubr. Rig Repair Rig Cut Off D.L.
SPM 10 Dev. Survey 0.50 73 11 Wireline Log 73 12 Run Csg/Cmt
13 Wait on Cmt 0.50 14 Nipple Up
Power 15 Test BOP kW 16 DST
219 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled firm cement from 312 m to 322 m KB. Circulated bottoms up. Tripped out bit #1A (RR). Ran bit #4A and 203 mm OD mud motor with 1.15° bent housing. Broke circulation. Control drilled at 3.0 m/h from 322 m to 333 m KB with 100% cement returns. Control drilled at 1.0 m/h from 333 m to 337 m KB with 100% cement in returns. Circulated bottoms up. Tripped out bit #4A. Increased bent housing setting from 1.15° to 1.86°. Ran bit #4A . Broke circulation and control drilled from 337 m to 342 m KB at 1.0 m/h with 93% cement and 7% shale in returns. Control drilling at report time, ROP: 1.0 m/h.
ESTIMATED COSTS: DAILY $ 41 881 CUMULATIVE $ 663 327 SUPERVISOR C. Creelman
Page No. 28
°C Road Good Date 96 12 08
No. 4A Size - mm 311 Type MDSH S.N. LH9115 Jets - mm 3 x 17.5 Wt. - daN 1 000 r/min 340 Out - m In In - m 322 Metres 19 Hours 27.50 Condition
DRILLING MUD ADDITIVES USED: 20 sxs Gel
19 L Acid
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec formation.
BITS SURVEYS 329 m 2.25 338 m 2.00 348 m 2.30 357 m 3.30
m m m
PUMP Liner Length
No. mm mm 1 159 229 2 159 229
HYDRAULIC PP
Output AV kPa
Umin m/min 7 000
1 900 12
BISSETT RESOURCE CONSULTANTS LTD. Cli
DAILY DRILLING REPORT
Weather Snowing Temp 0 Well GENOIL et al ST. LEONARD NO. 1 Ralex, 1
Depth 377 m Progress 35 m Hole Size 311 Drilling
Mud: Wt 1 055 kg/m3 Visc. 93 s/L W.L. 16.0 cm3 pH 13.0 PV 19 mPa.s YP
Methyl Blue 52.0 Solids 3.4 % Filter Cake 2.5 mm Salt 1 800
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt.
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt.
Centrifuge Underflow Wt. 1 495 kg/m3 Centrifuge Overflow Wt.
Rig mm Status
Day No. 12
15 Pa Gels 16/36 Pa mg/L Cal. 0 mg/L kg/m' Rate Umin
kg/m' Rate Umin 1 045 kg/m'
°N5W
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9
RU & RD °N2W Drill Actual 16.00 °N1OW Reaming °N24W Coring
Cond. Hole 0.50 Trips 5.75 Lubr. Rig Repair Rig Cut Off D.L.
SPM 10 Dev. Survey 1.75 72 11 Wireline Log 72 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
222 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Slid and rotated to 348 m KB. Circulated bottoms up. Tripped out bit #1 and adjusted bent housing from 1.86° to 1.50°. Ran bit and mud motor. Broke circulation and washed 10 m to bottom. Slid to 354 m KB, °90% shale in returns. Rotated to 360 m KB. Slid to 377 m KB. Returns show 80% siltstone and 20% cement at 370 m KB. Control drilling at report time, ROP: 4.0 m/h,
NOTE: Lost ±20 m3 drilling mud at 372 m KB.
ESTIMATED COSTS: DAILY $ 26 684 CUMULATIVE $ 690 011 SUPERVISOR C. Creelman
Page No. 29
J
No. 4A Size - mm 311 Type MDSH S.N. LH9115 Jets - mm 3 x 17.5 Wt. - daN 3 000 r/min 340 Out - m In In - m 322 Metres 78 Hours 24.50 Condition
DRILLING MUD ADDITIVES USED:
HYDRAULIC 26 sxs Gel
PP
Output AV 3 sxs Bicarb
kPa
Umin m/min 6 sxs Lignite
7 000
1 910 12.4
BITS
SURVEYS 367 m 3.60 376 m 3.20 385 m 3.10
m m m m
PUMP Liner Length
No. mm mm 1
159
229 2
159
229
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Foggy Temp -2 °C Road Good
Date 96 12 09
Well
GENOIL et al ST. LEONARD NO. 1
Rig
Ralex, 1
Day No. 13
Depth 400 m Progress 22 m Hole Size 311 mm Status Drilling Mud: Wt 1 055 kg/m' Visc. 44 s/L W.L. 16.0 cm3 pH 12.0 PV 12 mPa.s YP 13 Pa Gels 12/29 Pa
Methyl Blue 49.0 Solids 3.4 % Filter Cake 2.5 mm Salt 2 000 mg/L Cal. 0 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. 1 645 kg/m3 Centrifuge Overflow Wt. 1 045 kg/m'
TIME DISTRIBUTION Code/Operation Hours
° N21 W 1 RU & RD °N2OW 2 Drill Actual 18.25 °N16W 3 Reaming ° 4 Coring ° 5 Cond. Hole ° 6 Trips 3.75 ° 7 Lubr. Rig
8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 2.00
72 11 Wireline Log
72 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
222 17 Plug Back
18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec formation.
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled with reduced weight on bit to control deviation. Drilled to 383 m KB. Tripped out and changed bent housing setting from 1.50° to 1.86°. Tripped in, no fill. Control drilling at 4.0 m/hr. Drilling at report time. Samples indicated 85% shale and 15% cement.
ESTIMATED COSTS: DAILY $
27 330 CUMULATIVE $
717 341 SUPERVISOR
C. Creel man
Page No. 30
-8 Weather Well
Clear Temp GENOIL et al ST. LEONARD NO. 1
Date 96 12 10 °C Road Good
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Rig Ralex, 1
Depth 430 m Progress Mud: Wt 1 050 kg/m' Visc. 43 s/L W.L. 16.0 Methyl Blue 49.0 Solids 3.4 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
°N7W
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7
RU&RD °N5W Drill Actual 13.00 °N5W Reaming °N3W Coring °N5E Cond. Hole 1.50 °N6W Trips 7.00 ° Lubr. Rig
8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 2.50 73 11 Wireline Log 73 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
159 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled with mud motor to 419 m KB. Tripped out, changed bent housing from 1.86° to 2.12°. Tripping in, washed 10 m to bottom. Drilled with mud motor. Drilled to 430 m KB. Tripped out bit #4A, laid down mud motor. Ran bit #5A. Ran drift surveys at 419 m and 426 m KB. Tripping out at report time.
Strapped drill string out at 430 m KB, +0.50 m difference, no correction.
ESTIMATED COSTS: DAILY $ 38 371 CUMULATIVE $ 755 712 SUPERVISOR C. Creelman
Page No. 31
DRILLING MUD ADDITIVES USED: HYDRAULIC Output AV Umin m/min 1 910 12.4
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
No. 4A Size - mm 311 Type MDSH S.N. LH9115 Jets - mm 3x17.5 Wt. - daN 5 000 r/min 340 Out - m 419 In - m 322 Metres 97 Hours 52.50 Condition 2-3-2
PP kPa 5 000
BITS SURVEYS
m PUMP
Liner Length mm mm 159 229 159 229
394 m 3.20 403 m 3.40 413 m 5.40 419 m 6.40 426 m 5.30 419 m 6.00
5A 311 MFDSH LH9114 3x17.5 7 000 340 430 419 11 No.
1 2
3.00
cm3 pH 12.0 PV 11 mPa.s YP 13.5 Pa Gels 12/19 Pa
2.5 mm Salt 2 000 mg/L Cal. 0 mg/L kg/m' Rate Umin kg/m' Rate Umin
kg/m'
Umin Desander Underflow Wt. Umin Desander Overflow Wt.
Centrifuge Overflow Wt.
Day No. 14
J
30 m Hole Size 311 mm Status Tripping
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
I
Weather Snowing Temp -1 'C Road Good Date 96 12 11
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 15
Depth 489 m Progress 59 m Hole Size 311 mm Status Drilling
Mud: Wt 1 080 kg/m' Viso. 45 s/L W.L. 16.8 cm3 pH 11.6 PV 18 mPa.s YP 3.5 Pa Gels 3/21 Pa
Methyl Blue 52.0 Solids 5.0 % Filter Cake 2.5 mm Salt 1 250 mg/L Cal. 0 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 5A 422 m 5.7 °N3E 1 RU & RD
Size - mm 311 432 m 4.2 °N10E 2 Drill Actual 10.00
Type MFDSH 441 m 2.3 °N23E 3 Reaming
S.N. LH9114 451 m 1.2 °N13E 4 Coring
Jets - mm 3 x 17.5 460 m 1.2 °N73W 5 Cond. Hole 0.75 Wt. - daN 6 000 469 m 1.75 °N84W 6 Trips 8.25 r/min 40/340 m 7 Lubr. Rig 0.25
Out - m In PUMP 8 Repair Rig In - m 419 Liner Length 9 Cut Off D.L. Metres 70 No. mm mm SPM 10 Dey. Survey 3.75 Hours 16.50 1 159 229 73 11 Wireline Log Condition 2 159 229 75 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
3 sxs Lignite PP Output AV Power 15 Test BOP 3 sxs Bicarb kPa Umin m/min kW 16 DST
36 sxs Gel 8 000 1 940 12.6 258 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 1.00 Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping out. Checked mud motor and 2.12° bent housing setting. Reran bit #5 and 203 mm OD mud motor. Washed 10 m to bottom. Drilling. Slid from 430 m to 449 m KB. Rotated from 449 m to 452 m KB, 456 m to 461 m KB and 463 m to 485 m KB. Drilling at report time, ROP: 6.0 m/h.
NOTE: Floorhand was involved in an accident that resulted in an injured knee. Accident report to follow.
ESTIMATED COSTS: DAILY $ 26 168 CUMULATIVE $ 781 880 SUPERVISOR C. Creelman
Page No. 32
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -7 °C Road Good Date 96 12 12
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 16
Depth 530 m Progress 41 m Hole Size 311 mm Status Drilling
Mud: Wt 1 110 kg/m' Visc. 41 s/L W.L. 16.0 cm' pH 11.5 PV 15 mPa.s YP 4 Pa Gels 1/21 Pa
Methyl Blue 49.0 Solids 6.9 % Filter Cake 2 mm Salt 1 400 mg/L Cal. Trace mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 5A 6A 480 m 2.60 °N81W 1 RU & RD Size - mm 311 311 489 m 3.75 °N85W 2 Drill Actual 14.00
Type MFDSH M5153 499 m 5.00 °N73W 3 Reaming S.N. LH9114 LC7182 508 m 6.10 °N68W 4 Coring Jets - mm 3 x 17.5 3 x 17.5 m 5 Cond. Hole 0.25 Wt. - daN 5 000 5 000 m 6 Trips 6.25 r/min 32/340 340 m 7 Lubr. Rig 0.25 Out - m 524 In PUMP 8 Repair Rig In - m 419 524 Liner Length 9 Cut Off D.L. Metres 105 6 No. mm mm SPM 10 Dev. Survey 3.25 Hours 25.50 2.00 1 159 229 73 11 Wireline Log Condition 4-6-3 2 159 229 73 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
24 sxs Gel PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST 8 500 1 910 12.4 285 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Slid and rotated to 496 m KB. Pump pressure increased drastically. Tripped out bit #5A and found mud motor failed. Ran bit #6 and 203 mm OD mud motor with 1.86° bent housing. Broke circulation and washed 10 m to bottom. Orientated, rotated from 499 m to 504 m and 509 m to 513 m KB. Deviation continues to increase. Tripped out bit #6A. Changed mud motor bent housing to 2.12°. Ran bit #6A. Broke circulation and washed 10 m to bottom. Orientated, drilling ahead at report time, ROP: 4.0 m/h.
ESTIMATED COSTS: DAILY $ 45 964 CUMULATIVE $ 827 844 SUPERVISOR C. Creelman
Page No. 33
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp -2 °C Road Good Date 96 12 13
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 17
Depth 547 m Progress 65 m Hole Size 444 mm Status Reaming
Mud: Wt 1 115 kg/m' Visc. 48 s/L W.L. 13.0 cm3 pH 10.0 PV 21 mPa.s YP 4 Pa Gels 1/2 Pa
Methyl Blue 52.0 Solids 7 % Filter Cake 2.5 mm Salt 1 400 mg/L Cal. 60 mg/L
Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m3 Rate L/min
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 6A HO-1 517 m 5.9 °N71W 1 RU & RD Size - mm 311 444 526 m 6.2 °N63W 2 Drill Actual 6.00 Type M5153 Hole opener m 3 Reaming 3.00
S.N. LC7182 m 4 Coring Jets - mm 3 x 17.5 3x11.1,1x14.3 m ° 5 Cond. Hole 0.25 Wt. - daN 5 - 6 000 1 000 m 6 Trips 5.50 r/min 340 100 m 7 Lubr. Rig 0.25 Out - m 547 In PUMP 8 Repair Rig In - m 524 Surface Liner Length 9 Cut Off D.L. 0.75 Metres 23 95 No. mm mm SPM 10 Dev. Survey 2.00 Hours 6.00 8 1 159 229 90 11 Wireline Log Condition 1-1-1 2 159 229 90 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
62 sxs Gel PP Output AV Power 15 Test BOP 2 sxs Bicarb kPa Umin m/min kW 16 DST 2 sxs SAPP 7 000 2 360 15 274 17 Plug Back 1 pail Acid 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 1.50
Drilling in Quebec City formation. 21 Handle Tool 4.75 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Directionally drilled pilot hole to 547 m KB. Unable to orientate motor because of dog legs. Tripped out bit #6A. Ran 444 mm hole opener with extension and bull nose. Began reaming 311 mm pilot hole to 444 m KB. Reaming at report time, ROP: 18.0 m/h.
ESTIMATED COSTS: DAILY $ 25 134 CUMULATIVE $ 852 978 SUPERVISOR C. Creelman
Page No. 34
J
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 0 °C Road Good Date 96 12 14
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 18
Depth 238 m Progress 143 m Hole Size 444 mm Status Reaming
Mud: Wt 1 115 kg/m' Visc. 52 s/L W.L. 12.0 cm3 pH 9.0 PV 32 mPa.s YP 3.5 Pa Gels 1/5 Pa
Methyl Blue 60.0 Solids 7.0 % Filter Cake 2 mm Salt 1 100 mg/L Cal. 40 mg/L
Desilter Underflow Wt. 1 420 kg/m' Rate 2 L/min Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. 1 115 kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. 1 600 kg/m' Centrifuge Overflow Wt. 1 095 kg/m'
TIME DISTRIBUTION
BITS SURVEYS Code/Operation Hours
HO-2 m °N71W 1 RU & RD 444 m °N63W 2 Drill Actual Hole opener m • 3 Reaming 17.75
25-0/42 m • 4 Coring 3x11.1,1x25.0 m ° 5 Cond. Hole 6 000 m • 6 Trips 6.00 100 - 110 m • 7 Lubr. Rig 0.25 In PUMP 8 Repair Rig 238 Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey 1 159 229 90 11 Wireline Log 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
20 sxs Gel PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST 6 000 2 360 15 235 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Opened 311 mm pilot hole to 444 mm to 98 m KB. Circulated. Tripped out and unplugged bull nose nozzle. Ran HO-1. Broke circulation and reamed. Opened 311 mm hole to 444 mm to 238 m KB. Circulated. Tripped out HO-1. Changed cutters and redressed. Ran HO-1. Hole tight at 152 m KB. Broke circulation, reaming back to bottom at report time.
ESTIMATED COSTS: DAILY $ 31 483 CUMULATIVE $ 884 461 SUPERVISOR C. Creelman
Page No. 35
No. Size - mm Type
HO-1 444 Hole opener
S.N. 25-0/42 Jets - mm 3x11.1, 1x14.3 Wt. - daN 6 - 7 000 r/min 100 - 110 Out - m 238 In - m Surface Metres 238 Hours 20.75 Condition 3-8-1
BITS
Liner Length 9 Cut Off D.L. No. mm mm SPM 10 Dev. Survey
11 Wireline Log 12 Run Csg/Cmt
1 159 229 100 2 159 229 100
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
80 s/L W.L. 20.0 Solids 5.4 % Filter Cake
kg/m' Rate kg/m' Rate
1 505 kg/m'
Mud: Wt 1 085 kg/m' Visc. Methyl Blue 56.0 Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
No. Size - mm Type
HO-2 444 Hole opener
S.N. 25-0/42 Jets - mm 3x11.1, 1x25.0 Wt. - daN 7 000 r/min 100 - 110 Out - m In In - m 238 Metres 138 Hours 18.00 Condition
DRILLING MUD ADDITIVES USED: 72 sxs Gel 2 sxs Bicarb
16 sxs Lignite 2 sxs Soda Ash
Date 96 12 15
Ralex, 1
Day No. 19 Reaming
cm' pH 12 PV 25 mPa.s YP 5 Pa Gels 16/60 Pa 3.0 mm Salt 1 100 mg/L Cal. Trace mg/L
Umin Desander Underflow Wt. kg/m' Rate L/min L/min Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. 1 070 kg/m'
TIME DISTRIBUTION SURVEYS Code/Operation Hours
m °N71W 1 RU & RD m 'N63W 2 Drill Actual 18.25 m 3 Reaming m 4 Coring
m 5 Cond. Hole 2.25 m 6 Trips 2.50 m 7 Lubr. Rig 0.50
PUMP 8 Repair Rig 0.50
13 Wait on Cmt
HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST 7 000 2 620 17 223 17 Plug Back
18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
Well GENOIL et al ST. LEONARD NO. 1 Rig
Depth 376 m Progress 444 mm Status 138 m Hole Size
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
Weather Cloudy Temp 0 °C Road
Good
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Opened 311 mm pilot hole to 444 mm to 345 m KB. Circulated and treated out cement contamination in drilling fluid. Reamed to 358 m KB. Circulated and treated out cement contamination. Reamed. Reaming at report time, ROP: ±7.0 m/h.
ESTIMATED COSTS: DAILY $ 30 045 CUMULATIVE $ 914 506 SUPERVISOR C. Creelman
Page No. 36
1
PUMP 8 Repair Rig
Liner Length 9 Cut Off D.L. No. mm mm SPM 10 Dev. Survey
11 Wireline Log 12 Run Csg/Cmt
1 159 229 100 2 159 229 100
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 1
Well GENOIL et al ST. LEONARD NO. 1 Rig
Depth 410 m Progress 34 m Hole Size 444 mm Status
Mud: Wt 1 050 kg/m' Visc. 35 s/L W.L. 19.0
Methyl Blue 49.0 Solids 3.1 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. 1 590 kg/m'
Ralex, 1
Day No. 20 Reaming
°C Road Good Date 96 12 16
cm3 pH 12.4 PV 10 mPa.s YP 3 Pa Gels 1/11 Pa
2.0 mm Salt 1 300 mg/L Cal. Trace mg/L
Umin Desander Underflow Wt. kg/m' Rate Umin
Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Overflow Wt. 1 045 kg/m'
No. HO-2 Size - mm 444 Type Hole opener S.N. 25-0142 Jets - mm 3x11.1, 1x25.0 Wt. - daN 7 000 r/min 110 Out - m 403 In - m 238 Metres 165 Hours 21.50 Condition 3-8-1
TIME DISTRIBUTION SURVEYS Code/Operation Hours
m 1 RU & RD m 2 Drill Actual 7.75 m 3 Reaming 8.00 m 4 Coring m 5 Cond. Hole 2.00 m 6 Trips 6.00 m 7 Lubr. Rig 0.25
BITS HO-3 444 Hole opener 25-0142 3x11.1, 1x25.0 4 000 80 In 403 7 1.00
13 Wait on Cmt DRILLING MUD ADDITIVES USED:
HYDRAULIC 14 Nipple Up
10 sxs Gel
PP Output AV Power 15 Test BOP 4 pails Acid
kPa Umin m/min kW 16 DST 19 sxs Bicarb
7 500 2 620 17 326 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed 311 mm pilot hole to 444 mm to 403 m KB. Circulated. Tripped out hole opener #2. Changed cutters and redressed hole opener. Ran hole opener #3. Reamed from 150 m to 403 m KB on trip in. Reaming at report time, ROP: 4.0 m/h.
Conducted safety meeting.
ESTIMATED COSTS: DAILY $ 29 817 CUMULATIVE $ 944 323 SUPERVISOR
C. Creelman
Page No. 37
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
Date 96 12 17 1 'C Road Good Weather Cloudy Temp Day No. 21 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
444 mm Status Drilling Depth 490 m Progress 80 m Hole Size
Mud: Wt 1 090 kg/m3 Visc. 42 s/L W.L. 14.0
Methyl Blue 52.0 Solids 5.7 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m3 Rate Centrifuge Underflow Wt. 1 580 kg/m3
cm3 pH 9.0 PV 18 mPa.s YP 4 Pa Gels 1/5 Pa
2.0 mm Salt 1 200 mg/L Cal. 40 mg/L
Umin Desander Underflow Wt. kg/m3 Rate Umin
Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Overflow Wt. 1 055 kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. HO-3 HO-4 m 1 RU&RD
Size - mm 444 444 m 2 Drill Actual 13.50
Type Hole opener Hole opener m 3 Reaming 5.50
S.N. 25-0142 AZ-100X m 4 Coring
Jets - mm 3x11.1, 1x25.0 3x19.0, 1x25.0 m 5 Cond. Hole
Wt. - daN 5 000 6-7000 m 6 Trips 4.75
r/min 80-110 110 m ° 7 Lubr. Rig 0.25 Out - m 441 In PUMP 8 Repair Rig
In - m 403 441 Liner Length 9 Cut Off D.L. Metres 38 49 No. mm mm SPM 10 Dev. Survey Hours 10.00 9.00 1 159 229 100 11 Wireline Log Condition 1-6-1 2 159 229 100 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
43 sxs Gel PP Output AV Power 15 Test BOP 1 pail Acid kPa Umin m/min kW 16 DST
8 000 2 620 17.0 349 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed 311 mm pilot hole to 444 mm to 441 m KB. Experienced increased torque and slow ROP. Tripped out hole opener #3. Found Insert cutters damaged and worn. Ran hole opener #4. Broke circulation and washed/reamed 10 m to bottom. Reaming pilot hole at report time. ROP: ±3.0 m/h.
ESTIMATED COSTS: DAILY $ 27 628 CUMULATIVE $ 971 951 SUPERVISOR C. Creelman
Page No. 38
4 BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Cloudy Temp 5 °C Road
Good
Date 96 12 18
Well
GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1 Day No. 22
Depth 493 m Progress 3 m Hole Size 444 mm Status Tripping
Mud: Wt 1 080 kg/m3 Visc. 40 s/L W.L. 16.0 cm3 pH 9.0 PV 15 mPa.s YP 3 Pa Gels 1/6 Pa
Methyl Blue 52.0 Solids 5.0 % Filter Cake 2.0 mm Salt 1 200 mg/L Cal. Trace mg/L
Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. kg/m3 Rate L/min
Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m3 Rate L/min
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. HO-4 4A (RR) 526 m 6 1 RU & RD Size - mm 444 311 542 m 7 2 Drill Actual 6.50 Type Hole opener MFDSH m 3 Reaming 3.25 S.N. AZ-100X LH9115 m 4 Coring Jets - mm 3x19.0, 1x25.0 3 x 17.5 m 5 Cond. Hole 1.00 Wt. - daN 6 - 7 000 m 6 Trips 6.00 r/min 110 m 7 Lubr. Rig 0.25 Out - m 493 Clean PUMP 8 Repair Rig In - m 441 Out Liner Length 9 Cut Off D.L. Metres 52 Trip No. mm mm SPM 10 Dev. Survey 1.00 Hours 6.50 1 159 229 11 Wireline Log Condition 6-6-4 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
62 sxs Gel PP Output AV Power 15 Test BOP 2 pails Acid kPa L/min m/min kW 16 DST
2 sxs Bicarb 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 Worked Tight 24 Hole 2.25 25 Levelled Rig 3.75
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed 311 mm pilot hole to 444 mm to 473 m KB. Hole very tight. Worked tight hole from 490 m to 470 m KB (±30 000 daN overpull). Worked and reamed tight hole until clean. Tripped out HO-4. Ran bit #4A. Broke circulation, washed and cleaned fill from 532 m to 547 m KB. Levelled drilling rig. Ran drift surveys on bottom. Tripped out bit #4A. Preparing to run open ended drillpipe.
Plan to set 67 m cement plug from 547 m to 480 m KB due to deviation increase. Will redrill using MWD instead of single shot. Also plan to ream section from 413 m to 470 m KB.
ESTIMATED COSTS: DAILY $ 23 104 CUMULATIVE $ 995 055 SUPERVISOR C. Creelman
Page No. 39
1
ESTIMATED COSTS: DAILY $ 28 086 CUMULATIVE $ 1 023 141 SUPERVISOR C. Creelman
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 0 °C Road Good Date 96 12 19
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex 1 Day No. 23
Depth 493 m Progress 0 m Hole Size 444 mm Status WOC
Mud: Wt 1 050 kg/m3 Visc. 38 s/L W.L. 19.0 cm3 pH 9.0 PV 10 mPa.s YP 2 Pa Gels 1/10 Pa
Methyl Blue 48.0 Solids 3.1 % Filter Cake 2.0 mm Salt 1 300 mg/L Cal. Trace mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 7A (RT) m 1 RU & RD
Size - mm 444 m 2 Drill Actual
Type 544 m 3 Reaming S.N. 640248 m 4 Coring
Jets - mm Open m 5 Cond. Hole 10.50 Wt. - daN m 6 Trips 11.50 r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 11 Wireline Log Condition 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt 0.75 DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
23 sxs Gel 1 sx Lime PP Output AV Power 15 Test BOP 2 pails Acid kPa Umin m/min kW 16 DST 15 sxs Bicarb 17 Plug Back 1.25 15 sxs Lignite 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Drilling in Quebec City formation. 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Ran 114 mm OD drillpipe open ended. Landed at 546 m KB. Circulated to condition mud and hole. Rigged in cementers. Pressure tested surface lines to 21 000 kPa, okay. Held safety meeting. Ran plug #2: 547 m to 480 m KB with 9.0 m3 Class "G" + 2.0 CaCI, + 0.75% TIC at 2090 kg/m3 slurry density. Plug down at 21:45, 96 12 18. Pulled drillpipe to 435 m KB. Circulated, recovered 2.0 m3 water and 2.0 m3 clobbered mud. WOC. Tripped out. Slipped and cut line. Running bit #7A at report time to survey and tap cement plug.
Attached is a directional survey listing from 0 to 526 m KB (MD).
Page No. 40
SURVEYS 413 m 5.2 422 m 5.1 ° 432 m 3.9 ° 441 m 2.1 '
m m °
BITS
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowinq Temp -2 'C Road Good Date 96 12 20
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 24
Depth 485 m Progress 12 m Hole Size 444 mm Status WO Equipment
Mud: Wt 1 050 kg/m' Visc. 40 s/L W.L. 25.0 cm3 pH 12.0 PV 10 mPa.s YP 15 Pa Gels 30/35 Pa
Methyl Blue 50.0 Solids 5.0 % Filter Cake 2.0 mm Salt 1 200 mg/L Cal. 20 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 2.00 3 Reaming 4 Coring 5 Cond. Hole 10.50 6 Trips 7.75
m ° 7 Lubr. Rig PUMP 8 Repair Rig
Liner Length 9 Cut Off D.L. 1.00 No. mm mm SPM 10 Dev. Survey 2.75
11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 9 sxs Lignite PP Output AV Power 15 Test BOP
6 pails Acid kPa Umin m/min kW 16 DST 19 sxs Bicarb 8 000 2 800 19 373 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in with bit #7A. Circulated and treated contaminated mud to 460 m KB. Reran drift surveys from 473 m to 413 m KB. Circulated and WOC. Tagged top of plug #2 at 273 m KB (8.0 m high to theoretical top) at 21:45, 96 12 19. Drilled cement from 473 m to 485 m KB at 15 min/m. Circulating and WO MWD equipment to arrive (ETA is 06:00, 96 12 21).
Plan to kick off and directionally drill from 493 m KB until approximately 20 m to 20 m of straight hole is accomplished.
ESTIMATED COSTS: DAILY $ 46 848 CUMULATIVE $ 1 069 989 SUPERVISOR C. Creelman
Page No. 41
No. 7A (RT) Size - mm 444 Type S44 S.N. 640248 Jets - mm Open Wt. - daN 5 000 r/min 80 Out - m In In - m 473 Metres 12 Hours 2.00 Condition
1 159 229 100 2 159 229 100
J
BISSETT RESOURCE CONSULTANTS LTD. Cli
DAILY DRILLING REPORT
Weather Clear Temp -10 °C Road Good Date 96 12 21
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 25
Depth 485 m Progress 0 m Hole Size 444 mm Status WO Equipment
Mud: Wt 1 050 kg/m' Visc. 37 s/L W.L. 25.0 cm3 pH 12.0 PV 8 mPa.s YP 11 Pa Gels 7/7 Pa
Methyl Blue 46.0 Solids 4.0 % Filter Cake 2.0 mm Salt 1 200 mg/L Cal. Trace mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. 1 200 kg/m' Centrifuge Overflow Wt. 1 040 kg/m'
TIME DISTRIBUTION
BITS SURVEYS Code/Operation Hours
No. 7A (RT) m • 1 RU & RD Size - mm 444 m • 2 Drill Actual 1.50 Type 544 m ° 3 Reaming 4.50 S.N. 640248 m • 4 Coring Jets - mm Open m ° 5 Cond. Hole 11.75 Wt. - daN 5 000 m • 6 Trips 6.00 r/min 90 m c 7 Lubr. Rig 0.25 Out - m 485 PUMP 8 Repair Rig In - m 473 Liner Length 9 Cut Off D.L. Metres 12.0 No. mm mm SPM 10 Dev. Survey Hours 3.50 1 159 229 100 11 Wireline Log Condition Drill cement 2 159 229 100 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa L./min m/min kW 16 DST 7 000 2 600 17 303 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) WO MWD equipment. Tripped out bit #7A. Laid down 229 mm OD monel and 444 mm nonrotating stabilizer. Ran bit #7A and IB stabilizer. Reamed stabilizer from 400 m to 475 m KB, low torque and no problems. Circulated to condition mud and hole. Tripping out at report time to pick up MWD tools. Tool arrival time is ±07:00, 96 12 21.
ESTIMATED COSTS: DAILY $ 19 755 CUMULATIVE $ 1 089 744 SUPERVISOR C. Creelman
Page No. 42
J
No. 8A Size - mm 311 Type MFDSH S.N. LD 7277 Jets - mm 3 x 15.9 Wt. - daN 1 000 r/min 130 Out - m In In - m 485 Metres 6.0 Hours 5.00 Condition
BITS SURVEYS 21 m 1.00 30 m 1.00
403 m 3.80 413 m 4.40 422 m 4.30 432 m 3.40 441 m 2.30
PUMP Liner Length
No. mm mm 1 159 229 2 159 229
DRILLING MUD ADDITIVES USED:
HYDRAULIC PP
Output AV kPa
Umin m/min 10 500
2 200 14
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
Cli BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -5 'C Road Good
Date 96 12 22
Well GENOIL et al ST. LEONARD NO. 1
Rig Ralex 1 Day No. 26
Depth 491 m Progress 6 m Hole Size 311 mm Status Drilling
Mud: Wt 1 040 kg/m' Visc. 37 s/L W.L. 25.0 cm' pH 11.5 PV 7 mPa.s YP 5 Pa Gels 3/7 Pa
Methyl Blue 44.0 Solids 4.0 °A) Filter Cake 2.0 mm Salt 1 000 mg/L Cal. Trace mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. 1 200 kg/m' Centrifuge Overflow Wt. 1 030 kg/m'
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 4.00
'356 3 Reaming °356 4 Coring °2.3 5 Cond. Hole 8.50 *5.6 6 Trips 10.50 '9.0 7 Lubr. Rig 0.25
8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 0.75 100 11 Wireline Log 85 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
385 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, Unloaded, rigged up and tested MWD equipment. Ran bit #8A, 228 mm low speed mud motor with 2.1° from 410 m to 441 m KB. Orientated and drilled 100% cement from 485 m to 486 m KB, from 486 m to formation begin drilled. Tripped out bit #8A. Changed bent housing from 2.10° to 1.80° setting. Tripped no fill. Orientated, directional drilling at 1.0 m/h, samples show 100% formation. NOTE: Surveys are 17
description of drill string, etc.) bent housing. Checked surveys
489 m KB, samples indicate 100% in bit #8A, washed 10 m to bottom, m behind the bit.
Refer to the attached survey list for current directional data.
ESTIMATED COSTS: DAILY $ 42 406
CUMULATIVE $ 1 132 149 SUPERVISOR
C. Creelman
Page No. 43
J
ESTIMATED COSTS: DAILY $ 34 258 CUMULATIVE $ 1 166 407 SUPERVISOR C. Creelman
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp -3 'C Road Good Date 96 12 23
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 27
Depth 507 m Progress 16 m Hole Size 311 mm Status Tripping
Mud: Wt 1 045 kg/m3 Visc. 43 s/L W.L. 25.0 cm3 pH 11.0 PV 10 mPa.s YP 7 Pa Gels 10/20 Pa
Methyl Blue 50.0 Solids 2.0 % Filter Cake 2.0 mm Salt 1 000 mg/L Cal. Trace mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. 1 200 kg/m3 Centrifuge Overflow Wt. 1 040 kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 8A HO-5 451 m 1.30 °341.0 1 RU & RD Size - mm 311 444 460 m 1.00 °306.8 2 Drill Actual 9.00 Type MFDSH Hole opener 467 m 1.30 '296.0 3 Reaming
S.N. LD 7277 479 m 0.90 °289.2 4 Coring
Jets - mm 3 x 15.9 m 5 Cond. Hole 0.25 Wt. - daN 2 000 5 000 m 6 Trips 13.50 r/min 150 90 m 7 Lubr. Rig Out - m 507 499 PUMP 8 Repair Rig In - m 485 485 Liner Length 9 Cut Off D.L. Metres 22 14 No. mm mm SPM 10 Dev. Survey 1.25 Hours 13.00 5.50 1 159 229 100 11 Wireline Log Condition 1-1-1 2 159 229 100 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
40 sxs Gel PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
10 000 2 600 17 433 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Directionally drilled 311 mm pilot hole to 507 m KB. Tripped out bit #8A, laid down 228 mm OD mud motor and MWD. Ran 444 mm HO-5. Broke circulation and opened 311 mm hole to 444 mm from 485 m to 499 m KB. Hole opener quit drilling at 499 m KB. Circulated bottoms up. Tripping out hole opener at report time.
Page No. 44
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 0 °C Road Good Date 96 12 24
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 28
Depth 507 m Progress 0 m Hole Size 311 mm Status Tripping
Mud: Wt 1 040 kg/m' Visc. 42 s/L W.L. 25.0 cm' pH 11.0 PV 10 mPa.s YP 6 Pa Gels 8/18 Pa
Methyl Blue 48.0 Solids 3.0 % Filter Cake 2.0 mm Salt 1 000 mg/L Cal. Trace mg/L
Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt, kg/m' Rate Umin
Centrifuge Underflow Wt. 1 200 kg/m' Centrifuge Overflow Wt. 1 040 kg/m'
BITS SURVEYS
TIME DISTRIBUTION Code/Operation Hours
No. 8A (RR) 8A (RR) 489 m 0.3 °263.2 1 RU & RD
Size - mm 311 311 501 m 0.3 0 177.8 2 Drill Actual 5.50
Type MFDSH MFDSH m 3 Reaming 1.00
S.N. LD 7277 LD7277 m 4 Coring
Jets - mm 3 x 15.9 3 x 15.9 m 5 Cond. Hole 0.50 Wt. - daN 4 000 m 6 Trips 14.50 r/min 80 m 7 Lubr. Rig
Out - m 507 PUMP 8 Repair Rig In - m 485 507 Liner Length 9 Cut Off D.L.
Metres 22 No. mm mm SPM 10 Dev. Survey 2.50 Hours 1.00 1 159 229 100 11 Wireline Log Condition 1-1-1 2 159 229 100 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
20 sxs Gel PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST
10 000 2 600 17 433 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping out hole opener #5 (appears bull nose has been in the formation). Ran bit #8A and near bit stabilizer. Reamed 311 mm hole from 499 m to 507 m KB, no problem reaming. Ran single shot survey, unable to get survey tool into monel collar. Dropped Totco survey tool and tripped out. Found survey barrel in drill collar 25 m above the bit (Totco ring). Tripped in bit #8A with near bit stabilizer. Circulated and ran single shot survey at 501 m KB. Tripped out bit #8A. Ran bit #8A and stiff rotary drilling assembly. Tripping in at report time.
Plan to rotary drill to surface casing point.
ESTIMATED COSTS: DAILY $ 25 249 CUMULATIVE $ 1 119 656 SUPERVISOR C. Creelman
Page No. 45
1
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -13 °C Road Good Date 96 12 25
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 29
Depth 552 m Progress 45 m Hole Size 311 mm Status Drilling
Mud: Wt 1 060 kg/m' Visc. 56 s/L W.L. 20.0 cm' pH 9.5 PV 15 mPa.s YP 6 Pa Gels 2/22 Pa
Methyl Blue 50.0 Solids 4.0 % Filter Cake 2.0 mm Salt 1 000 mg/L Cal. Trace mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. 1 210 kg/m' Centrifuge Overflow Wt. 1 040 kg/m'
TIME DISTRIBUTION
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in with bit #8A. Broke circulation reamed hole and cleaned 17 m fill. Drilled 311 mm pilot hole. Drilled to 525 m KB. Finished tripping in with bit #8A. Broke circulation reamed hole and cleaned 17 m fill. Drilled 311 mm pilot hole. Drilled to 525 m KB. Held safety meeting. Drilling at report time, ROP: ±3.0 m/h. Held safety meeting. Drilling at report time, ROP: ±3.0 m/h.
Hole drag: 2 000 daN up Hole drag: 2 000 daN up
NOTE: Rained hard last night, roads very treacherous. NOTE: Rained hard last night, roads very treacherous.
MERRY CHRISTMAS!! MERRY CHRISTMAS!!
ESTIMATED COSTS: DAILY $ ESTIMATED COSTS: DAILY $ 27 226 CUMULATIVE $ 1 218 882 SUPERVISOR C. Creelman 27 226 CUMULATIVE $ 1 218 882 SUPERVISOR C. Creelman
Page No. 46 Page No. 46 Page No. 46
1
14 Nipple Up 37 sxs Gel PP Output AV Power 15 Test BOP 7 pails Acid kPa Umin m/min kW 16 DST
10 000 2 600 17 433 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
1
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Date 96 12 26 Weather Well Rig Ralex, 1 Day No. 30
Clear Temp -15 0 C Road Good GENOIL et al ST. LEONARD NO. 1
311 mm Status Underreaming 21 m Hole Size Depth 573 m Progress
m • 5 Cond. Hole 1.25 1 x 30
DRILLING MUD ADDITIVES USED: 56 sxs Gel 1 pail Acid
18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Test UR 4.50 24 25
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
13 Wait on Cmt
HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST 9 000 2 600 15 390 17 Plug Back
cm3 pH 9.0 PV 18 mPa.s YP 8 Pa Gels 4/24 Pa
2.0 mm Salt 1 100 mg/L Cal. Trace mg/L
Desander Underflow Wt. kg/m' Rate Umin
Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. 1 050 kg/m'
Mud: Wt 1 060 kg/m' Visc. 60 s/L W.L. 15.0 Methyl Blue 56.0 Solids 4.0 % Filter Cake Desilter Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. 1 220 kg/m'
No. 8A (RR) Size - mm 311 Type MFDSH S.N. LD 7277 Jets - mm 3 x 15.9 Wt. - daN 5 000 r/min 100 Out - m 573 In - m 507 Metres 66 Hours 26.25 Condition 2-3-1
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
UR-1 550 m 0.25 • 1 RU & RD 558 560 m 0.25 ° 2 Drill Actual 12.75 RTU 570 m 0.25 • 3 Reaming 6 310 m • 4 Coring
4 000 m ° 6 Trips 3.75 85 m 0 7 Lubr. Rig 0.50
PUMP 8 Repair Rig
Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey 1.25 5.00 1 159 229 100 11 Wireline Log
2 159 229 100 12 Run Csg/Cmt
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled 311 mm pilot hole. Drilled to 573 m KB (surface casing point). Circulated to condition mud and hole. Tripped out bit #8A. Picked up, made up and tested 558 mm underreamer. Tool malfunctioned. Stripped down underreamer. Found test plug inside tool. Reassembled and retested tool, okay. Ran UR-1. Broke circulation and underreamed 444 mm hole to 558 mm hole across dogleg from 430 m to 459 m KB. Circulated to condition mud and hole. Held safety meeting with service hands. Pulled and positioned underreamer at 400 m KB. Started underreaming. Underreaming at 404 m KB at report time.
ESTIMATED COSTS: DAILY $ 31 511 CUMULATIVE $ 1 250 392 SUPERVISOR C. Creelman
Page No. 47
J
ESTIMATED COSTS: DAILY $ 29 520 CUMULATIVE $ 1 279 922 SUPERVISOR C. Creelman
18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 2.00 23 24 25
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
TIME DISTRIBUTION Code/Operation Hours
°S5W 1 RU & RD 2 Drill Actual 3 Reaming 8.00 4 Coring 5 Cond. Hole 6 Trips 14.00 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 110 11 Wireline Log 110 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
507 17 Plug Back
No. UR-1 Size - mm 558 Type RTU S.N. 6 310 Jets - mm 1 x 30 Wt. - daN 4 000 r/min 85 Out - m 459 In - m 430 Metres 29 Hours 7.00 Condition 1-1-1
DRILLING MUD ADDITIVES USED: 53 sxs Gel
467 462 5 2.00 1-1-1
3x19.0,1x25.0 3 x 17.5
SURVEYS 527 m 0.25
PUMP Liner Length
No. mm mm 1 159 229 2 159 229
MFDSH LH9115
4A (RR) 311
1 000 100 Clean Out Trip
HYDRAULIC PP Output AV kPa Umin m/min
10 500 2 900 12
m m m m m m
BITS HO-6 444 Hole opener 250142
Page No. 48
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Underreamed 444 mm hole to 558 mm hole from 404 m to 430 m KB. Total underreamed section: 400 m to 459 m KB. Tripped out underreamer - #1. Ran HO-6, tagged bridge at 470 m KB. Broke circulation, cleaned and reamed from 462 m to 467 m KB. Unable to work hole opener below 467 m KB. Tripped out HO-1, found bull nose plugged. Ran bit #4A and near bit combo-stabilizer. Broke circulation and cleaned underreaming debris from 467 m to 501 m KB. Washed from 501 m to 573 m KB. Circulating at report time to condition mud and hole.
Plan to open 311 mm pilot hole from 501 m to 573 m KB. Surface casing will then be run and cemented.
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowing Temp -1
°C Road Good
Date 96 12 27
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
Day No. 31
Depth 573 m Progress 0 m Hole Size Mud: Wt 1 060 kg/m' Visc. 67 s/L W.L. 15.0 Methyl Blue 56.0 Solids 4.0 % Filter Cake
Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
311 mm Status Circulating
cm' pH 9.0 PV 19 mPa.s YP 8 Pa Gels 4/20 Pa
2.0 mm Salt 1 000 mg/L Cal. 40 mg/L
L/min Desander Underflow Wt. kg/m' Rate L/min
Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. HO-7 m
Size - mm 444 m
Type Hole opener m
S.N. m
Jets - mm 3x11.1,1x25.0 m
Wt. - daN 6 000 m
r/min 90 m
Out - m In PUMP In - m 499 Liner Length Metres 10 No. mm mm Hours 2.00 1 159 229 Condition 2 159 229
DRILLING MUD ADDITIVES USED: HYDRAULIC PP Output AV kPa Umin m/min 9 500 3 000 12
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
TIME DISTRIBUTION Code/Operation Hours 1 2
RU & RD Drill Actual
3 Reaming 3.00 4 Coring 5 Cond. Hole 0.25 6 Trips 5.50 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 0.25 116 11 Wireline Log 116 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
475 17 Plug Back 18 Squeeze Cmt 19 Fishing 15.00 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated. Ran drift survey. When pulling off bottom, driller was not watching weight indicator and parted drill string. No personnel hurt. Tripped out, found drillpipe parted in slip area. Top of fish at 167 m KB. Made up and ran 298 mm x 114 mm overshot. Tagged top of fish at ±165 m KB. Latched onto fish, broke circulation through fish. Circulated to condition mud and hole. Tripped out. Laid down 11 stands 114.3 mm OD drillpipe and 7 joints 114.3 mm OD HWDP. Picked up new drillpipe. Made up and ran HO-7. Broke circulation and washed from 400 m to 499 m KB. Started opening 311 mm pilot hole to 444 mm hole. Reaming at report time, ROP: 3.5 m/h.
ESTIMATED COSTS: DAILY $
41 575 CUMULATIVE $ 1 321 497 SUPERVISOR C. Creelman
Page No. 49
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -6 °C Road Good Date 96 12 28
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 32
Depth 509 m Progress 10 m Hole Size 444 mm Status Reaming
Mud: Wt 1 065 kg/m' Visc. 53 s/L W.L. 14.0 cm3 pH 9.0 PV 17 mPa.s YP 7 Pa Gels 3/6 Pa
Methyl Blue 50.0 Solids 4.0 % Filter Cake 2.0 mm Salt 1 000 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. 1 230 kg/m' Centrifuge Overflow Wt. 1 060 kg/m'
Day No. 33 Rig Ralex, 1 444 mm Status Tripping
Page No. 50
IC BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Depth 555 m Progress 46 m Hole Size Mud: Wt 1 070 kg/m' Visc. 53 s/L W.L. 14.0
Methyl Blue 54.0 Solids 4.0 % Filter Cake
Desilter Underflow Wt. kg/m3 Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. 1 770 kg/m3
Good
cm3 pH 9.0 PV 28 mPa.s YP 8 Pa Gels 4/6 Pa
2.0 mm Salt 1 000 mg/L Cal. 40 mg/L
Umin Desander Underflow Wt. kg/m3 Rate Umin
Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Overflow Wt. 1 060 kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. HO-7 m 1 RU & RD
Size - mm 444 m 2 Drill Actual
Type Hole opener m 3 Reaming 18.50
S.N. m 4 Coring
Jets - mm 3x111,1 x25.0 m 5 Cond. Hole Wt. - daN 6 000 m 6 Trips 5.50 r/min 90 m 7 Lubr. Rig
Out - m 555 PUMP 8 Repair Rig In - m 499 Liner Length 9 Cut Off D.L. Metres 56 No. mm mm SPM 10 Dev. Survey Hours 21.25 1 159 229 116 11 Wireline Log Condition 2-7-1 2 159 229 116 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
2 sxs Soda Ash PP Output AV Power 15 Test BOP 6 sxs Kelzan kPa Umin m/min kW 16 DST
59 sxs Gel 9 500 3 000 15/13 475 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed 311 mm pilot hole to 444 m KB. Reamed to 555 m KB, ROP decreased to 2.0 m/h. Tripped out hole opener-7. Laid down 2 - 171 mm drill collars because of damaged seal area. Changing cutters in hole opener at report time.
ESTIMATED COSTS: DAILY $ CUMULATIVE $ 1 370 885 SUPERVISOR C. Creelman/M. Kramps
Date 96 12 29 Weather Raining Temp Well GENOIL et al ST. LEONARD NO. 1
49 388
J
2 °C Road
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Snowing Temp -10 °C Road Good Date 96 12 30
Well
GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1 Day No. 34
Depth 571 m Progress 16 m Hole Size 444 mm Status Tripping
Mud: Wt 1 085 kg/m3 Visc. 70 s/L W.L. 11.0 cm' pH 9.0 PV 32 mPa.s YP 12 Pa Gels 5/9 Pa
Methyl Blue 63.0 Solids 5.0 % Filter Cake 2.0 mm Salt 900 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. 1 780 kg/m3 Centrifuge Overflow Wt. 1 075 kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. HO-8 HO-9 460 m 1.60 1 RU & RD Size - mm 444 444 451 m 1.70 2 Drill Actual Type Hole opener Hole opener 441 m 2.30 3 Reaming 8.00 S.N. 432 m 3.20 4 Coring Jets - mm 3x11.1,1x25.0 3x11.1,1x25.0 422 m 4.00 5 Cond. Hole 3.25 Wt. - daN 6 000 6 000 m 6 Trips 10.25 r/min 90 90 m 7 Lubr. Rig Out - m 555 571 PUMP 8 Repair Rig In - m 499 555 Liner Length 9 Cut Off D.L. Metres 56 16 No. mm mm SPM 10 Dev. Survey 2.50 Hours 21.25 8.00 1 159 229 116 11 Wireline Log Condition 2-7-1 2 159 229 116 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
51 sxs Gel PP Output AV Power 15 Test BOP 2 sxs Caustic kPa Umin m/min kW 16 DST
9 500 3 000 15/13 475 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Laid down 1 - 228 mm drill collar. Changed out cutters on hole opener. Tripped in HO-9. Broke circulation and washed 30 m to bottom, no fill. Reamed 311 mm pilot hole to 444 mm hole to 571 m KB (casing point). Circulated to condition mud and hole. Tripped out HO-9, ran drift surveys on trip out. Double strapped drill string, 0.00 m difference, no correction. Unable to break out 305 mm square drill collars. Stood same in derrick. Tripped in with HO-9, no fill. Circulated to condition mud and hole . Tripped out HO-9, laying down 444 mm drilling tools at report time. Will run surface casing once tools are laid down.
ESTIMATED COSTS: DAILY $
33 147 CUMULATIVE $ 1 404 032 SUPERVISOR Mike Kramps
Page No. 51
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Clear Temp -22 °C Road Good Date 96 12 31
Well
GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1 Day No. 35
Depth 571 m Progress 0 m Hole Size 444 mm Status WOC
Mud: Wt 1 090 kg/m' Visc. 45 s/L W.L. 12.0 cm3 pH 9.0 PV 23 mPa.s YP 5 Pa Gels 3/6 Pa
Methyl Blue 54.0 Solids 5.0 % Filter Cake 2.0 mm Salt 900 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. HO-9 m
Size - mm 444 m
Type Hole opener m
S.N. m
Jets - mm 3x11.1,1x25.0 m Wt. - daN 6 000 m r/min 90 m Out - m 571 PUMP In - m 555 Liner Length Metres 16 No. mm mm Hours 8.00 1 159 229 Condition 2-4-1 2 159 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 20 sxs Gel PP Output AV 3 sxs Lignite kPa Umin m/min 2 sxs Bicarb 300 1 300 22
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Drilling in Quebec City formation.
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5
RU & RD Drill Actual Reaming Coring Cond. Hole
6 Trips 1.00 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 100 11 Wireline Log
12 Run Csg/Cmt 19.50 13 Wait on Cmt 3.50 14 Nipple Up
Power 15 Test BOP kW 16 DST
7 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished laying down drilling tools. Held safety meeting. Rigged to run casing. Ran 45 joints 339.8 mm OD (570.03 m )90.8 kg/m K55 R3 8RD ST&C new casing. Landed at 569.52 m KB. Circulated to condition mud . Rigged in cementers. Held safety meeting. Pressure tested surface equipment to 20 000 kPa, okay. Spearheaded with 10.0 m' fresh water. Cemented using 85.6 tonnes Class "G" cement at 1 900 kg/m' slurry density. Bumped plug with 10 000 kPa. Floats held okay. Plug down at 02:15, 96 12 31. Approximately 10.0 m' cement returns. Rigged out cementers. Landed casing holding 100% string weight. WOC at report time.
ESTIMATED COSTS: DAILY $ 116 097 CUMULATIVE $ 1 520 129 SUPERVISOR Mike Kramps
Page No. 52
ESTIMATED COSTS: DAILY $ 96 607 CUMULATIVE $ 1 616 736 SUPERVISOR Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -20 'C Road Good Date 97 01 01
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex 1 Day No. 36
Depth 571 m Progress m Hole Size mm Status Heading up
Mud: Wt kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m 1 RU & RD Size - mm m 2 Drill Actual
Type m 3 Reaming
S.N. m 4 Coring Jets - mm m 5 Cond. Hole Wt. - daN m 6 Trips r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt 7.00 DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 17.00
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) WOC. Slacked off at 13:00, 96 12 31 (10.75 hours after bumping plug). Cut of 508 mm OD conductor barrel and 339.8 mm OD surface casing. Installed 346 mm x 340 mm 21 000 kPa WP slip on bowl with 2 - 52.4 mm 21 000 kPa studded side outlets. Pressure tested welds to 10 500 kPa for 10 minutes, okay. Started installing well control equipment. Installing well control equipment at report time.
Page No. 53
1
ESTIMATED COSTS: DAILY $ 21 194 CUMULATIVE $ 1 637 930 SUPERVISOR Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -12 °C Road Good Date 97 01 02
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 37
Depth 571 m Progress 0 m Hole Size mm Status Heading up
Mud: Wt kg/m3 Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate 1../min Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m 1 RU & RD Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole Wt. - daN m 6 Trips r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 24.00
PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Elevations: 21 Handle Tool 72.0 m GL 22 Clean to Btm 72.0 m CF 23 79.3 m KB 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued to install well control equipment and associated air drilling equipment. Improper intermediate casing spool was installed, changed out same. Welding and installing flare line spools and blouie line connections at report time.
Page No. 54
Visc. Solids
Well Depth 571 m Progress Mud: Wt kg/m3 Methyl Blue Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
LEONARD NO. 1 GENOIL et al ST. Rig Ralex, 1 Day No. 38
CI BISSETT RESOURCE CONSULTANTS LTD. $+
DAILY DRILLING REPORT
Weather Snowing Temp -6 °C Road Date 97 01 03
0 m Hole Size mm Status Fishing
s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
% Filter Cake mm Salt mg/L Cal. mg/L
kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
kg/m3 Centrifuge Overflow Wt. kg/m3
No. BITS SURVEYS
m
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6
RU & RD
Size - mm m Drill Actual Type m Reaming S.N. m Coring Jets - mm m Cond. Hole Wt. - daN m Trips r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig 3.00 In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 60 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 13.00
PP Output AV Power 15 Test BOP 1.00 kPa Umin m/min kW 16 DST
200 780 3 17 Plug Back 18 Squeeze Cmt 19 Fishing 7.00
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished installing well control equipment. NOTE: Dropped 41 mm x 178 mm stud down casing when installing BOP stack, Had to reposition blouie line around mouse hole. Welded spools for line from BOP stack to manifold. Function tested BOP components, made changes as required, okay. Attempted to pressure test, test valve leaking on stand pipe, repaired same. Pressure tested casing bowl, casing and blind rams to 1 400 kPa low and 10 500 kPa high for 10 minutes each, okay. Picked up and ran 292 mm skirted magnet. Worked magnet on bottom. Tripped out 292 mm skirted magnet - no recovery. Reran 292 mm skirted magnet, broke circulation and working magnet on bottom at report time.
ESTIMATED COSTS: DAILY $ 21 148 CUMULATIVE $ 1 659 078 SUPERVISOR Mike Kramps
Page No. 55
Good
Good Date 97 01 04 Weather Clear Temp -6 °C Road
ESTIMATED COSTS: DAILY $ 22 108 CUMULATIVE $ 1 681 186 SUPERVISOR Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 39
Depth 579 m Progress 6 m Hole Size 311 mm Status Blowing hole dry
Mud: Wt kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 8A (RR) m 1 RU & RD
Size - mm 311 m 2 Drill Actual 1.00 Type MFDSH m 3 Reaming
S.N. LD7277 m 4 Coring Jets - mm 3 x 15.9 m 5 Cond. Hole 1.50 Wt. - daN 2 000 m 6 Trips 2.00 r/min 80 m 7 Lubr. Rig Out - m In PUMP 8 Repair Rig 1.00 In - m 573 Liner Length 9 Cut Off D.L. 1.00 Metres 6.00 No. mm mm SPM 10 Dev. Survey Hours 1.00 1 159 229 110 11 Wireline Log Condition 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP 9.50 kPa Umin m/min kW 16 DST 4 500 1 430 107 17 Plug Back
18 Squeeze Cmt 19 Fishing 2.50
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Air Calculation Rate at Report Time: 21 Handle Tool 73 m'/min (2 600 scfm) at 2 758 kPa (400 psi) 22 Clean to Btm
23 Drill Out 2.75 24 Fit 1.25 25 Blow Hole 1.50
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Tripped out 292 mm skirted magnet. Recovered 41 mm x 78 mm stud. Attempted to run test plug, unsuccessful passing through annular preventer. Laid down test plug. Ran bit #8A (RR). Tagged float collar at 555 m KB. Broke circulation and displaced casing to fresh water. Pressure tested annular preventer to 1 400 kPa low and 10 500 kPa high for 10 minutes each, okay. Pressure tested pipe rams, casing, casing bowl, well control lines, manifold, kelly, safety valves, inside BOP and kelly cocks to 1 400 kPa low and 14 000 kPa high for 10 minutes each. Repaired numerous leaks and retested, okay. Drilled out cement. Drilled to 579 m KB. Ran formation integrity test, no leak-off observed to a pressure gradient of 22.0 kPa/m at the surface casing shoe. Terminated test. Rigged in air equipment. Unloaded water from casing. Blowing casing at report time with air to dry same.
Page No. 56
ESTIMATED COSTS: DAILY $ 54 859 CUMULATIVE $ 1 736 770 SUPERVISOR Mike Kramps
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Raining Temp 0 'C Road Good Date 97 01 05
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 40
Depth 628 m Progress 49 m Hole Size 311 mm Status Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 8A (RR) 1 582 m 1.3 °n/a 1 RU & RD
Size - mm 311 311 590 m 1.3 '358 2 Drill Actual 10.50 Type MFDSH H4552 m ° 3 Reaming S.N. LD7277 K56931 m ° 4 Coring Jets - mm 3 x 15.1 3 x 19.0 m 5 Cond. Hole Wt. - daN 2 000 1 000 m 6 Trips 3.50 r/min 80 35 m 7 Lubr. Rig Out - m 582 In PUMP 8 Repair Rig In - m 573 582 Liner Length 9 Cut Off D.L. 1.00 Metres 9.00 46 No. mm mm SPM 10 Dev. Survey 0.50 Hours 3.00 8.50 1 159 229 110 11 Wireline Log Condition 2-2-1 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 1.50
PP Output AV Power 15 Test BOP 1.00 kPa Umin m/min kW 16 DST 4 500 1 430 - 107 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool 0.25
22 Clean to Btm Air Calculation Rate at Report Time: 23 Dry Hole 5.75 73.0 m3/min at 1 450 kPa at 71.0°C 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Blew casing with air to dry. Installed rotating head drive. Drilled 1.0 m to 580 m KB - no dust. Blew casing to dry. Held safety meeting and BOP drill. Drilled 2.0 m to 582.0 m KB - started to make dust. Tripped out bit #8A (RR). Picked up and ran bit #1 and air hammer and drill collars. Slipped and cut line. Held safety meeting and BOP drill. Finished tripping in. Broke circulation with air. Circulating at 73.0 m3/min at 1 450 kPa. Slowly drilling ahead, worked pipe after drilling each metre. Increased air volume to 100.0 m3/min at 3 450 kPa to help dry hole. Drilled to 610 m KB, hole making good dust. Reduced air volume to 73.0 m3/min at 1 450 kPa at 71.0°C. Ran accumulator check, okay. Drilling at report time. ROP: 9.0 m/h.
Page No. 57
J
Weather Clear Temp 1 'C Road Good Date 97 01 06
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 41
Depth 763 m Progress 135 m Hole Size 311 mm Status Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 763 m KB with reduced WOB to control deviation. Hole making good dust. No indication of hydrocarbon entering the wellbore. Drilling at report time, ROP: 7.0 m/h.
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 763 m KB with reduced WOB to control deviation. Hole making good dust. No indication of hydrocarbon entering the wellbore. Drilling at report time, ROP: 7.0 m/h.
Average Air Calculation Rate: Average Air Calculation Rate: 69.0 m3/min at 1655 kPa at 80°C 69.0 m3/min at 1655 kPa at 80°C
ESTIMATED COSTS: DAILY $ ESTIMATED COSTS: DAILY $ 34 681 CUMULATIVE $ 1 771 451 SUPERVISOR Mike Kramps 34 681 CUMULATIVE $ 1 771 451 SUPERVISOR Mike Kramps
Page No. 58 Page No. 58
No. Size - mm Type S.N. Jets - mm Wt. - daN r/min Out - m In - m Metres Hours Condition
No. 1 Size - mm 311 Type H4552 S.N. K56931 Jets - mm 3 x 19.0
r/min 35 Out - m In In - m 582 Metres 181 Hours 30.00 Condition
BITS 1
BITS
311 H4552 K56931 3 x 19.0 500 - 1 000 Wt. - daN 500 - 1 000 35 In 582 181 30.00
TIME DISTRIBUTION
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
21 Handle Tool 22 Clean to Btm 23 24 25
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -8 °C Road Good Date 97 01 07
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 42
Depth 936 m Progress 173 m Hole Size 311 mm Status Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1 800 m 1.40 0 345 1 RU & RD
Size - mm 311 855 m 1.40 °353 2 Drill Actual 23.00 Type H4552 m 3 Reaming
S.N. K56931 m 4 Coring
Jets - mm 3 x 19.0 m 5 Cond. Hole Wt. - daN 500 - 1 000 m 6 Trips r/min 35 m 7 Lubr. Rig
Out - m In PUMP 8 Repair Rig In - m 582 Liner Length 9 Cut Off D.L. Metres 354 No. mm mm SPM 10 Dev. Survey 1.00 Hours 53.00 1 159 229 11 Wireline Log Condition 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Quebec City formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 936 m KB with reduced WOB to control deviation. Hole making good dust. Hole in good condition and there is no indication of hydrocarbon entering the wellbore. Drilling at report time, ROP:±9.0 m/h.
Average Air Circulation Rate: 69.0 m'/min at 1 520 kPa at 80°C
ESTIMATED COSTS: DAILY $ 35 502 CUMULATIVE $ 1 806 953 SUPERVISOR Mike Kramps
Page No. 59
J
Weather Well Rig Ralex, 1 Day No. 43 GENOIL et al ST. LEONARD NO. 1
Good Date 97 01 08 Snowing Temp -14 'C Road
ESTIMATED COSTS: DAILY $ 35 636 CUMULATIVE $ 1 842 589 SUPERVISOR Mike Kramps
BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Depth 1124 m Progress 188 m Hole Size 311 mm Status Drilling Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 1 927 m 1.00 1 RU & RD Size - mm 311 1003 m 2.75 2 Drill Actual 21.75 Type H4552 1040 m 2.00 3 Reaming
S.N. K56931 1087 m 1.75 4 Coring Jets - mm 3 x 19.0 m 5 Cond. Hole Wt. - daN 500 - 1 000 m 6 Trips
r/min 35 m 7 Lubr. Rig 0.50 Out - m In PUMP 8 Repair Rig In - m 582 Liner Length 9 Cut Off D.L. Metres 354 No. mm mm SPM 10 Dev. Survey 1.75 Hours 74.75 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine (?) formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling. Slowly increased WOB from 500 to 1000 daN to 2000 daN. Drilled to 1021 m KB. Inclination increased from 1.0° at 947 m KB to 2.75° at 1003 m KB. Reduced WOB back to 500 to 1000 daN. Drift is beginning to fall as a result of the WOB. Drilled to 1124 m KB, hole making good dust and is cleaning well. No indication of hydrocarbons entering the wellbore. Drilling at report time, ROP: ±8.0 m/h.
NOTE: Single shot directional instrument failed, replacement instrument due on location this date.
Page No. 60
J
ESTIMATED COSTS: DAILY $ 45 088 CUMULATIVE $ 1 887 677 SUPERVISOR Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Date 97 01 09 Good Clear Temp -15 'C Road GENOIL et al ST. LEONARD NO. 1
Weather Well Rig Ralex 1 Day No. 44
Depth 1335 m Progress 211 m Hole Size 311 mm Status Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1 1163 m 1.75 ° 1 RU & RD Size - mm 311 1237 m 1.50 2 Drill Actual 22.50 Type H4552 1314 m 1.50 3 Reaming S.N. K56931 m 4 Coring Jets - mm 3 x 19.0 m 5 Cond. Hole Wt. - daN 500 - 1 000 m 6 Trips r/min 35 m 7 Lubr. Rig 0.25 Out - m In PUMP 8 Repair Rig In - m 582 Liner Length 9 Cut Off D.L. Metres 753 No. mm mm SPM 10 Dev. Survey 0.75 Hours 97.25 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine (?) formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 1335 m KB. Hole making good dust. No indication of hydrocarbons entering wellbore. Hole in good condition. Ran let sub to blow/clean dust from BOP stack. Drilling at report time.
Average Air Circulation Rate: 69.0 m3/min at 1 655 kPa at 70°C
Page No. 61
LEONARD NO. 1 GENOIL et al ST.
s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
% Filter Cake mm Salt mg/L Cal. mg/L
m Progress kg/m' Visc.
Solids
Depth 1456 Mud: Wt Air Methyl Blue
121 m Hole Size 311 rnm Status Drilling
Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
kg/m3 Centrifuge Overflow Wt. kg/m'
SURVEYS Code/Operation Hours BITS
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Snowing Temp -12 °C Road Good Rig Day No. 45
Date 97 01 10 Ralex, 1
Weather Well
TIME DISTRIBUTION
No. 1 1409 m 1.00 ▪ 1 RU & RD Size - mm 311 m • 2 Drill Actual 14.00 Type H4552 m ° 3 Reaming
S.N. K56931 m ° 4 Coring
Jets - mm 3 x 19.0 m ° 5 Cond. Hole 1.75 Wt. - daN 500 - 1 000 m • 6 Trips 8.00 r/min 35 m ▪ 7 Lubr. Rig Out - m 1339 PUMP 8 Repair Rig In - m 582 Liner Length 9 Cut Off D.L. Metres 757 No. mm mm SPM 10 Dev. Survey 0.25 Hours 99.00 11 Wireline Log Condition 2-2-1 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine formation. 21 Handle Tool
22 Clean to Btm NOTE: On the day of the recent rig tour, the rig manager was sent to the Ralex shop to check on 23 the size and availability of a power pak for a drillpipe spinner. 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 1608 m KB. Blew hole to clean. Pulled three stands of drillpipe and repositioned drillpipe float. Hole is making good dust. Increased air circulation rate to 80 m3/min to assist hole cleaning. Drilling at report time. ROP: ±8.0 m/h.
Average Air Circulation Rate: 69.0 - 80.0 m3/min at 1 690 to 1 860 kPa at 70°C
ESTIMATED COSTS: DAILY $ 40 906 CUMULATIVE $ 1 999 131 SUPERVISOR Mike Kramps
Page No. 62
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -6 °C Road Good Date 97 01 11 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 46 Depth 1645 m Progress 189 m Hole Size 311 mm Status Drilling Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION BITS
SURVEYS Code/Operation Hours
No. 2 1496 m 1.30 °353 1 RU & RD Size - mm 311 1600 m 0.75 0353 2 Drill Actual 21.75 Type H4552 m 3 Reaming S.N. K56995 m 4 Coring Jets - mm 3 x 19.0 m ° 5 Cond. Hole 0.50 Wt. - daN 500 - 1 000 m 0 6 Trips 0.75 r/min 35 m 0 7 Lubr. Rig 0.50 Out - m In PUMP 8 Repair Rig In - m 1339 Liner Length 9 Cut Off D.L. Metres 306 No. mm mm SPM 10 Dev. Survey 0.50 Hours 35.00 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine formation. 21 Handle Tool
22 Clean to Btm NOTE: On the day of the recent rig tour, the rig manager was sent to the Ralex shop to check on the 23 size and availability of a power pak for a drillpipe spinner. 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 1608 m KB. Blew hole to clean. Pulled three stands of drillpipe and repositioned drillpipe float. Hole is making good dust. Increased air circulation rate to 80 m3/min to assist hole cleaning. Drilling at report time. ROP: ±8.0 m/hr.
Average Air Circulation Rate: 69.0 -80.0 at 1 690 - 1 860 kPa at 70°C
ESTIMATED COSTS: DAILY $ 40 906 CUMULATIVE $ 1 999 131 SUPERVISOR Mike Kramps
Page No. 63
1
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowing Temp -12 °C Road Good Date 97 01 12
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 47
Depth 1850 m Progress 195 m Hole Size 311 mm Status Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 2 1677 m 1.35 °345 1 RU & RD
Size - mm 311 1773 m 1.35 °13 2 Drill Actual 19.50 Type H4552 m 3 Reaming S.N. K56995 m 4 Coring Jets - mm 3 x 19.0 m 5 Cond. Hole 3.25 Wt. - daN 500 - 1 000 m 6 Trips r/min 35 m 7 Lubr. Rig 0.75 Out - m In PUMP 8 Repair Rig In - m 1339 Liner Length 9 Cut Off D.L. Metres 511 No. mm mm SPM 10 Dev. Survey 0.50 Hours 55.00 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine formation. 21 Handle Tool
22 Clean to Btm Held a safety meeting with each crew. 23
24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 1703 m KB, observed 150 kPa pressure increase. Blew hole clean and increased air circulation rate from 80 to 90 m'/min. Replaced drilling head rubber. Drilled to 1799 m KB. Tripped out three stands and repositioned drillpipe float. Drilling at report time. Hole in good condition and making good dust. No indication of hydrocarbons entering the wellbore. ROP: ±9.0 m/h.
Average Air Circulation Rate: 80.0 - 90.0 m'/min at 1 860 - 2 070 kPa at 70°C
ESTIMATED COSTS: DAILY $ 36 018 CUMULATIVE $ 2 035 149 SUPERVISOR Mike Kramps
Page No. 64
J
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
CLear Temp -8 'C Road
Good
Date 97 01 13
Well
GENOIL et al ST. LEONARD NO. 1
Rig Ralex 1 Day No. 48
Depth 1933 m Progress 83 m Hole Size 311 mm Status Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION
SURVEYS Code/Operation Hours 1 RU & RD 2 Drill Actual 8.75 3 Reaming 4 Coring 5 Cond. Hole 0.50 6 Trips 12.75
m 7 Lubr. Rig 0.25 PUMP 8 Repair Rig
Liner Length 9 Cut Off D.L. 0.50 No. mm mm SPM 10 Dev. Survey 1.25
11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Drilling in Lorraine formation. 21 Handle Tool 22 Clean to Btm 23 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 1850 m KB. Air hammer quit working. Blew hole clean and tripped out bit #2. Experienced 10 000 daN hole drag from 1850 m to 1830 m KB. Found Totco ring shattered which in turn caused the hammer to seize. Changed out 228 mm monel and replaced Totco ring. Serviced hammer, surface tested hammer, okay. Ran bit #2 and drill collars. Slipped and cut line. Ran directional survey on trip in (depths were missed when single shot instrument failed). No fill. Broke circulation with air, drilling. Drilling at report time. ROP: ±9.0 m/h.
Average Air Circulation Rate: 90.0 m3/min at 2 070 kPa at 70°C
ESTIMATED COSTS: DAILY $ 37 137 CUMULATIVE $ 2 072 286 SUPERVISOR Mike Kramps
Page No. 65
J
No. Size - mm Type S.N. Jets - mm Wt. - daN r/min Out - m In - m Metres Hours Condition
2 BITS
2 (RR) 311 311 H4552 H4552 KJ6995 KJ6995 3 x 19.0 3 x 19.0 500 - 1 000 500 - 1 000 35 35 1850 In 1339 1850 511 83 55.00 8.75 20% wear
927 m 1.75 '348 1040 m 2.25 °353 1163 m 2.00 °349 1314 m 1.75 °349 1870 m 1.50 °28
m °
Good Date 97 01 14 Weather Cloudy Temp -6 °C Road
ESTIMATED COSTS: DAILY $ 41 049 CUMULATIVE $ 2 113 335 SUPERVISOR Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 49
Depth 2078 m Progress 145 m Hole Size 311 mm Status Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 2 (RR) 1971 m 1.75 °313 1 RU & RD Size - mm 311 m 2 Drill Actual 15.75 Type -552 m 3 Reaming S.N. K56995 m 4 Coring Jets - mm 3x19.0 m 5 Cond. Hole Wt. - daN 500 - 1 000 m 6 Trips r/min 35 m 7 Lubr. Rig 0.50 Out - m In PUMP 8 Repair Rig In - m 1850 Liner Length 9 Cut Off D.L. Metres 229 No. mm mm SPM 10 Dev. Survey 0.25 Hours 24.50 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine formation. 21 Handle Tool
22 Clean to Btm Held safety meeting with two crews. 23 Repair Air
24 Equipment 7.50 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 1990 m KB. Pulled three stands to reposition drillpipe float. Pulled 10 000 daN over string weight. Lost two air compressors because of mechanical problems. Pulled bit #2 (RR) into surface casing. Repaired air compressors. Tripped bit #2 (RR) back to bottom, no fill. Broke circulation with air. Drilled to 2059 m KB. Lost 1 air compressor because of mechanical problems. Waiting on repairs. Slowly drilling ahead with reduced air circulation rate. Drilling at report time, ROP: ±8.0 m/h.
Average Air Circulation Rate: 94 to 69 m3/min at 2 070 to 1 725 kPa at 70°C
Page No. 66
Good Weather Date 97 01 15 Clear Temp -4 °C Road
ESTIMATED COSTS: DAILY $ 37 453 CUMULATIVE $ 2 150 788 SUPERVISOR Mike Kramps
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 50
Depth 2260 m Progress 182 m Hole Size 311 mm Status Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 2 (RR) 2097 m 1.50 °313 1 RU & RD Size - mm 311 2179 m 1.10 °08 2 Drill Actual 19.75 Type H4552 m ° 3 Reaming S.N. K56995 m 4 Coring Jets - mm 3 x 19.0 m 5 Cond. Hole Wt. - daN 500 - 1 000 m ° 6 Trips 2.75 r/min 35 m ° 7 Lubr. Rig 0.25 Out - m In PUMP 8 Repair Rig In - m 1850 Liner Length 9 Cut Off D.L. Metres 410 No. mm mm SPM 10 Dev. Survey 1.25 Hours 44.25 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 2086 m KB with air circulation rate of 69.0 m3/min. Repaired compressor and put back on line. Pulled 3 stands and repositioned drillpipe float. Experienced 2 directional survey misruns (2086 m and 2095 m KB). Drilled to 2199 m KB. Pulled 3 stands and repositioned drillpipe float. Drilling at report time. ROP: ±9.0 m/h.
Average Air Circulation Rate: 69.0 to 100.0 m'/min at 1 725 to 2 480 kPa at 70°C
Page No. 67
1
s/L W.L. % Filter Cake
kg/m3 Rate kg/m3 Rate kg/m'
Mud: Wt Air kg/m' Visc. Methyl Blue Solids Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
ESTIMATED COSTS: DAILY $ 39 055 CUMULATIVE $ 2 189 843 SUPERVISOR Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowing Temp 0
Well GENOIL et al ST. LEONARD NO. 1 Rig
Depth 2351 m Progress 91 m Hole Size 11 mm Status
Date 97 01 16
Ralex, 1 Day No. 51 Blowing hole mPa.s YP Pa Gels Pa
mg/L Cal. mg/L kg/m' Rate Umin
kg/m' Rate Umin kg/m'
3 cm' p H PV mm Salt Desander Underflow Wt. Desander Overflow Wt. Centrifuge Overflow Wt.
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 2 (RR) 1 (RR) 2283 m 0.4 °318 1 RU & RD Size - mm 311 311 m 2 Drill Actual 11.00 Type H4552 H4552 m 3 Reaming S.N. K56995 K56931 m 4 Coring Jets - mm 3x19.0 3x19.0 m 5 Cond. Hole 1.00 Wt. - daN 500 - 1000 50 - 1500 m 6 Trips 10.25 r/min 35 35 m ° 7 Lubr. Rig Out - m 2302 In PUMP 8 Repair Rig In - m 1850 2302 Liner Length 9 Cut Off D.L. Metres 452 49 No. mm mm SPM 10 Dev. Survey Hours 51.75 5.50 11 Wireline Log Condition 50% wear 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine formation. 21 Handle Tool
22 Clean to Btm Refer to attached Directional Survey Report for wellbore drift particulars. 23 Jet BOP 0.50 Held BOP drills and safety meetings. 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 2302 m KB. Pulled 3 stands to recover drillpipe float. Pulled 10 000 daN over string weight off bottom. Blew hole to clean. Installed jet sub and cleaned out BOP stack. Tripped out bit #2 (RR). Double strapped drill string, +1.50 m difference, no correction. Serviced air hammer and changed out bit because of broken and chipped inserts. Ran bit #1 (RR) and drill collars. Slipped and cut line. Finished tripping in. Broke circulation with air and cleaned 1.0 m fill. Drilled to 2351 m KB. Hole tight, increased air volume and blew hole to clean at report time.
Average Air Circulation Rate: 100.0 to 127.0 m'/min at 2 480 to 2 820 kPa at 70.0
Page No. 68
°C Road Good
Umin Umin
ESTIMATED COSTS: DAILY $ 43 881 CUMULATIVE $ 2 233 724 SUPERVISOR Mike Kramps
BISSETT RESOURCE CONSULTANTS LTD. itr
DAILY DRILLING REPORT
Weather Clear Temp -25 °C Road Good Date 97 01 17
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 52
Depth 2479 m Progress 128 m Hole Size 311 mm Status Blowing hole
Mud: Wt Air kg/m3 Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1 (RR) 2385 m 0.5 °33 1 RU & RD
Size - mm 311 m 2 Drill Actual 18.50 Type H4552 m 3 Reaming S.N. K56931 m 4 Coring
Jets - mm 3 x 19.0 m ° 5 Cond. Hole 0.25 Wt. - daN 500 - 1 000 m ° 6 Trips 1.00 r/min 35 m 7 Lubr. Rig
Out - m In PUMP 8 Repair Rig 0.50 In - m 2302 Liner Length 9 Cut Off D.L. Metres 177 No. mm mm SPM 10 Dev. Survey 0.50 Hours 22.75 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
20 sxs Gel PP Output AV Power 15 Test BOP 1sx Caustic kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine formation. 21 Handle Tool
22 Clean to Btm 23 Repair Air 24 Comp. 3.25 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulating with air to clean. Recovered large (+15 mm diameter) cutting while working drill string. Resumed drilling. Drilled to 2407 m KB. Tripped out 3 stands to reposition string float. Drilled to 2479 m KB. Shut down to repair air compressors. Blew hole while working on equipment.
Average Air Circulation Rate: 110.0 m3/min at 3 030 kPa at 70°C
Page No. 69
J
Good Date 97 01 18 Weather Clear Temp -30 °C Road
ESTIMATED COSTS: DAILY $ 44 985 CUMULATIVE $ 2 278 709 SUPERVISOR Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 53
Depth 2620 m Progress 141 m Hole Size 311 mm Status Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS No. 1 (RR) 2499 m 0.75 °48
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8
RU & RD Size - mm 311 m Drill Actual 19.00 Type H4552 m Reaming S.N. K56931 m Coring Jets - mm 3 x 19.0 m ° Cond. Hole Wt. - daN 500 - 1 000 m Trips 1.75 r/min 35 m Lubr. Rig 0.50 Out - m In PUMP Repair Rig In - m 2302 Liner Length 9 Cut Off D.L. Metres 318 No. mm mm SPM 10 Dev. Survey 0.50 Hours 41.75 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Drilling in Lorraine formation. 21 Handle Tool
22 Clean to Btm 23 Repair Air 24 Comp. 2.25 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Blew hole while repairing air equipment. Drilled to 2519 m KB. Pulled 3 stands to reposition drillpipe float. Drilled to 2547 m KB. Blew hole while repairing air equipment. Drilling at report time, ROP: ±8.0 m/h.
Average Air Circulation Rate: 110.0 m'/min at 3 440 kPa at 70°C
Page No. 70
J
Cst.BISSETT RESOURCE CONSULTANTS LTD.
Weather Clear Temp Well GENOIL et al ST. LEONARD NO. 1
DAILY DRILLING REPORT
-30 °C Road Good Date 97 01 19 Rig Ralex, 1 Day No. 54
78 m Hole Size 311 mm Status Tripping Depth 2698 m Progress Mud: Wt 1020 kg/m3 Visc. 55 s/L W.L. 6.0 Methyl Blue 55.0 Solids 2.0 % Filter Cake Desilter Underflow Wt. kg/m3 Rate Desilter Overflow Wt. kg/m3 Rate Centrifuge Underflow Wt. kg/m3
cm' pH 9.0 PV 10 2 mm Salt
mPa.s YP 15 Pa Gels 5/15 Pa 600 mg/L Cal. 40 mg/L
kg/m3 Rate Umin kg/m3 Rate Umin
kg/m3
Umin Desander Underflow Wt. Umin Desander Overflow Wt.
Centrifuge Overflow Wt.
BITS SURVEYS No. 1 (RR) 2612 m 1.25 °38
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7'
RU & RD Size - mm 311 2678 m 1.25 0 73 Drill Actual 13.00 Type H4552 m Reaming S.N. K56931 m Coring Jets - mm 3x 19.0 m Cond. Hole 3.00 Wt. - daN 500 - 1 000 m Trips 6.25 r/min 35 m Lubr. Rig 0.25 Out - m 2698 PUMP 8 Repair Rig In - m 2302 Liner Length 9 Cut Off D.L. Metres 396 No. mm mm SPM 10 Dev. Survey 1.50 Hours 54.75 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
61 sxs Gel 2 sxs Lignite PP Output AV Power 15 Test BOP 1 sx Caustic kPa Umin m/min kW 16 DST 1 sx Soda Ash 17 Plug Back
3 sxs Drispac 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Intermediate hole terminated in the Lorraine formation. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 2632 m KB. Pulled 3 stands and recovered drillpipe float. Jet solids from BOP stack. Drilled to 2698 m KB (intermediate casing point). Blew hole clean. Ran survey, misrun. Reran survey. Tripping out at report time to lay down air drilling bottom hole assembly.
Average Air Circulation Rate: 110.0 m3/min at 3 400 kPa at 70°C
ESTIMATED COSTS: DAILY $ 42 620 CUMULATIVE $ 2 321 329 SUPERVISOR Mike Kramps
Page No. 71
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
ESTIMATED COSTS: DAILY $ 29 147 CUMULATIVE $ 2 350 476 SUPERVISOR Mike Kramps
Date 97 01 20 Temp -10 °C Road Good Weather Clear LEONARD NO. 1 Rig Ralex, 1
0 m Hole Size 311 mm Status Mixing LCM/mud Depth 2698 m Progress Mud: Wt 1020 kg/m' Visc. Methyl Blue 50.0 Solids
12 mPa.s YP 11.5 Pa Gels 4/12 Pa
2.0 % Filter Cake 2 mm Salt 55 s/L W.L. 6.5 cm' pH 9.0 PV
550 mg/L Cal. 40 mg/L
Day No. 55 Well GENOIL et al ST.
kg/m' Rate kg/m' Rate kg/m'
Desilter Underflow Wt. kg/m' Rate I./min Desander Underflow Wt. Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt. Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt.
HYDRAULIC PP Output AV kPa Umin m/min
200 780 12
DRILLING MUD ADDITIVES USED: 5 sxs Gel 1 sx Drispac
5 sxs Celloflake
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5
RU&RD Drill Actual
° Reaming Coring Cond. Hole
6 Trips 9.50 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L. 1.00
SPM 10 Dev. Survey 60 11 Wireline Log 60 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
3 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Displace 24 Hole to Mud 13.50 25
SURVEYS m m m m m m m
PUMP Liner Length
No. mm mm 1 159 229 2 159 229
BITS 8A (RR) 311 MFDSH LD7277 Open
Clean Out Trip
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
No. 1 (RR) Size - mm 311 Type H4552 S.N. K56931 Jets - mm 3x19.0 Wt. - daN 500 - 1 000 r/min 35 Out - m 2698 In - m 2302 Metres 396 Hours 54.75 Condition 75% wear
Umin Umin
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping out bit #1 (RR). Double strapped drill string, +1.25 m difference, no correction. Laid down air drilling tools and excess drilling assembly. Ran bit #8A (RR), broke circulation with air and cleaned 10 m fill to bottom. Displaced hole to drilling fluid in 200 m intervals while tripping out. Pulled bit into surface casing. Attempted to break circulation unsuccessfully. Lost approximately 70 m' drilling fluid when filling hole. Filled mud tanks with fresh water. Mixing LCM and drilling fluid at report time.
Page No. 72
I
CBISSETT RESOURCE CONSULTANTS LTD.
Weather Well GENOIL et al ST. LEONARD NO. 1
DAILY DRILLING REPORT
Clear Temp -20 'C Road Good Date 97 01 21
Rig Ralex, 1 Day No. 56
Depth 2698 m Progress 0 m Hole Size 311 mm Status Circulating
Mud: Wt 1020 kg/m' Visc. 75 s/L W.L. 6.0 cm' pH 9.0 PV 23 mPa.s YP 9.5 Pa Gels 3/6 Pa
Methyl Blue 56.0 Solids 2.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. 8A (RR) m
Size - mm 311 m
Type MFDSH m S.N. LD7277 m
Jets - mm Open m Wt. - daN m r/min Clean m Out - m Out PUMP In - m Trip Liner Length Metres No. mm mm Hours 1 159 229 Condition 2 159 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 93 sxs Gel 39 sxs Celloflake PP Output AV
1 sx Caustic 15 sxs Quick Seal kPa Umin m/min
9 sxs Drispac 4000 1300 20 25 sxs Sawdust
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4
RU & RD Drill Actual Reaming Coring
5 Cond. Hole 4.00 6 Trips 7.50 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 100 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST 87 17 Plug Back
18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Mix Mud 7.50 24 Work Tight 25 Hole 5.00
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) No returns. Pumping drilling fluid at reduced rate, no returns. Cost 230 m' drilling fluid. Mixing drilling fluid. Mixed and displaced 25 m' LCM pill. Started displacing LCM pill and achieved full returns. Circulated to condition mud and hole with full returns. Tripped in to 2600 m KB, attempted to break circulation. Cuttings packed off around drill collars, unable to circulate. Unable to pull drill string. Worked drill string free and pulled bit to 2340 m KB. Broke circulation. Circulated to condition mud and hole. Ran in bit #8A. Broke circulation and circulated 30 minutes after each stand. Circulating and working drill string past tight hole at 2593 m KB at report time.
ESTIMATED COSTS: DAILY $ 26 693 CUMULATIVE $ 2 377 169 SUPERVISOR Mike Kramps
Page No. 73
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Temp °C Road Date 97 01 2221 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 57 Depth m Progress m Hole Size mm Status Mud: Wt kg/m3 Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. m 1 RU & RD Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole Wt. - daN m 6 Trips r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 11 Wireline Log Condition 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Morning report has been delayed today due to accident investigation activities. At approximately 4:30 a.m., 97 01 22, a derrickman fell from the monkey board to the rig floor. The extent of his injuries is unknown. Ralex management and appropriate authorities have been notified. Operations have been suspended until the accident investigation has been completed. The daily drilling report will be distributed when available.
ESTIMATED COSTS: DAILY $ 26 693 CUMULATIVE $ 2 377 169 SUPERVISOR Mike Kramps
Page No. 74
le BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Raining Temp -5 °C Road Good Date 97 01 22 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 57
Depth 2698 m Progress 0 m Hole Size 311 mm Status Operations suspended Mud: Wt 1060 kg/m' Visc. 75 s/L W.L. 6.0 cm3 pH 9.0 PV 23 mPa.s YP 10 Pa Gels 3/9 Pa Methyl Blue 60.0 Solids 4.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 40 mg/L Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate L./min Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate L/min Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 8A (RR) m 1 RU & RD Size - mm 311 m 2 Drill Actual Type MFDSH m 3 Reaming S.N. LD7277 m 4 Coring Jets - mm Open m 5 Cond. Hole 15.00 Wt. - daN m 0 6 Trips 4.50 r/min Clean m 7 Lubr. Rig Out - m Out PUMP 8 Repair Rig In - m Trip Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 120 11 Wireline Log Condition 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 3.00
37 sxs Gel PP Output AV Power 15 Test BOP 200 sxs Barite kPa L/min m/min kW 16 DST
7 sxs Drispac 17 Plug Back 1 sx Lignite 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
21 Handle Tool 22 Clean to Btm 23 Operations 24 Suspended 1.50 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated and reamed/cleaned hole from 2593 m to 2602 m KB. Mixed and pumped 25 m' - 1300 kg/m', 100 s/I viscosity pill. Unable to work past 2602 m KB because of fill. Recovering fines across the shale shaker. Tripped out bit #8A. Tore out and laid down 346.1 mm drilling head. Installed flow nipple. Ran bit #BA. Started running drill collars. Operations suspended because of an accident. Further details will be provided when available.
ESTIMATED COSTS: DAILY $ 31 838 CUMULATIVE $ 2 409 367 SUPERVISOR Mike Kramps
Page No. 75
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowing Temp -6 'C Road Good Date 97 01 23
Well GENOIL et al ST. LEONARD NO. 1 Depth 2698 m Progress 0 m Hole Size Mud: Wt 1060 kg/m' Visc. 100 s/L W.L. 6.0 Methyl Blue 66.0 Solids 4.0 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
Rig Ralex, 1 Day No. 311 mm Status Reaming
cm3 pH 9.0 PV 19 mPa.s YP 31 Pa Gels 2.0 mm Salt 400 mg/L Cal. 40
Limbo Desander Underflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate
Centrifuge Overflow Wt. kg/m'
58
5/6 Pa mg/L Umin L/min
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 8A (RR) m 1 RU & RD
Size - mm 311 m 2 Drill Actual
Type MFDSH m 3 Reaming 6.00
S.N. LD7277 m 4 Coring
Jets - mm Open m 5 Cond. Hole 7.25 Wt. - daN m 6 Trips 2.25 r/min Clean m 7 Lubr. Rig Out - m Out PUMP 8 Repair Rig
In - m Trip Liner Length 9 Cut Off D.L. 1.00 Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 120 11 Wireline Log Condition 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
121 sxs Gel PP Output AV Power 15 Test BOP
5 sxs Drispac kPa L/min m/min kW 16 DST 1 sx Caustic 5000 1600 27/24 133 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional The accident resulted in a fatality when the derrickman fell from the monkey boards. Details of the 21 Handle Tool casualty have been discussed verbally at this time. Accident reports will be available in the near future. 22 Clean to Btm
For details, contact Genoil's spokesperson, Maurice Durette at (819) 478-4141 (office) or 23 Accident (910) 472-9941 (cellular). 24 Investigation 7.50
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Operations suspended while accident investigation was conducted by Ralex management and government authorities (QPP and CSST) from 6:00 a.m. to 1:30 p.m.. Ran bit #8A (RR) and drill collars. Slipped and cut line. Tripped in to 1571 m KB. Hole tight. Broke circulation and circulated to condition mud and hole. Started reaming at 1571 m KB. Reamed and cleaned to 1589 m KB at report time with very high torque. Plan to increase mud density and viscosity to combat sloughing/spauling problem. No drilling fluid was lost over the past 24 hours. Unable to run both mud pumps, WO mechanic.
ESTIMATED COSTS: DAILY $ 28 934 CUMULATIVE $ 2 437 941 SUPERVISOR Mike Kramps
Page No. 76
J
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -25 °C Road Good Date 97 01 24
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 59
Depth 2698 m Progress 0 m Hole Size 311 mm Status Reaming
Mud: Wt 1100 kg/m' Visc. 150 s/L W.L. 5.0 cm' pH 9.0 PV 68 mPa.s YP 26 Pa Gels 8/16 Pa
Methyl Blue 77.0 Solids 6.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 80 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 8A (RR) m • 1 RU & RD
Size - mm 311 m • 2 Drill Actual
Type MFDSH m • 3 Reaming 24.00 S.N. LD7277 m ▪ 4 Coring Jets - mm Open m • 5 Cond. Hole Wt. - daN m ° 6 Trips r/min Clean m ° 7 Lubr. Rig Out - m Out PUMP 8 Repair Rig In - m Trip Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 120 11 Wireline Log Condition 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 275 sxs Gel PP Output AV Power 15 Test BOP 14 sxs Drispac kPa Umin m/min kW 16 DST
204 sxs Barite 5500 1600 27/24 146 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed/cleaned from 1589 m to 1674 m KB. Hole is slouching/spauling shale up to 19.0 mm in diameter. Reamed/cleaned from 1674 m to 1865 m KB. Hole is sloughing/spaulinq shale cuttings ranging from small slivers to 12.7 mm in diameter. Unable to run stands of drillpipe, must ream/clean each single. Reaming/cleaning at 1865 m KB at report time.
ESTIMATED COSTS: DAILY $
33 618 CUMULATIVE $ 2 442 625 SUPERVISOR Mike Kramps
Page No. 77
I
ESTIMATED COSTS: DAILY $ 26 122 CUMULATIVE $ 2 468 747 SUPERVISOR Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Date 97 01 25 Good Cloudy Temp -5 °C Road GENOIL et al ST. LEONARD NO. 1
Weather Well Rig Rolex, 1 Day No. 60
Depth 2698 m Progress 0 m Hole Size 311 mm Status Reaming
Mud: Wt 1100 kg/m' Visc. 150 s/L W.L. 5.0 cm3 pH 9.0 PV 55 mPa.s YP 28 Pa Gels 8/18 Pa
Methyl Blue 70.0 Solids 6.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 80 mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 8A (RR) m ° 1 RU & RD
Size - mm 311 m 0 2 Drill Actual
Type MFDSH m 3 Reaming 17.25
S.N. LD7277 m ° 4 Coring Jets - mm Open m 5 Cond. Hole Wt. - daN m 6 Trips 0.50 r/min Clean m 7 Lubr. Rig 0.25 Out - m Out PUMP 8 Repair Rig
In - m Trip Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 120 11 Wireline Log Condition 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 111 sxs Gel PP Output AV Power 15 Test BOP
2 sxs Drispac kPa L/min m/min kW 16 DST 2 sxs Caustic 8000 1600 27/24 213 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Work Tight 24 Hole 6.00 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed to 1885 m KB, recovering sharp up to 12.7 mm diameter cuttings. Attempted to run one stand of drillpipe. Unable to break circulation or move drill string, packed off. Worked drill string free in six hours. Pulled to 1865 m KB and circulated to condition mud and hole. Resumed reaming. Reamed to 1999 m KB. Ran drill string to 2084 m KB. Reamed to 2210 m KB, hard reaming from 2188 m to 2210 m KB. Recovering sharp 9.5 mm to 12.7 mm diameter cutting which the sloughing/spalling into the hole. Experiencing high torque when applying over 1 000 daN WOB. Reaming at report time. Beginning to increase mud density.
Page No. 78
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -20 'C Road Good
Date 97 01 26
Well GENOIL et al ST. LEONARD NO. 1 Rig Depth 2698 m Progress 0 m Hole Size 311 mm Status
Ralex, 1 Day No. 61 Working stuck pipe
Mud: Wt 1120 kg/m' Visc. 165 s/L W.L. 5.0 cm3 pH 9.0 PV 64 mPa.s YP 23 Pa Gels 7/17 Pa Methyl Blue 77.0 Solids 7.6 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 80 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. 8A (RR) m Size - mm 311 m Type MFDSH m S.N. LD7277 m Jets - mm Open m Wt. - daN m r/min Clean m Out - m Out PUMP In - m Trip Liner Length Metres No. mm mm Hours 1 159 229 Condition 2 159 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 137 sxs Gel PP Output AV 166 sxs Barite kPa Umin m/min
3 sxs Caustic 8000 1600 27/24
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
TIME DISTRIBUTION Code/Operation Hours 1 2
RU & RD Drill Actual
3 Reaming 20.50 4 Coring 5 Cond. Hole 6 Trips 7 Lubr. Rig 0.50 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 120 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
213 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Work Stuck 24 Pipe 3.00 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed and cleaned from 2210 m to 2556 m KB. Hole continued to unload 4.5 mm to 12.7 mm diameter cuttings. While reaming at 2556 m KB, pump pressure increased dramatically, packed off around drill collars. Unable to break circulation. Started working and jarring drill string. Gained approximately 0.3 m. Jars quit working. Continued to work drill string while waiting on fisherman.
ESTIMATED COSTS: DAILY $ 28 122 CUMULATIVE $ 2 496 854 SUPERVISOR Mike Kramps
Page No. 79
J
Good Date 97 01 27 Weather Clear Temp -20 °C Road
ESTIMATED COSTS: DAILY $ 28 638 CUMULATIVE $ 2 525 492 SUPERVISOR Mike Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 62
Depth 2698 m Progress 0 m Hole Size 311 mm Status Working stuck pipe Mud: Wt 1170 kg/m' Visc. 185 s/L W.L. 5.0 cm3 pH 9.0 PV 80 mPa.s YP 25 Pa Gels 9/19 Pa Methyl Blue 78.0 Solids 10.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 8A (RR) m 1 RU & RD
Size - mm 311 m ° 2 Drill Actual Type MFDSH m 3 Reaming S.N. LD7277 m ° 4 Coring
Jets - mm m 5 Cond. Hole Wt. - daN m 6 Trips r/min Clean m ° 7 Lubr. Rig Out - m Out PUMP 8 Repair Rig In - m Trip Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 11 Wireline Log Condition 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 156 sxs Barite PP Output AV Power 15 Test BOP
1 sx Kelsan kPa Umin m/min kW 16 DST 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Work Stuck 24 Pipe 24.00 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drill string stuck at 2556 m KB. Unable to break circulation. Continued to work stuck drill string. Rigged in Dowell cement unit to stand pipe. Attempted to break circulation, pressured up on drillpipe to 35 000 kPa while working the drill string, unable to break circulation. Rigged out Dowell. Continued to work stuck drill string while waiting on fishing tools. NOTE: Fishing tool estimated time of arrival is noon, 97 01 27.
Page No. 80
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowing Temp -5 °C Road
Good
Date 97 01 28 Well GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1 Day No. 63
Depth 2698 m Progress 0 m Hole Size
311 mm Status WO daylight Mud: Wt 1200 kg/rn3 Visc. 170 s/L W.L. 5.0 cm' pH 9.0 PV 74 mPa.s YP 23 Pa Gels 9/16 Pa Methyl Blue 77.0 Solids 12.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m3
TIME DISTRIBUTION
No. 8A (RR) Size - mm 311 Type MFDSH S.N. LD7277 Jets - mm Open Wt. - daN r/min Clean Out - m Out In - m Trip Metres Hours Condition
BITS
SURVEYS Code/Operation Hours
m 1 RU&RD
m 2 Drill Actual m 3 Reaming m 4 Coring
m 5 Cond. Hole m 6 Trips m 7 Lubr. Rig
PUMP 8 Repair Rig
Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey
1 159 229 11 Wireline Log
2 159 229 12 Run Csg/Cmt 13 Wait on Cmt
HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing 12.00 20 Directional 21 Handle Tool 22 Clean to Btm 23 Work Stuck 24 Pipe 9.00 25 WO Daylight 3.00
DRILLING MUD ADDITIVES USED: 50 sxs Barite
1 sx Kelsan
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued to work stuck drill string (jars not working) Rigged in wireline unit. Made up and ran free point tools. Stopped to test tools, kelly froze. Thawed kelly. Ran free point, determined free point at 2487 m KB (one drill collar below HWDP). Pulled and laid down free point tools. Shut down operation for safety reasons (wireline crew have been up over 18 hours) to allow wireline crew to rest. WO daylight. Plan to back off drill collars at 2487 m KB.
ESTIMATED COSTS: DAILY $ 32 527 CUMULATIVE $
2 558 019 SUPERVISOR Mike Kramps
Page No. 81
J
i
BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
°C Road Good Weather
Clear Temp -15
Centrifuge Overflow Wt. kg/m3
Well GENOIL et al ST. LEONARD NO. 1
Rig Depth 2698 m Progress 0 m Hole Size
311 mm Status
Mud: Wt 1200 kg/m' Visc. 160 s/L W.L. Methyl Blue 70.0 Solids 12.0 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
• 6 Trips 13.00 o 7 Lubr. Rig
8 Repair Rig
SURVEYS m
Code/Operation Hours 1 RU & RD 2 Drill Actual 3 Reaming 4 Coring
• 5 Cond. Hole
ESTIMATED COSTS: DAILY $ 24 639 CUMULATIVE $ 2 582 158 SUPERVISOR Mike Kramps
Ralex, 1
5.0 cm' pH 9.0 PV 75 mPa.s YP 20 Pa Gels 8/15 Pa 2.0 mm Salt 400 mg/L Cal. 80 mg/L Umin Desander Underflow Wt. kg/m' Rate Umin
Umin Desander Overflow Wt. kg/m' Rate Umin
TIME DISTRIBUTION
Page No. 82
J
m m m m m m PUMP
Tripping
Date 97 01 29 Day No. 64
BITS
Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey
1 159 229 11 Wireline Log
2 159 229 12 Run Csg/Cmt
No. 8A (RR) Size - mm 311 Type MFDSH S.N. LD7277 Jets - mm Open Wt. - daN r/min Clean Out - m Out In - m Trip Metres Hours Condition
-36 Date 97 01 30 Day No. 65
°C Road Good Rig Ralex 1
BISSETT RESOURCE CONSULTANTS LTD. $+
DAILY DRILLING REPORT
Weather Clear Well Depth Mud: Wt 1200 kg/m3 Visc. Methyl Blue 77.0 Solids Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
Temp
195 s/L W.L. 5.0 12.0 % Filter Cake
kg/m3 Rate kg/m3 Rate
kg/m3
cm3 pH 9.0 PV 84 mPa.s YP 2.0 mm Salt 400
Umin Desander Underflow Wt. Umin Desander Overflow Wt.
Centrifuge Overflow Wt.
GENOIL et al ST. LEONARD NO. 1
kg/m3 Rate Umin kg/m3 Rate Umin kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 8A (RR) m 1 RU & RD Size - mm 311 m 2 Drill Actual Type MFDSH m 3 Reaming S.N. LD7277 m 4 Coring Jets - mm Open m 5 Cond. Hole 16.50 Wt. - daN m 6 Trips 7.50 r/min Clean m ° 7 Lubr. Rig Out - m Out PUMP 8 Repair Rig In - m Trip Liner Length 9 Cut Off D.L.
Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 72 11 Wireline Log Condition 2 159 229 72 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 292 sxs Barite PP Output AV Power 15 Test BOP
2 sxs Kelzan kPa Umin m/min kW 16 DST 30 sxs Gel 10 000 2000 28/35 333 17 Plug Back 2 sxs Caustic 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Ran bit #4 (RR) to 569 m KB, surface casing shoe. Circulated to condition mud. Tripped in to 928 m KB, circulated to condition mud and hole. Tripped in to 1212 m KB, circulated to condition mud and hole. Tripped in to 1493 m KB, circulated to condition mud and hole at report time, recovering moderate amount of cuttings ranging in size from 10 to 12 mm in diameter.
Plan to clean to top of fish. Condition mud and hole. Trip out, pick up and run screw in sub and jarring assembly.
ESTIMATED COSTS: DAILY $ 114 686 CUMULATIVE $ 2 697 344 SUPERVISOR Mike Kramps
Page No. 83
J
2698 m Progress 0 m Hole Size 311 mm Status Tripping 30 Pa Gels 15/25 Pa
mg/L Cal. 80 mg/L
Good Date 97 01 31 GENOIL et al ST. LEONARD NO. 1
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Clear Temp -14 °C Road Weather Well Depth 2698 m Progress 0 m Hole Size 311 mm Status Reaming Mud: Wt 1220 kg/m' Visc. 200 s/L W.L. 5.0 cm' pH 9.0 PV 76 mPa.s YP 30 Pa Gels 9/18 Pa Methyl Blue 78.0 Solids 12.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 100 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 4 m 1 RU & RD Size - mm 311 m 2 Drill Actual Type MFDSH m 3 Reaming S.N. LG3442 m 4 Coring Jets - mm Open m 5 Cond. Hole Wt. - daN m 6 Trips r/min Clean m 7 Lubr. Rig Out - m Out PUMP 8 Repair Rig 2.00 In - m Trip Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 80 11 Wireline Log Condition 2 159 229 80 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 346 sxs Barite PP Output AV Power 15 Test BOP
3 sxs Kelzan kPa Umin m/min kW 16 DST 73 sxs Gel 11 000 2100 39/31 385 17 Plug Back
2 sxs Caustic 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 22.00 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Tripped into 1725 m KB, hole began taking string weight. Broke circulation. Reamed and cleaned to 1734 m KB. "O" ring on gooseneck failed. Stood back kelly, rigged in Nubbin and circulated while repairing gooseneck. Picked up kelly, continued reaming and cleaning. Reaming/cleaning at 2016 m KB at report time.
NOTE: Recovering cuttings ranging up to 25 mm diameter slivers. Reaming is spotty as is volume of cuttings across shaker. Hole seems to be improving in terms of drag, torque and volume of cuttings. Continued to increase mud density. Second supervisor is on location to provide 24-hour supervision.
ESTIMATED COSTS: DAILY $ 32 383 CUMULATIVE $ 2 729 727 SUPERVISOR M. Kramps/D. Gaboury
Page No. 84
Rig Ralex, 1 Day No. 66
D m Hole Size 311 mm Status Reaming 190 s/L W.L. 5.0 cm' pH 9.0 PV 70 mPa.s YP
13.0 % Filter Cake 2.0 mm Salt 400 30 Pa Gels 11/23 Pa mg/L Cal. 120 mg/L
No. 4 Size - mm 311 Type MFDSH S.N. LG3442 Jets - mm Open Wt. - daN r/min Clean Out - m Out In - m Trip Metres Hours Condition
BITS SURVEYS m m m m m m m PUMP
Liner
Length No. mm mm
1
159
229 2
159
229
DRILLING MUD ADDITIVES USED: HYDRAULIC 469 sxs Barite 10 sxs Sawdust PP Output AV
3 sxs Kelzan kPa Umin m/min 96 sxs Gel 11 500 1850 33/27 2 sxs Caustic
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
C BISSETT RESOIJRCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy and Snowing Temp -4 °C Road Fair
Date 97 02 01 Well GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1
Day No. 67 Depth 2698 m Progress Mud: Wt 1250 kg/rn3 Visc. Methyl Blue 80.0 Solids Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
Umin Desander Underflow Wt. Umin Desander Overflow Wt.
Centrifuge Overflow Wt.
kg/m' Rate Umin kg/m' Rate Umin
kg/m'
TIME DISTRIBUTION Code/Operation Hours 1 RU&RD 2 Drill Actual 3 Reaming 4 Coring 5 Cond. Hole 6 Trips 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 135 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
354 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 24.00 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued to ream and clean to bottom. From 2016 m to 2325 m KB reaming/cleaning operations were normal with small amount of formation cuttings coming across the shaker. Starting at 2325 m KB, reaming rate of penetration slowed considerably. Reamed from 2325 m to 2360 m KB at report time (4 hours). Recovered 10 mm to 12 mm diameter sharp formation cuttings over the shaker. Reaming progress is slow due to penetration and having to ream each single numerous times. Amount of cuttings over the shaker has increased through this interval. The hole appears to be cleaning well.
NOTE: Unable to run pump 2 because of overheating.
ESTIMATED COSTS: DAILY $
33 183 CUMULATIVE $ 2 762 910 SUPERVISOR M. Kramps/D. Gaboury
Page No. 85
BITS No. 4
SURVEYS Code/Operation Hours m 1 RU & RD m 2 Drill Actual m 3 Reaming 20.50 m 4 Coring
m 5 Cond. Hole 1.25 m 6 Trips m 7 Lubr. Rig
PUMP 8 Repair Rig 2.25
1 159 229 90 2 140 229 90
Size - mm 311 Type MFDSH S.N. LG3442 Jets - mm Open Wt. - daN r/min Clean Out - m Out In - m Trip Metres Hours Condition
Liner Length 9 Cut Off D.L. No. mm mm SPM 10 Dev. Survey
11 Wireline Log 12 Run Csg/Cmt
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowing Temp -8 CC Road
Good
Date 97 02 02 Well GENOIL et al ST. LEONARD NO. 1
Rig Ralex 1
Day No. 68 Depth 2698 m Progress 0 m Hole Size 311
mm Status Circulating
Mud: Wt 1290 kg/m' Visc. 200 s/L W.L. 5.0 cm' pH 9.0 PV
80 mPa.s YP 30
Pa Gels 11/23 Pa Methyl Blue 82.0 Solids 14.0 % Filter Cake
2.0 mm Salt 400 mg/L Cal. 120 mg/L
Desilter Underflow Wt. kg/m' Rate L/min Desilter Overflow Wt. kg/m' Rate 1../min Centrifuge Underflow Wt. kg/m'
kg/m' Rate L/min kg/m' Rate L/min
kg/m'
Desander Underflow Wt. Desander Overflow Wt. Centrifuge Overflow Wt.
TIME DISTRIBUTION
13 Wait on Cmt DRILLING MUD ADDITIVES USED:
HYDRAULIC 14 Nipple Up
390 sxs Barite
PP Output AV Power 15 Test BOP 1 sx Kelzan
kPa L/min m/min kW 16 DST 131 sxs Gel
16500 2200 41/33 605 17 Plug Back 1 sx Caustic
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed and cleaned from 2360 m to 2435 m KB. Progress is slow because of reaming penetration rate. Recovered up to 25 mm rounded formation cuttings over shaker, hole is cleaning well. Kelly hose failed, blew hose off end coupling. Rigged in 50 mm hose, broke circulation and repaired kelly hose. Rigged in kelly hose, broke circulation and resumed reaming. Reamed and cleaned from 2435 m to 2498 m KB, top of fish. Circulating at report time to condition mud and hole. Recovering 12 mm semirounded cuttings over shaker.
ESTIMATED COSTS: DAILY $
30 385 CUMULATIVE $ 2 790 884 SUPERVISOR M. Kramps/D. Gaboury
Page No. 86
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Well
Clear Temp -5 °C Road Good Date 97 02 03 GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1 Day No. 69
Depth 2698 m Progress 0 m Hole Size 311 mm Status Tripping Mud: Wt 1290 kg/m' Visc. 200 s/L W.L. 5.0 cm3 pH 9.0 PV 80 mPa.s YP 30 Pa Gels 11/23 Pa Methyl Blue 82.0 Solids 14.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 120 mg/L
Desilter Underflow Wt. kg/m' Rate 1../min Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Under(low Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS No. 4 m Size - mm 311 m Type MFDSH m
S.N. LG3442 m Jets - mm Open m
Wt. - daN m r/min m Out - m Clean PUMP In - m Out Liner Length Metres Trip No. mm mm Hours 64.50 (reaming) 1 159 229 Condition 2-2-1 2 140 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 210 sxs Barite PP Output AV
1 sx Caustic kPa Umin m/min 36 sxs Gel 16500 2200 41/38
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Hole drag up: 8 - 10 000 daN Held BOP drill with each crew. Held safety meeting with two crews.
°
TIME DISTRIBUTION Code/Operation Hours 1 2
RU & RD Drill Actual
° 3 Reaming 6.50 4 Coring 5 Cond. Hole 10.75
° 6 Trips 6.50 0 7 Lubr. Rig 0.25
8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 90 11 Wireline Log 90 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
605 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated on top of fish at 2498 m KB to condition mud and hole. Initially, recovered a lot of 12 mm diameter cuttings - after four bottoms up, cuttings decreased to very small amount. Mixed and pumped 10 m' - 1500 kg/m3 density , 400 s/L viscous - weighted pill. Valve cap gasket failed on pump 2 when pumping pill. Circulated pill with pump 1, no increase in cuttings when pill came to surface. Started dummy trip. Pumped out a single at 2346 m KB and at 2213 m KB. Tripped out to 1700 m KB. Pumped weighted pill. Finished tripping out bit 4. Hole was in good condition from 1700 m KB to surface. Strapped drill string, +0.62 m difference, no correction. Laid down 2 - 229 mm square drill collars. Ran bit 4 (RR). Running in drill collars at report time.
ESTIMATED COSTS: DAILY $ 35 602 CUMULATIVE $ 2 826 486 SUPERVISOR M. Kramps/D. Gaboury
Page No. 87
J
Code/Operation Hours 1 RU & RD 2
Drill Actual 3 Reaming 4 Coring 5
Cond. Hole 2.00 6 Trips 18.75 7 Lubr. Rig 8
Repair Rig 9
Cut Off D.L. 0.75 10 Dev. Survey 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up 15 Test BOP 16 DST 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 2.50 22 Clean to Btm 23 24 25
ie BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
311 Well GENOIL et al ST. LEONARD NO. 1 Depth 2698 m Progress 0 m Hole Size
Rig mm Status
Ralex, 1 Circulating
Weather Clear Temp -20 °C Road
Good Date 97 02 04 Day No. 70
Mud: Wt 1295 kg/m' Visc. 200 s/L W.L. 5.0 cm3 pH 9.0 PV 75 rPa.s YP 30 Pa Gels 11/23 Pa Methyl Blue 80.0 Solids 14.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 160 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION BITS
SURVEYS
No. 4
m Size - mm 311 Type MFDSH S.N. LG3442 Jets - mm Open Wt. - daN r/min Out - m Clean In - m Out Metres Trip Hours Condition
DRILLING MUD ADDITIVES USED: 72 sxs Barite 2 sxs Drispac
26 sxs Gel 1 sx Kelzan
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
m m m m m m
PUMP
Liner
Length No. mm mm SPM
1 140
229
100 2 140
229
100
HYDRAULIC PP
Output AV
Power kPa
Umin m/min
kW 15 000
2100 39/32
525
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in bit #4 (RR) an drill collars. Circulated while slipping and cutting line and changed out pump liners in pump no. 1. Tripped in to 1000 m KB, circulated bottoms up, minimal amount of cuttings. Tripped in to 1725 m KB, circulated bottoms up. Recovered minimal amount of 12 mm diameter cuttings with some 25 mm sharp slivers. Continued tripping in, reamed bridges from 1798 m to 1808 m KB, 1996 m to 2006 m KB, 2176 m to 2185 m KB, 2420 m to 2430 m KB and 2450 m to 2459 m KB. NOTE: No hole drag between bridges. Tagged top of fish at 2498 m KB. Circulated to condition mud and hole. Recovering minimal amount of 12 mm cuttings. Circulating at report time. After circulating plan to trip out and run open hole logs.
ESTIMATED COSTS: DAILY $ 26 997 CUMULATIVE $ 2 853 483 SUPERVISOR M. Kramps/D. Gaboury
Page No. 88
J
No. 4 (RR) Size - mm 311 Type MFDSH S.N. LG3442 Jets - mm Open Wt. - daN r/min Out - m Clean In - m Out Metres Trip Hours Condition
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowing Temp -5 °C Road Good
Date 97 02 05
Rig Day No. 71 311 mm Status
cm3 pH 9.0 PV 80 mPa.s YP 30 Pa Gels 12/25 Pa Filter Cake 2.0 mm Salt 400 mg/L Cal. 160 mg/L
L/min Desander Underflow Wt. kg/m' Rate L/min L/min Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Overflow Wt. kg/m'
Well GENOIL et al ST. LEONARD NO. 1 Depth 2698 m Progress 0 m Hole Size Mud: Wt 1300 kg/m' Visc. 200 s/L W.L. 5.0 Methyl Blue 82.0 Solids 14.0 % Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
Ralex, 1 Circulating
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
1 (RR) m • 1 RU & RD 311 m • 2 Drill Actual FD6HC m • 3 Reaming 1.00 LF8663 m • 4 Coring Open m 0 5 Cond. Hole 4.50
m ° 6 Trips 13.75 m ° 7 Lubr. Rig 0.25
Clean PUMP 8 Repair Rig Out Liner Length 9 Cut Off D.L. Trip No. mm mm SPM 10 Dev. Survey
11 Wireline Log 4.50 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED:
HYDRAULIC 14 Nipple Up 130 sxs Barite 1 sx Caustic PP Output AV Power 15 Test BOP
1 sx Drispac kPa L/min rn/min kW 16 DST 46 sxs Gel 15 000 2100 39/32 525 17 Plug Back 2 sxs Kelzan 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated to condition mud and hole while setting on top of fish at 2498 m KB. Tripped out bit #4 (RR). Pulled tight at 2144.5 m KB and 2135.5 m KB, circulation was not required. Pulled to 2080 m KB, broke circulation, reamed and cleaned from 2080 m to 2060 m KB. Continued trip out, no further tight hole encountered. Rigged in loggers. Ran logging tools. Hole bridged at 1742 m KB. Attempted to work tools by bridge - unsuccessful. Pulled and laid down logging tools. Rigged out loggers. Ran bit #1 (RR). Broke circulation. Reamed and cleaned bridges from 1740 m to 1770 m KB, 2234 m to 2246 m KB and 2330 m to 2377 m KB. Recovering 10 mm rounded cuttings, small to moderate amount. Circulating at report time to condition mud and hole. Plan to trip out to run open hole logs, will dummy trip if hole is tight.
ESTIMATED COSTS: DAILY $ 24 617 CUMULATIVE $ 2 878 100 SUPERVISOR M. Kramps/D. Gaboury
Page No. 89
1
1 140 229 100 2 140 229 100
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -8 °C Road Fair Date 97 02 06 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 72 Depth 2698 m Progress 0 m Hole Size 311 mm Status Circulating Mud: Wt 1350 kg/rn3 Visc. 200 s/L W.L. 5.0 cm' pH 9.0 PV 85 mPa.s YP 35 Pa Gels 18/36 Pa Methyl Blue 81.0 Solids 15.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 160 mg/L Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. kg/m3 Rate Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m3 Rate L/min min Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS No. 1 (RR)
SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
Size - mm 311 m 0 2 Drill Actual Type FD6HC m 3 Reaming 7.25 S.N. LF8663 m 4 Coring Jets - mm Open _ m 5 Cond. Hole 9.75 Wt. - daN m 6 Trips 5.75 r/min m 0 7 Lubr. Rig Out - m Clean PUMP 8 Repair Rig 1.25 In - m Out Liner Length 9 Cut Off D.L. Metres Trip No. mm mm SPM 10 Dev. Survey Hours 1 140 229 105 11 Wireline Log Condition 2 140 229 105 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 417 sxs Barite 3 sxs Soda Ash PP Output AV Power 15 Test BOP
2 sxs Drispac kPa L/min m/min kW 16 DST 62 sxs Gel 16 250 2 205 41/34 595 17 Plug Back
2 sxs Kelzan 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed and washed from 2377 m to 2498 m KB. (Cleaned 20 m fill on top of fish.) Circulated to condition mud and hole. Tripped out bit #1 (RR) to run open hole logs. Hole tight at 1731 m KB. Broke circulation. Reamed and washed from 1731 m to 1789 m KB. Tripped out to 1700 m KB. Broke circulation, reamed and washed from 1700 m to 1731 m KB. Worked pipe and circulated with pump 2 while repairing pump 1. Reamed and washed from 1731 m to 1769 m KB. Made two wiper trips from 1769 m to 1666 m KB. Hole in good condition. No tight hole. Tripped back to bottom. Reamed and washed bridges from 1821 m to 1839 m KB 1862 m to 1894 m KB, 1938 m to 1995 m KB 2477 m to 2498 m KB (top of fish). Circulating to condition mud and hole while increasing mud density to 1350 kg/m3. When mud density is a consistent 1350 kg/m3, plan to dummy trip to 1650 m KB, followed by open hole logs. While circulating in the past 24 hours, recovered small to moderate amount of formation fines and thumbnail size cuttings. Hole seems to have stopped unloading large formation cuttings.
ESTIMATED COSTS: DAILY $ 40 845 CUMULATIVE $ 2 918 945 SUPERVISOR M. Kramps/D. Gaboury
Page No. 90
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp -7 °C Road Well GENOIL et al ST. LEONARD NO. 1
Fair
Date 97 02 07
Rig
Ralex, 1
Day No. 73
Depth 2698 m Progress 0 m Hole Size Mud: Wt 1350 kg/m' Visc. 200 s/L W.L. 5.0 Methyl Blue 81.0 Solids 15.0 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1 (RR) m ° 1 RU & RD Size - mm 311 m ° 2 Drill Actual Type FD6HC m 3 Reaming 6.50
S.N. LF8663 m ° 4 Coring Jets - mm Open m ° 5 Cond. Hole 2.00 Wt. - daN m 6 Trips 9.75 r/min m 7 Lubr. Rig
Out - m Clean PUMP 8 Repair Rig In - m Out Liner Length 9 Cut Off D.L. Metres Trip No. mm mm SPM 10 Dev. Survey
Hours 1 140 229 100 11 Wireline Log 5.75 Condition 2 140 229 100 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 389 sxs Barite PP Output AV Power 15 Test BOP
1 sx Drispac kPa Umin m/min kW 16 DST
30 sxs Gel 15 000 2 100 39/32 525 17 Plug Back 1 sx Caustic 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated to condition mud and hole while setting at 2498 m KB. Dummy tripped to 1700 m KB. Hole pulled tight from 2390 m to 2288 m KB. Pumped out one single at 2114 m KB. Tripped back to bottom, reamed and washed tight hole from 2070 m to 2122 m KB, 2213 m to 2263 m KB and from 2391 m to 2498 m KB. Circulated to condition mud and hole. Tripped out bit #1 (RR) to log. Pulled tight at 2315 m to 2305 m KB, 2260 m to 2245 m KB, 2190 m to 2185 m KB, 2050 m to 2040 m KB and 1699 m to 1651 m KB. Was able to pull through at tight spots. Ran back through without taking weight. Tight spots were only noticeable pulling up. Finished tripping out. Hole appears to be in good condition. Conducted safety meeting. Rigged in Schlumberger. Made up and ran logging tools. Tagged effective total depth at 2477.8 m KB (20.2 m fill). Ran phasor-induction log from 2472.0 m to 569.7 m KB and BHCSL from 2460.0 m to 569.7 m KB. Rigged out Schlumberger. Preparing to run bit #1 RR at report time. Plan to conduct cleanout trip and set ±75.0 m cement plug on top of fish.
ESTIMATED COSTS: DAILY $ 28 699 CUMULATIVE $ 2 947 644 SUPERVISOR M. Kramps/D. Gaboury
Page No. 91
311 mm Status
Tripping cm3 pH 9.0 PV 85 mPa.s YP
35 Pa Gels 18/36 Pa
2.0 mm Salt 400 mg/L Cal. 160 mg/L
Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m'
1
Good Date 97 02 08 Weather Clear Temp -23 °C Road
ESTIMATED COSTS: DAILY $ 52 363 CUMULATIVE $ 3 000 007 SUPERVISOR M. Kramps/D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 74 Depth 2698 m Progress 0 m Hole Size 311 mm Status Tripping Mud: Wt 1350 kg/m' Visc. 240 s/L W.L. 5.0 cm' pH 9.0 PV 80 mPa.s YP 40 Pa Gels 14/28 Pa Methyl Blue 82.0 Solids 15.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 200 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS No. 1 (RR)
SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9 10
RU & RD Size - mm 311 m Drill Actual Type FD6HC m Reaming 1.50 S.N. LF8663 m Coring Jets - mm Open m ° Cond. Hole 9.50 Wt. - daN m Trips 11.75 r/min m Lubr. Rig 0.25 Out - m Clean PUMP
Liner Length No. mm mm SPM
Repair Rig In - m Out Cut Off D.L. 1.00 Metres Trip Dev. Survey Hours 1 140 229 98 11 Wireline Log Condition 2 140 229 98 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
32 sxs Bicarb 1 sx Kelzan PP Output AV Power 15 Test BOP 185 sxs Barite kPa Umin m/min kW 16 DST
90 sxs Gel 16 500 2 100 39/32 578 17 Plug Back 1 sx Caustic 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Ran bit #1 (RR) and drill collars (changed out hydraulic jars). Finished tripping in. Broke circulation and cleaned 20 m fill to top of fish. Circulated to condition mud and hole. Pretreated drilling fluid for cement contamination. Circulated. Tripped out bit #1 (RR), hole was tight at: 2270 m, 2242 m, 2215 m, 2099 m, 2071 m, 2042 m and 1957 m KB. Pulled 10 to 25 000 daN over string weight when pulling, yet tight spots would not take weight when moving drill string downward. Did not have to pick up kelly to circulate any of the tight spots. NOTE: BHCSL caliper maximum reach was 390 mm hole diameter, log showed hole size was in excess of 390 mm from first reading to 1700 m KB. Tripped out from 1957 m KB without any further tight hole. Ran 114 mm OD drillpipe open ended to surface casing shoe. Slipped and cut line. Tripping in with open ended drillpipe at report time to run plug #3.
Page No. 92
i
BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -30 ̀C Road Good Date 97 02 09 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex 1 Day No. 75 Depth 2698 m Progress 0 m Hole Size 311 mm Status WOC Mud: Wt 1350 kg/m3 Visc. 200 s/L W.L. 5.0 cm3 pH 9.0 PV 65 mPa.s YP 30 Pa Gels 12/24 Pa Methyl Blue 80.0 Solids 0.15 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 160 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m 1 RU&RD Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole 16.00 Wt. - daN m 6 Trips 6.00 r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 229 84 11 Wireline Log Condition 2 140 229 84 12 Run Csg/Cmt 1.50
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
10 sxs Gel PP Output AV Power 15 Test BOP kPa I./min m/min kW 16 DST
15 500 1 800 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Safety Mtg 0.50 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in with open ended drillpipe to 2460 m KB. Broke circulation and washed to top of fish, no fill. Circulated two bottoms up to condition mud and hole and lower BHT. Drillpipe landed at 2394 m KB. Held safety meeting. Rigged in cementers. Pressure tested surface lines to 15 000 kPa for 3 minutes, okay. Displaced 3.0 m' + 100 s/L bentonite/water spacer fluid. NOTE: spacer fluid was given 5 hours to hydrate. Ran plug #3, 2494 m to 2393 m KB with 35.0 tonnes (22.0 m3) Class "G" + 0.1% D81 + 1.0% D65 at 2100 kg/m' slurry density. Displaced with 0.2 m' fresh water + 16.3 m' drilling mud. Plug down at 17:35, 97 02 08. Pulled 12 stands wet drillpipe to 2160 m KB. Broke circulation and circulated bottoms up. Recovered ±1.0 m' of what appeared to be highly clobbered preflush fluid contaminated with cement, bypassed to sump. Circulated to condition mud and hole. Tripping out at report time while waiting on cement. Plan to stand cement a minimum of 36 hours before polishing plug.
ESTIMATED COSTS: DAILY $ 73 564 CUMULATIVE $ 3 073 571 SUPERVISOR M. Kramps/D. Gaboury
Page No. 93
1
15.0 % Filter Cake 2.0 mm Salt 400
ESTIMATED COSTS: DAILY $ 22 074 CUMULATIVE $ 3 095 645 SUPERVISOR M. Kramps/D. Gaboury
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -10 °C Road Good Date 97 02 10 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 76 Depth 2698 m Progress 0 m Hole Size 311 mm Status Tripping Mud: Wt 1320 kg/rn3 Visc. 190 s/L W.L. 5.0 Methyl Blue 77.0 Solids Desilter Underflow Wt. kg/m3 Rate Desilter Overflow Wt. kg/m3 Rate Centrifuge Underflow Wt. kg/m3
cm' pH 9.0 PV 8.0 mPa.s YP 35 Pa Gels 12/24 Pa mg/L Cal. 120 mg/L
Umin Desander Underflow Wt. kg/m3 Rate Umin Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Overflow Wt.. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 1 (RR) m 1 RU & RD Size - mm 311 m 2 Drill Actual Type FDGHC m 3 Reaming S.N. LH8663 m 4 Coring Jets - mm Open m 5 Cond. Hole 6.50 Wt. - daN m 6 Trips 16.25 r/min m 7 Lubr. Rig 0.25 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 229 125 11 Wireline Log Condition 2 140 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 152 sxs Barite PP Output AV Power 15 Test BOP
5 sxs Bicarb kPa Umin m/min kW 16 DST 10 sxs Sawdust 6 000 1 300 20 130 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Clean Floor 1.00 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping out open ended drillpipe. Laid down 19 joints of drillpipe with cement sheath inside. Cleaned off cement from outside of drillpipe. Cleaned rig floor. Reran drillpipe open ended to 2160 m KB. Circulated to condition mud and hole while waiting on cement. Tripped out open ended drillpipe. Laid down 17 joints drillpipe with cement sheath on inside of drillpipe. Ran bit #1 (RR). Tripping in at report time to polish cement plug, strap drill string on trip in.
NOTE: Pump 2 down the past 24 hours for repairs.
Page No. 94
1
BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Clear Temp -20 °C Road Good Date 97 02 11
Well
GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1 Day No. 77
Depth 2340 m Progress 32 m Hole Size 311 mm Status Conditioning mud Mud: Wt 1320 kg/m' Visc. 200 s/L W.L. 5.0 cm3 pH 9.0 PV 80 mPa.s YP 35 Pa Gels 12/24 Pa
Methyl Blue 77.0 Solids 15.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 120 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
No. 1 (RR) BITS SURVEYS
m
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9 10
RU & RD Size - mm 311 m Drill Actual 5.25
Type FDGHC m Reaming
S.N. LH8663 m Coring
Jets - mm Open m Cond. Hole 14.75
Wt. - daN m Trips 2.50
r/min m ° Lubr. Rig 0.25
Out - m Clean PUMP
Liner Length No. mm mm SPM
Repair Rig 1.25
In - m Out Cut Off D.L.
Metres Trip Dev. Survey
Hours 1 140 229 100 11 Wireline Log
Condition 2 140 229 100 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
20 sxs Barite PP Output AV Power 15 Test BOP
11 sxs Bicarb kPa Umin m/min kW 16 DST 14 500 2 100 39/32 508 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in bit #1 (RR). Worked on mud pump 2, faulty valves and air contamination. Broke circulation, washed and cleaned to 2254 m KB. Circulated bottoms up. Washed and cleaned to 2254 m KB. Circulated and washed to 2308 m KB, tagged top of plug 3 (186 m plug). Drilled plug to 2314 m KB. Circulated bottoms up to confirm cement. Mud was not contaminated. Drilled cement to 2323 m KB. Circulated to condition drilling fluid. Drilled cement to 2340 m KB. Circulating at report time to treat out severe cernent-contaminated mud.
NOTE: Plug 3: 2494 m to 2308 m KB, 186 m length, average hole size: 388 mm
ESTIMATED COSTS: DAILY $
21 186 CUMULATIVE $ 3 116 831 SUPERVISOR M. Kramps/D. Gaboury
Page No. 95
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -12 °C Road Good Date 97 02 12 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 78 Depth 2340 m Progress 2342 m Hole Size 311 mm Status Circulating Mud: Wt 1230 kg/m3 Visc. 135 s/L W.L. 6.0 cm' pH 10.5 PV 70 mPa.s YP 20 Pa Gels 2/12 Pa Methyl Blue 66.0 Solids 13.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1 (RR) m 1 RU & RD Size - mm 311 m 2 Drill Actual 0.25
Type FDGHC m 3 Reaming S.N. LH8663 m 4 Coring Jets - mm Open m 5 Cond. Hole 23.50
Wt. - daN m ° 6 Trips r/min m ° 7 Lubr. Rig 0.25 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres 34 No. mm mm SPM 10 Dev. Survey Hours 5.25 1 140 229 145 11 Wireline Log Condition 2 140 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
36 sxs Gel PP Output AV Power 15 Test BOP
25 sxs Bicarb kPa Umin m/min kW 16 DST 20 sxs Lignite 7 500 1 525 23 190 17 Plug Back 10 sxs Sawdust 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled cement plug from 2340 m to 2342 m KB. Circulated while treating cement contaminated drilling fluid. At 14:00, drilling fluid flipped from +300 s/L to 60 - 65 s/L. Continued to circulate to condition drilling fluid and build volume. Additionally, cleaned out solids from pump 2 suction lines and tank. Circulating at report time.
Motor exhausts repaired 97 02 09.
ESTIMATED COSTS: DAILY $ 22 081 CUMULATIVE $ 3 138 412 SUPERVISOR M. Kramps/D. Gaboury
Page No. 96
J
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp -20 °C Road Poor Date 97 02 13 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 79 Depth 2342 m Progress 0 m Hole Size 311 mm Status Circulating Mud: Wt 1230 kg/in' Vise. 170 s/L W.L. 6.0 cm' pH 10.5 PV 50 mPa.s YP 20 Pa Gels 5/19 Pa Methyl Blue 70.0 Solids 14.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 80 mg/L
Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1 (RR) m 1 RU & RD
Size - mm 311 m 2 Drill Actual
Type FDGHC m 3 Reaming
S.N. LH8663 m 4 Coring
Jets - mm Open m 5 Cond. Hole 16.25
Wt. - daN m 6 Trips 7.00
r/min m 7 Lubr. Rig 0.75
Out - m PUMP 8 Repair Rig
In - m Liner Length 9 Cut Off D.L.
Metres 34 No. mm mm SPM 10 Dev. Survey
Hours 5.25 1 140 229 100 11 Wireline Log Condition 2 140 229 100 12 Run Csg/Cmt
13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 80 sxs Gel 1 sx Drispac PP Output AV Power 15 Test BOP
8 sxs Bicarb kPa L/min m/min kW 16 DST 17 sxs Lignite 7 500 1 525 23 190 17 Plug Back
1031 sxs Barite 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished cleaning out mud tanks. Continued to circulate while building volume. Mixed new drilling mud until 16:00. Pump 2 continued to cavitate (found 1/. turn valve on mud tank to be in wrong position). Pump 2 working fine. Circulated to condition mud and hole. Made dummy trip to surface casing shoe. Three minor tight spots on trip out - kelly not required. Ran into 1325 m KB, drilling fluid clobbered badly. Circulated to condition drilling fluid. Finished tripping in to 2342 m KB, 2 m fill. Circulating at report time to condition mud and hole. Plan to conduct dummy trip to 1500 m, circulate and trip out to run intermediate casing.
ESTIMATED COSTS: DAILY $ 35 588 CUMULATIVE $ 3 174 500 SUPERVISOR M. Kramps/D. Gaboury
Page No. 97
f
Date 97 02 14 Weather Clear Temp -30 °C Road Fair Day No. 80 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
ESTIMATED COSTS: DAILY $ 27 330 CUMULATIVE $ 3 201 830 SUPERVISOR M. Kramps/D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
1
Depth 2342 m Progress 0 m Hole Size 311 mm Status Mud: Wt 1250 kg/m3 Visc. 60 s/L W.L. 6.0 cm3 pH 9.5 PV 42 Methyl Blue 50.0 Solids 12.0 % Filter Cake 2.0 mm Salt Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt.
kg/m' Rate Umin kg/m3 Rate Umin kg/m3
mPa.s YP 7 Pa Gels 3/6 Pa 400 mg/L Cal. 80 mg/L
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 1 (RR) m ° 1 RU & RD Size - mm 311 m 2 Drill Actual
Type FDGHC m 3 Reaming
S.N. LH8663 m 4 Coring
Jets - mm Open m 5 Cond. Hole 15.25
Wt. - daN m 6 Trips 8.25
r/min m 7 Lubr. Rig 0.50
Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L.
Metres 34 No. mm mm SPM 10 Dev. Survey
Hours 5.25 1 140 229 100 11 Wireline Log Condition 2 140 229 100 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
35 sxs Gel 3 sxs Kelzan PP Output AV Power 15 Test BOP
3 sxs Bicarb kPa Umin m/min kW 16 DST
26 sxs Lignite 12 500 2 105 39/32 578 17 Plug Back
105 sxs Barite 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Made dummy trip to 1450 m KB, no fill. Broke circulation, returning drilling mud was clobbered (very high gel strength). Circulated to condition mud and hole. Determined mud was dehydrated, added thinners and water. Fluid properties dropped dramatically after adding thinners and water. Circulated to condition mud and hole. Started dummy trip, called off after tripping to 2075 m KB, no fill after running in. NOTE: Hole condition was good on both dummy trips, worked three tight spots -kelly not required. Circulated and mixed mud in an attempt to increase viscosity. Fluid properties improving. Dummy tripping to 1450 m KB at report time. If drilling fluid properties remain stable, plan to trip out and run intermediate casing.
NOTE: Tight spots on dummy trip: ±2218 m, ±2076 m and 1505 m KB. Required 10 000 daN to pull up and 0 daN down.
Page No. 98
Dummy tripping
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -5 °C Road Fair Date 97 02 15 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 81 Depth 2342 m Progress 0 m Hole Size 311 mm Status Running casing Mud: Wt 1250 kg/in' Visc. 90 s/L W.L. 6.0 cm3 pH 9.5 PV 55 mPa.s YP 15 Pa Gels 3/9 Pa Methyl Blue 60.0 Solids 12.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS
No. 1 (RR) m Size - mm 311 m Type FDGHC m S.N. LH8663 m Jets - mm Open m Wt. - daN m r/min m Out - m PUMP In - m Liner Length Metres 34 No. mm mm Hours 5.25 1 140 229 Condition 2 140 229
DRILLING MUD ADDITIVES USED: HYDRAULIC 12 sxs Gel PP Output AV 30 sxs Barite kPa Umin m/min
1 sx Kelzan 500 1 100 14
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4
RU & RD Drill Actual Reaming Coring
5 Cond. Hole 2.75 6 Trips 8.50 7 Lubr. Rig 0.25 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 100 11 Wireline Log
12 Run Csg/Cmt 8.25 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
9 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Safety Mtg 0.25 24 Jack Rig 3.50 25 Pump Pill 0.50
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished dummy trip, no fill. Circulated to condition mud and hole and monitored drilling fluid properties. Drilling fluid in good condition. Pumped pill, tripped out laying down drill string. Worked tight hole at 2299 m, 2152 m and 1497 m KB. Required up to 25 000 daN over string weight to pull through initially, 0 daN string weight on downward movement. Worked tight spots until normal string weight was achieved up and down. Finished laying down drill string. Jacked and levelled drilling rig. Rigged to run casing. Held safety meeting. Tallied, drifted, picked up and ran 244.5 mm OD intermediate casing to ±569 m KB. Circulated bottoms up. Continued running casing, approximately ±90 m of casing run at report time.
ESTIMATED COSTS: DAILY $ 21 324 CUMULATIVE $ 3 223 154 SUPERVISOR M. Kramps/D. Gaboury
Page No. 99
1
BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -20 °C Road Fair Date 97 02 16
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex 1 Day No. 82
Depth 2342 m Progress 0 m Hole Size 311 mm Status Circulating Mud: Wt 1250 kg/rn' Visc. 120 s/L W.L. 6.0 cm3 pH 9.5 PV 55 mPa.s YP 15 Pa Gels 3/9 Pa
Methyl Blue 60.0 Solids 12.0 % Filter Cake 2.0 mm Salt 400 mg/L Cal. 80 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. m
Size - mm m
Type m S.N. m
Jets - mm m Wt. - daN m r/min m Out - m PUMP In - m Liner Length
Metres No. mm mm Hours 1 140 229 Condition 2 140 229
DRILLING MUD ADDITIVES USED: HYDRAULIC PP Output AV kPa Umin m/min 2500 2400 32
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4
RU & RD Drill Actual Reaming Coring
5 Cond. Hole 9.00 6 Trips 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 110 11 Wireline Log 110 12 Run Csg/Cmt 14.75
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
100 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Safety Mtg 0.25 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Ran 244.5 mm OD casing to 997 m KB. Circulated bottoms up. Ran casing to 1613 m KB. Circulated to condition mud and hole. Ran casing to 1703 m KB, rejected two joints. Difficult to break out joints as coupling appeared out of round. Ran casing to 1834 m KB. Circulated casing while working on pumps to establish required circulation rate. Continued to run casing. Tagged total depth at 2342 m KB, no fill. Circulated with pump 2 - changed liner in pump 1. Put both pumps on line, circulating at report time to condition mud and hole. Held safety meeting.
Pick-up string weight: 180 000 daN Slack-off string weight: 140 000 dan
ESTIMATED COSTS: DAILY $ 20 836 CUMULATIVE $ 3 243 990 SUPERVISOR M. Kramps/D. Gaboury
Page No. 100
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -35 °C Road Good Date 97 02 17 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 83 Depth 2342 m Progress 0 m Hole Size 216 mm Status WOC/head up Mud: Wt 1000 kg/m3 Visc. 28 s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m 1 RU & RD Size - mm m ° 2 Drill Actual Type m 3 Reaming S.N. m ° 4 Coring Jets - mm m 5 Cond. Hole 6.00 Wt. - daN m 6 Trips r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 229 110 11 Wireline Log Condition 2 140 229 110 12 Run Csg/Cmt 9.00
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 8.00
30 sxs Sawdust PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST 2500 2400 32 100 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Set Slips 1.00 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated casing to condition mud. Reduced viscosity to 60 s/L. Ran 244.5 mm OD (2346.91 m) 79.6 kg/m API GDE N80 R3 8RD LT&C new casing. Landed at 2342.0 m KB. Rig air supply compressor motor failed. Utilized cementers air supply while changing out motor. Held safety meeting. Rigged in cementers. Pressure tested surface equipment to 20 000 kPa (changed seal in cementing head). Spearheaded with 4.0 m' fresh water + 6.0 m3 CW-100 spacer fluid. Cemented stage 1 using: Lead: 59.0 tonnes (51.5 m3) Class "G" + 2.0% D-20 + 0.5% D-65 + 3 Utonnes D81 at 1795 kg/m3 slurry density, Tail: 49.0 tonnes (36.9 m3) Class "G" + 0.75% D-65 + 0.3% D-160 + 5.0 Utonnes D81 at 1900 kg/m3 slurry density. Bumped plug with 24 000 kPa, floats held okay. Plug down at 16:44, 97 02 16. Had 3.0 m' cement returns to surface. Either caliper log is in error or cement channelled. Dropped dart and opened stage collar, broke circulation. Cemented stage 2 with 28.0 tonnes (24.5 m3) Class "G" + 2.0% D-20 + 0.5% D-65 + 3.0 Utonnes D81. Bumped plug and closed stage tool with 15 000 kPa (no backflow). Plug down at 19:58, 97 02 16. Approximately 2.0 m' cement returns. Rigged out cementers. Picked up BOP stack and set casing in slips with full string weight (180 000 daN). Cut off and dressed casing stub. Heading up at report time.
ESTIMATED COSTS: DAILY $ 482 032 CUMULATIVE $ 3 726 022 SUPERVISOR M. Kramps/D. Gaboury
Page No. 101
J
Cil BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp -10 'C Road Good
Date 97 02 18
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
Day No. 84
Depth 2342 m Progress 0 m Hole Size 216 mm Status Heading up Mud: Wt kg/rn3 Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION
BITS
DRILLING MUD ADDITIVES USED:
SURVEYS Code/Operation Hours m 1 RU & RD m 2 Drill Actual m 3 Reaming m 4 Coring m 5 Cond. Hole m 6 Trips m 7 Lubr. Rig
PUMP 8 Repair Rig 3.00
Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey
1 140 229 11 Wireline Log
2 140 229 12 Run Csg/Cmt 13 Wait on Cmt
HYDRAULIC 14 Nipple Up 21.00
No. Size - mm Type S.N. Jets - mm Wt. - daN r/min Out - m In - m Metres Hours Condition
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Correction to day no. 83: 21 Handle Tool 244.5 mm OD intermediate casing was landed at 2340.5 m KB, not at 2342.0 m KB as reported on 22 Clean to Btm the daily drilling report, day no. 83. 23
24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Removed drilling spacer spool and installed casing spool with secondary seals. Reinstalled BOP stack without cutting or welding kill lines or well control lines. Installed rotating head and mud/blouie lines. Heading up at report time. Plan to begin pressure testing and tripping in today.
NOTE: Repairing both mud pumps and change pumps. Plan to modify mud handling system. Will not drill out until fluid circulating system is fully operational.
Three hours downtime to repair air compressor motor failure on February 16, 1997.
ESTIMATED COSTS: DAILY $
28 538 CUMULATIVE $ 3 754 560 SUPERVISOR M. Kramps/D. Gaboury
Page No. 102
ESTIMATED COSTS: DAILY $ 10 511 CUMULATIVE $ 3 765 071 SUPERVISOR M. Kramps/D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp 5 °C Road Good Date 97 02 19 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 85 Depth 2342 m Progress 0 m Hole Size 216 mm Status Pressure testing Mud: Wt kg/rn3 Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate L/min
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m 1 RU&RD Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole Wt. - daN m 6 Trips r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig 16.00 In - m Liner Length 9 Cut Off D.L.
Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 229 11 Wireline Log Condition 2 140 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 8.00
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished installing well control equipment. Repaired and worked on both mud pumps and charge pumps. Changed out drilling line. Dumped settling tanks and cleaned same. Transferred mud from suction tanks to settling tanks and cleaned suction tanks. Repaired suction line valves (found 1.0 m of solids in tanks). Set test plug. Pressure tested annular preventer to 1 400 kPa low and 15 000 kPa high for 10 minutes each. Pressure testing well control equipment at report time.
NOTE: 19.00 hours of rig time will be classified as downtime when running casing and heading up because of rig repairs (3.00 hours on 97 02 17 and 16.00 hours 97 02 18).
Page No. 103
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -15 'C Road Good Date 97 02 20 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 86 Depth 2342 m Progress 0 m Hole Size 216 mm Status Tripping Mud: Wt 1000 kg/m3 Visc. 28 s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 5 m 1 RU&RD Size - mm 216 m 2 Drill Actual 1.00 Type HP13G m 3 Reaming S.N. MM6056 m 4 Coring Jets - mm 3 x 15.9 m 5 Cond. Hole Wt. - daN 2 - 4 000 m 6 Trips 13.00 r/min 50 m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m 2342 Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 159 229 11 Wireline Log Condition 2 159 229 145 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP 10.00 kPa Umin m/min kW 16 DST 3000 1600 118/62 80 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Pressure tested BOP stack, kill lines, well control lines and manifold to 1 400 kPa and 35 000 kPa high for 10 minutes each. Had difficulty pulling test plug because of compacted solids on top of the plug. Pressure tested casing, kelly, safety valves and inside BOPs to 1 400 kPa low and 27 000 kPa high for 10 minutes each. Ran jet sub and jetted BOP stack to remove solids. Ran bit 5. Picked up and ran drill collars, HWDP and drillpipe. Tagged stage collar at 626.96 m KB. Broke circulation and drilled out stage collar. Repeatedly reamed stage collar. Continued to pick up and run 114 mm drillpipe. Bit is at 1500 m KB at report time.
ESTIMATED COSTS: DAILY $ 33 129 CUMULATIVE $ 3 778 200 SUPERVISOR M. Kramps
Page No. 104
I
ESTIMATED COSTS: DAILY $ 35 680 CUMULATIVE $ 3 823 812* SUPERVISOR M. Kramps
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -5 °C Road Good Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
Date 97 02 21 Day No. 87
Depth 2342 m Progress 0 m Hole Size 216 mm Status Dry hole Mud: Wt Air kg/rn' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
mg/L Cal. mg/L kg/m' Rate Umin
kg/m' Rate Umin kg/m'
mm Salt Umin Desander Underflow Wt. Umin Desander Overflow Wt.
Centrifuge Overflow Wt.
No. 5 BITS SURVEYS
m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
Size - mm 216 m 2 Drill Actual 4.50 Type HP13G m 3 Reaming S.N. MM6056 m 4 Coring Jets - mm 3 x 15.9 m 5 Cond. Hole 0.75 Wt. - daN 2 - 4 000 m 6 Trips 7.50 r/min 50 - 70 m 7 Lubr. Rig Out - m In PUMP
Liner Length No. mm mm SPM
8 Repair Rig In - m 2342 9 Cut Off D.L. Metres 10 Dev. Survey Hours 1 159 229 11 Wireline Log Condition 2 159 229 145 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST 5000 1600 118 133 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Leak-off 1.00 24 Test Casing 1.25 25 Blow Casing 9.00
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Picked up and ran 114 mm OD drillpipe. Tagged float collar at 2326 m KB. Broke circulation and drilled out float collar to 2330 m KB. Circulated bottoms up. Pressure tested casing to 1 400 kPa low and 27 000 kPa high, okay. Drilled out cement and drilled to 2342 m KB. Circulated bottoms up. Ran formation integrity test, determined leak-off gradient: 19.6 kPa/m. Bled off pressure. Rigged in air equipment. Unloaded water and blow casing to dry at report time.
Air circulation Rate: 95 m'/min at 2070 kPa, temperature: 80°C
*Adjusted cumulative cost by $10 068. Page No. 105
ESTIMATED COSTS: DAILY $ 40 960 CUMULATIVE $ 3 874 840 SUPERVISOR M. Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
Weather Cloudy Wind NW at 25 km/h Temp -5 °C Road Good Date 97 02 22 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 88 Depth 2 441 m Progress 99 m Hole Size 216 mm Status Blowing hole dry Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 5 2 352 m 1 ° 1 RU & RD Size - mm 216 2 361 m 1/2 2 Drill Actual 17.00 Type HP13G 2 371 m 1/4 ° 3 Reaming S.N. MM6056 2 400 m 1 1/8 ° 4 Coring Jets - mm 3 x 15.9 2 438 m 1/8 5 Cond. Hole 3.50 Wt. - daN 2 - 10 m ° 6 Trips r/min 50 - 70 m 7 Lubr. Rig 0.25 Out - m PUMP 8 Repair Rig In - m 2 342 Liner Length 9 Cut Off D.L. Metres 99 No. mm mm SPM 10 Dev. Survey 3.25 Hours 19 1 159 229 11 Wireline Log Condition INC 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continue to blow hole dry for 15 minutes every 2 m intervals while drilling from 2 342 m -2 355 m. Survey-misrun, blow hole, survey, drill 2 355 m - 2 365 m, survey. Could not get to bottom after survey, hole not drying up as mud began coming in from fractures in formation. Commence soap injection at 12 litres/minute and blow hole clean and survey. Drill from 2 365 m - 2 367 m, 95% formation returns. Blow hole clean and survey. Drill from 2 367 m - 2 374 m, blow hole and survey. Drill from 2 374 m - 2 403 m, 95% formation returns. Survey at 2 400 m. Estimated departure from original hole = 0.99 m. Mud returns declined to almost nil, drill from 2 403 m - 2 441 m. Pull up to recover string float. Run in and survey. Mud returns increased, appears to also be contaminated cement. Returns now 50% formation. Rig service, blow hole. Discontinue soap at 04:00 hrs. Hole dry at 06:00 hrs. Continue to blow hole. Held safety meeting.
Air flow at 95 m'/minute, temperature 80 °C Air Pressure 2 760 kPa Accumulator draw down: Start 21 000 kPa - Finish 10 200 kPa Recharge 1 minute 55 seconds.
DAILY DRILLING REPORT
Page No. 106
J
Date 97 02 23 Weather Cloudy Calm Temp -15 °C Road Good Day No. 89 Rig Ralex, 1 Well GENOIL et al ST. LEONARD NO. 1
Desander Underflow Wt. Desander Overflow Wt. Centrifuge Overflow Wt.
mPa.s YP Pa Gels Pa mg/L Cal. mg/L
kg/m3 Rate Umin kg/m3 Rate Umin
kg/m3
ESTIMATED COSTS: DAILY $ 40 894 CUMULATIVE $ 3 915 734 SUPERVISOR M. Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Depth 2 450 m Progress Mud: Wt Air kg/m3 Visc. Methyl Blue Solids Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
9 m Hole Size s/L W.L. % Filter Cake
kg/m3 Rate kg/m3 Rate
kg/m3
216 mm Status Tripping cm3 pH PV
mm Salt Umin Umin
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 5 6* 2 438 m 1 1 RU & RD Size - mm 216 216 2 447 m 3/4 2 Drill Actual 0.25 Type HP13G HP43A m 3 Reaming S.N. MM6056 2 348 m 3/4 4 Coring Jets - mm 3 x 15.9 3 x 15.9 2 376 m 1/2 5 Cond. Hole 8.75 Wt. - daN 2 - 12 m 6 Trips 13.00 r/min 35 - 70 m 7 Lubr. Rig Out - m 2 450 2 450 PUMP 8 Repair Rig In - m 2342 Liner Length 9 Cut Off D.L. Metres 108 No. mm mm SPM 10 Dev. Survey 2.00 Hours 10.5 1 159 229 11 Wireline Log Condition 2-2-1 INC 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Blow hole dry. Re-survey at 2 438 m 1° - drilling from 2 441 m to 2 450 m. Mud at surface after drilling 0.50 m. Iniected soap at 12 litres/minute and unload hole 85% formation returns. Attempted to blow hole dry, no success, 1/2 inch stream mud returns. Trip out of hole. No hole problems. Pick up kick off assembly and RIH and survey at 2 348 m and 2 376 m. RIH could not pass 2 400 m. Pick up kelly. Apply air up to 2 070 kPa. Could not get returns to surface. Suspect motor failure. Continue to pump air. Returns at surface, gas blow 2.5 minutes. Attemp to drill ahead. No progress. POOH to change motor. Function BOP's. Check motor shut offs. New motors on location at 23:00 hrs.
Air flow at 62 - 95 m3/minute, temperature 80 °C Air Pressure 2 070 kPa - 2 760 kPa * Broken Teeth 2 cones
Page No. 107
ESTIMATED COSTS: DAILY $ 35 035 CUMULATIVE $ 3 950 769 SUPERVISOR M. Kramps
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Clear Calm Temp -14 °C Road Good Date 97 02 24 Weather GENOIL et al ST. LEONARD NO. 1
Blow Hole For Survey m Progress kg/rn3 Visc. cm' pH
Ralex, 1 Day No. 90 Well Depth 2 505 Mud: Wt Air Methyl Blue Solids Desilter Underflow Wt.
PV mm Salt
Umin Desander Underflow Wt.
mPa.s YP Pa Gels Pa mg/L Cal. mg/L kg/m' Rate Umin
kg/m' Rate Umin kg/m'
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt.
Rig 55 m Hole Size 216 mm Status
s/L W.L. % Filter Cake kg/m' Rate
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 6RR 2 405 m 1 1 RU & RD Size - mm 216 2 436 m 1/2 2 Drill Actual 10.00 Type HP43A 2 461 m 2.5 3 Reaming S.N. JD1708 2 489 m 4.5 4 Coring Jets - mm 3 x 15.9 m 5 Cond. Hole 2.75 Wt. - daN 1 - 10 m 6 Trips 8.00 r/min 40 m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m 2450 Liner Length 9 Cut Off D.L. Metres 55 No. mm mm SPM 10 Dev. Survey 3.25 Hours 9 1 159 229 11 Wireline Log Condition INC 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Mist drilling with 50 m'/minute air and 12 litres/minute soap at a velocity of 1 646 m/minute. 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) POOH change out motor for Black Max air drilling bent housing motor with a 1.50 degree setting. RIH to 2 374 m. Install rotating head
seal assembly. Air blow hole clean while picking up singles to a depth of 2 424 m. Blow hole, Run directional survey. Blow hole clean while picking up singles to total depth of 2 450 m. Blow hole. Run directional survey. Orientate motor to a setting of 360 degree azimuth. Work pipe while air blowing hole clean. Run survey to check orientation of air drilling bent housing motor. Air drilled from 2 450 m to 2 471 m in a slide mode with a directional heading of 90 degrees azimuth. Rotate from 2 471 m to 2 476 m. Blow hole. Retrieve string float and survey. Blow hole clean 2.5 m of FRC. Rotate and drill from 2 476 m - 2 504 m. Blow hole clean.
Air flow at 50 m'/minute, temperature 80 °C Air Pressure 2 160 kPa
Page No. 108
1
CrISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Wind West 5 km/hr Temp -25 °C Road Good Date 97 02 25
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 91 Depth 2 549 m Progress 44 m Hole Size 216 mm Status Drilling Mud: Wt Air kg/m3 Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Vit. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 6RR 7 2 489 m 4.65 1 RU & RD Size - mm 216 216 2 499 m 4.35 2 Drill Actual 3.75 Type HP43A HP51H 2 526 m 3.20 3 Reaming 1.50 S.N. JD1708 LH9671 m 4 Coring Jets - mm 3 x 15.9 3 x 15.9 m 5 Cond. Hole 5.00 Wt. - daN 1 - 10 2 - 6 m 6 Trips 8.75 r/min 40 60 - 120 m 7 Lubr. Rig Out - m 2515 PUMP 8 Repair Rig In - m 2 450 2 515 Liner Length 9 Cut Off D.L. Metres 65 34 No. mm mm SPM 10 Dev. Survey 2.75 Hours 11.25 3.75 1 159 229 11 Wireline Log Condition 2-2-I INC 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Increased flow rate after drilling to 2 534 m from 50 m'/minute to 64 m3/minute for better hole cleaning. 21 Handle Tool Increased annular velocity from 1 900 m/minute to 2 400 m/minute. 22 Clean to Btm
23 24 Attempt to 25 blow hole 2.25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Retrieve string float. Survey. Blow hole clean, Drilled from 2 504 m to 2 514.89 m. Retrieve string float. Survey. Attempt to blow hole. No air returns. Pull to the shoe. Attempt to blow hole. No air returns. Pull 15 stands. Attempt to blow hole. No air returns. POOH. Bit plugged. Lay down air motor. Pick up new bit and RIH with rotary assembly to the shoe at 2 340.5 m. Blow hole. No mud in returns.
RIH to 2 474 m. Blow hole and precautionary ream from 2 474 m to 2 515 m. Drilled from 2 515 m to 2 534 m. Retrieve string float. RIH. 12 m of fill. Blow hole clean and ream to bottom. Survey. Blow hole. Drilled from 2 534 m to 2 549 m at 06:00 hrs. Function BOP's Check motor shut offs.
Air flow at 64 m'/minute, temperature 80 °C Air Pressure 2 100 kPa Injecting 12 litres/minute of soap
ESTIMATED COSTS: DAILY $ 40 660 CUMULATIVE $ 3 991 429 SUPERVISOR M. Kramps
Page No. 109
1
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Wind West 20 km/hr Temp -5 °C Road Good Date 97 02 26 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 92 Depth 2 684 m Progress 135 m Hole Size 216 mm Status Working Tight Hole Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 7 2 576 m 1.50 1 RU & RD Size - mm 216 m 2 Drill Actual 8.25 Type HP51H m 3 Reaming S.N. LH9671 m 4 Coring Jets - mm 3 x 15.9 m 5 Cond. Hole 2.75 Wt. - daN 2 - 6 m 6 Trips r/min 60 - 120 m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m 2 515 Liner Length 9 Cut Off D.L. Metres 169 No. mm mm SPM 10 Dev. Survey 1.00 Hours 10.75 1 159 229 11 Wireline Log Condition INC 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional BHA = Bit + Bit Slik + 171 mm Monel + 3 x 171 mm DC+ Jars + 4 x 171 mm DC + HWDP. 21 Handle Tool Total length = 143.27 m. Lenght below jars = 38.34 m 22 Clean to Btm
23 24 Work tight 25 hole 12.00
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drill from 2 534 m to 2 591 m. Blow hole. Retrieve float. Blow hole. Survey. Drill form 2 591 m to 2 684 m. Observed increased air pressure of 1 100 kPa. Attempt to pull off bottom. Pull 25 000 daN over string cut. No upwards movement. Jars not working. Could rotate on bottom for 2 hours. Lost rotation. Cannot circulate with 7 000 kPa pressure, Air pressure does not bleed down. Working tight hole at 06:00 hrs. Circulating pressures were 2 100 kPa at 2 534 m at 64 m3/min and 2 200 kPa at 2 684 m at 64 m3/min.
Air flow at 64 m3/minute, temperature 80 °C Air Pressure 2 200 kPa Injecting 12 - 20 litres/minute of soap
ESTIMATED COSTS: DAILY $ 30 182 CUMULATIVE $ 4 021 611 SUPERVISOR M. Kramps
Page No. 110
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Calm Temp +2 'C Road Good Date 97 02 27 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex 1 Day No. 93 Depth 2 684 m Progress Nil m Hole Size 216 mm Status Running Free Point Mud: Wt Air kg/m3 Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m'
No. 7 BITS SURVEYS
m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
Size - mm 216 m 2 Drill Actual Type HP51H m 3 Reaming S.N. LH9671 m ° 4 Coring Jets - mm 3 x 15.9 m 5 Cond. Hole 0.50 Wt. - daN 2 - 6 m 6 Trips 12.75 r/min 60 - 120 m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m 2 515 Liner Length 9 Cut Off O.L. Metres 169 No. mm mm SPM 10 Dev. Survey Hours 10.75 1 159 229 11 Wireline Log Condition INC 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Uminm/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Work stuck pipe 5.75 24 Run free point 4.75 25 Back off drillpipe 0.25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Work tight hole. Make a mechanical back off at 1 958 m to enable recovery of string float. Back off successfully. Blow hole clean. No
formation and no mud at surface after 30 minutes. POOH no hole drag. Change out drill pipe. Total Grade "G" in the hole 1 363 m. Total new Grade "E" 591 m. Rest of the drill pipe in the hole used Grade "E". Screw back into fish and torque up same. Work string to 160 daN. Calculated safety margin at 80% 164 daN still could not set jars to work. Safety meeting held. Rig up and run free point. Back off point should be at 2 568 m leaving 116 m of fish in the hole. Running free point indicator at report time.
ESTIMATED COSTS: DAILY $ 26 606 CUMULATIVE $ 4 048 217 SUPERVISOR M. Kramps
Page No. 111
Good Date 97 02 28 Temp -5 °C Road Weather Cloudy Wind North West 15 km/hr
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 94 Depth 2 684 m Progress Nil m Hole Size
216 mm Status Running in the hole
Mud: Wt Air kg/rn' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake
mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m'
Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 7 m 1 RU & RD Size - mm 216 m 2 Drill Actual Type HP51H m 3 Reaming S.N. LH9671 m 4 Coring Jets - mm 3x15.9 m 5 Cond. Hole 1.75 Wt. - daN 2 - 6 m 6 Trips 6.50 r/min 60 - 120 m 7 Lubr. Rig Out - m Lost in hole PUMP 8 Repair Rig 0.25 In - m 2 515 Liner Length 9 Cut Off D.L. Metres 169 No. mm mm SPM 10 Dev. Survey Hours 10.75 1 159 229 11 Wireline Log Condition INC 2 159 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing 15.50
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Fish left in hole: 21 Handle Tool Bit + Bit Sub + 1 x 171 mm Monel DC + 3 x 171 mm DC + Jars + 4 x 171 mm DC + xo + 22 Clean to Btm 6 x 114 mm HWDP + 1 x114mmDP 23 Total Length = 152.52 m 24 Top of fish = 2531.48 m 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Run free point indicator. Established free point of 88% at 2 577.3 m. Pull out of the hole with free point indicator. Lay down tools. Safety meeting. Ensure radio silence. Block entrance to location. Rig up string shot. RIH. Attempt to correlate shot-back off point. CCL installed in the wrong mode. Pull out tools and change out CCL. RIH with tool. Position string shot at 2 577.3 m. Back off successful . POOH with wireline tools. Work pipe with 70 000 daN over string weight. Repair draworks. Lay down 1 single and pick up kelly and continue to work pipe and attempt to circulate. No success. Rig up loggers. Safety meeting held. Ensure radios silence. Block entrance to location. Rig up string shot. RIH with tool. Back off one single above HWDP at 2 531.48 m. POOH with tools. POOH with drill pipe. Slip and cut drilling line. Condition surface mud. RIH with open ended drill pipe.
ESTIMATED COSTS: DAILY $ 31 067 CUMULATIVE $ 4 079 284 SUPERVISOR M. Kramps
Page No. 112
J
C BISSETT RESOURCE CONSULTANTS LTD. `N DAILY DRILLING REPORT
Weather Clear Calm Temp Well GENOIL et al ST. LEONARD NO. 1 Depth 2 684 m Progress Nil m Hole Size 216 mm Status Circulate and condition mud Mud: Wt 1 070 kg/m' Visc. 70 s/L W.L. 7.0 cm3 pH 9.0 PV 37 mPa.s YP 11.5 Pa Gels 4/12 Pa Methyl Blue 40 Solids 10 % Filter Cake 2 mm Salt 40 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate Desilter Overflow Wt. kg/m3 Rate Centrifuge Underflow Wt. kg/m3
Umin Desander Underflow Wt. kg/m3 Rate Umin Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Overflow Wt. kg/m3
No. BITS SURVEYS
m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
Size - mm m0 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole 22.25 Wt. - daN m 6 Trips 1.75 r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 229 11 Wireline Log Condition 2 140 229 90 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
Gel 132 sxs PP Output AV Power 15 Test BOP Drispac 3 sxs kPa Umin m/min kW 16 DST Caustic 2 sxs 2 500 1 000 38 42 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) RIH with open ended drill pipe to 2 331 m. Condition surface volume. Displace surface volume. No returns. Continue to build more volume. Displace same, circulate and condition mud. Stage in hole with one stand at a time. Circulating bottoms up after each stand. Tag fish at 2 531 m. Circulate and condition mud and rig up cementing equipment. No fill on top of fish. Motor shut offs checked. Rig services new.
ESTIMATED COSTS: DAILY $ 63 893 CUMULATIVE $ 4 143 172 SUPERVISOR M. Kramps
Page No. 113
0 °C Road
Good
Date 97 03 01 Rig Ralex, 1 Day No. 95
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Raining Calm Temp +4
°C Road Good Date 97 03 02
Rig 216 mm Status
Ralex, 1 Day No. 96 Circulate hole clean
Well GENOIL et al ST. LEONARD NO. 1 Depth 2 340 m Progress Nil m Hole Size Mud: Wt 1 050 kg/m3 Visc. 55 s/L W.L. 7.0 Methyl Blue 38 Solids 0.05 % Filter Cake Desilter Underflow Wt. kg/m3 Rate Desilter Overflow Wt. kg/m3 Rate Centrifuge Underflow Wt. kg/m3
cm' pH 10.0 PV 2 mm Salt
30 mPa.s YP 10 Pa Gels 110 Pa 400 mg/L Cal. 80 mg/L
Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 8RR m 1 RU & RD Size - mm 216 m 2 Drill Actual
3 Reaming 4 Coring 5 Cond. Hole 5.00 6 Trips 11.50 7 Lubr. Rig 8 Repair Rig 0.50
Length 9 Cut Off D.L. mm SPM 10 Dev. Survey 229 11 Wireline Log
140 229 90 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST 7 000 1 000 38 116 17 Plug Back 1.50
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Plan on condition surface volume. Polish plug to 2 360 m. Displace to mud - trip out for sidetrack 21 Handle Tool assembly. 22 Clean to Btm
23 Displace to H2O 2.50 24 Drill cement 3.00 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulate and condition mud. Held safety meeting. Rig in Cementers. Pressure test lines to 17 MPa. Spear head with 3m3 water followed by 12.2m3 of oilwell class "G" + 6.0 litres/tonne of D81 + 1.0% D65. Displaced with 0.8m3 water and 13.5m3 of mud. Bleed off. Pull back to 2 246 m. Circulate 2m3 of good cement returns. POOH. Check for cement in tool joints and in drill pipe tube. Make up drilling assembly and RIH to 2 246 m. Displace hole to water. Work on pumps. Drill out cement from 2 246 m to 2 340 m. Circulate. Condition surface mud to 1 250 kg/m3. Add 2 kg/m3 of bicarbonate for cement contamination when sidetracking. Motor shut off checked. Safety meetings held.
Jets - mm 3 x 15.9 Wt. - daN 2-5 r/min 60 Out - m In - m 2246 Metres 94
Type HP43A
Condition INC
S.N. JD1708
Hours 3 No.
1 2
Liner mm 140
m m m m m PUMP
ESTIMATED COSTS: DAILY $ 59 122 CUMULATIVE $ 4 202 299 SUPERVISOR M. Kramps
Page No. 114
Date 97 03 03 Day No. 97
Weather Clear Calm Temp -12 'C Road Good Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Depth 2 360 m Progress 20 m Hole Size 216 mm Status Tripping
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Mud: Wt 1 070 kg/m' Visc. 100 s/L W.L. 8.0 cm3 pH 11.0 PV 20 mPa.s YP 15 Pa Gels 13/28 Pa Methyl Blue 66 Solids 0.05 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. kg/m' Rate L/min Desilter Overflow Wt. kg/m' Rate 1.../min Desander Overflow Wt. kg/m' Rate 1../min Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 8RR m 1 RUBRD Size - mm 216 m 2 Drill Actual Type HP43A m 3 Reaming S.N. JD1708 m 4 Coring Jets - mm 3 x 15.9 m 5 Cond. Hole Wt. - daN 2 - 5 m 6 Trips 0.75 r/min 60 m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig In - m 2246 Liner Length 9 Cut Off D.L. Metres 114 No. mm mm SPM 10 Dev. Survey Hours 4.75 1 140 229 11 Wireline Log Condition INC 2 140 229 90 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
Gell 65 sxs PP Output AV Power 15 Test BOP Barite 135 sxs kPa L/min m/min kW 16 DST Drispac 5 sxs 2 500 1 000 38 42 17 Plug Back Bicarb 12 sxs 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Mud in hole 37 vis. Density 1 015 kq/m'. 21 Handle Tool Build to 15° by 2 438 azimuth 30 - 8 m departure. 22 Clean to Btm Build to 15° by 2 500 azimuth 30 - 30 m departure. 23 Drill cement 1.75 Build to 15° by 2 630 azimuth 30 - 62 m departure. 24 WOC and
Build to 15° by 2 700 azimuth 30 - 81 m departure. 25 condition mud 21.00
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulate after drilling out cement to the shoe at 2 340 m. Condition surface volume. Drill out cement from 2 340 m to 2 360 m. Circulate. Pull back into shoe. Rig service. Circulate and condition surface volume. Rig service. Circulate and condition surface volume while waiting on side track tools. POOH to pick up side track tools. Plan to build to 15° or slightly higher in a North to Northeast direction. Expect side track tools on location 12:00 hrs, 97 03 03. Function tested BOPS. Motor shut offs checked. Held BOP drills.
ESTIMATED COSTS: DAILY $ 28 713 CUMULATIVE $ 4 231 012 SUPERVISOR M. Kramps / D. Gaboury
Page No. 115
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Well GENOIL et al ST. Depth 2 360 m Progress Mud: Wt 1 020 kg/rn' Visc.
Temp -10 °C Road LEONARD NO. 1
57 s/L W.L. 11 cm' pH 9.0
Good Date 97 03 04 Rig Ralex, 1 Day No. 98
Running in hole PV 19 mPa.s YP 8 Pa Gels 4/8 Pa
0 m Hole Size 216 mm Status
Methyl Blue 35 Solids 0.01 % Filter Cake 2 mm Salt 400 mg/L Cal. 40 mg/L Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate L/min Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate L/min Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5
RU & RD Drill Actual Reaming Coring Cond. Hole
6 Trips 5.0 7 Lubr. Rig 0.50 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 5.0 21 Handle Tool 22 Clean to Btm 23 Wait on tools 6.0 24 Mix new mud 7.5 25
No. 9 Size - mm 216 Type HP51A (51.7) S.N. DM9154 Jets - mm 3 x 15.9 Wt. - daN r/min Out - m In - m 2360 Metres Hours Condition INC
Soda Ash 1 sx
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Xan-vis should be on location by 18:00.
BITS SURVEYS m m m m m m m
PUMP
Liner Length No. mm mm
1 140 229 2 140 229
DRILLING MUD ADDITIVES USED: HYDRAULIC Gell 60 sxs PP Output AV Kalzan 5 sxs kPa L/min m/min Caustic 1 sx
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Pull out of hole. Dump and clean mud tanks. Weld and repair as required. Fill with fresh water and mix mew mud while waiting on directional tools. Rig up MWD instrumentation and continue to mix new mud. Pick up mud motor and MWD and orientate same. Pick up kelly and test tools. All okay. Ran in hole and test MWD tools every 15 stands.
Serviced rig and function tested BOPs.
ESTIMATED COSTS: DAILY $ 30 682 CUMULATIVE $ 4 261 694 SUPERVISOR M. Kramps / D. Gaboury
Page No. 116
Date 97 03 05 Weather Flurries Temp -6 °C Road Good
ESTIMATED COSTS: DAILY $ 45 705 CUMULATIVE $ 4 307 403 SUPERVISOR M. Kramps / D. Gaboury
Ralex, 1 Day No. 99 Drilling
17.5 Pa Gels 13/21 Pa mg/L Cal. 60 mg/L
cm' pH 9.5 PV 22 mPa.s YP 2 mm Salt 400
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Depth 2 416 m Progress 56 m Hole Size 216 mm Status Mud: Wt 1 075 kg/m' Visc. 72 s/L W.L. 9.0 Methyl Blue 30 Solids 0.04 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m' 6 RPM = 18 ; 3 RPM = 15
No. 9 BITS SURVEYS
m
TIME DISTRIBUTION Code/Operation Hours 1 RU&RD
Size - mm 216 m 2 Drill Actual 14.25 Type HP51H m ° 3 Reaming S.N. DM9154 m 4 Coring Jets - mm 3 x 15.9 m 5 Cond. Hole 3.75 Wt. - daN 2-10 m 6 Trips 5.50 r/min 40-80 m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig In - m 2360 Liner Length 9 Cut Off D.L. Metres - No. mm mm SPM 10 Dev. Survey Hours 1 140 229 115 11 Wireline Log Condition INC 2 140 229 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
Drispac - 3 sxs Gel - 70 sxs PP Output AV Power 15 Test BOP Xan-vis - 3 sxs Barite - 100 sxs kPa Umin m/min kW 16 DST Bicarb - 2 sxs 7 500 1 300 90.5/49 162 17 Plug Back Kelsan - 6 sxs 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Ran in hole and serviced rig. Function tested BOPs. Ran in hole and tested tools every 15 stands. Tagged cement at 2 360 m.. Orientated and directionally drilled from 2 360 to 2 392 m KB. Serviced rig and function tested BOPs. Circulated and conditioned mud. Orientated and directionally drilled from 2 392 to 2 416 m KB.
Conditioned mud and brought up mud density while drilling. Mud additives on location at 18:00.
Page No. 117
J
kg/m' Rate Umin kg/m' Rate Umin kg/m'
Umin Umin
Desander Underflow Wt. Desander Overflow Wt. Centrifuge Overflow Wt.
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowing Wind SW 30 km/hr Temp -5 °C Road Very Poor
Date 97 03 06 Well GENOIL et al ST. LEONARD NO. 1 Rig
Ralex, 1
Day No. 100 29 m Hole Size 216 mm Status Tripping
60 s/L W.L. 9.0 cm' pH 9.0 PV 29 mPa.s YP 16 Pa Gels 18/28 Pa 2 mm Salt 400 mg/L Cal. 60 mg/L
Umin Desander Underflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate
Centrifuge Overflow Wt. kg/m'
Depth 2 445 m Progress Mud: Wt 1 200 kg/rn' Visc. Methyl Blue 30 Solids 0.10 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow WL kg/m' Rate Centrifuge Underflow Wt. kg/m'
Umin Umin
PP kPa 9 500
No. 8 Size - mm 216 Type HP51H S.N. DM9154 Jets - mm 3 x 15.9 Wt. - daN 2-10 r/min 40 - 80 Out - m In - m 2360 Metres 85 Hours 34.0 Condition INC
DRILLING MUD ADDITIVES USED: Barite 863 sxs Gel 13 sxs Xanuis 6 sxs Drispac 2 sxs
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual
20.25 3 Reaming 4 Coring ° 5 Cond. Hole
6 Trips 3.25 7 Lubr. Rig 0.50 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 115 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
205 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
SURVEYS 2 413.03 m 1.7 2 422.61 m 1.9
m m m m m
PUMP Liner Length
No. mm mm 1 140
235 2 140
235
HYDRAULIC Output AV Umin m/min 1 300 90.5/49
BITS
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling from 2 416 m to 2 445 m with surveys. Trip. Suspect motor failure. Rig Services. BOP drills held.
ESTIMATED COSTS: DAILY $ 48 791 CUMULATIVE $ 4 356 194 SUPERVISOR M. Kramps / D. Gaboury
Page No. 118
J
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 15.00
2 431.55 SURVEYS
m 1.9 2 440.56 m 2.1 ° 2 450.16 m 2.2 2 459.18 m 2.2 °
m m °
No. 1 2
m PUMP
Liner Length mm mm
140 235 140 235
BITS 4 216 HP51H DM9154 3-15.9 2-10 40/80 2445 2 360 85 34.0 1 -1 -No-A-E-I-Dae
DRILLING MUD ADDITIVES USED: Barite 94 sxs Xanuis 2 sxs
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
No. 5 Size - mm 216 Type SYH (215) S.N. LF8420 Jets - mm 2/15.9 1/11.1 Wt. - daN 13-14 r/min 30 - 120 Out - m In - m 2 445 Metres 30 Hours 15.0 Condition INC
3 Reaming 4 Coring 5 Cond. Hole 6 Trips 7.50 7 Lubr. Rig 0.75 8 Repair Rig 9 Cut Off D.L. 0.75
SPM 10 Dev. Survey 11 Wireline Log
115 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
216 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
HYDRAULIC PP
Output AV kPa
L/min m/min 10 000
1 300 90.5/49
ita BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Rig 216 mm Status
Weather Well
GENOIL et al ST. LEONARD NO. 1 Depth 2 475 m Progress 30 m Hole Size Mud: Wt 1 200 kg/m' Visc. 62 s/L W.L. 9.0 Methyl Blue 30 Solids 10 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
Date 97 03 07 Ralex, 1
Day No. 101 Drilling
23 mPa.s YP 18.5 Pa Gels 16/23 Pa 400 mg/L Cal. 160 mg/L kg/m' Rate Umin kg/m' Rate Umin kg/m'
cm' pH 9.0 PV 2 mm Salt
Umin Desander Underflow Wt. Umin Desander Overflow Wt.
Centrifuge Overflow Wt.
Stormy Temp -7 °C Road Good
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Change out mud motors and reset to 1.5° bent housing angle. Pick up 2 DCs. RIH. BHA to DP. Test MWD. Slip and cut. RIH. Fill pipe twice. Clean 1/2 m to bottom. Drill with Sperry-Sun from 2 445 m to 2 475 m.
Rio services. BOP drills held. Function BOPs.
ESTIMATED COSTS: DAILY $
34 458 CUMULATIVE $ 4 390 652 SUPERVISOR
D. Gaboury / M. Kramps
Page No. 119
Rig GENOIL et al ST. LEONARD NO. 1
400 mg/L Cal. 160 mg/L Methyl Blue 35 Solids 0.10 % Filter Cake 2 mm Salt
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Clear Temp -12 0 C Road Good Date 97 03 08 Day No. 102 Ralex, 1
Weather Well
HYDRAULIC Output AV Umin m/min 1300 90.5/49
PP kPa
10 000
ESTIMATED COSTS: DAILY $ 36 131 CUMULATIVE $ 4 426 783 SUPERVISOR D. Gaboury/R. Genest
°69.10
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
°82.90 2 Drill Actual 23.25 0 87.4 3 Reaming 0 95.3 4 Coring
5 Cond. Hole 6 Trips 7 Lubr. Rig 0.75 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 11 Wireline Log
115 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
216 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
No. 5 Size - mm 215.9 Type STC 3VH S.N. LF8420 Jets - mm 2x15.9/1x11.1 Wt. - daN 13-14000 r/min 30 - 60 Out - m In In - m 2445 Metres 68 Hours 40.25 Condition Run
DRILLING MUD ADDITIVES USED: 89 sxs Barite 3 sxs Drispac 2 sxs Xanuis
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
SURVEYS 2468.69 m 2.60 2478.11 m 3.20 2487.68 m 3.90 2497.18 m 5.00
m m m
PUMP Liner Length mm mm 140 235 140 235
BITS
No. 1 2
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled ahead with Sperry-Sun from 2475 m to 2513 m. Three rig services. Held safety meeting and BOP drill with crew. Function tested BOPS.
RSPP 2: 4100 kPa at 55 SPM
Page No. 120
I
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt.
kg/m' Rate Umin kg/m' Rate Umin
kg/m'
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Clear Temp -22 'C Road Good Rig Ralex, 1 GENOIL et al ST. LEONARD NO. 1
Weather Well
Date 97 03 09 Day No. 103
Depth 2540 m Progress 27 m Hole Size 215.9 mm Status Drilling Mud: Wt 1200 Methyl Blue Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt.
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 4RR 5 2508 m 6.00 '93.90 1 RU&RD Size - mm 215.9 215.9 2517 m 6.80 '101.90 2 Drill Actual 13.00 Type HP51A SVH m 3 Reaming S.N. DM9154 LF8420 m 4 Coring Jets - mm 1x14.3/2x11.1 2x15.9/1x11.1 m 5 Cond. Hole 1.75 Wt. - daN 14 000 13 - 14 000 m 6 Trips 8.50 r/min Slid 30 / 60 m 7 Lubr. Rig 0.50 Out - m In 2514 PUMP 8 Repair Rig In - m 2514 2445 Liner Length 9 Cut Off D.L. Metres 26 69 No. mm mm SPM 10 Dev. Survey 0.25 Hours 12.00 41.25 1 140 235 115 11 Wireline Log Condition Run 6-8-1 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
86 sxs Barite PP Output AV Power 15 Test BOP 2 sxs Drispac kPa Umin m/min kW 16 DST
1 sx Xanuis 10 000 1300 90.5/49 216 17 Plug Back 1 sx Caustic 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled from 2513 m to 2514 m. Serviced rig, surveyed and pumped pill. Laid down 22 singles. Tripped out and laid down motor and picked up new motor. Tripped in and broke circulation at 38 stands and 60 stands. Cleaned to bottom - 2.0 m fill. Orientated tool and drilled. Slid from 2518 m to 2540 m.
RSPP 1: 3500 kPa at 50 SPM Function tested blind rams
19 Pa Gels 13/18 Pa mg/L Cal. 100 mg/L kg/m' Rate Umin
kg/m' Rate Umin kg/m'
kg/m3 Visc. 60 s/L W.L. 8.0 cm3 pH 9.0 PV 32 mPa.s YP 35 Solids 0.10 % Filter Cake 2 mm Salt 400
ESTIMATED COSTS: DAILY $ 31 131 CUMULATIVE $ 4 457 914 SUPERVISOR D. Gaboury/R. Genest
Page No. 121
ESTIMATED COSTS: DAILY $ 41 094 CUMULATIVE $ 4 499 008 SUPERVISOR D. Gaboury/R. Genest
Page No. 122
BISSETT RESOURCE CONSULTANTS LTD. 411
DAILY DRILLING REPORT
Snowing Temp -6 °C Road Fair Date 97 03 10 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 104
Depth 2610 m Progress 70 m Hole Size 215.9 mm Status Drilling Mud: Wt 1200 kg/rn3 Visc. 70 s/L W.L. 8.0 cm3 pH 9.0 PV 38 mPa.s YP 26 Pa Gels 17/23 Pa Methyl Blue 40 Solids 10 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. 1570 kg/m' Centrifuge Overflow Wt. 1070 kg/m'
BITS No. 4RR
SURVEYS 2526 m 8.00
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8
RU & RD Size - mm 215.9 2536 m 9.80 Drill Actual 23.25 Type HP51A 2545 m 10.8 Reaming S.N. DM9154 2555 m 11.3 Coring Jets - mm 1x14.1/2x11.1 2564 m 11.4 Cond. Hole
Wt. - daN 12 000 2574 m 11.8 Trips r/min 50 2602 m 13.5 Lubr. Rig 0.75 Out - m In PUMP Repair Rig In - m 2514 Liner Length 9 Cut Off D.L. Metres 96 No. mm mm SPM 10 Dev. Survey Hours 33.25 1 140 235 11 Wireline Log Condition Run 2 140 235 120 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
9 sxs Xanuis PP Output AV Power 15 Test BOP 2 sxs Caustic kPa Umin m/min kW 16 DST
22 sxs Gel 12 000 1300 90.5/49 216 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Gas show at 2598 m to 2599 m - 214 units
20 21
Directional Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Rotary drilled from 2540 m to 2600 m with surveys. Slid from 2600 m to 2605 m. Rotary drilled from 2605 m to 2615 m. Azimuth readings assumed not functional below 2526 m because of proximity to fish.
String weight: 75 000 daN Hole drag: 8 - 12 000 daN Down: 4 - 8 000 daN
RSPP 2: 3800 kPa at 50 SPM (Ran cent, for 1 circulation = 2.00 hours)
J
Weather
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Rotary drilled from 2610 m to 2628 m. Surveyed at 2611 m. Dummy tripped to casing. Pumped out one single 20 000 daN over on second stand off bottom, then decreased to normal drag near end of stand. Cleaned to bottom - 2.0 m fill. Drilled from 2628 m to 2681 m - slide.
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Rotary drilled from 2610 m to 2628 m. Surveyed at 2611 m. Dummy tripped to casing. Pumped out one single 20 000 daN over on second stand off bottom, then decreased to normal drag near end of stand. Cleaned to bottom - 2.0 m fill. Drilled from 2628 m to 2681 m - slide.
RSPP 2: 5300 kPa at 60 SPM RSPP 2: 5300 kPa at 60 SPM
Hole Drag Up: 8 - 12 000 Hole Drag Up: 8 - 12 000 Hole Drag Down: 6 - 8 000 Hole Drag Down: 6 - 8 000
TIME DISTRIBUTION
e Up
18 Squeeze Cmt 19 Fishing
21 Handle Tool 22 Clean to Btm 23 24 25
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -7 'C Road
Good
Date 97 03 11 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 105 Depth 2651 m Progress 41 m Hole Size 215.9 mm Status Drilling Mud: Wt 1200 kg/m' Visc. 60 s/L W.L. 7.5 cm' pH 9.0 PV 34 mPa.s YP 25 Pa Gels 17/22 Pa Methyl Blue 40 Solids 10 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate L./min Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
ESTIMATED COSTS: DAILY $ ESTIMATED COSTS: DAILY $ 36 774 CUMULATIVE $ 4 535 782 SUPERVISOR D. Gaboury/R. Genest 36 774 CUMULATIVE $ 4 535 782 SUPERVISOR D. Gaboury/R. Genest
Page No. 123 Page No. 123
L 1 L 1
ESTIMATED COSTS: DAILY $ 40 408 CUMULATIVE $ 4 576 190 SUPERVISOR D. Gaboury/R. Genest
BISSETT RESOURCE CONSULTANTS LTD. Cli
DAILY DRILLING REPORT
Weather Clear Temp -13 °C Road Good Date 97 03 12 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 106 Depth 2695 m Progress 44 m Hole Size 215.9 mm Status Drilling Mud: Wt 1200 kg/m3 Visc. 70 s/L W.L. 7.0 cm3 pH 9.0 PV 30 mPa.s YP 30 Pa Gels 17/23 Pa Methyl Blue 45 Solids 0.11 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m3 Rate L/min Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS No. 4RR 2639 m 16.4 °2.9
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8
RU & RD Size - mm 215.9 2648 m 16.5 °358.3 Drill Actual 22.25 Type HP51A 2658 m 16.8 '353.9 Reaming
S.N. DM9154 2667 m 16.9 °351.1 Coring Jets - mm 1x14.1/2x11.1 2677 m 16.6 °348.6 Cond. Hole Wt. - daN 12 000 m Trips r/min Slide m Lubr. Rig 0.50 Out - m In PUMP Repair Rig In - m 2514 Liner Length 9 Cut Off D.L. Metres 181 No. mm mm SPM 10 Dev. Survey 1.25 Hours 76.50 1 140 235 120 11 Wireline Log Condition Run 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
6 sxs Xanuis PP Output AV Power 15 Test BOP 1 sx Caustic kPa Umin m/min kW 16 DST
32 sxs Gel 12 500 1300 90/49 270 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Fracture Gas Peak: 980 units at 2677.8 m 21 Handle Tool Background Gas: 2677 m to 2695 m, 3 to 8 units 22 Clean to Btm Connection Gas: 2651 m to 2695 m, 2 to 8 units 23
24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled from 2651 m to 2656 m (slide mode). Serviced rig. Rotary drilled from 2656 m to 2661 m. Drilled from 2661 m to 2684 m with surveys (slide mode). Serviced rig. Drilled from 2684 m to 2695 m with surveys (slide mode).
String Weight: 76 000 daN RSPP Pump 1: 5600 kPa at 60 SPM
Hole Drag Up: 8 - 10 000 daN Hole Drag Down: 6 - 8 000 daN
Page No. 124
ESTIMATED COSTS: DAILY $ 45 003 CUMULATIVE $ 4 621 193 SUPERVISOR D. Gaboury/R. Genest
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -19 °C Road Good Date 97 03 13 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 107
Depth 2713 m Progress 18 m Hole Size 215.9 mm Status Tripping in with bit Mud: Wt 1200 kg/m3 Visc. 75 s/L W.L. 6.0 cm' pH 9.0 PV 44 mPa.s YP 33 Pa Gels 18/24 Pa Methyl Blue 47 Solids 0.11 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 4RR 6 2686 m 16 0 344.6 1 RU & RD Size - mm 215.9 215.9 2696 m 15.6 °341.2 2 Drill Actual 9.50 Type HP51A F299R m 3 Reaming S.N. DM9154 LF3195 m 4 Coring Jets - mm 1x14.1/2x11.1 1x14.1/2x11.1 m 5 Cond. Hole 1.00 Wt. - daN 12 000 12 000 m 6 Trips 11.50 r/min Slide Slide m 7 Lubr. Rig 0.50 Out - m 2713 In PUMP 8 Repair Rig In - m 2514 2713 Liner Length 9 Cut Off D.L. 0.75 Metres 199 No. mm mm SPM 10 Dev. Survey 0.50 Hours 86.00 1 140 235 120 11 Wireline Log Condition 5-6-1 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
1 sx Xanuis PP Output AV Power 15 Test BOP 3 sxs Caustic kPa Umin m/min kW 16 DST
65 sxs Barite 12 500 1300 90/49 270 17 Plug Back 15 sxs Sawdust 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Background gas: 3 to 10 units 21 Handle Tool 22 Clean to Btm 0.25 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled from 2695 m to 2703 m (slide). Serviced ria.'Surveyed. Five-stand wiper trip (pulled tight at 2692 m and 2672 m - 35 000 daN over string weight). Drilled from 2703 m to 2713 m (slide). Surveyed. Circulated bottoms up. Tripped for bit (2700 m to 2690 m and 2680 m to 2670 m. Pulled 35 000 daN over). Changed out mud motor/service MWD/running drill collars and 1 stand drillpipe. Serviced rig - slipped and cut drill line. Tripped in hole. Broke circulation at 40 stands drillpipe.
Page No. 125
2 mm Salt Umin Desander Underflow Wt. Umin Desander Overflow Wt.
Centrifuge Overflow Wt.
cm' pH 9.0 PV 35 mPa.s YP 24 Pa Gels 17/23 Pa 400 mg/L Cal. 80 mg/L kg/m' Rate Umin
kg/m' Rate Umin kg/m'
0339.6 1 RU & RD 2 Drill Actual 6.25
BITS SURVEYS
No. 6 2704 m 14.2
Size - mm 215.9 m
Type F2PPR m °
S.N. LF3195 m
Jets - mm 1x14.1/2x11.1 m
Wt. - daN 12 000 m r/min Slide m Out - m In PUMP In - m 2713 Liner Length
Metres 14 No. mm mm Hours 6.25 1 140 235
Condition Run 2 140 _ 235
Accumulator check: Down Time on Accumulator 2.50 hours
Close Pipe 9 sec 9 600 kPa Open HCR 6 sec 8 750 kPa Recharge Time 3 min 45 sec
Function tested MWD 1.25 hours Trip for wash out 2.50 hours
Total 3.75 hours
ESTIMATED COSTS: DAILY $ 31 548 CUMULATIVE $ 4 652 741 SUPERVISOR D. Gaboury/R. Genest
CBISSETT RESOURCE CONSULTANTS LTD.
Weather Clear Temp -18 °C Road Good Date 97 03 14 Day No. 108 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
Depth 2727 m Progress 14 m Hole Size 215.9 mm Status Drilling
Mud: Wt 1200 kg/rn3 Visc. 68 s/L W.L. 6.0 Methyl Blue 46 Solids 0.11 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
kPa Umin m/min 13 000 1300 90/49 _ 281
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background gas: 3 units show at 2714 m - 243 units Trip gas unit: 1254 units Ralex to supply three mew meter gauges for accumulator.
19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 10.25 23 24 25
DRILLING MUD ADDITIVES USED: HYDRAULIC
10 sxs Gel PP Output AV
• 5 Cond. Hole • 6 Trips 5.00 o 7 Lubr. Rig 0.25
8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 0.25
120 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP
kW 16 DST 17 Plug Back 18 Squeeze Cmt
Page No. 126
1
Precharge pressure was low - brought up from 5 500 kPa to 7 000 kPa
DAILY DRILLING REPORT
TIME DISTRIBUTION Code/Operation Hours
3 Reaming 4 Coring
Accumulator check: Down Time on Accumulator 2.50 hours
Close Pipe 9 sec 9 600 kPa Open HCR 6 sec 8 750 kPa
Function tested MWD 1.25 hours Trip for wash out 2.50 hours
Total 3.75 hours Recharge Time 3 min 45 sec
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Revision No. 1
Weather Clear Temp -18 'C Road Good Date 97 03 14
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 108
Depth 2727 m Progress 14 m Hole Size 215.9 mm Status Drilling
Mud: Wt 1200 kg/rn3 Visc. 68 s/L W.L. 6.0 cm3 pH 9.0 PV 35 mPa.s YP 24 Pa Gels 17/23 Pa
Methyl Blue 46 Solids 0.11 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L
Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m3 Rate L/min
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 6 2704 m 14.2 °339.6 1 RU & RD Size - mm 215.9 m 2 Drill Actual 6.25 Type F2PPR m 3 Reaming
S.N. LF3195 m 4 Coring Jets - mm 1x14.1/2x11.1 m 5 Cond. Hole Wt. - daN 12 000 m 6 Trips 5.00 r/min Slide m 7 Lubr. Rig 0.25 Out - m In PUMP 8 Repair Rig In - m 2713 Liner Length 9 Cut Off D.L. Metres 14 No. mm mm SPM 10 Dev. Survey 0.25 Hours 6.25 1 140 235 120 11 Wireline Log Condition Run 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
10 sxs Gel PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST
13 000 1300 90/49 281 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Background gas: 3 units show at 2714 m - 243 units 21 Handle Tool Trip gas unit: 1254 units 22 Clean to Btm 1.25 Ralex to supply three mew meter gauges for accumulator. 23 Accumulator 2.50
24 Crown Prob. 7.25 25 MWD Check 1.25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Accumulator check - worked rams - increased precharge. Tripped in to bridge at 2559 m and 2596 m. Cleaned to bottom from 2694 m to 2713 m (2 m fill). Serviced rig. Rotary drilled from 2713 m to 2724 m with surveys. Attempted to get MWD to work. Signal strength fluctuating. Tripped out for washed pipe. (Washed out found at 15 stands out in ioint of "G" drillpipe, 0.5 m above pin, approximately 40 mm wide x 3 mm high. MWD tool determined to be funtioninq properly.Tripped in, hit crown after attempting to latch stand of drilipipe, crown saver either not set or not functioning. Picked up kelly and circulated - assessed damage, secured timbers. Tripped in. Cleaned to bottom -2.0 m. Drilled from 2724 m to 2727 m (slide).
Start 22 000 kPa Crown 7.25 hours Close Hydril 18 sec 11 200 kPa Total 9.75 hours
Precharge pressure was low - brought up from 5 500 kPa to 7 000 kPa
ESTIMATED COSTS: DAILY $ 31 548 CUMULATIVE $ 4 652 741 SUPERVISOR D. Gaboury/R. Genest
Page No. 127
Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
1200 kg/m' Visc. 70 s/L W.L. 6.0 cm3 pH 9.0 PV 33 mPa.s YP 27 Pa Gels 17/20 Pa
Methyl Blue 40 Solids 0.11 % Filter Cake 2 mm Salt 400 mg/L Cal. 60 mg/L
kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
kg/m' Rate 1../min Desander Overflow Wt. kg/m' Rate Umin
1550 kg/m' Centrifuge Overflow Wt. 1190 kg/m'
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
2773 m Progress 46 m Hole Size 215.9 mm Status Drilling
6RPM-26 3RPM-23
DRILLING MUD ADDITIVES USED: 20 sxs Gel 4 sxs Xanvis
1 sx Caustic
5 to 18 units from 2727 m to 2739 m 215 to 320 units from 2739 to 2747 m 30 to 100 units from 2747 m to 2772 m
Gas Show: 2739 m to 2740 m = 641 units Connection Gas: 100 to 210 units
'337.9
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9
RU & RD '337.0 Drill Actual 21.00 '335.5 Reaming '334.5 Coring '332.5 Cond. Hole '330.5 Trips '329.6 Lubr. Rig 0.75
Repair Rig Cut Off D.L.
SPM 10 Dev. Survey 2.25 120 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
281 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
BITS SURVEYS No. 6 2713 m 14.1 Size - mm 215.9 2723 m 15.4 Type F2PPR 2732 m 16.8 S.N. LF3195 2742 m 17.5 Jets - mm 1x14.1/2x11.1 2752 m 18.2 Wt. - daN 15 000 2761.7 m 18.4 r/min Slide/60 2767 m 18.3 Out - m In PUMP In - m 2713 Liner Length Metres 60 No. mm mm Hours 26.75 1 140 235 Condition Run 2 140 235
PP kPa
13 000
HYDRAULIC
Output AV
Umin m/min
1300 90/49
Checked motor kills, okay. Circulated through lower kill line at rig service.
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas:
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Rotary drilled from 2727 m to 2730 m. Surveyed and serviced rig. Rotary drilled from 2730 m to 2740 m. Surveyed. Drilled from 2740 m to 2743 m (slide). Rotary drilled from 2743 m to 2749 m. Serviced rig and function tested BOPs. Surveyed. Drilled from 2749 m to 2752.5 m (slide). Rotary drilled from 2752.5 m to 2759 m. Surveyed. Drilled from 2759 m to 2763 m (slide). Serviced rig and function tested Hydril - closing time 18 seconds. Rotary drilled from 2763 m to 2769 m. Surveyed. Drilled from 2769 m to 2773 m (slide). Held safety meetings. Function tested BOP and serviced rig. Ran BOP drills.
Drill String Weight: 78 000 daN RSPP 1: 6 000 kPa at 54 SPM Hole Drag Up: 14 to 16 000 daN Hole Drag Down: 4 to 6 000 daN
ESTIMATED COSTS: DAILY $ 35 258 CUMULATIVE $ 4 687 999 SUPERVISOR D. Gaboury/R. Genest
Page No. 128
J
Depth Mud: Wt
Weather Snowing/Raining Temp -6 Well
'C Road Fair Date 97 03 15 Day No. 109 GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -19 °C Road Fair Date 97 03 16
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 110
Depth 2807 m Progress 34 m Hole Size 215.9 mm Status Reamed (wiper trip) Mud: Wt 1200 kg/m' Visc. 72 s/L W.L. 6.0 cm3 pH 9.0 PV 40 mPa.s YP 25.5 Pa Gels 18/22 Pa
Methyl Blue 47 Solids 0.11 % Filter Cake 2 mm Salt 400 mg/L Cal. 60 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
6 RPM - 25 3 RPM - 21
BITS
SURVEYS
No. 6 2761 m 18.4 Size - mm 215.9 2771 m 17.8 Type F2PPR BHA 179.33 m 2780 m 17.1 S.N. LF3195 211 its E DP 2002.01 m m Jets - mm 1x14.1/2x11.1 51 its G DP 490.37 m m Wt. - daN 12 000 12 its S135 DP 123.12 m m r/min Slide/60 Kelly 12.65 m m Out - m In Total 2807.48 m PUMP In - m Liner Length Metres 94 No. mm mm Hours 41.75 1 140 235 Condition Run 2 140 235
DRILLING MUD ADDITIVES USED: HYDRAULIC 17 sxs Gel PP Output AV 3 sxs Xanvis kPa Umin m/min 3 sxs Caustic 13 000 1300 90/49
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
°330.5
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9
RU & RD °329.0 Drill Actual 15.00 °328.4 Reaming
Coring Cond. Hole 0.50 Trips 6.00 Lubr. Rig 0.50 Repair Rig Cut Off D.L.
SPM 10 Dev. Survey 1.50 120 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
281 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Slide from 2773 m to 2777 m. Rotated from 2777 m to 2778 m. Serviced rig and function tested BOP. Surveyed. Slide from 2778 m to 2784 m. Rotated from 2784 m to 2788 m. Surveyed. Slide from 2788 m to 2790 m. Rotated from 2790 m to 2797 m. Serviced rig and function tested BOP. Surveyed. Slide from 2797 m to 2800 m. Rotated from 2800 m to 2807 m. Wiper trip (17 stands). Pumped out 4 singles off bottom, circulated out 2540 m to 2500 m. Circulated. Tripped in and picked up kelly. Reamed tight hole from 2550 m to 2590 m. New metric gauges installed on accumulator system. Cassady Engineering from Nisku, Alberta inspected the derrick - okay.
Hole Drag Up: 16 to 20 000 daN Hole Drag Down: 6 to 10 000 daN RSPP 1: 1 to 6 000 kPa at 55 SPM Hook Load: 90 000 daN
ESTIMATED COSTS: DAILY $ 34 074 CUMULATIVE $ 4 722 073 SUPERVISOR D. Gaboury/R. Genest
Page No. 129
J
No. 6 Size - mm 215.9 Type F2PPR S.N. LF3195 Jets - mm. 1x14.1/2x11.1 Wt. - daN 16 000 r/min Slide/60 Out - m In In - m 2713 Metres 147 Hours 61.25 Condition Run
BITS
DRILLING MUD ADDITIVES USED:
HYDRAULIC 73 sxs Gel 10 sxs Beads
PP Output AV Power
4 sxs Xanvis
kPa Umin m/min kW 2 sxs Caustic
1300 90/49
SURVEYS 2790 m 17.2 °327.2 2799 m 17.6 '326.3 2809 m 18.2 '325.4 2818 m 18.1 '324.5 2828 m 17.8 '323.7 2837 m 17.3 '321.7 2847 m 17.1 °320.7
PUMP
Liner Length No. mm mm SPM
1 140 235 2 140 235 120
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -20 'C Road Good
Date 97 03 17
Well GENOIL et al ST. LEONARD NO. 1
Rig
Ralex, 1
Day No. 111
Depth 2860 m Progress 53 m Hole Size 215.9
mm Status
Drilling 72 s/L W.L. 6.0
0.12 % Filter Cake kg/m3 Rate
kg/m3 Rate kg/m3
Mud: Wt 1200 kg/m3 Visc. Methyl Blue 46 Solids Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
cm3 pH 9.0 PV 41 mPa.s YP 22.5 Pa Gels 17/20 Pa
2 mm Salt 400 mg/L Cal. 60 mg/L Umin Desander Underflow Wt. kg/m3 Rate Umin Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Overflow Wt. kg/m3
6RPM-21 3RPM-17
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 19.50 3 Reaming 4 Coring 5 Cond. Hole 6 Trips 7 Lubr. Rig 0.75 8 Repair Rig 9 Cut Off D.L. 10 Dev. Survey 1.50 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up 15 Test BOP 16 DST 17 Plug Back
30 sxs Barite
14 000 1300 90/49
303 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
20 Directional Background Gas: 0 units
21 Handle Tool Connection Gas: 0 units
22 Clean to Btm 2.25 Wiper trip: 2807 m - 880 units
23
Premix and shear - 1 sxs Xanvis, 10 sxs beads, 45 sxs gel, 30 sxs barite (transferred to active system
24 over 1 circulation)
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Cleaned to bottom (fine to medium cuttings, no caving). Surveyed. Slide from 2807 m to 2809 m. Rotary drilled from 2809 m to 2816 m. Serviced riq (function tested Hydril and checked motor kill). Surveyed. Slide from 2816 m to 2821 m. Rotary drilled from 2821 m to 2825 m. Serviced rig and function tested upper and lower. Surveyed. Slide from 2825 m to 2831 m. Rotary drilled from 2831 m to 2835 m. Surveyed. Slide from 2835 m to 2840 m. Rotary drilled from 2840 m to 2844 m. Surveyed. Serviced riq and function tested BOPs. Slide from 2844 m to 2848 m, Rotary drilled from 2848 m to 2854 m. Surveyed. Slide from 2854 m to 2857 m. Rotary drilled from 2857 m to 2860 m. Plan to dummy trip and reposition Grade "G" drillpipe near 2870 m.
Hole Drag up: 15 - 22 000 daN Hole Drag Down: 7 - 14 000 daN RSPP 2: 6 100 kPa at 55 SPM
ESTIMATED COSTS: DAILY $
36 945 CUMULATIVE $ 4 759 018 SUPERVISOR D. Gaboury/R. Genest
Page No. 130
SURVEYS 2847 m 17.1 2856 m 17.1
m m m m m
PUMP Liner Length
No. mm mm 1 140 235 2 140 235
No. 6 Size - mm 215.9 Type F2PPM S.N. LF3195 Jets - mm 1x14.1/2x11.1 Wt. - daN 15 000 r/min Slide/50 Out - m In In - m 2713 Metres 160 Hours 66.50 Condition Run
BITS
BHA "E" Premium
115 joints "E" New
60 joints Grade "G"
108 joints
Cli BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -13
°C Road Good
Date 97 03 18 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
Day No. 112
Depth 2873 m Progress 13 m Hole Size 215.9 mm Status Tripping in hole Mud: Wt 1200 kg/rn' Visc. 78 s/L W.L. 6.0 cm3 pH 9.0 PV 40 mPa.s YP 22.5 Pa Gels 17/21 Pa Methyl Blue 46 Solids 0.11 % Filter Cake 2 mm Salt 400 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m' 6RPM-21 3RPM-17
TIME DISTRIBUTION Code/Operation Hours °320.7 1 RU & RD °321.2 2 Drill Actual 5.25
3 Reaming ° 4 Coring ° 5 Cond. Hole 1.25
6 Trips 16.75 7 Lubr. Rig 0.25 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 0.50 11 Wireline Log
120 12 Run Csg/Cmt
DRILLING MUD ADDITIVES USED: 15 sxs Gel 10 sxs Copolymer Beads
1 sx Xanvis (Lubraglide) 2 sxs Caustic
35 sxs Barite
13 Wait on Cmt
HYDRAULIC
14 Nipple Up PP
Output
AV
Power
15 Test BOP kPa
Umin m/min
kW
16 DST 1300
90/49
17 Plug Back 1 400 1300 90/49
303 18 Squeeze Cmt
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas: 2860 m to 2873 m - 5 units Connection Gas: 2807 m to 2860 m - 5 units Trip Gas: 2873 m - 1263 units
19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm
23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Rotary drilled from 2860 m to 2864 m. Surveyed. Slide from 2864 m to 2867 m. Rotated from 2867 m to 2873 m. Surveyed. Circulated (condition hole). Tripped out (pumped out 16 singles). Racked back Grade "G" drillpipe. Laid down 31 singles Grade "G" + 19 joints "S" drillpipe. Ran in Grade "E" drillpipe from derrick. Ran in 51 straight singles while laying down bent singles from Grade "E" pipe racked in derrick. Tripped in hole. Picked up kelly and reamed tight spots from 2470 m to 2510 m and 2626 m to 2653 m. Cleaned to bottom 3 singles. Checked crown saver, okay. Function tested Hydril.
Hole Drag Up - 14 - 22 000 daN Hole Drag Down - 7 - 10 000 daN RSPP 2: 6100 kPa at 55 SPM
ESTIMATED COSTS: DAILY $
35 586 CUMULATIVE $ 4 794 604 SUPERVISOR D. Gaboury/R. Genest
Page No. 131
BITS SURVEYS No. 6 Size - mm 215.9 Type F2PPM S.N. LF3195 Jets - mm 1x14.1/2x11.1 Wt. - daN 15 000 r/min Slide/60 Out - m In In - m 2713 Metres 209 Hours 83.50 Condition Run
2867 m 17.3 2877 m 16.8 2886 m 16.4 2895 m 16.6 2906 m 17.2
m m
PUMP
Liner
Length No. mm mm
1 140
235 2 140
235
DRILLING MUD ADDITIVES USED: 10 sxs Gel PP 4 sxs Xanvis kPa 2 sxs Caustic
HYDRAULIC Output AV Umin m/min 1300 90/49
30 sxs Beads 14 000 1300 90/49
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas: 100 units at 2886 m Connection Gas: 88 units at 2922 m Gas Show: 1810 units at 2879 m to 2880 m
2286 units at 2880.5 m
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -18 °C Road Good
Date 97 03 19
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Depth 2922 m Progress 49 m Hole Size 215.9 mm Status Wiper trip
Day No. 113
Mud: Wt 1200 kg/rn3 Visc. 70 s/L W.L. 6.0 cm3 pH 9.0 PV 40 mPa.s YP 22.5 Pa Gels 17/20 Pa Methyl Blue 40 Solids 0.12 % Filter Cake 2 mm Salt 400 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3 6 RPM - 20 3 RPM - 17
°321.2
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9
RU & RD °321.5 Drill Actual 17.00 °321.8 Reaming °321.9 Coring °321.4 Cond. Hole 1.50
Trips 3.75 ° Lubr. Rig 0.75
Repair Rig Cut Off D.L.
SPM 10 Dev. Survey 1.00 11 Wireline Log
120 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
17 Plug Back 303 18 Squeeze Cmt
19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Cleaned to bottom (2 ni fill). Rotary drilled from 2873 m to 2874 m. Circulated (worked pipe - cleaned hole). Slide from 2874 m to 2877 m. Rotated from 2877 m to 2884 m. Serviced rig and function tested upper and lower pipe rams. Surveyed. Slide from 2884 m to 2888 m. Rotated 2888 m to 2894 m. Surveyed. Slide from 2894 m to 2896 m. Rotated 2896 m to 2903 m. Serviced rig and function tested Hydril. Surveyed. Rotated 2903 m to 2912 m. Surveyed. Slide from 2912 m to 2915 m. Rotated from 2915 m to 2922 m. Worked pipe and circulated hole. Serviced rig and function tested upper pipe. Wiper trip - pumped out first 17 singles, maximum drag 36 000 daN. Pulled 4 stands. Maximum drag 15 000 daN. Operation at 06:00 - start to run in.
RSPP 2: 6300 kPa at 62 SPM Hook Load: 89 000 daN Hole Drag Up: 36 000 daN Hole Drag Down: 8 - 10 000 daN
Shear mud in premix at 1300 kPa using pump 1. Checked Crown saver, okay.
ESTIMATED COSTS: DAILY $ 44 511 CUMULATIVE $ 4 839 115 SUPERVISOR D. Gaboury/R. Genest
Page No. 132
0. BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Clear
Temp -8 'C Road
Good Date 97 03 20 Well
GENOIL et al ST. LEONARD NO. 1
Rig
Ralex, 1 Day No. 114 Depth
2979 m Progress 57 m Hole Size 215.9 mm Status
Circulating - working hole before wiper trip Mud: Wt 1215 kg/m' Visc. 97 s/L W.L. 6.0 cm' pH 9.0 PV 47 Methyl Blue 47 Solids 0.13 % Filter Cake 2 mm Salt Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. 6 RPM - 20 3 RPM - 17
TIME DISTRIBUTION
DRILLING MUD ADDITIVES USED: 50 sxs Gel PP
kPa
55 sxs Beads 14 500
Output L./min 1300
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas: 2979 m - 1 to 6 units
Gas Show: None 23 Wiper Trip: 2922 m - 95 units 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Tripped in and surveyed. Slide from 2922 m to 2925 m. Rotated from 2925 m to 2931 m. Serviced rig. Checked motor kill and function tested pipe rams. Surveyed. Slide and rotated from 2931 m to 2940 m KB. Surveyed. Slide from 2940 m to 2942 m. Rotated from 2942 m to 2950 m. Serviced rig and function tested Hydril. Surveyed. Rotated from 2950 m to 2960 m. Surveyed. Slide from 2960 m to 2963 m. Rotated from 2963 m to 2969 m. Serviced rig and function tested top ram. Surveyed. Slide from 2969 m to 2972 m KB. Rotated from 2972 m to 2979 m. Circulated and worked hole before wiper trip. One spot 30 000 daN over on first single, tight hole at 2700 m to 2690 m.
om 2925 m to 2931 m. Serviced rig. Checked motor kill and function tested pipe rams. Surveyed. Slide and rotated from 2931 m to 2940 m KB. Surveyed. Slide from 2940 m to 2942 m. Rotated from 2942 m to 2950 m. Serviced rig and function tested Hydril. Surveyed. Rotated from 2950 m to 2960 m. Surveyed. Slide from 2960 m to 2963 m. Rotated from 2963 m to 2969 m. Serviced rig and function tested top ram. Surveyed. Slide from 2969 m to 2972 m KB. Rotated from 2972 m to 2979 m. Circulated and worked hole before wiper trip. One spot 30 000 daN over on first single, tight hole at 2700 m to 2690 m.
Hook Load: 91 000 daN Hook Load: 91 000 daN Average Drag: 25 000 daN Average Drag: 25 000 daN Hole Drag Down: 7 - 10 000 daN Hole Drag Down: 7 - 10 000 daN
RSPP 2: 6750 kPa at 60 SPM RSPP 2: 6750 kPa at 60 SPM
ESTIMATED COSTS: DAILY $ ESTIMATED COSTS: DAILY $ 58 429 CUMULATIVE $ 4 897 544 SUPERVISOR D. Gaboury/R. Genest 58 429 CUMULATIVE $ 4 897 544 SUPERVISOR D. Gaboury/R. Genest
Page No. 133 Page No. 133
mPa.s YP 27.5 Pa Gels 17/21 Pa 400 mg/L Cal. 80 mg/L kg/m' Rate Umin
kg/m' Rate L./min kg/m'
J J
4 BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
1
Weather Clear Temp -12 °C Road Good Date 97 03 21 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 115 Depth 3008 m Progress 29 m Hole Size 215.9 mm Status Drilling Mud: Wt 1210 kg/m3 Viso. 105 s/L W.L. 6.0 cm' pH 9.0 PV 46 mPa.s YP 27 Pa Gels 17/22 Pa Methyl Blue 47 Solids 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
6 RPM - 20 3 RPM - 17
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 6 2962 m 18.5 °324.0 1 RU & RD
Size - mm 215.9 2971 m 18.2 °324.9 2 Drill Actual 12.50 Type F2PPM 2981 m 17.9 °325.7 3 Reaming
S.N. LE3195 2991 m 17.8 0326.2 4 Coring
Jets - mm 1x14.1/2x11.1 m 5 Cond. Hole 0.50 Wt. - daN 15 000 m 6 Trips 5.25 r/min Slide/60 m 7 Lubr. Rig Out - m In PUMP 8 Repair Rig 0.75 In - m 2713 Liner Length 9 Cut Off D.L. 1.00 Metres 295 No. mm mm SPM 10 Dev. Survey 1.00 Hours 115.75 1 140 235 11 Wireline Log Condition Run 2 140 235 120 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
27 sxs Gel PP Output AV Power 15 Test BOP 3 sxs Xanvis kPa Umin m/min kW 16 DST
1 sx Caustic 1300 90/49 17 Plug Back 44 sxs Beads (24-fine, 20-coarse) 14 500 1300 90/49 314 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Background Gas: 2979 m to 3008 m - 99 units 21 Handle Tool Connection Gas: 2979 m to 3008 m - 99 units 22 Clean to Btm 1.50 Trip Gas: 2979 m - 95 units 23 Change Brake 1.50 Gas Show: None 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated work pipe. Pumped out 13 singles (4 with no pump). Wiper trip to casing (tight hole at 2700 m, pulled 35 000 daN over with pump on). Serviced rig. Changed drawworks brake pads. Slipped and cut drilling line. Tripped in (worked tight spot at 2700 m). Picked up kelly and cleaned from 2966 m. Surveyed. Slide from 2979 m to 2982 m, rotated from 2982 m to 2988 m. Serviced rig and function tested Hydril. Surveyed. Slide from 2988 m to 2990 m. Rotated from 2990 m to 2998 m. Serviced rig and function tested pipe rams. Surveyed. Slide from 2998 m to 2999 m. Rotated from 2999 m to 3008 m. Surveyed.
Hook Load: 91 000 daN Up Drag: 15 to 25 000 daN Down Drag: 7 - 12 000 daN RSPP 2: 6600 at 62 SPM
ESTIMATED COSTS: DAILY $ 40 268 CUMULATIVE $ 4 937 812 SUPERVISOR D. Gaboury/R. Genest
Page No. 134
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -5 'C Road Good
Date 97 03 22
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Depth 3009 m Progress 1 m Hole Size 215.9 mm Status Drilling
Day No. 116
Mud: Wt 1190 kg/rn3 Visc. 140 s/L W.L. 6.0 cm' pH 9.0 PV 55 mPa.s YP 30 Pa Gels 18/24 Pa Methyl Blue 48 Solids 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6 RPM - 20 3 RPM - 18
BITS SURVEYS No. 6 7 m
Size - mm 215.9 215.9 m Type F2PPM F2RP m S.N. LE3195 LG4774 m Jets - mm 1x14.1/2x11.1 1x14.1/2x11.1 m Wt. - daN 15 000 15 000 m r/min Slide/60 Slide/60 m Out - m 3009 In PUMP In - m 2713 3009 Liner Length Metres 296 - No. mm mm Hours 117.50 1 140 235 Condition 7-8-UI Run 2 140 235
DRILLING MUD ADDITIVES USED: HYDRAULIC 15 sxs Gel PP Output AV
1 sx Xanvis kPa Umin m/min 2 sxs Caustic 1300 90/49
14 000 1300 90/49
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas: 3009 m - 3 to 5 units Connection Gas: n/a Trip Gas: 3009 m - 257 units Gas Show; nil
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 1.75 3 Reaming 3.50 4 Coring 5 Cond. Hole 1.25 6 Trips 10.50 7 Lubr. Rig 0.75 8 Repair Rig 9 Cut Off D.L. 1.00
SPM 10 Dev. Survey 11 Wireline Log
120 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
17 Plug Back 303 18 Squeeze Cmt
19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Inspect DC 3.75 24 Change Motor 1.50 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Rotated from 3008 m to 3008.5 m. Circulated bottoms up. Rotated from 3008.5 m to 3009 m. Tripped out - pumped out 12 singles and laid down 4 singles. Serviced rig and function tested Hydril. Inspected HWDP and drill collars. Changed out mud motor. Slipped and cut drill line. Tripped in hole and reamed bridge from 2600 m to 2660 m (took 6 to 8 000 daN). Reamed to bottom - 3 singles (1000 daN). Serviced rig. Checked BOP accumulator and motor kills, okay.
Accumulator check: Start
22 000 kPa Hook Load: 91 000 daN Close Hydril 15 000 kPa 24 seconds Drag Up: 15 to 25 000 daN Close Pipe 13 000 kPa 9 seconds Drag Down: 6 to 8 000 daN Open HCR 12 500 kPa 6 seconds Motor Kills Okay Precharge At 7 000 kPa Pump Up 4 minutes 10 seconds Nitrogen Bottle 10 500 kPa Minimum RSPP 2: 6 000 kPa at 52 SPM
ESTIMATED COSTS: DAILY $ 56 272 CUMULATIVE $ 4 994 084 SUPERVISOR D. Gaboury/R. Genest
Page No. 135
47 Solids 0.13 % Filter Cake 2 mm Salt Methyl Blue
Date 97 03 23 Day No. 117
CrISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -13 °C Road Good Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
Mud: Wt 1200 kg/rn3 Visc. 120 s/L W.L. 6.0 cm' pH 10.0 PV
6RPM-20 3RPM-18
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 7 3000 m 17.9 °325.8 1 RU & RD Size - mm 215.9 3009 m 18.4 °325.6 2 Drill Actual 15.50 Type F2RP m 3 Reaming S.N. LG4774 m 4 Coring Jets - mm 1x14.3/2x11.1 m 5 Cond. Hole 0.50 Wt. - daN 12 - 16 000 m 6 Trips 0.50 r/min 60/Slide m 7 Lubr. Rig 5.50 Out - m In PUMP 8 Repair Rig In - m 3009 Liner Length 9 Cut Off D.L. Metres 23 No. mm mm SPM 10 Dev. Survey 0.50 Hours 14.75 1 140 235 130 11 Wireline Log Condition Run 2 140 235 12 Run Csg/Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 1 sx Xanvis PP Output AV Power
kW
13 Wait on Cmt 14 Nipple Up 15 Test BOP
20 sxs Beads kPa Umin m/min 16 DST 14 000 1400 90/52 326 17 Plug Back
1400 90/49 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Background Gas: 3009 m to 3032 m - 4 to 10 units 21 Handle Tool Connection Gas: 3009 m to 3032 m - 7 to 13 units 22 Clean to Btm 1.50 Trip Gas: 3032 m - 52 units 23 Gas Show: Nil 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Slide from 3009 m to 3010 m. Rotated from 3010 m to 3017 m. Surveyed. Slide from 3017 m to 3018.5 m. Rotated from 3018.5 m to 3021 m. Circulated work pipe. Slide from 3021 m to 3021.5 m. Rotated from 3021.5 m to 3026 m. Serviced rig and function tested BOP. Surveyed. Slide from 3026 m to 3028 m. Rotated from 3028 to 3032 m. Wiper trip and pumped out 13 singles. Maximum 32 000 daN over pulled and laid down 3 singles. 15 to 20 000 daN over, pulled 12 stands - 20 to 25 000 daN over. Ran in - no tight spots. Reamed to bottom from 3017 m to 3032 m. Took 10 to 12 000 daN. Tried to slide (no pump differential, no back torque). Serviced rig and checked crown stop, function tested both pipe rams. Tripped out for motor. Pumped out 2 singles from 28 to 30 000 daN.
Hook Load; 91 000 daN Drag Up: 25 to 32 000 daN Drag Down: 10 to 12 000 daN RSPP 1: 5 500 kPa at 64 SPM
ESTIMATED COSTS: DAILY $ 32 256 CUMULATIVE $ 5 026 340 SUPERVISOR D. Gaboury/R. Genest
Page No. 136
Depth 3032 m Progress 215.9 mm Status Tripping for mud motor 23 m Hole Size 44 mPa.s YP 26.5 Pa Gels 18/24 Pa
400 mg/L Cal. 60 mg/L kg/m' Rate Umin kg/m' Rate Umin
kg/m'
Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desander Overflow Wt.
kg/m' Centrifuge Overflow Wt.
J
ESTIMATED COSTS: DAILY $ 47 943 CUMULATIVE $ 5 074 283 SUPERVISOR D. Gaboury/R. Genest
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -16 °C Road Good Date 97 03 24 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 118 Depth 3055 m Progress 23 m Hole Size 215.9 mm Status Drilling Mud: Wt 1210 kg/rn3 Visc. 100 s/L W.L. 6.0 cm3 pH 9.0 PV 43 mPa.s YP 23 Pa Gels 18/24 Pa Methyl Blue 47 Solids 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3 6 RPM -18 3RPM-15
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 7 8 3019 m 18.9 °325.9 1 RU & RD Size - mm 215.9 215.9 3029 m 19.0 °325.9 2 Drill Actual 9.75 Type F2RP F3PP 3039 m 18.5 °326.0 3 Reaming S.N. LG4774 LF7928 m 4 Coring Jets - mm 1x14.3/2x11.1 1x14.3/2x11.1 m 5 Cond. Hole Wt. - daN 15 000 15 000 m 6 Trips 9.00 r/min 60/Slide 60/Slide m 7 Lubr. Rig 0.75 Out - m 3032 In PUMP 8 Repair Rig In - m 3009 3032 Liner Length 9 Cut Off D.L. Metres 23 23 No. mm mm SPM 10 Dev. Survey 0.75 Hours 15.50 9.75 1 140 235 120 11 Wireline Log Condition 3-2-I Run 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
1 sx Xanvis PP Output AV Power 15 Test BOP 20 sxs Beads kPa Umin m/min kW 16 DST
2 sxs Caustic 14 500 1300 90/49 314 17 Plug Back 86 sxs Barite 1300 90/49 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Background Gas: 3032 m - 22 units 21 Handle Tool 2.50 Connection Gas: 3032 m - 11 units 22 Clean to Btm 1.25 Trip Gas: 3032 m - 175 units 23 Gas Show: Nil 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Tripped out for failed mud motor. Changed out motor and MWD (intermittent failures). Tripped in drill collars and checked motor. Serviced rig and function tested rams. Tripped in. Service rig and checked motor kills. Reamed and cleaned to bottom from 3018 m to 3032 m. Slide from 3032 m to 3036 m. Surveyed. Rotated from 3036 m to 3043 m. Slide from 3043 m to 3046 m. Serviced rig and checked brake linkage. Surveyed. Rotated from 3046 m to 3053 m. Slide from 3053 m to 3055 m. Average ROP: 2.36 m/h.
Hook Load: 91 000 daN Up Drag: 12 to 251000 daN Down Drag: 8 to 12 000 daN RSPP 1: 6 000 kPa at 58 SPM
Page No. 137
J
PUMP Liner Length
No. mm mm 1 140 235 2 140 235
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -14 °C Road
Good
Date 97 03 25 Well GENOIL et al ST. LEONARD NO. 1 Rig
Ralex, 1
Day No. 119 Depth 3102 m Progress 47 m Hole Size 215.9 mm Status Wiper trip Mud: Wt 1210 kg/rn3 Visc. 82 s/L W.L. 6.0 cm3 pH 9.0 PV 40 Methyl Blue 45 Solids 0.13 % Filter Cake 2 mm Salt Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. 6RPM-16 3RPM-13
mPa.s YP 22 Pa Gels 17/22 Pa 400 mg/L Cal. 60 mg/L kg/m' Rate Umin kg/m3 Rate Umin kg/m3
No. 8 Size - mm 215.9 Type F3PP S.N. LF7928 Jets - mm Wt. - daN 15 000 r/min 60/Slide Out - m In In - m 3032 Metres 70 Hours 30.50 Condition Inc
1x14.3/2X11.1
BITS SURVEYS 3029 m 19.00 3038 m 18.50 3048 m 17.80 3057 m 17.70 3066 m 17.90 3076 m 18.30 3085 m 18.70
TIME DISTRIBUTION Code/Operation Hours
'325.9 1 RU & RD '326.0 2 Drill Actual 19.75 '325.3 3 Reaming '324.6 4 Coring °323.6 5 Cond. Hole 0.50 '322.2 6 Trips 1.75 °322.8 7 Lubr. Rig 0.50
8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 1.50 120 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
314 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
DRILLING MUD ADDITIVES USED:
HYDRAULIC
4 sx Xanvis
PP
Output AV
2 sxs Caustic
kPa
Umin m/min 14 500
1300 90/49
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB Circulated and worked pipe. Drilled from 3055 m to 3065 m. Serviced rig and function tested BO 3074 m. Surveyed. Drilled from 3074 m to 3083 m. Surveyed. Serviced rig. Checked motor kills, Circulated and worked pipe. Pumped out 6 singles to 3046 m. Pulled out of hole. Maximum pull trip to 2600 m, ran in hole. Rotated from 3055 m to 3074 m. Slide from 3074 m to 3077 m. Slide 3085 m to 3102 m.
Pick Up Weight: 12 to 25 000 daN over string weight Slack Off Weight: 8 to 10 000 daN under string weight String Weight: 92 000 daN RRSP 1: 6200 kPa at 60 SPM
ESTIMATED COSTS: DAILY $
36 955 CUMULATIVE $ 5 063 295 SUPERVISOR M. Kramps/D. Gaboury
Page No. 138
J
to CF, description of drill string, etc.) Ps. Surveyed. Drilled from 3065 m to okay. Drilled from 3083 m to 3102 m.
over string weight 40 000 daN, wiper from 3083 to 3085 m. Rotated from
ESTIMATED COSTS: DAILY $ 44 249 CUMULATIVE $ 5 107 544 SUPERVISOR M. Kramps/D. Gaboury
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather CLoudy Temp 4 °C Road Good Date 97 03 26 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 120 Depth 3125 m Progress 23 m Hole Size 215.9 mm Status Tripping Mud: Wt 1195 kg/m3 Visc. 120 s/L W.L. 6.0 cm' pH 9.0 PV 50 mPa.s YP 22.5 Pa Gels 17/24 Pa Methyl Blue 49 Solids 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m3 Rate L/min Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
6RPM-18 3RPM-15
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 8 3075 m 18.30 '322.0 1 RU & RD
Size - mm 215.9 3085 m 18.70 °322.0 2 Drill Actual 15.50 Type F3PP 3094 m 19.70 °323.5 3 Reaming 0.50 S.N. LF7928 3104 m 20.60 0324.7 4 Coring Jets - mm 1x14.3/2x11.1 m ° 5 Cond. Hole 0.50 Wt. - daN 15 000 m 6 Trips 6.25 r/min 60/Slide m ° 7 Lubr. Rig 0.50 Out - m In PUMP 8 Repair Rig In - m 3032 Liner Length 9 Cut Off D.L.
Metres 93 No. mm mm SPM 10 Dev. Survey 0.75 Hours 46.00 1 140 235 120 11 Wireline Log Condition Inc 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
3 sx Xanvis PP Output AV Power 15 Test BOP 2 sxs Caustic kPa L/min m/min kW 16 DST
50 sxs Gel 14 500 1300 90/49 314 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Background Gas: 4 to 16 units 21 Handle Tool Connection Gas: 4 to 37 units 22 Clean to Btm Gas Show at 3117.5 m - 442 units 23
24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Wiper trip to 2600 m. Tight spots at 2842 m, 2747 m and 2600 m. Serviced rig. Checked brakes, function tested BOPs and checked crown stopper. Ran in hole to 3085 m. Washed and reamed from 3085 m to 3102 m. Serviced rig and surveyed at 3085 m. Drilled and surveyed to 3125 m. Motor stalling out. Circulated and pulled out of hole. Pumped out six singles - pulled to 2690 m - stuck in hole. Broke out one single, established circulation. Worked pipe free, continued to trip out. Slide from 3102 m to 3105 m, 3111 m and 3114 m and 3121 m to 3125 m. Serviced rig. Held BOPs drill and checked motor shut offs.
Pick Up Weight: 12 to 25 000 daN over string weight Slack Off Weight: 8 to 10 000 daN under string weight String Weight: 92 000 daN
RSPP 1: 6250 kPa at 60 SPM
Page No. 139
ESTIMATED COSTS: DAILY $ 41 819 CUMULATIVE $ 5 148 563 SUPERVISOR M. Kramps/D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -6 'C Road Good Date 97 03 27 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 121 Depth 3125 m Progress 0 m Hole Size 215.9 mm Status Working junk sub Mud: Wt 1200 kg/m' Visc. 106 s/L W.L. 6.0 cm' pH 9.0 PV 44 mPa.s YP 19 Pa Gels 17/22 Pa Methyl Blue 46 Solids 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m' 6RPM-13 3 RPM -10
ti BITS SURVEYS
TIME DISTRIBUTION Code/Operation Hours
No. 8 9 m 1 RU & RD Size - mm 215.9 215.9 m 2 Drill Actual Type F3PP F5 m 3 Reaming 9.00
S.N. LF7928 LF4637 m 4 Coring Jets - mm 1x14.3/2x11.1 1x14.3/2x11.1 m 5 Cond. Hole 0.25 Wt. - daN 15 000 5 - 7 000 m 6 Trips 10.75 r/min 60/Slide 60 - 120 m 7 Lubr. Rig 0.50 Out - m 3125 PUMP 8 Repair Rig
In - m 3032 3125 Liner Length 9 Cut Off D.L. 1.00 Metres 93 No. mm mm SPM 10 Dev. Survey Hours 46.00 1 140 235 120 11 Wireline Log
Condition 8-8-In Inc 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 1 sx Caustic PP Output AV Power 15 Test BOP
kPa Umin m/min kW 16 DST 14 500 1300 90/49 314 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Damaged tube on one joint Grade "G" drillpipe when stuck at 2650 m. 21 Handle Tool 1.00
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Tripped out. Tight spot at 2568 m - worked tight hole to 2560 m - continued to pull out of hole - racked motor in derrick - slipped and cut - handled tools - serviced rig and functioned tested BOPs. Ran in hole to shoe, serviced rig - checked brakes. Ran in hole to 2583 m. Reamed to 2600 m, ran in hole to 2631 m - reamed to 2731 m - ran in hole to 3035 m. Reamed from 3035 m to 3125 m undergauged hole from 3120 m to 3125 m hard reaming at this point. Worked junk sub and attempted to bypass iron left in hole.
String Weight: 87 000 daN Hole Drag Up: 10 - 30 000 daN with peaks at t 30 000 daN Drag Down: 8 - 10 000 daN
Page No. 140
J
BITS No. 9 10 Size - mm 215.9 215.9 Type F5 HP61A S.N. LF4637 JT6152 Jets - mm 1x14.3/2x11.1 1x14.3/2x11.1 Wt. - daN 5-7000 5-15000 r/min 60 - 120 60/Slide Out - m 3131 In In - m 3125 3131 Metres 6 5 Hours 4.00 3.00 Condition 5-3-2 Inc.
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -5 °C Road Good
Date 97 03 28
Well GENOIL et al ST. LEONARD NO. 1
Rig
Ralex, 1
Day No. 122 215.9 mm Status Drilling
cm3 pH 9.0 PV 46 mPa.s YP 21 Pa 2 mm Salt 400 mg/L Cal.
L/min Desander Underflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Overflow Wt. kg/m'
Depth 3136 m Progress 11 m Hole Size Mud: Wt 1195 kg/m' Visc. 102 s/L W.L. 7.0 Methyl Blue 47 Solids 0.13 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m' 6RPM-15 3RPM-13
Gels 17/25 Pa 80 mg/L
L/min
PUMP Liner Length
No. mm mm 1 140 235 2 140 235
8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey
125 11 Wireline Log 12 Run Csg/Cmt
TIME DISTRIBUTION SURVEYS
Code/Operation Hours
3113 m 20.2 °325.7 1 RU & RD 3123 m 19.7 °325.1 2 Drill Actual 7.00
m
3 Reaming
m
4 Coring
m
5 Cond. Hole 1.50
m
6 Trips 12.00
m
7 Lubr. Rig 0.75
DRILLING MUD ADDITIVES USED: 2 sxs Caustic
50 sxs Gel 1 sx Xanvis
13 Wait on Cmt
HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST
14 500 1300 90/49 314 17 Plug Back 25 sxs Barite
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
20 Directional Background Gas: 13 - 48 units
21 Handle Tool 2.00
Trip Gas: 3131 m -222 units
22 Clean to Btm 23 Worked 24 Junk Sub 0.75 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Worked iunk sub. Drilled from 3125 m to 3126 m. Serviced rig and function tested BOPs. Drilling from 3126 m to 3131 m. Worked junk sub every metre. Circulated and worked pipe. Pumped out 9 singles. Overpulled to 30 000 daN. Pulled out of the hole and changed the bottomhole assembly. Serviced rig. Checked motor kills. Ran in hole with bottomhole assembly and tested MWD. Ran in the hole to the shoe. Filled pipe. Ran in hole to 3064 m. Reamed and cleaned to bottom. Rotary drilled from 3131 m to 3133 m. Serviced rig. Function tested BOPs and checked motor kills. Drilled - slide from 3133 m to 3136 m. NOTE: Recovered several inserts plus fragments of nose debris in funk sub.
ROP at 06:00: 1.8 m/h String Weight: 94 000 daN Pick Up Weight: 130 000 daN Slack Off: 84 000 daN RRSP 1: 6 250 kPa at 60 SPM Hole Drag Up: 15 to 25 000 daN with peaks to 35 000 daN
ESTIMATED COSTS: DAILY $
38 692 CUMULATIVE $ 5 235 998 SUPERVISOR M. Kramps/D. Gaboury
Page No. 141
SURVEYS 3113 ni 20.2 '325.7 3123 m 19.7 '325.1 3132 m 19.3 °324.8 3142 m 18.5 °324.8 3151 m 17.7 '324.0 3160 m 17.2 °324.0
m ° PUMP
Liner Length No. mm mm SPM
1 140 235 128 2 140 235
HYDRAULIC Output AV
Power Umin m/min
kW 1408 90/49
375
CrISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp
6 'C Road Good
Date 97 03 29 Well GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1
Day No. 123 Depth 3180 m Progress 44 m Hole Size 215.9 mm Status Drilling Mud: Wt 1195 kg/rn3 Visc. 105 s/L W.L. 8.0 cm' pH 9.5 PV 47 mPa.s YP 23 Pa Gels 16/25 Pa Methyl Blue 48 Solids 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate L/min Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3 6RPM-15 3RPM-13
BITS No. 10 Size - mm 215.9 Type HP61A S.N. JT6152 Jets - mm 1x14.3/2x11.1 Wt. - daN 5 - 15 000 r/min 60/Slide Out - m In In - m 3131 Metres 49 Hours 24.75 Condition
DRILLING MUD ADDITIVES USED: 3 sxs Caustic
15 sxs Gel 2 sxs Xanvis
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 19.50 3 Reaming 4 Coring 5 Cond. Hole 6 Trips 2.75 7 Lubr. Rig 0.75 8 Repair Rig 9 Cut Off D.L. 10 Dev. Survey 1.00 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up 15 Test BOP 16 DST 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
PP kPa 1600
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas: 3135 m to 3147 m - 28 to 16 units
3147 m to 3175 m-16 to 8 units Gas Show: 3134.25 m to 3134.5 m - 316 units
3175 m to 3176 m - 1182 units
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled from 3136 m to 3140 ni (rotated). Serviced rig and function tested BOPS. Surveyed. Slide drilled from 3140 ni to 3143 m. Rotated from 3143 m to 3149 m. Surveyed. Slide drilled from 3149 ni to 3153 m. Rotated from 3153 m to 3159 m. Serviced rig and function tested BOPs. Checked brakes and crown stopper, Surveyed. Rotated from 3159 m to 3168 m. Serviced rig and function tested BOPs. Checked brakes. Surveyed. Drilled from 3168 m to 3180 m at 06:00.
ROP: 2 m/h String Weight: 94 000 daN Pick Up Weight: 128 000 daN Slack Off Weight: 80 01)0 daN
RSPP 1: 5000 kPa at 58 SPM
ESTIMATED COSTS: DAILY $
35 386 CUMULATIVE $ 5 271 384 SUPERVISOR
M. Kramps/D. Gaboury
Page No. 142
No. 10 Size - mm 215.9 Type HP61A S.N. JT6152 Jets - mm 1x14.3/2x11.1 Wt. - daN 5 - 15 000 r/min 60/Slide Out - m In In - m 3131 Metres 66 Hours 32.25 Condition
DRILLING MUD ADDITIVES USED: 2 sxs Caustic
10 sxs Gel 1 sx Drispac
40 sxs Barite
SURVEYS 3170 m 17.0 3180 m 17.3
m m m m m
PUMP Liner Length
No. mm mm 1 140 235 2 140 235
HYDRAULIC PP
Output AV kPa
L/min m/min 16 000
1408 90/49
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas: 3175 m to 3197 m - 330 to 1780 units Gas Show: 3189 m to 3190 m - 1822 units, 3182 m to 3182.5 m - 1585 units
BITS
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp
2 °C Road
Good
Date 97 03 30 Well GENOIL et al ST. LEONARD NO. 1
Rig
Ralex, 1
Day No. 124 Depth 3197 m Progress 17 m Hole Size 215.9 mm Status Reaming Mud: Wt 1195 kg/m' Visc. 100 s/L W.L. 6.5
cm3 pH 9.0 PV 50 mPa.s YP 21 Pa Gels 16/24 Pa
Methyl Blue 48 Solids 0.13 % Filter Cake
2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. kg/m'
Centrifuge Overflow Wt. kg/m'
6RPM-15 3RPM-13
°324.7
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9 10
RU & RD °324.7 Drill Actual 8.25 ° Reaming 12.00 ° Coring
Cond. Hole 0.25 ° Trips 2.50 ° Lubr. Rig 0.25
SPM
Repair Rig Cut Off D.L. Dev. Survey 0.50
128 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
375 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Flow Check 0.25 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Flow check. Installed rubber for rotating head because of gas influx. Drilled from 3178 m. Rotated to 3187 m. Serviced rig and function tested BOPS. Surveyed. Drilled from 3187 m. Rotated to 3197 m. Circulated - wiper trip to 2500 m. Ran in hole to 2588 m. Reamed from 2588 m to 2720 m. Held safety meetings.
String Weight: 94 000 daN Pick Up Weight: 128 000 daN Slack Off Weight: 80 000 daN RSPP 1: 7200 kPa at 80 SPM
ESTIMATED COSTS: DAILY $
41 013 CUMULATIVE $ 5 312 397 SUPERVISOR M. Kramps/D. Gaboury
Page No. 143
J
BITS
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas: 10 to 110 units Gas Show: 3197 m - 3345 units
SURVEYS 3189 m 17.7 3199 m 18.3
m m m m m
PUMP Liner Length mm mm 140 235 140 235
HYDRAULIC PP Output AV kPa Umin m/min
16 500 1408 90/49
No. 10 Size - mm 215.9 Type HP61A S.N. JT6152 Jets - mm Wt. - daN r/min 60/Slide Out - m In
1x14.3/2x11.1 5-15000
In - m 3131 Metres 87 Hours 46.75 Condition 8-8-I
No. 1 2
DRILLING MUD ADDITIVES USED: 1 sx Caustic
75 sxs Gel 8 sxs Drispac
478 sxs Barite
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Snowing
Temp -5 oC Road
Good
Date 97 03 31
Well GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1
Day No. 125 Depth 3218 m Progress 21 m Hole Size
215.9 mm Status Tripping
Mud: Wt 1190 kg/m3 Visc. Methyl Blue 48 Solids Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. 2250 kg/m'
95 s/L W.L. 6.0 cm' pH 9.0 PV 49 mPa.s YP 16 Pa Gels 16/30 Pa 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L
Umin Desander Underflow Wt. kg/m' Rate
L/min Umin Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Overflow Wt. 11.40 kg/m'
6RPM-16 3RPM-13
0 324.2
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
°323.7 2 Drill Actual 14.50 3 Reaming 2.75 4 Coring 5 Cond. Hole 6 Trips 4.75 7 Lubr. Rig 0.75 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 1.25 128 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
387 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed from 2720 m to 2950 m. Ran in hole to 2177 m. Serviced rig and function tested BOPS. Checked motor kills. Held safety meetings. Reamed from 3177 m to 3197 m. Drilled from 3197 m (slide) to 3199 m. Rotated from 3199 m to 3206 m. Surveyed. Drilled from 3206 m (slide) to 3209 m. Rotated from 3209 m to 3216 m. Serviced rig and function tested BOPs. Surveyed. Drilled from 3216 m (slide) to 3218 m. Slow progress - motor stalling. Pumped out 14 singles. Maximum pull 35 000 daN over string weight. Pulled out of hole. Worked through tight spot at 2720 m. Serviced rig and flow checked. Pulled out of hole.
String Weight: 94 000 daN Pick Up Weight: 128 000 daN Slack Off Weight: 76 000 daN RSPP 1: 7 500 kPa at 60 SPM
ESTIMATED COSTS: DAILY $ 45 629 CUMULATIVE $ 5 358 026 SUPERVISOR M. Kramps/D. Gaboury
Page No. 144
Weather Well GENOIL et al ST. LEONARD NO. 1
Clear
Temp -8 °C Road
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Rig Ralex, 1 Day No. 126 Good
Date 97 04 01
Depth 3231 m Progress 13 m Hole Size 215.9 mm Status Drilling Mud: Wt 1180 kg/m' Visc. 105 s/L W.L. 6.0 cm' pH 9.0 PV 40 mPa.s YP 17 Pa Gels 20/30 Pa Methyl Blue 48 Solids 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. kg/m3 Rate I./min Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m3 Rate L/min Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6RPM-20 3RPM-18
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 10 11 3203 m 18.6 °323.5 1 RU & RD Size - mm 215.9 215.9 3213 m 18.8 °323.5 2 Drill Actual 6.50 Type HP61A F4 m 3 Reaming 1.00 S.N. JT6152 LJ6534 m 4 Coring Jets - mm 1x14.3/2x11.1 3 x 15.9 m 5 Cond. Hole Wt. - daN 5 - 15 000 5 - 15 000 m 6 Trips 9.00 r/min 60/Slide 60/Slide m 7 Lubr. Rig 0.50 Out - m 3218 In PUMP 8 Repair Rig 5.50 In - m 3131 3218 Liner Length 9 Cut Off D.L. 0.75 Metres 87 13 No. mm mm SPM 10 Dev. Survey 0.75 Hours 46.75 6.50 1 140 235 130 11 Wireline Log Condition 8-8-1 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
2 sxs Caustic PP Output AV Power 15 Test BOP 72 sxs Barite kPa 1../min m/min kW 16 DST
14 500 1430 104/54 345 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas: 0 units
20 Directional 21 Handle Tool
Trip Gas: 850 units 22 Clean to Btm Connection Gas: 0 units 23
24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Pulled out of hole. Service rig. Changed out motor and bit. Ran in hole with bottomhole assembly. Slipped and cut. Ran in hole to 2120 m. Filled pipe. Ran in hole to 3216 m. Serviced rig. Function tested BOPs. Reamed from 3216 m to 3218 m. Drilled from 3218 m to 3220 m. Surveyed. Slide from 3220 m to 3224 m. Rotated from 3224 m to 3229 m. Broke low chain. Repaired same. Rotated from 3229 m to 3230 m. Repaired low chain. Surveyed. Slide from 3230 m to 3231 m. NOTE: All rig repair time due to broken low drive chain.
ROP: 2 m/h String Weight: 94 000 daN Pick Up Weight: 134 000 daN Slack Off Weight: 74 000 daN
ESTIMATED COSTS: DAILY $ 39 924 CUMULATIVE $ 5 397 950 SUPERVISOR M. Kramps/D. Gaboury
Page No. 145
I
BISSETT RESOURCE CONSULTANTS LTD. Calts
DAILY DRILLING REPORT
Weather Clear Temp -4 0C Road Good Date 97 04 02 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 127 Depth 3273 m Progress 42 m Hole Size 215.9 mm Status Drilling Mud: Wt 1200 kg/m' Visc. 110 s/L W.L. 6.0 cm' pH 9.0 PV 40 mPa.s YP 17.5 Pa Gels 17/28 Pa Methyl Blue 48 Solids 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6RPM-19 3RPM-17
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 11 Size - mm 215.9 Type F461A S.N. LJ6534 Jets - mm 3x15.9 Wt. - daN 5 - 15 000
3222 m 18.2 '323.8 3232 m 18.0 '323.9 3241 m 17.9 '324.3 3250 m 17.8 '326.1
m m
1 RU & RD 2 Drill Actual 21.75 3 Reaming 4 Coring 5 Cond. Hole 6 Trips
r/min 60/Slide m 7 Lubr. Rig 0.75 Out - m In PUMP 8 Repair Rig In - m 3218 Liner Length 9 Cut Off D.L. Metres 55 No. mm mm SPM 10 Dev. Survey 1.50 Hours 28.25 1 140 235 11 Wireline Log Condition Run 2 140 235 128 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
3 sxs Caustic PP Output AV Power 15 Test BOP 235 sxs Barite kPa Umin m/min kW 16 DST
6 sxs Drispac 15 000 1408 90/49 352 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Background Gas: 45 units 21 Handle Tool
Trip Gas: - 22 Clean to Btm Connection Gas: 145 units 23 Gas Show: 246 units at 3248 m KB 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Slide from 3231 m to 3233 m KB. Serviced rig and function tested BOPs. Slide from 3233 m to 3234 m KB. Rotated from 3234 m to 3439 m KB. Worked pipe and surveyed. Slide from 3239 m to 3244 m KB, rotated from 3249 m to 3449 m KB. Worked pipe and surveyed. Slide from 3239 m to 3254 m KB, rotated from 3254 m to 3258 m KB. Serviced rig and function tested top rams. Surveyed. Slide from 3258 m to 3265 m KB, rotated from 3265 m to 3267 m KB. Serviced rig and function tested Hydril. Surveyed. Slide from 3267 m to 3272 m KB. Rotated from 3272 to 3273 m KB.
String Weight: 94 000 daN Drag Up: 36 000 daN Drag Down: 20 000 daN RSPP 1: 6 000 kPa at 60 SPM
ESTIMATED COSTS: DAILY $ 38 424 CUMULATIVE $ 5 436 374 SUPERVISOR M. Kramps/R. Genest
Page No. 146
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -8 'C Road Good Date 97 04 03 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 128 Depth 3285 m Progress 12 m Hole Size 215.9 mm Status Cleaning to bottom Mud: Wt 1180 kg/m3 Visc. 70 s/L W.L. 7.0 cm' pH 9.0 PV 35 mPa.s YP 12.5 Pa Gels 8/16 Pa Methyl Blue 40 Solids 0.13 % Filter Cake 2 mm Salt 400 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate 1.../min Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6 RPM -10 3RPM-7
BITS SURVEYS
No. 11 3259 m 17.6 Size - mm 215.9 m Type F4 m S.N. LJ6534 m Jets - mm 3x15.9 m Wt. - daN 5 - 15 000 m r/min 60/Slide m Out - m In PUMP In - m 3218 Liner Length Metres 67 No. mm mm Hours 34.00 1 140 235 Condition Run 2 140 235
DRILLING MUD ADDITIVES USED: HYDRAULIC 6 sxs Caustic 47 sxs Gel PP Output AV
196 sxs Barite 4 sxs Lignite kPa 1../min m/min 4 sxs Drispac 13 500 1430 90/49
22 sxs Beads
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Background Gas: 3285 m - 109 units Trip Gas: 3285 m - 3081 units Connection Gas: 3280 m - 237 units Gas Show: 3285 - 1267 units
'327.0
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9 10
RU & RD ° Drill Actual 5.75
Reaming 1.00 ° Coring
Cond. Hole 3.75 ° Trips 4.00 ° Lubr. Rig 0.50
SPM
Repair Rig Cut Off D.L. Dev. Survey 0.25
130 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
321 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 0.50 23 Cond. Mud 8.25 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Rotated from 3273 m to 3276 m KB. Slide from 3276 m to 3282 m KB. Rotated from 3282 m to 3285 m KB. Worked pipe and surveyed. Circulated sample. Serviced rig and function tested BOPs and checked brakes. Wiper trip to casing. Tight from 2713 m to 2530 m KB. Cleaned tanks. Serviced rig. Cleaned tanks and built volume. Circulated hole and mixed mud from casing shoe. Tripped in. Reamed tight hole from 2690 m to 2710 m KB. Ran in to 3154 m KB. Cleaned to bottom and reamed from 3154 m to 3182 m KB.
String Weight: 94 000 daN Up Drag: 30 to 36 000 daN Down Drag: 20 000 daN RSPP 1: 7250 kPa at 80 SPM
ESTIMATED COSTS: DAILY $ 39 274 CUMULATIVE $ 5 475 648 SUPERVISOR M. Kramps/R. Genest
Page No. 147
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 2 °C Road Good Date 97 04 04 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 129 Depth 3321 m Progress 36 m Hole Size 215.9 mm Status Drilling Mud: Wt 1200 kg/rn3 Visc. 140 s/L W.L. 7.5 cm3 pH 7.8 PV 55 mPa.s YP 22 Pa Gels 19/30 Pa Methyl Blue 57 Solids 12.6 % Filter Cake 2 mm Salt 150 mg/L Cal. 80 mg/L
Umin L/min
Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. kg/m3 Rate Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6RPM-21 3RPM-19
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 11 3278 m 16.7 °328.1 1 RU & RD Size - mm 215.9 3287 m 16.3 °329.1 2 Drill Actual 16.00 Type F4 3296 m 16.6 0 329.6 3 Reaming 2.00 S.N. LJ6534 m ° 4 Coring Jets - mm 3x15.9 m 5 Cond. Hole 3.00 Wt. - daN 19 000 m ° 6 Trips r/min 60/Slide m 7 Lubr. Rig 0.75 Out - m In PUMP 8 Repair Rig In - m 3218 Liner Length 9 Cut Off D.L. Metres 103 No. mm mm SPM 10 Dev. Survey 1.25 Hours 50.00 1 140 235 11 Wireline Log Condition 2 140 235 128 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
1 sx Caustic 113 sxs Gel PP Output AV Power 15 Test BOP 196 sxs Barite 1 sx Lignite kPa Umin m/min kW 16 DST
3 sxs Drispac 15 500 1410 103/53 364 17 Plug Back 1 sx Xanvis 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Background Gas: 3321 m - 386 units 21 Handle Tool Trip Gas: n/a 22 Clean to Btm 1.00 Connection Gas: 3321 m - 2264 units 23 Gas Show: 3308 m - 686 units; 3317 m 800 units 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated to condition mud. Reamed from 3182 m to 3220 m KB. Ran in hole. Cleaned to bottom (5 m fill). Serviced rig and function tested BOPS. Slide from 3285 m to 3288 m KB. Rotated from 3288 m to 3295 m KB. Serviced rig and function tested Hydril. Slide from 3295 m to 3299 m KB. Rotated from 3299 m to 3304 m KB. Surveyed. Slide from 3304 m to 3305 m KB. Rotated from 3305 m to 3313 m KB. Serviced rig and function tested BOPs. Surveyed. Rotated from 3313 m to 3321 m KB.
String Weight: 95 000 daN Hole Drag Up: 40 000 daN Hole Drag Down: 22 000 daN RSPP 1: 5 000 kPa at 55 SPM
ESTIMATED COSTS: DAILY $ 38 011 CUMULATIVE $ 5 513 659 SUPERVISOR M. Kramps/R. Genest
Page No. 148
Clear Temp -4 'C Road Good Weather Date 97 04 05 Well GENOIL et al ST. LEONARD NO. 1 Depth 3343 m Progress 22 m Hole Size Mud: Wt 1195 kg/m3 Visc. 117 s/L W.L. 7.0 Methyl Blue 50 Solids 12.3 % Filter Cake Desilter Underflow Wt. kg/m3 Rate Desilter Overflow Wt. kg/m3 Rate Centrifuge Underflow Wt. kg/m3 6RPM-19 3RPM-17
cm3 pH 9.0 PV 60 mPa.s YP 23 Pa Gels 17/24 Pa 2 mm Salt 150 mg/L Cal. 80 mg/L
Umin Desander Underflow Wt. kg/m3 Rate Umin Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Overflow Wt. kg/m3
Day No. 130 215.9
Ralex, 1 Tripping
Rig mm Status
203 sxs Barite 3 sxs Lignite kPa Umin m/min kW 16 DST
SURVEYS 3306 m 17.0 0 330.5
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6
RU & RD 3316 m 17.0 '331.0 Drill Actual 10.25
m Reaming m Coring m Cond. Hole m Trips 6.75 m 7 Lubr. Rig 0.50
PUMP 8 Repair Rig Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey 1.00 1 140 235 11 Wireline Log 2 140 235 130 12 Run Csg/Cmt
13 Wait on Cmt HYDRAULIC 14 Nipple Up
5 sxs Caustic 115 sxs Gel PP Output AV Power 15 Test BOP
BITS No. 11 Size - mm 215.9 Type F4 S.N. LJ6534 Jets - mm 3x15.9 Wt. - daN 19 000 r/min 60/Slide Out - m 3343 In - m 3218 Metres 125 Hours 60.25 Condition 3-3-1
DRILLING MUD ADDITIVES USED:
Cl BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
4 sxs Drispac 5 sxs Beads 15 500 1410 103/53 364 17 Plug Back 4 sxs Xanvis
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Rotated from 3321 m to 3323 m KB. Surveyed. Slide from 3323 m to 3327 m KB. Rotated from 3327 m to 3333 m KB. Serviced rig. Checked motor kills and brakes. Surveyed. Slide from 3333 m to 3335 m KB. Rotated from 3335 m to 3342 m KB. Serviced rig and function tested BOPs. Surveyed. Rotated from 3342 m to 3343 m KB. MWD failed. Circulated to condition mud. Worked pipe. Pumped out 12 singles. Tripped out with flow checks. Worked tight spot from 2650 m to 2670 m KB. Pulled 42 000 daN over with pump on for 12 singles - 42 000 daN over for first stand with no pump.
String Weight: 95 000 daN Drag Up: 40 000 daN Drag Down: 19 000 daN RSPP 2: 6 500 kPa at 75 SPM
ESTIMATED COSTS: DAILY $
42 006 CUMULATIVE $ 5 555 665 SUPERVISOR M. Kramps/R. Genest
Page No. 149
I
18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Cond. Mud 5.50 24 25
CrISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Raining Temp 4 'C Road Good Date 97 04 06 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 131 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Circulating top of fish Mud: Wt 1200 kg/m' Visc. 160 s/L W.L. 7.0 cm' pH 8.0 PV 61 mPa.s YP 24 Pa Gels 9/18 Pa Methyl Blue 60 Solids 12.6 % Filter Cake 1.5 mm Salt 100 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3 6RPM-20 3RPM-18
BITS No. 12
SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 3 Reaming 4 Coring
Cond. Hole 6 Trips 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L. 10 Dev. Survey 11 Wireline Log 12 Run Csg/Cmt
Size - mm 215.9 m Type EHP61A m 9.00 S.N. m ° Jets - mm 3x15.9 m 0 5 1.00 Wt. - daN m 9.50 r/min m 0.75 Out - m In PUMP
SPM In - m 3343 Liner Length 0.75 Metres No. mm mm Hours 1 140 235 Condition 2 140 235
DRILLING MUD ADDITIVES USED: 2 sxs Caustic
HYDRAULIC PP Output AV kPa Umin rn/min
Power kW
13 Wait on Cmt 14 Nipple Up 15 Test BOP 16 DST 17 Plug Back 18 Squeeze Cmt
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Pulled to 140 000 daN while reaming.
19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Check MWD
1.50 Pulled to 130 000 daN with pump to trip out first 13 singles. Maximum pull of 130 000 daN on 12 stands. 0.25 Pipe parted with 125 000 daN maximum. 24 Time Change 1.00
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Tripped out. Serviced rig and changed out mud motor and MWD. Serviced rig. Closed blind rams and function tested BOPs. Tripped in drill collars and HW drillpipe and 5 stands drillpipe. Tested MWD (100 SPM - 5 500 kPa). Slipped and cut drilling line. Tripped in (fill every 30 stands). Accumulator check. Reamed from 2600 m to 2606 m KB. Serviced rig. Reamed from 2606 m to 2735 m KB. Ran in 6 stands and 1 single. Reamed from 2878 m to 2906 m KB. Ran 5 stands. Reamed from 3001 m to 3080 m KB. Serviced rig. Changed pumps, lost ±4 000 kPa pump pressure. Checked surface equipment. Pulled 9 singles (pumped as necessary). Laid down single from u-door. Pulled 4 singles (pumped as required). Pulled 12 stands (pipe parted). Circulated hole clean above fish.
ESTIMATED COSTS: DAILY $ 29 336 CUMULATIVE $ 5 585 001 SUPERVISOR M. Kramps/R. Genest
Page No. 150
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp Well GENOIL et al ST. LEONARD NO. 1 Depth 3343 m Progress 0 m Hole Size Mud: Wt 1195 kg/m' Visc. 155 s/L W.L. 8.0 Methyl Blue 57 Solids 12.5 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underfiow Wt. kg/m' 6RPM-19 3RPM-17
Rig Ralex 1 Day No. 215.9 mm Status Fishing
cm3 pH 8.5 PV 60 mPa.s YP 23 Pa Gels 1.5 mm Salt 100 mg/L Cal. 80
Umin Desander Underfiow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate
Centrifuge Overflow Wt. kg/m'
5 °C Road
Good
Date 97 04 07 132
8/17 Pa mg/L Umin Umin
TIME DISTRIBUTION BITS
No. 13 Size - mm 215.9 Type STCMFD9HL S.N. LT 7510 Jets - mm 3x28 Wt. - daN Nil r/min 20 Out - m 3343 In - m 3343 Metres Hours Condition Tag Fish
SURVEYS m m m
Code/Operation Hours 1 RU & RD 2 Drill Actual 3 Reaming 4 Coring 5 Cond. Hole 5.00
m m m m PUMP
Liner
Length No. mm mm
1 140
235 2 140
235
6 Trips 16.25 7 Lubr. Rig 0.75 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey
115 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED:
HYDRAULIC 14 Nipple Up
2 sxs Caustic
PP Output AV Power 15 Test BOP
1 sx Drispac
kPa Umin m/min kW 16 DST
1 sx Spercene
12 500 1270 105/54 265 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
20 Directional 21 Handle Tool 2.00 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated. Tripped out, strapped drill string. Found wash out in slip area on 29th joint drillpipe above drill collars. Fish details: 446.13 m total length, top at 2142.0 m KB, base at 2588.15 m KB when string parted. Laid one joint drillpipe with stub onto catwalk. WOO. Crew decided to break out parted stub off last joint of drillpipe. Single with stub was inverted, run in hole and set in slips. Driller did not close pipe rams. When connection broke, slips jumped out and one joint drillpipe and short stub fell into the casing on top of fish no. 1 (overall length of fish no. 2 = 9.90 m). Picked up and ran 206.4 mm x 158.8 mm overshot and 3 - 171 mm OD drill collars. Laid down overshot and ran bit 13. Tripped in very slowly. Tagged fill at 2573.5 m KB. Broke circulation and cleaned 2.5 m fill. Tagged top of fish at 2576.0 m KB with 2 000 daN maximum weight. Circulated to condition mud and hole. Tripped out bit 13. Picking up fishing tools at report time.
NOTE: No marks on bit from fish.
ESTIMATED COSTS: DAILY $ 32 274 CUMULATIVE $ 5 617 275 SUPERVISOR M. Kramps/R. Genest
Page No. 151
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp -4 °C Road Good Date 97 04 08
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 133 Depth 3343 m Progress 0 m Hole Size 219.9 mm Status Reaming Mud: Wt 1190 kg/m3 Visc. 190 s/L W.L. 8.0 cm3 pH 8.5 PV 56 mPa.s YP 20.5 Pa Gels 12/33 Pa Methyl Blue 56 Solids 12.0 % Filter Cake 1.5 mm Salt 100 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m' 6 RPM - 31 3 RPM - 27
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
m • 1 RU & RD m ° 2 Drill Actual m 0 3 Reaming 8.75 m c 4 Coring m • 5 Cond. Hole m • 6 Trips 11.25 m • 7 Lubr. Rig 0.25
PUMP 8 Repair Rig Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey 1 140 235 130 11 Wireline Log 2 140 235 130 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
2 sxs Caustic PP Output AV Power 15 Test BOP 2 sxs Drispac kPa Umin m/min kW 16 DST 2 sxs Lignite 8 400 1430 90/49 197 17 Plug Back
8 400 1430 90/49 197 18 Squeeze Cmt 19 Fishing 0.75
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 3.00 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Made up and ran 206 mm x 159 mm overshot, 6 - 171 mm OD drill collars and jars. Broke circulation and worked overshot to 2576 m KB. Worked overshot, attempted to latch onto fish. No surface indication that fish is in overshot. Tripped out, did not recover fish. There were no markings on overshot to indicate fish was contacted. Made up and ran bit 13. Broke circulation, started reaming and cleaning at 2576 m KB. Required 5 hours to clean from 2576 m to 2588 m KB because of sloughing formation. (Material over shaker ranges from cutting size up to 38 mm sharp slivers.) Hole is cleaning well. Reaming and cleaning at 2596 m KB at report time.
Hole Drag: 3 - 4 000 daN up 1 - 2 000 daN down
Correction to day no. 1:33: Drillpipe washout occurred ±50 mm below upset and not in slip area as originally reported.
ESTIMATED COSTS: DAILY $ 51 669 CUMULATIVE $ 5 668 944 SUPERVISOR M. Kramps/R. Genest
Page No. 152
No. 13 Size - mm 215.9 Type STCMFD9HL S.N. LT 7510 Jets - mm 3x28 Wt. - daN 2 - 5 000 r/min 40 - 70 Out - m In In - m 3343 Metres 20 Hours 8.75 Condition Reaming
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp -8 °C Road Good Date 97 04 09 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 134 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Tripping Mud: Wt 1220 kg/m' Visc. 190 s/L W.L. 8.5 cm3 pH 9.0 PV 61 mPa.s YP 28 Pa Gels 8/28 Pa Methyl Blue 63 Solids 11.7 % Filter Cake 1.0 mm Salt 100 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6 RPM - 30 3 RPM - 29
TIME DISTRIBUTION BITS SURVEYS
No. 13 m Code/Operation Hours 1 RU & RD
Size - mm 215.9 m 2 Drill Actual Type STCMFD9HL m 3 Reaming 19.75 S.N. LT 7510 m 4 Coring Jets - mm 3x28 m 5 Cond. Hole 1.50 Wt. - daN 2 - 5 000 m ° 6 Trips 2.00 r/min 40 - 70 m ° 7 Lubr. Rig 0.75 Out - m 2746 PUMP 8 Repair Rig In - m 2576 Liner Length 9 Cut Off D.L. Metres 170 No. mm mm SPM 10 Dev. Survey Hours 28.50 1 140 235 130 11 Wireline Log Condition Reaming 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
10 sxs Caustic 201 sxs Barite PP Output AV Power 15 Test BOP 5 sxs Drispac 2 sxs Xanvis kPa Umin rn/min kW 16 DST 2 sxs Lignite 8 400 1430 90/49 197 17 Plug Back
90 sxs Gel 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Tagged fish at 2746 rn at 2:30 a.m. 21 Handle Tool Circulated from top of fish for 1.50 hours. 22 Clean to Btm
23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Reamed from 2576 m to 2595 m KB. Serviced rig and function tested top pipe rams. Reamed from 2595 m 2674 m KB. Serviced rig and function tested lower rams. Reamed from 2674 m to 2739 m KB. Serviced rig. Reamed from 2739 m to 2746 m KB (tagged fish). Circulated hole clean from top of fish. Wiper trip to casing shoe. Ran in hole - 14 m fill. Cleaned back down to top of fish.
Maximum Drag Up: 18 000 daN Maximum Drag Down: 10 000 daN on wiper trip String Weight: 70 000 daN
ESTIMATED COSTS: DAILY $ 38 279 CUMULATIVE $ 5 707 223 SUPERVISOR D. Gaboury/R. Genest
Page No. 153
Weather Well GENOIL et al ST. LEONARD NO. 1
Cloudy
Temp -8 0C Road
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Date 97 04 10 Rig Ralex, 1 Day No. 135
Good
Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Tripping in with overshot Mud: Wt 1220 kg/rn3 Visc. 190 s/L W.L. 8.5 cm' pH 9.0 PV 61 mPa.s YP 28 Pa Gels 8/28 Pa Methyl Blue 63 Solids 11.7 % Filter Cake 1.5 mm Salt 100 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m' 6 RPM - 30 3 RPM - 29
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 13 RR m 1 RU&RD Size - mm 215.9 m • 2 Drill Actual Type STCMFD9HL m • 3 Reaming S.N. LF 7510 m 0 4 Coring Jets - mm 3x28 m • 5 Cond. Hole 5.50 Wt. - daN 2 - 5 000 m ° 6 Trips 14.00 r/min 40 - 70 m 7 Lubr. Rig 0.50 Out - m 2746 PUMP 8 Repair Rig In - m 2576 Liner Length 9 Cut Off D.L. Metres 170 No. mm mm SPM 10 Dev. Survey Hours 28.50 1 140 235 11 Wireline Log Condition 7-6-U/10 2 140 235 130 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
1 sx Caustic PP Output AV Power 15 Test BOP 1 sx Drispac kPa Umin m/min kW 16 DST
45 sxs Gel 9 000 1430 90/49 214 17 Plug Back 15 sxs Barite 18 Squeeze Cmt
19 Fishing 0.50 GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Hole in good shape. Slight bridge or ledge at 2760 m. 21 Handle Tool 3.00 22 Clean to Btm 0.50 23 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated to top of fish. Circulated to condition mud and hole. Serviced rig and function tested pipe rams. Circulated to condition mud and hole. Strapped out of hole. Made up overshot 209.6 mm with 155.6 mm grapple. Ran in hole. Circulated to top of fish (0.25 hours). Worked overshot. Tripped out. Serviced rig. Tripped out - no fish. Checked overshot for marks and re-assembled. Ran in with overshot 209.6 mm with 155.6 mm. Hole in good shape.
String Weight: 69 000 daN Pipe Tally; 2675.13 ni Strap: 2674.13 m Difference: 1.00 m
ESTIMATED COSTS: DAILY $ <29 426>* CUMULATIVE $ 5 677 797 SUPERVISOR D. Gaboury/R. Genest
*Casing and casing equipment return - credit of $60 221 Page No. 154
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -5 °C Road Good Date 97 04 11 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 136 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Circulating - conditioning mud Mud: Wt 1220 kg/rn3 Visc. 185 s/L W.L. 8.2 cm3 pH 9.0 PV 68 mPa.s YP 26.5 Pa Gels 9/28 Pa Methyl Blue 64 Solids 11.3 % Filter Cake 1.0 firm mm Salt 100 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m' Rate 1../min Desander Underflow Wt. kg/m' Rate L/min Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m' Rate L/min Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m3 6 RPM - 20 3 RPM - 18
TIME DISTRIBUTION BITS
No. SURVEYS
m Code/Operation Hours 1 RU & RD
Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole 8.75 Wt. - daN m 6 Trips 12.25 r/min m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. 0.50 Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 235 11 Wireline Log Condition 2 140 235 130 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST 9 000 1430 90/49 214 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 2.00 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Tripped in with overshot. Circulated to top of fish and worked overshot. Tripped out of hole - no fish. Inspected overshot crossover catcher. Ran in with overshot 209.6 mm with 152.4 mm grapple. Slipped and cut drilling ling. Serviced rig. Tripped in with overshot. Circulated and cleaned to top of fish. Serviced riq and checked motor kills and crown saver. Circulated to condition mud and hole.
String Weight: 69 000 daN Hole Drag Up: 8 000 daN Hole Drag Down: 7 000 daN
ESTIMATED COSTS: DAILY $ 30 494 CUMULATIVE $ 5 708 291 SUPERVISOR D. Gaboury/R. Genest
Page No. 155
1
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -4 'C Road Good Date 97 04 12 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 137 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Fishing Mud: Wt 1195 kg/rn' Visc. 130 s/L W.L. 8.0 cm' pH 9.0 PV mPa.s YP 60 Pa Gels 8/25 Pa Methyl Blue 57 Solids 11.0 % Filter Cake 1.0 firm mm Salt 100 mg/L Cal. 60 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6RPM-18 3RPM-17
TIME DISTRIBUTION BITS
No.
SURVEYS m
Code/Operation Hours 1 RU & RD
Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole 2.50 Wt. - daN m 6 Trips 11.75 r/min m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 235 130 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
55 sxs Gel PP Output AV Power 15 Test BOP 25 sxs Barite kPa Umin m/min kW 16 DST
3 sxs Caustic 9 000 1430 90/49 214 17 Plug Back 2 sxs Drispac 18 Squeeze Cmt
19 Fishing 2.75 GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
15 000 kPa while over fish. Pulled to 120 000 daN. 20 Directional 21 Handle Tool 1.00
Inside of grapple rubbed smooth (run 155.6 mm) 22 Clean to Btm 23 Spot Pill 0.75 24 WOO 4.75 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated. Worked overshot. Tripped out (no recovery). Serviced rig. WOO. Tripped in with 209.6 mm overshot with 158.8 mm grapple. Circulated bottoms up. Checked mud. Worked overshot. Serviced rig. Pumped pill (1200 kg/m' density - 250 viscosity). Tripped out with overshot (no fish). Inspected overshot and assembled with 155.6 mm grapple.
String Weight: 70 000 daN Drag Up: 8 to 9 000 daN Drag Down: 6 000 daN
ESTIMATED COSTS: DAILY $ 33 017 CUMULATIVE $ 5 741 308 SUPERVISOR D. Gaboury/R. Genest
Page No. 156
CIBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Well Depth 3343 m Progress 0 m Hole Size Mud: Wt 1200 kg/rn' Viso. 195 s/L W.L. 8.5 Methyl Blue 64 Solids 10.5 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m' 6 RPM - 24 3 RPM - 22
Rig Ralex, 1 Day No. 215.9 mm Status Tripping out
cm3 pH 9.0 PV 71 mPa.s YP 28.5 Pa Gels 1.5 mm Salt 100 mg/L Cal. 60
Umin Desander Underflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate
Centrifuge Overflow Wt. kg/m'
Cloudy Temp -2 °C Road Good Date 97 04 13
GENOIL et al ST. LEONARD NO. 1 138
9/32 Pa mg/L Umin Umin
BITS SURVEYS No. m
Size - mm m Type m
S.N. m Jets - mm m Wt. - daN m r/min m Out - m PUMP In - m Liner Length Metres No. mm mm Hours 1 140 235 Condition 2 140 235
DRILLING MUD ADDITIVES USED: HYDRAULIC 24 sxs Gel PP Output AV 12 sxs Barite kPa Umin m/min
1 sx Caustic 9 000 1410 90/49 1 sx Xanvis
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Transferred 20.0 m' from active mud system to premix tank for pills.
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4
RU & RD Drill Actual Reaming Coring
5 Cond. Hole 5.25 6 Trips 12.50 7 Lubr. Rig 0.50 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 130 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
214 17 Plug Back 18 Squeeze Cmt 19 Fishing 4.50 20 Directional 21 Handle Tool 1.25 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Tripped in with 206.4 mm overshot and 155.6 mm grapple. Circulated. Worked overshot (1.00 hour). Not able to get over fish. Tripped out. Serviced rig and checked crown saver and brakes. Inspected overshot and reassembled. Ran in hole with 206.4 mm overshot and 155.6 mm grapple. Circulated to condition mud and hole. Serviced rig and function tested top rams. Worked overshot (3.50 hours). Tripped out of hole with overshot. Not able to get over fish - in beside it.
String Weight: 70 000 daN Drag Up: 8 to 10 000 daN Drag Down: 5 to 8 000 daN
ESTIMATED COSTS: DAILY $ 35 089 CUMULATIVE $ 5 776 397 SUPERVISOR D. Gaboury/R. Genest
Page No. 157
ESTIMATED COSTS: DAILY $ 36 423 CUMULATIVE $ 5 812 820 SUPERVISOR D. Gaboury/R. Genest
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp -1 °C Road Good Date 97 04 14 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 139 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Tripping In Mud: Wt 1205 kg/n' Visc. 195 s/L W.L. 8.0 cm' pH 8.5 PV 71 mPa.s YP 27 Pa Gels 7/28 Pa Methyl Blue 64 Solids 10.7 % Filter Cake 1.5 mm Salt 100 mg/L Cal. 80 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underfiow Wt. kg/m' Rate L/min Desilter Overflow Wt. kg/m3 Rate 1../min Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underfiow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6RPM-21 3RPM-19
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. m 1 RU & RD Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole 2.00 Wt. - daN m 6 Trips 15.50 r/min m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. 0.50 Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 235 125 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
63 sxs Gel PP Output AV Power 15 Test BOP 24 sxs Barite kPa Umin m/min kW 16 DST
1 sx Caustic 8 300 1350 97/50 186 17 Plug Back 18 Squeeze Cmt 19 Fishing 2.50
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Laid down three singles: 21 Handle Tool 3.00 #1 - 9.72 m Wall: 6.81 to 6.65 mm 22 Clean to Btm #2 - 9.48 m Wall: 7.11 mm, Pit: 6.81 mm 23 #3 - 9.59 m Wall: 7.11 mm, Pit: 6.60 mm 24 Average wall thickness on remainder of pipe 8.13 mm 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Tripped out with overshot (no recovery). Laid down overshot - jars, etc, made up bit. Tripped in with bit. Serviced rig. Slipped and cut drill line. Tripped in to fish. Worked bit at fish. Circulated to condition mud. Tripped out with bit. Positive indications of 114.3 mm wear pattern in centre of bit which explains near total loss of string torque. Inspected "E" pipe on way out. Serviced rig. Made up 187.3 mm overshot and 155.6 mm spiral grapple. Bent single. Tripped in with overshot.
String Weight: 70 000 daN Hole Drag Up: 10 000 daN Hole Drag Down: 8 000 daN
Page No. 158
J
CBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 12 'C Road Good Date 97 04 15 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 140 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Tripping Mud: Wt 1200 kg/rn3 Visc. 200 s/L W.L. 8.8 cm3 pH 8.5 PV 61 mPa.s YP 20 Pa Gels 9/30 Pa Methyl Blue 64 Solids 10.6 % Filter Cake 1.5 med mm Salt 100 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m3 Rate L/min Desander Under,low Wt. kg/m3 Rate L/min Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m3 Rate L/min Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3 6RPM-19 3RPM-17
TIME DISTRIBUTION BITS
No. Mill-1 SURVEYS
m Code/Operation Hours 1 RU & RD
Size - mm 206.4 m 2 Drill Actual Type Flat btm m 3 Reaming S.N. C14058 m 4 Coring Jets - mm m 5 Cond. Hole Wt. - daN 4-6000 m 6 Trips 13.25 r/min 30 - 60 m 7 Lubr. Rig 0.25 Out - m 2744.80 PUMP 8 Repair Rig In - m 2744.60 Liner Length 9 Cut Off D.L.
Metres 0.20 No. mm mm SPM 10 Dev. Survey Hours 2.25 1 140 235 110 11 Wireline Log Condition Worn 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa L/min m/min kW 16 DST 8 000 1210 88/46 161 17 Plug Back
18 Squeeze Cmt 19 Fishing 3.75
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 4.25 22 Clean to Btm 23 Milling 2.25 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in with 187.3 mm OD x 155.6 mm overshot and bent single. Broke circulation and worked overshot from 2742.60 m to 2744.60 m KB. Unable to contact fish 2, no pressure response observed. Spotted 12 m3 viscous pill on bottom (1210 kg/m3 MD, 250 s/L vis). Tripped out overshot, cut lip guide bent inwards slightly, probably from contacting fish 1. No indication fish was inside overshot. Serviced rig. Made up and ran mill-1. Broke circulation, circulated to top of fish at 2744.60 m KB (did not appear to encounter any fill). Milled fish from 2744.60 m to 2744.80 m KB in about 1.25 hours, no progress next 1.00 hour. Unable to mill further. Tripped out and inspected mill-1. Marking on mill face indicated 114.3 mm OD tube had been contacted and 162.6 mm tool ioint had also been milled. Milling progress ceased when the hard band on the tool joint was contacted by the mill. (It appears that the top of fish 2 is now located at 2744.80 m KB.) Made up and ran 206.4 mm x 171.5 mm shoe and 193.7 mm x 171.5 mm x 9.48 m wash pipe. Tripping in at report time. Plan to wash over fish 2 about 1.0 m, spot pill, trip out and run overshot to capture fish 2.
String Weight: 70 000 daN
ESTIMATED COSTS: DAILY $ 35 285 CUMULATIVE $ 5 848 105 SUPERVISOR D. Gaboury/R. Genest
Page No. 159
J
BISSETT RESOURCE CONSULTANTS LTD. iel
DAILY DRILLING REPORT
Weather Clear Temp 0 'C Road Good Date 97 04 16 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 141 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Tripping
200 s/L W.L. 8.0 cm3 pH 8.5 PV 61 mPa.s YP 20 Pa Gels 9/30 Pa 10.6 % Filter Cake 1.5 mm Salt 100 mg/L Cal. 60 mg/L kg/m3 Rate L/min Desander Underflow Wt. kg/m3 Rate L/min
kg/m3 Rate L/min Desander Overflow Wt. kg/m3 Rate L/min
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3 6RPM-19 3RPM-17
TIME DISTRIBUTION BITS
No. 14 SURVEYS
m Code/Operation Hours 1 RU&RD
Size - mm 215.9 m 2 Drill Actual
Type ST FDS+ m 3 Reaming
S.N. LF 9060 m 4 Coring
Jets - mm 2x28 1x24 m 5 Cond. Hole 1.00
Wt. - daN m 6 Trips 14.50
r/min m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. 0.75
Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 235 100 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
4 sxs Caustic 20 sxs Gel PP Output AV Power 15 Test BOP 40 sxs Barite kPa L/min rn/min kW 16 DST
2 sxs Drispac 7 000 1100 80/41 128 17 Plug Back 3 sxs Lignite 18 Squeeze Cmt
19 Fishing 1.75 GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
21 Handle Tool 1.50 22 Clean to Btm 23 Wash Over 4.00 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in with 206.4 mm x 193.7 mm x 9.48 m wash pipe. Broke circulation and washed from 2745.59 m to 2761.03 m KB. Did not bottom out on fish no. 2. Circulated to condition mud and hole. Placed 12.0 m3 viscous pill on bottom (1210 kg/m3 MD and 250 s/L visc.) Tripped out, laid down and inspected wash pipe. Very few markings on outside. Fish no. 2 had definitely been swallowed as indicated by markings inside. Made up and ran 206.4 mm x 155.6 mm overshot (overshot run no. 12) with 158.8 mm mill control and drill collars. Slipped and cut line. Finished tripping in. Tagged fill at 2750.6 m KB. Broke circulation, cleaned 2.0 m fill to suspected top of fish at 2752.60 m KB. Worked overshot and made 28 attempts to latch onto the fish - unsuccessful. Rotated overshot and made further 12 attempts to latch onto the fish - unsuccessful. Worked overshot from 2752.60 m to 2854.60 m KB. No pressure indication of fish entering overshot. Tripped out and inspected overshot. Found cut lip guide bent outwards 12.5 mm , three small gouges on outside of cut lip guide. Fish did not enter overshot. Ran bit 14, tripping in at report time to clean suspected fill and locate top of fish.
String Weight: 73 000 daN While running overshot, pulled to 90 000 daN maximum No pump change at all during the procedure Hole Drag: 6 to 8 000 daN
ESTIMATED COSTS: DAILY $ 28 889 CUMULATIVE $ 5 876 994 SUPERVISOR D. Gaboury/R. Genest
Page No. 160
J
Mud: Wt 1200 kg/rn3 Visc. Methyl Blue 64 Solids Desilter Underflow Wt. Desilter Overflow Wt.
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 4 °C Road Good Date 97 04 17 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex 1 Day No. 142 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Laying Down Fish 2 Mud: Wt 1180 kg/rn3 Visc. 203 s/L W.L. 8.0 cm3 pH 9.0 PV 62 mPa.s YP 26.5 Pa Gels 8/30 Pa Methyl Blue 64 Solids 10.4 % Filter Cake 1.0 firm mm Salt 100 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. kg/m3 Rate L/min Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m3 Rate L/min Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3 6RPM-20 3RPM-18
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 14 m 1 RU & RD Size - mm 215.9 m 2 Drill Actual Type ST FDS+ m 3 Reaming S.N. LF 9060 m 4 Coring Jets - mm 2x28 1x24 m ° 5 Cond. Hole 3.00 Wt. - daN Nil m ° 6 Trips 14.25 r/min 35 m 7 Lubr. Rig Out - m 2806 PUMP 8 Repair Rig In - m 2749 Liner Length 9 Cut Off D.L. Metres 57 No. mm mm SPM 10 Dev. Survey Hours 3.00 reams_ 1 140 235 130 11 Wireline Log Condition 3-2-1 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
33 sxs Barite PP Output AV Power 15 Test BOP 3 sxs Gel kPa L/min m/min kW 16 DST
9 250 1430 90/49 220 17 Plug Back 18 Squeeze Cmt
19 Fishing 3.50 GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 1.75 22 Clean to Btm 1.50 23 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in with bit 14. Broke circulation, cleaned fill and chased fish 2 from 2749.0 m to 2806.0 m KB. Set 20 000 daN on fish 2 - no movement. Circulated to condition mud and hole. Spotted 12.0 m3, 1210 kg/m3 MD, 250 s/L pill on bottom. Tripped out bit 14, strapped drill string, +1.05 m difference, no correction. Made up and ran 206.4 mm x 155.6 mm overshot with 158.8 mm mill control. Broke circulation and cleaned bridge at 2760.0 m KB. Circulated to top of fish at 2806.0 m KB. Worked fish into overshot, pump pressure increased from 6 000 kPa to 10 500 kPa. Set 30 000 daN string_weight on fish. Pulled to 120 000 daN (string weight: 73 000 daN) to free fish, no pump pressure loss observed. Pulled out joint 1 at 110 to 120 000 daN. Pumped out joint 2 at 90 000 daN, no pump pressure loss observed. Stood back kelly and tripped out overshot. Recovered fish 2 (fish 2 consisted of: remainder of tool joint, 155.6 mm OD box end which had been milled to the hard band and 1 - 114.3 mm OD joint drillpipe, overall length: 9.35 m). Preparing to trip in with bit 14.
ESTIMATED COSTS: DAILY $ 29 652 CUMULATIVE $ 5 906 646 SUPERVISOR D. Gaboury/R. Genest
Page No. 161
J
No. 14 RR Size - mm 215.9 Type ST FDS+ S.N. LF 9060 Jets - mm 2x28. 1x24 Wt. - daN 1 - 2 000 r/min 0 - 30 Out - m 2816 In - m 2806 Metres 10 Hours 4.00 (ream) Condition 3-3-1
DRILLING MUD ADDITIVES USED: 65 sxs Barite 24 sxs Gel
2 sxs Caustic 1 Xanvis
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
BITS
SURVEYS m m m m m m m
PUMP Liner Length
No. mm mm 1 140 235 2 140 235
HYDRAULIC PP Output AV kPa Umin m/min 9 000 1430 90/49
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
LEONARD NO. 1 0 m Hole Size
280 s/L W.L. 8.5 10.5 % Filter Cake
kg/ma Rate kg/ma Rate
kg/ma
Well GENOIL et al ST. Depth 3343 m Progress Mud: Wt 1185 kg/ma Vise. Methyl Blue 67 Solids Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
Rig Ralex, 1 215.9 mm Status Tripping
cm3 pH 9.5 PV 60 mPa.s YP 23 Pa Gels 9/31 Pa 1.0 firm mm Salt 100 mg/L Cal. 40 mg/L
Desander Underflow Wt. kg/m3 Rate Umin Desander Overflow Wt.
kg/ma Rate Umin Centrifuge Overflow Wt. kg/ma
Weather Cloudy Temp 2 °C Road Good Date 97 04 18 Day No. 143
Umin Umin
6RPM-20 3RPM-19
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4
RU & RD Drill Actual Reaming Coring
° 5 Cond. Hole 6.50 6 Trips 14.75 7 Lubr. Rig 0.25 8 Repair Rig 9 Cut Off D.L. 0.75
SPM 10 Dev. Survey 130 11 Wireline Log 130 12 Run Csg/Cmt
13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
214 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 1.75 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished laying down Fish 2 and overshot. Ran bit 14RR. Broke circulation at 2806.0 m KB. Circulated and cleaned fill to top of Fish 1 at 2815.64 m KB. Circulated to condition mud and hole. Spotted 14.0 ma viscous pill on bottom (1210 kg/m3 MD and +300 s/L visc.). Tripped out bit 14 RR. Made up and ran 206.4 mm x 114.3 mm overshot and drill collars. Slipped and cut line. Finished tripping in. Broke circulation and worked tight spot at 2660 m KB. Circulated to top of Fish, circulated bottoms up. Latched onto Fish 1 at 2815 m KB. Began working Fish 1 and attempting to break circulation. Jarred (uppers set fired about six times). Worked Fish 1 to 140 000 daN, obtained full circulation at 16 000 kPa pump pressure (pump pressure 6 800 kPa before latching onto Fish). Fish began moving. Continued to work Fish 1 out of the hole at report time, bottom of Fish 1 is at 2892 m KB (370 m above stuck depth).
ESTIMATED COSTS: DAILY $ 32 071 CUMULATIVE $ 5 938 717 SUPERVISOR D. Gaboury/R. Genest
Page No. 162
J
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Raining Temp 2 'C Road Fair Date 97 04 19 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 144 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Tripping Mud: Wt 1185 kg/m3 Visc. 260 s/L W.L. 8.5 cm3 pH 9.5 PV 60 mPa.s YP 23 Pa Gels 9/31 Pa Methyl Blue 67 Solids 10.5 % Filter Cake 1.0 firm mm Salt 100 mg/L Cal. 40 mg/L Desilter Undertow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6 RPM - 20 3 RPM - 19
BITS SURVEYS No. 14 RR m Size - mm 215.9 m
Type ST FDS+ m
S.N. LF 9060 m Jets - mm 2x28 1x24 m
Wt. - daN m r/min m Out - m PUMP In - m Above Liner Length Metres Casing No. mm mm Hours Shoe 1 140 235 Condition 1 140 235
DRILLING MUD ADDITIVES USED: HYDRAULIC PP Output AV kPa Umin m/min
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5
RU & RD Drill Actual Reaming Coring Cond. Hole
6 Trips 19.00 7 Lubr. Rig 0.50 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 1.50 22 Clean to Btm 23 RU&RD 24 Machine 3.00 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued tripping out Fish 1. Removed overshot and laid down fishing tools. Tripped out and laid down Fish 1. NOTE: Fish was plugged with formation solids. Recovered Fish 1 in its entirety. Serviced rig and checked BOPs. Ran drill collars and 78 joints 114.3 mm OD premium drillpipe. Rigged in lay down machine. Serviced rig and checked crown saver. Laid down 78 ioints 114.3 mm OD premium drillpipe. Tripped out drill collars. Ran drill collars, strapped and calipered on trip in. Rigged out lay down machine. Plan to run drill string to casing shoe, circulate while installing top drive and shakers.
ESTIMATED COSTS: DAILY $ 34 144 CUMULATIVE $ 5 972 861 SUPERVISOR D. Gaboury/R. Genest
Page No. 163
J
ESTIMATED COSTS: DAILY $ 30 963 CUMULATIVE $ 6 003 796 SUPERVISOR D. Gaboury/R. Genest
BISSETT RESOURCE CONSULTANTS LTD. 40),
DAILY DRILLING REPORT
Weather Clear Temp -2 °C Road Good Date 97 04 20 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 145 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Rigging in top drive Mud: Wt 1190 kg/m3 Visc. 155 s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow VVt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 14 RR m 1 RU & RD Size - mm 215.9 m 2 Drill Actual Type ST FDS+ m 3 Reaming
S.N. LF 9060 m 4 Coring Jets - mm 2x28 1x24 m 5 Cond. Hole 1.50 Wt. - daN m 6 Trips 3.25 r/min Circulating m 7 Lubr. Rig Out - m Trip PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 235 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Installing 24 Shakers & 25 Tesco Unit 19.25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Ran 114.3 mm OD drillpipe in right order. Tripped in to 2093.89 m KB. Circulated bottoms up. Tore out and removed old shakers. Installed new linear motion shakers. Dumped and cleaned mud tanks. Mixed new mud volume. Loaded out and moved off location 114.3 mm OD drillpipe that had been laid down. Loaded out SOC skid unit and transferred to Dartmouth. Moved 45 m' water tank to side of location. Started installing top drive gear. About 50% complete at report time. Continued to inspect replacement "E" drillpipe. Plan to inspect HWDP and drill collars (Fish 1). Anticipate having pipe fully inspected by Monday, April 21, 1997. Should be operational tomorrow.
Page No. 164
Clats.BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 146
Clear Temp 4 °C Road Good Date 97 04 21
Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Rigging in top drive Mud: Wt 1200 kg/m' Visc. 145 s/L W.L. 8.0 cm' pH 9.5 PV 64 mPa.s YP 25 Pa Gels 9/31 Pa Methyl Blue 70 Solids 10 % Filter Cake 1.0 mm Salt 100 mg/L Cal. 400 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6 RPM - 22 3 RPM - 20
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 14 RR m • 1 RU&RD Size - mm 215.9 m • 2 Drill Actual Type ST FDS+ m • 3 Reaming S.N. LF 9060 m ▪ 4 Coring Jets - mm 2x28. 1x24 m ° 5 Cond. Hole Wt. - daN m ° 6 Trips r/min Circulating m ° 7 Lubr. Rig Out - m Trip PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 235 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 160 sxs Gel 4 sxs Caustic PP Output AV Power 15 Test BOP 145 sxs Barite kPa Umin m/min kW 16 DST
1 sx Xanvis 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 RU Top Drive 24.00 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued to rig in top drive assembly. Should be operational by 12:00 noon.. Continued to inspect Grade "E" drillpipe. Inspection equipment
moving to location this morning to inspect HWDP and drill collars. Held safety meetings with both crews. Rigging in top drive assembly at report time.
ESTIMATED COSTS: DAILY $ 32 347 CUMULATIVE $ 6 036 143 SUPERVISOR D. Gaboury/R. Genest
Page No. 165
J
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Calm Temp 4 °C Road Well GENOIL et al ST. LEONARD NO, 1
Good Date 97 04 22 Rig
Ralex, 1 Day No. 147 Depth 3343 m Progress 0 m Hole Size 215.9 mm Status Picking up drillpipe
Mud: Wt 1190 kg/m3 Visc. 185 s/L W.L. 9.0 cm3 pH 9.0 PV 93 mPa.s YP 31 Pa Gels 14/30 Pa Methyl Blue 64 Solids 8.5 % Filter Cake
1.0 mm Salt 60 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. Desilter Overflow Wt._ kg/m3 Rate L/min Desander Overflow Wt. Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. 6RPM-22 3RPM-19
kg/m3 Rate L/min kg/m3 Rate L/min kg/m3
BITS SURVEYS No. 14 RR m Size - mm 215.9 m Type ST FDS+ m
S.N. LF 9060 m Jets - mm 2x28 1x24 m Wt. - daN 0 m r/min - 0 m Out - m PUMP In - m 3343 Liner Length Metres 0 No. mm mm Hours 0 1 140 235 Condition Inc. 2 140 235
DRILLING MUD ADDITIVES USED: HYDRAULIC 79 sxs Gel PP Output AV
102 sxs Barite kPa L/min m/min 3 sxs Xanvis 7600 1140 101/54 3 sxs Caustic
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
0 1
TIME DISTRIBUTION Code/Operation Hours
2 3 4
RU & RD Drill Actual
° Reaming Coring
° 5 Cond. Hole 0 6 Trips 6.00
7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 104 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
144 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 RU Top Drive 18.00 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished rigging in top drive. Rigging up completed at 23:59, 97 04 21. Held safety meetings and top drive operational training sessions for all crews. Checked out all mountings and securing points after installation, okay. Finished inspecting replacement Grade "E" drillpipe, HWDP and drill collars. Tripped out to drill collars. Started picking up replacement Grade "E" drillpipe. Sixty joints picked up at report time, 80 joints remaining to be picked up. Plan to make a clean-out trip to present total depth, trip out, pick up and run directional drilling assembly.
ESTIMATED COSTS: DAILY $ 35 250 CUMULATIVE $ 6 039 045 SUPERVISOR D. Gaboury/M. Kramps
Page No. 166
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Calm Temp -2 'C Road Good Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1
Date 97 04 23
Day No. 148
Depth 3345 m Progress 2 m Hole Size 215.9 mm Status Circulating Mud: Wt 1210 kg/m3 Visc. 175 s/L W.L. 8.2 cm3 pH 9.0 PV 83 mPa.s YP 30.5 Pa Gels 10/21 Pa Methyl Blue 67 Solids 7.8 % Filter Cake 1.0 firm mm Salt 100 mg/L Cal. 40 mg/L Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. kg/m3 Rate L/min Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m3 Rate LJmin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3 6RPM-19 3RPM-18
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 14 RR m ° 1 RU & RD Size - mm 215.9 m 2 Drill Actual 0.25 Type ST FDS+ m 3 Reaming 10.25 S.N. LF 9060 m ° 4 Coring Jets - mm 2x28, 1x24 m ° 5 Cond. Hole 5.25 Wt. - daN 4 000 m 6 Trips 8.00 r/min 65 m 7 Lubr. Rig 0.25 Out - m In PUMP 8 Repair Rig In - m 3343 Liner Length 9 Cut Off D.L. Metres 2 No. mm mm SPM 10 Dev. Survey Hours Ream 4 1 140 235 125 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
30 sxs Gel 3 sxs Drispac PP Output AV Power 15 Test BOP 84 sxs Barite kPa L/min m/min kW 16 DST
2 sxs Xanvis 10 000 1380 101/52 230 17 Plug Back 2 sxs Caustic 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
String Weight Static: 82 000 daN 21 Handle Tool String Weight Up: 120 000 daN (+38 000 daN) 22 Clean to Btm String Weight Down: 78 000 daN (+4 000 daN) 23
24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished picking up replacement "E" drillpipe. Tripped in with bit 14. Broke circulation and reamed bridges at 2500 m to 2503 m KB, 2708 m to 2710 m KB, 2860 m to 2873 m KB and 3002 m to 3343 m KB (only slight resistance from 3002 m to 3343 m KB. Drilled 2.0 m of hole to ensure no junk on bottom of hole. Circulating at report time to condition mud and hole. Drilling fluid is patchy. MD as low as 1165 kg/m3 and funnel viscosity ranges from 65 to 175 s/L. Hole began unloading formation solids up to 3 to 4 mm in diameter for the past two circulations. Held safety meetings and top drive familiarization meetings with all crews.
ESTIMATED COSTS: DAILY $ 32 827 CUMULATIVE $ 6 071 872 SUPERVISOR D. Gaboury/R. Genest
Page No. 167
1
RESOURCE CONSULTANTS LTD. C14,BISSETT
DAILY DRILLING REPORT
Weather Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 149
Clear Calm Temp 4 °C Road Good Date 97 04 24
Depth 3349 m Progress 4 m Hole Size 215.9 mm Status Drilling Mud: Wt 1200 kg/m3 Visc. 190 s/L W.L. 7.5 cm' pH 9.0 PV 83 mPa.s YP 30 Pa Gels 10/21 Pa Methyl Blue 67 Solids 7.8 % Filter Cake 1.0 mm Salt 100 mg/L Cal. 40 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3 6RPM-19 3RPM-18
BITS SURVEYS No. 14 RR 15 m Size - mm 215.9 215.9 m Type ST FDS+ F4 m S.N. LF 9060 LJ7973 m Jets - mm 2x28, 1x24 2x13.7/1x14.3 m Wt. - daN 4 000 10 000 m r/min 65 35 m Out - m 3345 PUMP In - m 3343 3345 Liner Length Metres 2 4 No. mm mm Hours Ream 14.25 Drill 0.25 1.50 1 140 235 Condition 3-3-1 2 140 235
DRILLING MUD ADDITIVES USED: HYDRAULIC 18 sxs Gel 1 sx Drispac PP Output AV 77 sxs Barite kPa Umin m/min
2 sxs Xanvis 14 500 1380 101/52 2 sxs Caustic
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 1.50 3 Reaming 4.00 4 Coring 5 Cond. Hole 2.00 6 Trips 16.25 7 Lubr. Rig 0.25 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 11 Wireline Log
125 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
333 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated to condition mud and hole. Cuttings coming over shaker were minimal at end. Tripped out bit 14RR, pumped out 8 stands, hole drag ±40 000 daN. Ran bit 15 and directional drilling assembly. Tested MWD at intermediate casing shoe, okay. Serviced rig and function tested BOPs. Continued trip in, reamed from 2760 m to 2900 m KB and 3250 m to 3345 m KB. Drilled. Slide from 3345 m to 3349 m KB. Drilling at report time, ROP: ±2.5 m/h.
String Weight: 82 000 daN Hole Drag Up: 33 000 daN Hole Drag Down; 6 000 daN
ESTIMATED COSTS: DAILY $ 32 949 CUMULATIVE $ 6 104 821 SUPERVISOR D. Gaboury/M. Kramps
Page No. 168
Rig Ralex, 1
kg/m3 Rate Umin kg/m3 Rate Umin
kg/m'
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt.
ESTIMATED COSTS: DAILY $ 42 258 CUMULATIVE $ 6 147 079 SUPERVISOR D. Gaboury / M. Kramps
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Calm Temp + 4 Well GENOIL et al ST. LEONARD NO. 1
°C Road Good Date 97 04 25 Day No. 150
Depth 3 367 m Progress 18 m Hole Size Mud: Wt 1 195 kg/m3 Visc. 156 s/L W.L. 7.5 Methyl Blue 67 Solids 9.8 % Filter Cake
216 mm Status cm3 pH 9.0 PV 65
1 mm Salt mPa.s YP 30 Pa Gels 12/36 Pa
100 mg/L Cal. 40 mg/L
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 15 16RR 3 347 m 17.2 1 RU & RD Size - mm 216 216 m 2 Drill Actual 8.00 Type F4 STFDST m 3 Reaming S.N. LJ7973 LF9060 m 4 Coring Jets - mm 2x127 1x143 2x28, 1x24 m 5 Cond. Hole Wt. - daN 30 000 m 6 Trips 11.50 r/min 60 m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig 2.50 In - m 3 345 3 367 Liner Length 9 Cut Off D.L. 1.00 Metres 22 No. mm mm SPM 10 Dev. Survey 0.50 Hours 9.75 1 140 235 125 11 Wireline Log Condition INC Run in 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
Gel 30 sxs PP Output AV Power 15 Test BOP Drispac 2 sxs kPa Umin m/min kW 16 DST Caustic 3 sxs 15 500 1 380 101/52 356 17 Plug Back Lignite /sxs 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Repair stand pipe. Serviced rig and function tested BOPs. Drilling from 3 349 m to 3 355 m (rotate). Survey. Serviced rig. Drilling from 3 355 m to 3 360 m (slide). Rotate from 3 360 m to 3 364 m. Slide from 3 364 m to 3 367 m. Loss of 2 000 kPa. Suspect wash out. POOH to 2 699 m. Work tight hole. 130 000 daN string pull. String weight of 92 000 daN. String parted. POOH. Fish left in hole - 39 stands plus BHA. Approx. top of fish 2 099 m or higher. Serviced rig and function tested BOPs. Slip and cut drilling line. Pick up bit and BHA and RIH.
BHA: Bit, Bit Sub, XO, 6 x 171 mm DC
NOTE: Pipe parted in upset area of replacement Grade E drill pipe.
Page No. 169
Clean out trip
BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Calm Temp + 4 °C Road Good Date 97 04 25 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 150 Depth 3 367 m Progress 18 m Hole Size 216 mm Status Clean out trip Mud: Wt 1 195 kg/rn3 Vise. 156 s/L W.L. 7.5 cm3 pH 9.0 PV 65 mPa.s YP 30 Pa Gels 12/36 Pa Methyl Blue 67 Solids 9.8 % Filter Cake 1 mm Salt 100 mg/L Cal. 40 mg/L
Umin Umin
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Repair stand pipe. Serviced ria and function tested BOPs. Drilling from 3 349 m to 3 355 m (rotate). Survey. Serviced ria. Drilling from 3 355 m to 3 360 m (slide). Rotate from 3 360 m to 3 364 m. Slide from 3 364 m to 3 367 m. Loss of 2 000 kPa. Suspect wash out. POOH to 2 699 m. Work tiaht hole. 130 000 daN strina pull. String weiaht of 92 000 daN. String parted. POOH. Fish left in hole - 39 stands plus BHA. Approx. too of fish 2 099 m or hiaher. Serviced rig and function tested BOPs. Slip and cut drilling line. Pick uo bit and BHA and RIH.
ESTIMATED COSTS: DAILY $ 42 258 CUMULATIVE $ 6 147 079 SUPERVISOR D. Gaboury / M. Krems
Page No. 170
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 15 16RR 3 347 m 17.2 1 RU & RD Size - mm 216 216 m 2 Drill Actual 8.00 Type F4 STFDST m o3 Reaming S.N. LJ7973 LF9060 m 4 Coring Jets - mm 2x127. 1x143 2x28. 1x24 m 5 Cond. Hole Wt. - daN 30 000 m 6 Trips 11.50 r/min 60 m ° 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig 2.50 In - m 3 345 3 367 Liner Length 9 Cut Off D.L. 1.00 Metres 22 - No. mm mm SPM 10 Dev. Survey 0.50 Hours 9.75 1 140 235 125 11 Wireline Log Condition INC Run in 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
Gel 30 sxs PP Output AV Power 15 Test BOP Drispac 2 sxs kPa Umin m/min kW 16 DST Caustic 3 sxs 15 500 1 380 101/52 356 17 Plug Back Lignite lsxs 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
21 Handle Tool 22 Clean to Btm 23 24 25
BHA: Bit, Bit Sub, XO. 6 x 171 mm DC
NOTE: Pioe parted in upset area of replacement Grade E drill pipe.
ESTIMATED COSTS: DAILY $ 39 415 CUMULATIVE $ 6 186 494 SUPERVISOR M. Kramps / D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp + 6 °C Road Good Date 97 04 26 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 151
Depth 3 367 m Progress 0 m Hole Size 216 mm Status POOH Mud: Wt 1 190 kg/rn' Visc. 300 s/L W.L. 8.0 cm' pH 8.5 PV 71 mPa.s YP 24 Pa Gels 11/34 Pa Methyl Blue 64 Solids 8.7 % Filter Cake 1 mm Salt 100 mg/L Cal. 40 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 16RR m 1 RU & RD Size - mm 216 m 2 Drill Actual Type STFDST m 3 Reaming S.N. LF9060 m 4 Coring Jets - mm 2x28, 1x24 m 5 Cond. Hole 1.00 Wt. - daN m 6 Trips 11.00 r/min m 7 Lubr. Rig 0.25 Out - m PUMP 8 Repair Rig In - m 3 367 Liner Length 9 Cut Off D.L. Metres Clean out No. mm mm SPM 10 Dev. Survey Hours 1 140 235 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing 11.75
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) RIH. Tag fish at 2 083.94 m. Circulate and condition mud. POOH. Check wall thickness of remaining Grade "E" DP in fishing string. Pick up fishing tools. Serviced rig. Check crown stopper and brakes. RIH with 8 1/8" overshot with 4 1/2" grapple. Latch on to fish. Attempted to circulate. No circulation. Work pipe to maximum of 160 000 daN from 22:30 hrs to 12:30 hrs. Start to make progress. POOH with fish. 8 stands of drill pipe to pull to top of fish at report time.
Page No. 171
BITS No. 16RR Size - mm 216 Type STFDST S.N. LF9060 Jets - mm Wt. - daN
2x28. 1x24
r/min Out - m In - m 3367 Metres Clean out Hours Condition
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Mud: Wt 1 190 kg/m' Visc. Methyl Blue 64 Solids Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underfiow Wt.
cm3 pH 8.5 PV 71 mPa.s YP 1 mm Salt 100 Umin Desander Underfiow Wt.
Umin Desander Overflow Wt. Centrifuge Overflow Wt.
Date 97 04 26 Day No. 151
24 Pa Gels 11/34 Pa mg/L Cal. 40 mg/L kg/m' Rate Umin kg/m' Rate Umin kg/m'
300 s/L W.L. 8.0 8.7 % Filter Cake kg/m' Rate
kg/m' Rate kg/m'
Weather Clear Temp + 6 °C Road Good Well GENOIL et al ST. LEONARD NO. 1
Rig Ralex. 1
Depth 3 367 m Progress 0 m Hole Size 216 mm Status POOH
TIME DISTRIBUTION SURVEYS Code/Operation Hours m • 1 RU & RD
m • 2 Drill Actual m • 3 Reaming m • 4 Coring m • 5 Cond. Hole 1.00
m • 6 Trips 11.00 m • 7 Lubr. Rig 0.25
PUMP 8 Repair Rig
Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey
1 140 235 11 Wireline Log 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED:
HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
17 Plug Back 18 Squeeze Cmt 19 Fishing 11.75 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) RIH. Tao fish at 2 083.94 m. Circulate and condition mud. POOH. Check wall thickness of remaining Grade "E" DP in fishing string. Pick up fishing tools. Serviced ria. Check crown stopper and brakes. RIH with 8 1/8" overshot with 4 1/2" grapple. Latch on to fish. Attempted to circulate. No circulation. Work pipe to maximum of 160 000 daN from 22:30 hrs to 12:30 hrs. Start to make progress. POOH with fish. 8 stands of drill pipe to pull to top of fish at report time.
ESTIMATED COSTS: DAILY $
39 415 CUMULATIVE $ 6 186 494 SUPERVISOR M. Kramps / D. Gaboury
Page No. 172
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp - 2 Well GENOIL et al ST. LEONARD NO. 1
°C Road Good Ralex, 1
Date 97 04 27 Day No. 152 Rig
Depth 3 367 m Progress 0 m Hole Size Mud: Wt 1 180 kg/m' Visc. 308 s/L W.L. 8.4 Methyl Blue 63 Solids 0.086 % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
216 mm Status
1 mm Salt
Desander Underflow Wt. Desander Overflow Wt. Centrifuge Overflow Wt.
RIH for clean out
kg/m' Rate Umin kg/m' Rate Umin
kg/m'
Urnin Umin
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 16 m 1 RU & RD Size - mm 216 m 2 Drill Actual Type FDS m 3 Reaming 0.25 S.N. LF9051 m 4 Coring Jets - mm 3x20 m 0 5 Cond. Hole Wt. - daN m 6 Trips 23.50 r/min m 7 Lubr. Rig 0.25 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres Clean out No. mm mm SPM 10 Dev. Survey Hours 1 140 235 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional BHA: Bit, Bit Sub, 6 x 171 m DC, Jars, 3 HWDP, XO, Total Length = 90.86 m 21 Handle Tool
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) POOH with fish. Inspect monels and drill collars and HWDP. Lay down drill collars. Monels and HWDP and 30 joints of bent drill pipe. Serviced rig. Check motor kills. Check brakes. Function tested blind rams. RIH. Pick up 18 joints of new Grade "E". Continue to RIH to 3 327 m. Wash and ream to bottom.
ESTIMATED COSTS: DAILY $ 46 634 CUMULATIVE $ 6 233 128 SUPERVISOR M. Kramps / D. Gaboury
Page No. 173
J
cm' pH 8.5 PV 75 mPa.s YP 25.5 Pa Gels 10/32 Pa 100 mg/L Cal. 40 mg/L
411 BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Clear Temp - 2 °C Road Good
Date 97 04 27 Well GENOIL et al ST. LEONARD NO. 1 Rig Depth 3 367 m Progress 0 m Hole Size 216 mm Status Mud: Wt 1 180 kg/m3 Visc. Methyl Blue 63 Solids Desilter Underflow Wt. Umin Desilter Overflow Wt. Umin Centrifuge Underflow Wt.
308 s/L W.L. 0.086 % Filter Cake
kg/m3 Rate kg/m3 Rate
kg/m3
Gels 10/32 Pa 40 mg/L
Umin Umin
Ralex. 1 Day No. 152 RIH for clean out
8.4 cm3 pH 8.5 PV 75 mPa.s YP 25.5 Pa 1 mm Salt 100 mg/L Cal.
Desander Underflow Wt. kg/m3 Rate Desander Overflow Wt. kg/m3 Rate Centrifuge Overflow Wt. kg/m3
TIME DISTRIBUTION BITS
SURVEYS
Code/Operation Hours No. 16
m
o 1 RU & RD Size - mm 21~_ m • 2 Drill Actual Type FDS m • 3 Reaming 0.25 S.N. LF9051 m • 4 Coring Jets - mm 3x20 m ▪ 5 Cond. Hole Wt. - daN m • 6 Trips 23.50 r/min m • 7 Lubr. Rig 0.25 Out - m
PUMP 8 Repair Rig In - m
Liner Length 9 Cut Off D.L. Metres Clean out
No. mm mm SPM 10 Dev. Survey Hours
1 140 235 11 Wireline Log Condition
2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED:
HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
20 Directional BHA: Bit. Bit Sub. 6 x 171 m DC. Jars. 3 HWDP, XO. Total Length = 90.86 m
21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) POOH with fish. Inspect monels and drill collars and HWDP. Lay down drill collars. Monels and HWDP and 30 ioints of bent drill pipe. Serviced rig. Check motor kills. Check brakes. Function tested blind rams. RIH. Pick up 18 ioints of new Grade "E". Continue to RIH to 3 327 m. Wash and ream to bottom.
ESTIMATED COSTS: DAILY $
46 634 CUMULATIVE $ 6 233 128 SUPERVISOR M. Kramps / D. Gaboury
Page No. 174
iCI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Raining Temp + 6 °C Road Good Date 97 04 28 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 153 Depth 3 367 m Progress 0 m Hole Size 216 mm Status Circulate and condition Mud: Wt 1 205 kg/rn3 Visc. 180 s/L W.L. 7.5 cm' pH 9.5 PV 65 mPa.s YP 22.5 Pa Gels 9/34 Pa
Methyl Blue 67 Solids 7.3 % Filter Cake 1 firm mm Salt 80 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. kg/m' Rate L/min
Desilter Overflow Wt. kg/m' Rate L/min Desander Overflow Wt. kg/m' Rate L/min
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 16 m • 1 RU&RD Size - mm 216 m ° 2 Drill Actual Type FDS m • 3 Reaming 1.25 S.N. LF9051 m ° 4 Coring Jets - mm 3x20 m • 5 Cond. Hole 18.00 Wt. - daN m • 6 Trips 4.25 r/min m ° 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres Clean out No. mm mm SPM 10 Dev. Survey Hours 1 140 235 130 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
Caustic 5 sxs Barite 140 sxs PP Output AV Power 15 Test BOP Drispac 5 sxs kPa L/min m/min kW 16 DST Lignite 2 sxs 17 Plug Back Xanvis 2 sxs 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Pipe in hole: 21 Handle Tool 124 Premium "E" 22 Clean to Btm 62 New "E" 23 158 Grade "G" 24 RSPP 5 200 kPa at 80 SPM. 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Was to bottom. Circulate and condition mud. Service rig. Check crown stop. Wiper trip to shoe. Wash to bottom. 7 m fill. Service rig. Check motor kills and crown stop. Circulate and condition mud.
Pick up weight 109 000 daN String weight 86 000 daN Slack off 69 000 daN
ESTIMATED COSTS: DAILY $ 34 642 CUMULATIVE $ 6 267 770 SUPERVISOR M. Kramps / D. Gaboury
Page No. 175
J
DAILY DRILLING REPORT
Cste..BISSETT RESOURCE CONSULTANTS LTD.
ESTIMATED COSTS: DAILY $ 34 642 CUMULATIVE $ 6 267 770 SUPERVISOR M. Kramps / D. Gaboury
Page No. 176
J
Weather Raining Temp + 6 °C Road Good Date 97 04 28 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 153 Depth 3 367 m Progress 0 m Hole Size 216 mm Status Circulate and condition Mud: Wt , 1 205 kg/rn3 Visc. 180 s/L W.L. 7.5 cm3 pH 9.5 PV 65 mPa.s YP 22.5 Pa Gels 9/34 Pa
Methyl Blue 67 Solids 7.3 % Filter Cake 1 firm mm Salt 80 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m3 Rate L/min Desander Underflow Wt. kg/m3 Rate L/min
Desilter Overflow Wt. kg/m3 Rate L/min Desander Overflow Wt. kg/m3 Rate L/min
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 16 m 1 RU & RD Size - mm 216 m 2 Drill Actual Type FDS m ° 3 Reaming 1.25 S.N. LF9051 m 4 Coring Jets - mm 3x20 m 5 Cond. Hole 18.00 Wt. - daN m 6 Trips 4.25 r/min m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres Clean out No. mm mm SPM 10 Dev. Survey Hours 1 140 235 130 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
Caustic 5 sxs Barite 140 sxs PP Output AV Power 15 Test BOP Drispac 5 sxs kPa L/min m/min kW 16 DST Lignite 2 sxs 17 Plug Back Xanvis 2 sxs 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional
Pipe in hole: 21 Handle Tool 124 Premium "E" 22 Clean to Btm 62 New "E" 23 158 Grade "G" 24 RSPP 5 200 kPa at 80 SPM. 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Was to bottom. Circul- g and condition mud. Service ria. Check crown stop. Wiper trip to shoe. Wash to bottom. 7 m fill. Service ria. Check motor kills and crown stop. Circulate and condition mud.
Pick up weight 109 000 daN String weight 86 000 daN Slack off 69 000 daN
DRILLING MUD ADDITIVES USED: Caustic 1 sxs PP Drispac 1 sxs kPa Barite 27 sxs Xanvis 1 sxs
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) Plan to lay down Grade "E" premium pipe. Change out pipe rams. Run in BHA. Inspect new Grade "E" and Grade "G" pipe with ultrasonic WT and MPI over upset areas.
BITS No. 16 Size - mm 216 Type FDS S.N. LF9051 Jets - mm 3x20 Wt. - daN r/min Out - m In - m Metres nil Hours Condition Clean out
SURVEYS m m m m m m m
PUMP Liner Length
No. mm mm SPM 1 140 235 2 140 235 130
HYDRAULIC Output AV
Power Umin m/min
kW
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 3 Reaming 4 Coring 5 Cond. Hole 17.75 6 Trips 5.75 7 Lubr. Rig 0.50 8 Repair Rig 9 Cut Off D.L. 10 Dev. Survey 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up 15 Test BOP 16 DST 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
10 400 1 430 105/54 247
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Overcast Temp
+ 3 oC Road Fair Date 97 04 29 Well
GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1
Day No. 154 Depth 3 367 m Progress 0 m Hole Size 216 mm Status
Lady down drill string
Mud: Wt 1 205 kg/rn3 Viso. 195 s/L W.L. 8.0 cm' pH 9.0 PV 61
mPa.s YP 30.5 Pa Gels 14-39 Pa Methyl Blue 67 Solids 7.5 % Filter Cake 1 firm mm Salt
80 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt.
kg/m3 Rate Umin Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt.
kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m3
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulate and condition mud and hole. Serviced rig and function tested upper and lower pipe rams. Checked crown saver. Checked brakes. Trip out of hole. Hole tight at 2 943 to 2 858 m. Rig up to lay down Grade "E" premium pipe.
String weight 86 000 daN Pulled to 130 000 daN at 2 943 m RSPP - Pump #2 = 5 200 kPa at 80 SPM
ESTIMATED COSTS: DAILY $ 34 007 CUMULATIVE $ 6 301 777
SUPERVISOR R. Genest / M. Kramps
Page No. 177
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
ESTIMATED COSTS: DAILY $ 28 608 CUMULATIVE $ 6 330 385 SUPERVISOR R. Genest/M. Kramos
Weather Clear Temp 4 °C Road Good Date 97 04 30 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 155 Depth 3367 m Progress 0 m Hole Size 215.9 mm Status Circulating (WO DP inspectors) Mud: Wt 1205 kg/m' Visc. 190 s/L W.L. 7.5 cm3 pH 9.5 PV 61 mPa.s YP 30.5 Pa Gels 14/39 Pa Methyl Blue 67 Solids 7.5 % Filter Cake 1.0 mm Salt 80 mg/L Cal. 40 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6 RPM - 28 3 RPM - 27
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No.
m _IS_ 1 RU & RD Size - mm 215.9 m 2 Drill Actual Type FDS m - 3 Reaming S.N. LP9051 m 4 Coring Jets - mm 3 x 20 m 5 Cond. Hole 11.50 Wt. - daN m ° 6 Trips 9.75 r/min m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig 0.75 In - m Liner Length 9 Cut Off D.L. 0.50 Metres No. mm mm SPM 10 D'ev. Survey Hours 1 140 235 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP 0.50 kPa Umin m/min kW 16 DST 8900 1430 105/54 212 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional Recirculated and waited on drillpipe inspection. 21 Handle Tool 0.50
22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Laid down Grade "E" premium drillpipe (old Grade "E"). Pulled out of hole. Rigged out and laid down machine. Picked up drill collars and ran in hole. Serviced ria and checked BOPs. Slipped and cut drilling line. Repaired top drive.Trioped in with bit. Circulated. Serviced ria. Circulated and pressure tested accumulator. Variable bore pipe rams on location, prepared to install and conduct casing inspection log after testing BOPs and accumulator.
Page No. 178
J
aBISSETT RESOIJRCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp
9 °C Road
Good Date 97 05 01 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 156 Depth 3367 m Progress 0 m Hole Size 215.9 mm Status Inspecting DP Mud: Wt 1205 kg/m' Visc. 180 s/L W.L. 8.0 cm3 pH 9.0 PV 65 mPa.s YP 22.5 Pa Gels 14/32 Pa Methyl Blue 67 Solids 7.5 % Filter Cake 1.0 firm mm Salt 60 mg/L Cal. 40 mg/L Desilter Underflow Wt.. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m3 6 RPM - 27 3 RPM - 25 (mud tank check)
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4
RU & RD Drill Actual
° Reaming Coring
5 Cond. Hole 6.75 6 Trips 7 Lubr. Rig 0.50 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 11 Wireline Log
130 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
212 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Inspect DP 16.75 24 25
BITS
SURVEYS No. 16 - m Size - mm 215.9 m Type FDS
m S.N. LF9051 m Jets - mm 3 x 20 m Wt. - daN m r/min Clean m Out - m Out
PUMP In - m _ Trio
Liner Length Metres
No. mm mm Flours
1 140 235 Condition
140 235
DRILLING MUD ADDITIVES USED:
HYDRAULIC 10 sxs Gel PP
Output
AV 2 sxs Caustic kPa
Umin m/min
8900 1430 105/54
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) A umulator Check: Start at 21 500 kPa
Close Hvdril 16 seconds - 16 500 kPa Close Pipe 2 seconds - 13 500 kPa Open HCR 1 second -13 300 kPa
Precharge at 7 400 kPa - Pumo up in 2.24 seconds
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated and waited on pipe inspectors. Tripped out bit 16. Inspected drilloipe full while tripping out. Serviced rig and conducted BOP check. Continued to trio out inspecting drillpipe. Inspecting drillpipe at report time. 140 joints inspected. 79 ioints remaining to be inspected. Culled one joint (thread damage). Expect Grade "S" drillpipe on location by 24:00 hours today.
Held safety meeting and oreiob orientation with rio crew before starting pipe inspection.
ESTIMATED COSTS: DAILY $ 43 524 CUMULATIVE $ 6 373 909 SUPERVISOR R. Genest/M. Kramps
Page No. 179
i
Good 6 °C Road Date 97 05 02 Weather Overcast Temp
Methyl Blue 67.0 Solids 60 mg/L Cal. 40 mg/L 7.5 % Filter Cake 1.0 firm mm Salt Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin kg/m' Centrifuge Overflow Wt. kg/m'
BISSETT RESOURCE CONSULTANTS LTD. 40
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig
Depth 3367 m Progress 0 m Hole Size 215.9 mm Status Circulatina Mud: Wt 1205 kg/m3 Visc. 170 s/L W.L. 8.0 cm3 pH 9.0 PV 65 mPa.s YP 22.5 Pa Gels 14/32 Pa
6 RPM - 27 3 RPM - 25
No. 16 Size - mm 215.9 _, Type FDS S.N. LP9051 Jets - mm _3A/2_ Wt. - daN r/min Out - m In - m Metres Hours Condition
BITS SURVEYS m m m m
m m m °
PUMP Liner Length
No. mm mm 1 140 235 2 140 - 235 ,
8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey
130 11 Wireline Log 12 Run Csg/Cmt
Ralex, 1 Day No. 157
TIME DISTRIBUTION Code/Operation Hours
° 1 RU&RD 2 Drill Actual 3 Reaming
° 4 Coring 5 Cond. Hole 2.25 6 Trips 3.25 7 Lubr. Rig 0.50
13 Wait on Cmt
HYDRAULIC 14 Nipple Up 7.00 PP Output AV Power 15 Test BOP 3.75 kPa Umin m/min kW 16 DST 8900 1430 105/54 212 17 Plug Back
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
18 Squeeze Cmt 19 Fishing 20 Directional
DRILLING MUD ADDITIVES USED:
Good Date 97 05 03
ESTIMATED COSTS: DAILY $ 27 709 CUMULATIVE $ 6 430 174 SUPERVISOR R. Genest
BISSETT RESOURCE CONSULTANTS LTD. C11"..
DAILY DRILLING REPORT
Clear Temp 2 °C Road GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 158
Weather Well Depth 3367 m Progress 0 m Hole Size 215.9 mm Status Tripping Mud: Wt 1200 kg/m' Visc. 240 s/L W.L.. 8.0 çm3 pH 8.8 PV 74 mPa.s YP 25 Pa Gels 9/30 Pa Methyl Blue 64 Solids 7.8 % Filter Cake 1.0 firm mm Salt 60 mg/L Cal. 40 mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6RPM-19 3RPM-18
BITS SURVEYS No. 16 m Size - mm 215.9 m Type FDS m S.N. LP9051 m Jets - mm 3 x 20 m Wt. - daN Nil m r/min 30 m Out - m 3367 PUMP In - m 3367 Liner Length Metres n/a No. mm mm Hours Condition Clean Out 2 140 235
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
10 500 1430 105/54 17 Plug Back 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool
22 Clean to Btm 4.00 23 Unload DP 1.00 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated and waited on 127 mm OD drilloioe and handling tools. Unloaded drillpioe and handling tools. Picked up and ran 127 mm OD drillpioe. Tripped in tg 2900 m KB. Broke circulation and circulated bottoms uo. Finished tripping in. Cleaned 2.0 m fill to bottom. Hole is in good shape. Circulated to condition mud and hole. Pumped three markers (flagged - paint - cellophane) for hole size determination. Circulated. Tripped out bit 16. Dumped out seven stands.
Plan to run intermediate casing inspection log followed by resumption of directional drilling operations. String Weight: 97 000 daN Hole Draa - Up: 43 000 daN (oumo on) Hole Draa - Down: 6 - 8 000 daN
Page No. 181
J
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 2 Drill Actual 3 Reaming 4 Coring 5 Cond. Hole 13.50 6 Trips 5.25 7 Lubr. Rig 0.25 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 11 Wireline Log
, 130 12 Run Csg/Cmt
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
ESTIMATED COSTS: DAILY $ 52 881 CUMULATIVE $ 6 483 055 SUPERVISOR R. Genest/M. Kramps
Weather Rain - Windy Temp 4 °C Road Good Date 97 05 04
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 159
Depth 3367 m Progress 0 m Hole Size 215.9 mm Status Tripping
Mud: Wt 1200 kg/m3 Visc. 240 s/L W.L. 8.0 cm3 pH 8.8 PV 74 mPa.s YP 25 Pa Gels 9/30 Pa
Methyl Blue 64.0 Solids 7.8 % Filter Cake 1.0 firm mm Salt 60 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m'
6RPM-19 3RPM-18
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 17 m 1 RU & RD
Size - mm 215.9 m 2 Drill Actual
Type ST F-4 m 3 Reaming
S.N. LF8637 m 4 Coring
Jets - mm 2x22/1x18 m 0 5 Cond. Hole
Wt. - daN m 6 Trips 12.25 r/min m 7 Lubr. Rig 0.25 Out - m In PUMP 8 Repair Rig In - m 3367 Liner Length 9 Cut Off D.L.
Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 . 235 11 Wireline Log 9.50 Condition 140 235 _2 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
15 sxs Gel 3 sxs Drisoac PP Output AV Power 15 Test BOP
5 sxs Caustic 2 sxs Cellophane kPa Umin m/min kW 16 DST 3 sxs Lignite 1430 105/54 17 Plug Back 2 sxs Xanvis 18 Squeeze Cmt
19 Fishing GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 2.00
21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping out bit 16. Riaaed in loggers. Ran intermediate casino inspection caliper log from 2285 m KB to surface. Preliminary field interpretation shows nominal casing wear. Riaaed out loaaers. Ran bit 17 and directional drilling tools. Orientated MWD. Tripping in at report time.
Plan to resume drilling until drilling liner casino point is reached.
Page No. 182
SURVEYS TIME DISTRIBUTION
Code/Operation Hours 3355 m 17.0 °329.0 1 RU & RD 3364 m 17.5 °328.5 2 Drill Actual 10.75 3373 m 17.4 0328.3 3 Reaming 3383 m 16.5 °329.0 4 Coring
m 5 Cond. Hole 2.25 m 6 Trips 9.50 m 7 Lubr. Rig 0.25
PUMP 8 Repair Rig Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey 1.25 1 140 235 125 11 Wireline Log 2 140 235 12 Run Csg/Cmt
BITS No. 17 Size - mm 215.9 Type STC F-4 S.N. LF8637 Jets - mm 2x20/1x18 Wt. - daN 35 - 40 000 r/min Slide Out - m In In - m 3367 Metres 33 Hours 10.75 Condition Running
ESTIMATED COSTS: DAILY $ 38 972 CUMULATIVE $
6 522 027 SUPERVISOR R. Genest/D. Gaboury/ M. Kramps
Page No. 183
J
13 Wait on Cmt DRILLING MUD ADDITIVES USED:
HYDRAULIC 14 Nipple Up
38 sxs Gel 15 sxs Barite PP Output AV Power 15 Test BOP
kPa Umin m/min kW 16 DST 14 000 1380 101/51 322 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in bit 17. Circulated gas cut mud. Drilling. Rotated from 3367 m to 3372 m KB15.0 m). slide from 3372 m to 3377 m KB (5.0). Surveyed and serviced ria. Rotated from 3377 m to 3381 m KB (4.0 m). Slide from 3381 m to 3386 m KB( 5.0 m). Surveyed at 3364 m KB. Rotated from 3386 m to 3390 m KB (4.0 m). Slide from 3390 m to 3396 m KB (6.0 m). Surveyed at 3374 m KB. Rotated from 3396 m to 3400 ni KB (4.0 m). Surveyed at 3383 m KB. Circulated up sample. Dummy trip to intermediate casino shoe. Tripping in at report time.
Pumped and rotated out first ten stands: 150 000 daN (maximum) Pumped and rotated out next six stands: 135 000 daN (maximum) Pulled next 24 stands (Dump off): 125 - 135 000 daN
String Weight: 100 000 daN Hole Drag - Up: 50 000 daN Hole Drag - Down: 4 - 6 000 daN
2 sxs Caustic 2 sxs Drispac 7 sxs Beads
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
cm' pH 9.0 PV 65 mPa.s YP 27.5 Pa Gels 8.5/21 Pa 1.5 firm mm Salt 40 mg/L Cal. 60 mg/L
Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m'
Weather
Overcast
Temp 4 Well
GENOIL et al ST. LEONARD NO. 1 Depth 3400 m Progress
33 m Hole Size
Mud: Wt 1205 kg/m3 Visc. 190 s/L W.L. 8.0 Methyl Blue 67.0 Solids
7.7 % Filter Cake
Desilter Underflow Wt.
kg/m' Rate Desilter Overflow Wt.
kg/m' Rate Centrifuge Underflow Wt. kg/m'
°C Road Good
Date 97 05 05 Rig
Ralex, 1
Day No. 160 215.9
mm Status
Tripping
6RPM-18 3RPM-17
Hours
15.25
6.00 0.25 0.50
1.50
aBISSETT RESOURCE CONSULTANTS LTD. DAILY DRILLING REPORT
Weather
Overcast and rain Temp
10 °C Road
Good
Date 97 05 06 Well
GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1 Day No. 161 Depth 3448 m Progress 48 m Hole Size 215.9 mm Status Circulating Mud: Wt 1220 kg/rn3 Visc. 200 s/L W.L. 7.5 cm3 pH 8.8 PV 66 mPa.s YP 24.5 Pa Gels 8/19 Pa Methyl Blue 67.0 _ Solids
7.9 % Filter Cake 1.0 firm mm Salt 40 mg/L Cal. 60 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6 RPM -18 3 RPM - 16 (mud very gassified)
TIME DISTRIBUTION BITS
No. 17 Size - mm 215.9 Type STC F-4 S.N. LF8637 Jets - mm 2x20/1x18 Wt. - daN 35 - 40 000 r/min S ide/30 Out - m In In - m 3367 Metres 81 Hours 26.00 Condition Runnina
DRILLING MUD ADDITIVES USED: 25 sxs Gel 95 sxs Barite PP 2 sxs Caustic 2 sxs Xanvis kPa 5 sxs Drisoac 4 sxs Lignite 15 200
SURVEYS Code/Operation 3393 m 15.8 °329.1 1 RU & RD 3402 m 15.6 °328.9 2 Drill Actual 3412 m 16.2 °329.3 3 Reaming 3421 m 15.7 °329.8 4 Coring 3431 m 15.0 °330.8 5 Cond. Hole
m 6 Trips m 7 Lubr. Rig
PUMP 8 Repair Rig Liner Length 9 Cut Off D.L.
No. mm mm SPM 10 Dev. Survey 140 235 125 11 Wireline Log 140 235 , 12 Run Csg/Cmt
13 Wait on Cmt HYDRAULIC 14 Nipple Up
Output AV Power 15 Test BOP Umin m/min kW 16 DST 1380 101/51 349 17 Plug Back
17 sxs Beads 1 pail Acid suif. 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
20 Directional Gas Detector: 21 Handle Tool Backaround Gas: 2 units 22 Clean to Btm Connection Gas: 4 units 23 Work Pioe 0.50 Fracture Gas: 210 units 24 RSPP: 5250 kPa @ 55 SPM 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripoina in after dummy trip. Cleaned 1.0 m fill. Serviced ria. Slide from 3400 m to 3405 m KB (5.0 m), rotated from 3405 m to 3410 ni KB (5.0 m). Surveyed at 3393 ni KB. Slide from 3410 m to 3412 m KB (2.0 m), rotated from 3412 m to 3419 m KB (7.0 m). Serviced ria. Surveyed at 3402 m KB. Slide from 3429 m to 3433 m KB (4.0 m). rotated from 3433 m to 3438 m KB (4.0 m). Worked tight connection. Surveyed at 3424 m KB. Slide from 3438 m to 3442 m KB. Circulated out ass cut mud. Reduced pump rate to prevent mud from coming over drillina nipple. Started increasina mud density. Rotated from 3442 m to 3448 m KB (6.0 m). Surveyed at 3431 m KB. Circulating sample at report time while increasing mud density.
Plan to dummy trio to intermediate casino shoe.
NOTE: At 3442 m KB. experienced cas cut mud to surface`aas was blowing mud over drilling nipple at reduced puma rate. Ran one circulation through drillina choke while increasina mud density. Resumed drillina. drillina fluid Gas cut. String Weiaht: 102 000 daN Hole Drag - Up: 40 000 daN Hole Drag - Down: 6 - 8 000 daN
ESTIMATED COSTS: DAILY $ 44 866 CUMULATIVE $ 6 566 893 SUPERVISOR
R. Genest/D. Gaboury
Page No. 184
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Rainina and snowina Temp -2 °C Road Good Date 97 05 07 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 162 Depth 3495 m Progress 47 m Hole Size 215.9 mm Status Wioer tripping Mud: Wt 1215 kg/m3 Visc. 205 s/L W.L. 7.5 cm' pH 8.5 PV 65 mPa.s YP 30 Pa Gels 11/28 Pa Methyl Blue 67.0_ Solids 7.8 % Filter Cake 1.0 firm mm Salt 60 mg/L Cal. 40 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m' 6RPM-24 3RPM-22
TIME DISTRIBUTION SURVEYS Code/Operation Hours
1 RU & RD 2 Drill Actual 16.00 3 Reaming 4 Coring 5 Cond. Hole 3.25 6 Trips 2.75
r/min Slide/55 m 7 Lubr. Rig 0.25 Out - m 3495 PUMP 8 Repair Rig In - m 3367 Liner Length 9 Cut Off D.L. Metres 128 No. mm mm SPM 10 Dev. Survey 1.50 Hours 42.00 1 140 235 125 11 Wireline Log Condition Runnina 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
63 sxs Gel 280 sxs Barite PP Output AV Power 15 Test BOP 4 sxs Caustic 2 sxs Xanvis kPa Umin m/min kW 16 DST 2 sxs Drisoac 14 500 . 1380 101/51 333 17 Plug Back
14 sxs Beads 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Flow Check 0.25 24
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated bottomhole samples while increasing mud density. Serviced ria. Slide from 3448 m to 3452 m KB (4.0 ml, rotated 3452 m to 3457 m KB (5.0 m). Surveyed at 3440 rn KB. Dummy trio three stands. conducted flow check. Serviced ria. Slide from 3457 m to 3461 m KB (4.0 m). rotated from 3461 m to 3467 m KB (6.0 ml. Surveyed at 3450 m KB. Slide from 3467 m to 3471 m KB (4.0 m). rotated from 3471 m to 3477 m KB (6.0 m). Surveyed at 3460 m KB. Slide from 3477 m to 3483 m KB (6.0 m), rotated 3483 m to 3486 m KB (3.0 m). Surveyed at 3469 m KB. Slide from 3486 m to 3490 m KB (4.0 m). Rotated from 3490 m to 3495 m KB. Surveyed at 3478 m KB. Circulated UD bottom hole trip. Dummy tripoina to intermediate casino shoe at report time.
Casino point: 3495 m KB. Plan to conduct two dummy trios or until hole conditions are satisfactory. Will then run 177.8 mm OD drillina liner.
Strina Weiaht: 102 000 daN Hole Draa - Up: 50 000 daN (pump on) Hole Draa - Down: 6 - 8 000 daN RSPP: 5250 kPa at 55 SPM
ESTIMATED COSTS: DAILY $ 94 509* CUMULATIVE $ 6 661 402 SUPERVISOR R. Genest/D. Gaboury *Includes drillpipe inspection of $47 700
Page No. 185
3440 m 14.2 °331.1 3450 m 13.5 °331.9 3460 m 13.0 °331.7 3469 m 12.1 °330.3 3478 m 11.1 0327.9
3495* m 9.1 °325.0
BITS No. 17 Size - mm 215.9 Type STC F-4 S.N. LF8637 Jets - mm 2x20/1x18 Wt. - daN 20 - 30 000
No. 1_ Size - mm 215.9 Type STC F-4 S.N. LF8637 Jets - mm 2x20/1x18 Wt. - daN 20 - 30 000 r/min 30 Out - m 3495 In - m 3367 Metres 128 Hours 42.00 Condition
BITS SURVEYS m m m m m m m
PUMP Liner Length
No. mm mm 1 140 235
140 235
DRILLING MUD ADDITIVES USED: HYDRAULIC
14 sxs Beads PP Output AV
4 sxs Caustic kPa Umin m/min 140sxs Barite 12 500 1380 101/51
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
1
°C Road Good
Date 97 05 08 Rig
Ralex. 1
Day No. 163 0 m Hole Size 215.9 mm Status Tripoina
180 s/L W.L. 7.8 cm3 pH 9.0 PV 65 mPa.s YP 22.5 Pa Gels 8.5/19.8 Pa 7.5 % Filter Cake 1.0 firm mm Salt 60 mg/L Cal. 40 mg/L Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m'
6RPM-19 3RPM-17
Weather Clear Temp
Well GENOIL et al ST. LEONARD NO. 1
Depth 3495 m Progress Mud: Wt 1215 kg/m' Visc. Methyl Blue 64.0 Solids Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4
RU&RD Drill Actual Reaming Coring
5 Cond. Hole 8.00 6 Trips 13.50 7 Lubr. Rig 0.75 8 Repair Rig 9 Cut Off D.L. 1.00
SPM 10 Dev. Survey 125 11 Wireline Log
12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
287 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Flow Check 0.25 24 Check Too 25 Drive 0.50
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished dummy trip to intermediate casino shoe, Serviced no and function tested pipe rams. Slipped and cut line. Tripped back to bottom. Broke cirçjlation and washed 20 m to bottom. Approximately 2.0 m fill. Circulated to condition mud and hole. Dummy trio jo intermediate casino shoe. Rotated out first 15 stands at 20 to 30 000 daN hole draa. Pulled bit to intermediate casino shoe. Serviced ria and ran flow check. Tripped bit 17 back to bottom. hole drag 8 000 _daN maximum. Inspected too drive and running near. Washed to bottom. no fill. Circulated to condition mud and hole. Serviced rig and conducted flow check. Tripped out bit 17. rotated out first 15 stands. Strapped drill string on trio out. Tripping out at report time.
NOTE: Plan to trio out, pick uP and run 177.&mm OD drillina liner.
String Weight: 102 000 daN Hole Draa - Up: 33 - 38 000 daN (first 15 stands. rotated oioe)
Up: 25 - 30 000 daN (Dulling only to casino shoe) Uo: 43 - 48 000 daN (stands 18. 19. 20. maximum only)
RSPP: 7 600 kPa at 90 SPM
ESTIMATED COSTS: DAILY $
53 843 CUMULATIVE $ 6 715 248 SUPERVISOR R. Genest/D. Gaboury
Page No. 186
I
C BISSETT RESOURCE CONSULTANTS LTD. DAILY DRILLING REPORT
Weather
Clear
Temp 4 °C Road
Good
Date 97 05 09 Well
GENOIL et al ST. LEONARD NO. 1 Rig
Rolex. 1
Day No. 164 Depth 3495 m Progress
0 m Hole Size
215.9
mm Status
Trim:Ana Mud: Wt 1215 kg/m' Visc. 180 s/L W.L. 7.8 Methyl Blue 64.0 Solids Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt.
kg/m' Rate Centrifuge Underflow Wt. kg/m'
cm3 pH 9.0 PV 65 mPa.s YP 22.5 Pa Gels 8.5/19 Pa 60 mg/L Cal. 40 mg/L
Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Overflow Wt. kg/m'
7.5 % Filter Cake 1.0 firm mm Salt
6RPM-19 3RPM-17
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5
RU & RD Drill Actual Reaming Coring Cond. Hole
6 Trips 12.75 7 Lubr. Rig 8 Repair Rig 0.25 9 Cut Off D.L.
SPM 10 Dev. Survey 100 11 Wireline Log
12 Run Csg/Cmt 8.00 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
12 17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 1.00 22 Clean to Btm 23 Circ. Casino 2.00 24 25
BITS
SURVEYS No. 17
m Size - mm 215.9
m Type STC F
m
S.N. LF8637
m Jets - mm 2x20/1x18
m
Wt. - daN 20 - 30 000
m r/min 3_ m Out - m 3495
PUMP In - m 3367
Liner Length
Metres 128
No. mm mm Hours 42.00
1 140 235
Condition 5-5-1
140 235
DRILLING MUD ADDITIVES USED: HYDRAULIC 9 sxs Beads PP Output AV
20 sxs Barite kPa Umin m/min 7 000 1100 75
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished triopina out bit 17. Strapped drill string. +0.64 m difference, no correction. Laid down directional drillina tools. Riaaed to run casino. Held safety meetina. Tallied, drifted. picked uo and ran 177.8 mm OD &illina liner and liner hanaer. Sorted drilloipe to achieve proper and safe stick-up. Tripped in with liner, broke circulation every ten stands. Tripped in to2360 m KB. Circulated bottoms up. Ran 11 stands, circulated out aas-cut mud for 45 minutes. Tripoina in liner at report time.
Casino hook load: 48 000 daN
ESTIMATED COSTS: DAILY $
120 563 CUMULATIVE $ 6 835 811 SUPERVISOR R. Genest/D. Gaboury
Page No. 187
Depth 3495 m Progress 0 m Hole Size 215.9 mm Status WOC
ESTIMATED COSTS: DAILY $ 40 781 CUMULATIVE $ 6 876 592 SUPERVISOR R. Genest/D. Gaboury
C:ISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Overcast Temp GENOIL et al ST. LEONARD NO. 1
°C Road Good Ralex, 1
Weather Well Rig
6RPM-5 3RPM-3
TIME DISTRIBUTION BITS
No.
SURVEYS m
Code/Operation Hours 1 RU & RD
Size - mm m 2 Drill Actual Type m 3 Reaming
S.N. m 4 Coring Jets - mm m 5 Cond. Hole 1.00 Wt. - daN m 6 Trips 1.50 r/min m 7 Lubr. Rig 0.25 Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 235 125 - 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt 8.50
13 Wait on Cmt 5.25 DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST 8 200 1400 101/51 191 17 Plug Back
18 Squeeze Cmt 0.25 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Circ. Casino 6.50 24 Safety Mta 0.25 25 Set Hanoer 0.50
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Ran 96 ioints 177.8 mm OD (1260.04 m) 43.2 ka/m API GDE L80 R3 8RD LT&C new casino and 1 - 244.5 mm x 177.8 mm liner hanger with tie-back sleeve. Landed drillina liner at 3494.00 m KB. top tie-back sleeve at 2233.96 m KB. NOTE: Circulated and worked liner oast tie soot beainnina at *3170.0 m KB. Circulated to condition mud and hole. Riaaed in cementers. Pressure tested surface eauipment to 35 000 kPa. Held safety meetina. Spearheaded with 0.5 m' fresh water + 3.0 m' mud push at 1300 ka/m3 density. Cemented usina 46.5 tonnes Class "G° + 0.5% D-81 + 0.5% D-65 + 0.7% D-160FL + 0.61% anti-foam at 1900 ka/m3 slurry density. Bumped plus with 22 700 kPa. Floats held okay. Plua down at 22:05. 97 05 09. Pressured uo on liner to 4 000 kPa. set and released liner hanaer. Pulled 17 stands (±487 m) and landed drill string at 1746.96 m KB. Circulated 4 bottoms up at 2.6 m'/min. Closed pipe rams and pressured up drilloipe to 3 500 kPa. Pressure bled off to 2 800 kPa. Pressured up to 3 500 kPa. Pressure bled off to 2 800 kPa and remained static. Allowed well to remain shut in undisturbed with 2 800 kPa SIDPP. WOC at report time.
Page No. 188
Day No. 165 Date 97 05 10 5
11.5 Pa Gels 3/13 Pa 60 mg/L Cal. 40 mg/L
kg/m' Rate Umin kg/m' Rate Umin
kg/m'
Mud: Wt 1200 kg/.m' Visc. Methyl Blue 50 Solids Desilter Underflow Wt. Desilter Overflow Wt._ Centrifuge Underflow Wt.
95 s/L W.L. 95 cm3 pH 8.5 PV 42 mPa.s YP 7.7 % Filter Cake 1.5 mm Salt
kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desander Overflow Wt.
kg/m' Centrifuge Overflow Wt.
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Overcast Temp 5 °C Road Good Date 97 05 11
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 166
Depth 3495 m Progress 0 m Hole Size 155 mm Status Rigged Up Floor Mud: Wt 1200 kg/m' Visc. 95 s/L W.L. 95 cm3 pH 8.5 PV 42 mPa.s YP 11.5 Pa Gels 3/13 Pa
Methyl Blue_ 50 Solids 7.7 % Filter Cake 1.5 mm Salt 60 mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m3 Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
6RPM-5 3RPM-3
TIME DISTRIBUTION BITS SURVEYS Code/Operation Hours
No. 16RR 18 m • 1 RU & RD
Size - mm 216 155 m • 2 Drill Actual Type FDS WRB J3XP m • 3 Reaming S.N. LF9051 N34ED m • 4 Coring Jets - mm 3 x 20 m ° 5 Cond. Hole 1.50 Wt. - daN m • 6 Trips 12.75 r/min m • 7 Lubr. Rig 0.25 Out - m Clean PUMP 8 Repair Rig In - m Out Liner Length 9 Cut Off D.L. 1.0Q Metres Trip No. mm mm SPM 10 Dev. Survey Hours 1 140 235 115 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt 2.75 DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP 1.75 kPa Umin m/min kW 16 DST 7500 1265 97147 _1 8 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 1.50 22 Clean to Btm 23 Clean Tank 0.50 24 Lay Down DC 2.00
25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Bled off surface pressure. Tripped out and laid down liner running tools. Ran bit 16RR laid down 114.3 mm OD Grade 0E" drillpipe. Slipped and cut line. Finished tripping in. Strapped drill string. Tagged top of liner at 2233.59 m KB. No cement on top of liner. Cleaned suction tank. Displaced casino to fresh water while salvaging drilling fluid in surface tanks. Closed pipe rams and pressure tested casing to 21 000 kPa for 15 minutes. Pressure bled off to 19 600 kPa. Checked surface equipment. Pressure tested casing to 25 000 kPa for 30 minutes. pressure slowly bled off to 21 200 kPa in 30 minutes. Checked surface equipment for leaks, Bled off pressure. Tripped out. Laid down 114.3 mm OD hevi-wate and 171 mm OD drill collars. Rigging up at report time to pick uo 121 mm OD drill collars and 89 mm OD drillpipe.
ESTIMATED COSTS: DAILY $ 124 629 CUMULATIVE $ 7 001 221 SUPERVISOR R. Genest/D. Gaboury
Page No. 189
J
ESTIMATED COSTS: DAILY $ 27 875 CUMULATIVE $ 7 029 096 SUPERVISOR R. Genest/D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp 2 °C Road Good Date 97 05 12 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 167
Depth 3495 m Progress 0 m Hole Size 155 mm Status Waiting on Packer Assembly Mud: Wt 1000 kg/m' Visc. 28 s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 18 m 1 RU & RD Size - mm 155 m 0 2 Drill Actual Type HC J3XP m 3 Reaming S.N. N34ED m 4 Coring Jets - mm 3 x 14.3 m 5 Cond. Hole 0.50 Wt. - daN m 6 Trips 15.00 r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 235 _ 120 11 Wireline Log Condition 140 235 _2 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP 2.50 kPa Umin m/min kW 16 DST
12 000 1 320 _98/48 264 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Drill Out 4.75 24 WO Packer 1.25 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished rigging uo working floor. Ran bit 18. picked uo and ran 120 mm OD drill collars. 89 mm OD HWDP and 89 mm OD drilloipe. Taoged cement at 3441 m KB. Drilled out cement to ball catcher at 3457 m KB. Drilled up ball catcher and drilled out hard cement to float collar at 3480 m KB. Circulated bottoms up. Closed oioe rams and pressure tested intermediate casing and drilling liner to 23 300 kPa for 30 minutes. Pressure slowly bled off to 17 500 kPa in 30 minutes. Released pressure. Circulating and waiting on liner packer assembly.
NOTE: Did not find any cement on too of liner tie back stem. Pressure test indicates lack of pressure integrity on the back side of the 177.8 mm OD drilling liner. Seal assembly, liner packer and tie-back sleeve left Nisku at ±09:30. 97 05 11 on a hot shot truck with two drivers.
Page No. 190
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
Rig 8 °C Road Weather
Well
Clear Temp GENOIL et al ST. LEONARD NO. 1
Good Date 97 05 13 Ralex. 1 Day No. 168
27 875 CUMULATIVE $ 7 056 971 SUPERVISOR R. Gen@SUD. Gaboury ESTIMATED COSTS: DAILY $
0 m Hole Size 155 mm Status
30 s/L W.L. cm3 pH 9.0 PV mPa.s YP Pa Gels Pa
% Filter Cake mm Salt mg/L Cal. mg/L
kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
kg/m' Centrifuge Overflow Wt. kg/m'
Depth 3495 m Progress Mud: Wt 1020 kg/m' Visc. Methyl Blue Solids
Desilter Underflow Wt.
Centrifuge Underflow Wt.
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m ° 1 RU&RD
Size - mm 155 m 2 Drill Actual
Type HC J3XP m 3 Reaming
S.N. N34ED m 4 Coring
Jets - mm 3 x 14.3 m 5 Cond. Hole
Wt. - daN m 6 Trips
r/min m 7 Lubr. Rig
Out - m PUMP 8 Repair Rig
In - m Liner Length 9 Cut Off D.L.
Metres No. mm mm SPM 10 Dev. Survey
Hours 1 140 235 55 11 Wireline Log
Condition 140 235, 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
2 Pails Acid PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST 3 600 600 32 36 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 WO Packer 24.00 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated and waited on liner packer assembly. Changed out stand pipe hammer union and repaired hole fill valve on the stand pipe. Pressure tested stand pipe to 21 000 kPa. okay. Commenced circulating through surface sump, adiusted pH of sump fluid to allowable levels by adding acid. Circulating atreport time.
Page No. 191
Desilter Overflow Wt.
Waiting on Packer Assembly
Clear Temp Weather Good 7 °C Road Date 97 05 14
R. Genest/D. Gaboury ESTIMATED COSTS: DAILY $ 39 755 CUMULATIVE $ 7 096 726 SUPERVISOR
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1
Depth 3495 m Progress 0 m Hole Size 155 mm Status Circulating
Mud: Wt 1020 kg/m' Visc. 30 s/L W.L. cm' pH
Methyl Blue Solids % Filter Cake
Desilter Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m'
8.0 PV mPa.s YP Pa Gels Pa
mm Salt mg/L Cal. mg/L
Desander Underflow Wt. kg/m' Rate Umin
Desander Overflow Wt. kg/m' Rate Umin Centrifuge Overflow Wt. kg/m'
No. 18
BITS SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
Size - mm 155 m 2 Drill Actual Type HC J3X9 m 3 Reaming
S.N. N34ED m 4 Coring
Jets - mm 3 x 14.3 m ° 5 Cond. Hole 13.00
Wt. - daN m 6 Trips 9.25
r/min m 7 Lubr. Rig 0.25
Out - m PUMP 8 Repair Rig
In - m Liner Length 9 Cut Off D.L.
Metres No. mm mm SPM 10 Dev. Survey
Hours 1 140 235 120 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST 2 00 1 320 71 5.5 17 Plug Back
18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 1.25 22 Clean to Btm 23 Set Packer 0.25 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated through sump while waiting on drilling liner packer assembly. Serviced rip, checked brakes, pins and crown saver. Circulated. Tripped out bit 18. Made up and ran 244.5 mm x 177.8 mm seal assembly, packer and tie-back sleeve. Circulated bottoms up. Observed pas cut water on bottoms up. Located seal assembly in top of tie-back sleeve on too of drilling liner. Set packer and pulled off setting tools. Circulating at report time.
Page No. 192
Day No. 169
ESTIMATED COSTS: DAILY $ 67 491 CUMULATIVE $ 7 164 217 SUPERVISOR R. Genest/D. Gaboury
4 BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 5 °C Road Good Date 97 05 15
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 170
Depth 3495 m Progress 4 m Hole Size 155 mm Status Tripping
Mud: Wt 1020 kg/m' Visc. 30 s/L W.L. cm3 pH 8.0 PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 18 19 m 1 RU & RD
Size - mm 155 155 m 2 Drill Actual - Type HC J3X9 ST MF156 (4-4-7) m 3 Reaming
S.N. N34ED LM 1396 m Coring 4
Jets - mm 3 x 14.3 Open m 5 Cond. Hole 2.00
Wt. - daN 2-4000 m 6 Trips 17.75
r/min 40 - 60 m 7 Lubr. Rig 0.25
Out - m 3499 In PUMP 8 Repair Rig
In - m 3495 3 499 Liner Length 9 Cut Off D.L.
Metres 4 No. mm mm SPM 10 Dev. Survey
Hours Drill Out 1 140 235 100 11 Wireline Log
Condition 3-1-I Run 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
10 500 1 100 59 192 17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 2.00 22 Clean to Btm 23 Pressure Test 1.75 24 Drill Out 2.00 25 Set Packer 0.25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Pressure tested 177.8 mm OD drilling liner to 21 000 kPa for 15 minutes, okay. Pulled out of drilling liner and circulated bottoms up, Pulled off drilling liner and pressure tested 244.5 mm OD intermediate casing and liner packer to 21 000 kPa for 30 minutes. okay. Trippg. out and laid down setting toole. Ran bit 18 and drill collars. Serviced rig and picked up three 89 mm OD HWDP. Finished tripping_ in. Broke circulation and drilled out cement. Drilled to 3499 m KB. Circulated bottoms up. Ran formation integrity test. no leak-off observed at 15.8 kPa/m pressure gradient at drilling liner shoe. Tripped out bit 18. Ran bit 19 and bottomhole assembly. Tripping in at report time to begin drying casing.
Page No. 193
J
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
ESTIMATED COSTS: DAILY $ 32 315 CUMULATIVE $ 7 196 532 SUPERVISOR R. Genest/D. Gaboury
Overcast Temp 5 °C Road Date 97 05 16 Weather Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 171 Depth 3499 m Progress 0 m Hole Size 155 mm Status Blowing Casing to Dry Mud: Wt kg/'m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS No. 19 m
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9 10
RU&RD Size - mm 155 m Drill Actual Type ST MF156 m Reaming S.N. LM 1396 m ° Coring Jets - mm Open m ° Cond. Hole Wt. - daN m Trips 0.50 r/min m ° Lubr. Rig 0.50 Out - m In PUMP
SPM
Repair Rig In - m 3 499 Liner Length Cut Off D.L. Metres No. mm mm Dev. Survey Hours 1 140 235 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional NOTE: Well began flowing natural gas as water was unloaded. Volume: TSTM 21 Handle Tool
22 Clean to Btm 23 Blow Hole 21.50 24 Repair Comp. 1.50 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in bit 1 to 600 m KB. Installed rotating head and rigged in blouie line. Rigged in air equipment. Unloaded casing with air. Continued tripping in while unloading casino every 20 stands. Shut down to repair crosshead shaft on air compressor. Reached total depth at 23:00, 97 03 15. Blew casino with air to dry. Air circulation rate: 71.8 m3/min at 2240 kPa.
Page No. 194
J
Good
Cli BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
1
Weather Overcast Temp 6 °C Road Good Date 97 05 17 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 172
Depth 3532 m Progress 33 m Hole Size 155 mm Status Waiting on compressor Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 19 m 1 RU & RD Size - mm 155 m 2 Drill Actual 4.50 Type MF156 m 3 Reaming S.N. LM 1396 m Coring 4 Jets - mm Open m 5 Cond. Hole Wt. - daN 2 - 3 000 m 6 Trips 8.50 r/min 65 m 7 Lubr. Rig 0.50 Out - m In PUMP 8 Repair Rig In - m 3 499 Liner Length 9 Cut Off D.L. Metres 33 No. mm mm SPM 10 Dev. Survey Hours 4.50 1 140 235 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Blow Hole 6.00 24 WO Booster 4.50 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued to blow casing to unload moisture. Slowly drilled ahead. well began making dust. Drilled to 3532 m KB at 7.4 m/h ROP. Booster compressor failed. Unable to circulate. Pulled bit 19 up into the 244.5 mm OD casing. Tore out booster compressor. Serviced ria. Tripped out to check bottomhole assembly. okay. Found small amountof cuttings adhering to tool ioints and bottomhole assembly. Waiting on booster compressor to arrive from Nisku.
String Weight: 109 000 daN Hole Draa (177.8 mm OD casing): 28 - 32 000 daN Rotary Torque: 8 550 to 14 250 N•m at 60 RPM Air Circulation Rate: 68.0 m'/min at 2 240 kPa (temp: 135°C)
ESTIMATED COSTS: DAILY $
32 917 CUMULATIVE $ 7 229 449 SUPERVISOR R. GenesUD. Gaboury
Page No. 195
Weather Well
Cloudy Temp
GENOIL et al ST. LEONARD NO. 1
8 °C Road Good Rig
Date 97 05 18 Day No. 173 Ralex. 1
Depth 3532 m Progress
Mud: Wt Air kg/m' Visc.
Methyl Blue Solids Desilter Underflow Wt, Desilter Overflow Wt. Centrifuge Underfiow Wt.
Waiting on compressor
ake mm Salt mg/L Cal. mg/L Umin Desander Underfiow Wt. kg/m' Rate Umin
Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Overflow Wt. kg/m'
0 m Hole Size 155 mm Status mPa.s YP Pa Gels Pa s/L W.L. cm3 pH 8.0 PV
% Filter C kg/m' Rate kg/m' Rate
kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 19 m 1 RU & RD
Size - mm 155 m 2 Drill Actual
Type MF156 m 3 Reaming
S.N. LM 1396 m ° 4 Coring
Jets - mm Open m 5 Cond. Hole
Wt. - daN m 6 Trips 6.25
r/min m 7 Lubr. Rig 0.50
Out - m PUMP 8 Repair Rig
In - m 3499 Liner Length 9 Cut Off D.L. 1.00
Metres No. mm mm SPM 10 Dev. Survey
Hours 1 140 235 11 Wireline Log
Condition 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 WO Booster 16.25 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Checked bottomhole assembly. Ran bit 19 and drill collars, Slipped and cut line. Finished tripping in to 2127 m KB. Serviced rig. WO booster compressor to arrive from Nisku,
Observed GTS at 21:00. 97 02 18. Lazy 1.0 m flare. TSTM.
Pumped sump 24 hours, ±0.6 m freeboard, pH = 8.0
Security personnel stopped eight people trvina to access location the past 24 hours. A lot of attention is being aiven to this operation by_ mostly investors. In light of this number, will maintain security wa` . during down period.
ESTIMATED COSTS: DAILY $ 27 894 CUMULATIVE $ 7 257 343 SUPERVISOR R. Genest/D. Gaboury
Page No. 196
CII BISSETT RESOURCE CONSULTANTS LTD. 1
DAILY DRILLING REPORT
Good 8 °C Road Weather Date 97 05 19 Cloudy Temp LEONARD NO. 1 GENOIL et al ST. Rig Ralex. 1 Day No. 174
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well Depth 3532 m Progress Mud: Wt kg/m' Visc. Methyl Blue Solids Desilter Underflow Wt. Desilter Overflow Wt. Centrifuge Underflow Wt.
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 19 m 1 RU&RD Size - mm 155 m 2 Drill Actual Type MF156 m 3 Reaming S.N. LM 1396 m 4 Coring Jets - mm Open m 5 Cond. Hole Wt. - daN 2-3000 m 6 Trips r/min m 7 Lubr. Rig 0.50 Out - m In PUMP 8 Repair Rig In - m 3499 Liner Length 9 Cut Off D.L. Metres 33 No. mm mm SPM 10 Dev. Survey Hours 4.50 1 140 235 , 11 Wireline Log Condition 2 235 _LIIL 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 WO Booster 23.50 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Waited on booster compressor to arrive from Nisku. Held BOP drill with crews. Serviced ria. Well continued to flow annular gas with a lazy 1.0 to 1.5 m flare. TSTM.
ESTIMATED COSTS: DAILY $ CUMULATIVE $ 7 292 460 SUPERVISOR R. Genest/D. Gaboury
Page No. 197
J
0 m Hole Size 155 mm Status Waiting on compressor PV mPa.s YP Pa Gels mm Salt mg/L Cal.
Umin Desander Underflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate
Centrifuge Overflow Wt. kg/m'
35 117
s/L W.L. cm' pH % Filter Cake
Pa mg/L Umin Umin
kg/m' Rate kg/m' Rate
kg/m'
ESTIMATED COSTS: DAILY $ 28 744 CUMULATIVE $ 7 321 204 SUPERVISOR R. Genest/D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Raining Temp 12 °C Road Good Date 97 05 20 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 175 Depth 3532 m Progress 0 m Hole Size 155 mm Status Waiting on mechanic Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m3
No. 19 BITS SURVEYS
m
TIME DISTRIBUTION Code/Operation Hours 1 RU&RD
Size - mm 155 m 2 Drill Actual Type MF156 m 3 Reaming S.N. LM 1396 m 4 Coring Jets - mm Open m 5 Cond. Hole Wt. - daN 2 - 3 000 m ° 6 Trips 1.00 r/min _65 m 7 Lubr. Rig 0.50 Out - m In PUMP 8 Repair Rig In - m 3 499 Liner Length 9 Cut Off D.L. Metres 33 No. mm mm SPM 10 Dev. Survey Hours 4.50 1 140 235 11 Wireline Log Condition Run 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 WO Booster 9.75 24 WO Mechanic 10.75 25 Unload Booster 2.00
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Waited on booster compressor. Ran bit 19 in to tight spot at 2897 m KB. Serviced ria. Waiting on booster compressor. Booster arrived at 17:00. 97 05 19. Unloaded booster and tied into circulating system. Started compressors. Developed severe lubricating on leak on drive shaft aear on primary compressor. Shut down. Contacted Canadian Air Drilling Services. Mechanic and parts are being flown to location. (ETA. wellsite. 112:00. W 05 20.) Shut down while waiting on mechanic.
Well continues to flow lazy 1.0 to 1.5 m flare.
Page No. 198
ESTIMATED COSTS: DAILY $ 27 084 CUMULATIVE $ 7 348 288 SUPERVISOR R. Genest/D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp 5 °C Road Good Date 97 05 21
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 176
Depth 3532 m Progress 0 m Hole Size 155 mm Status Waiting on repairs
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 19 m 1 RU & RD
Size - mm 155 m 2 Drill Actual
Type MF156 m 3 Reaming
S.N. LM 1396 m Coring 4
Jets - mm Open m 5 Cond. Hole
Wt. - daN 2-3000 m 6 Trips r/min 65 m 7 Lubr. Rig 0.50
Out - m In PUMP 8 Repair Rig
In - m 3499 Liner Length - 9 Cut Off D.L.
Metres 33 No. mm mm SPM 10 Dev. Survey Hours 4.50 1 140 235 11 Wireline Log
Condition 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Repairs 24 Cdn Air 23.50 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Waited on mechanic to arrive from Nisku. Serviced rig. Replaced main shaft on seal in low pressure compressor. Unable to start low pressure compressor driver. Appears fuel infection system is not working. Began looking and telephoning for replacement iniector pump. Found same in Quebec City. Canadian Air Drilling mechanic travelled to Quebec City and picked up replacement iniector Dump. Returned to location. Installed replacement iniector pump. Seals leaking on replacement pump. attempted to tighten same, unsuccessful. Tore out replacement infector pump. Travelled to Quebec City to exchange iniector pump. Estimated mechanic will return from Quebec City. install new infector pump and be ready to attemotto start driver by 12:00. 97 05 21.
Well continues to flow natural pas, 1.0 to 1.5 m lazy flare. TSTM.
Page No. 199
13 Wait on Cmt
HYDRAULIC 14 Nipple Up Output AV Power 15 Test BOP Umin m/min kW 16 DST
17 Plug Back
aBISSETT RESOURCE CONSULTANTS LTD. DAILY DRILLING REPORT
Weather Raining Temp 4 °C Road Good
Date 97 05 22 Well GENOIL et al ST. LEONARD NO. 1
Rig Ralex. 1
Day No. 177 Depth 3532 m Progress
0 m Hole Size 155 mm Status Tripping
Mud: Wt Air kg/m' Visc.
s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids
Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m'
Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION Code/Operation Hours 1 RU&RD 2 Drill Actual 3 Reaming 4 Coring 5 Cond. Hole 0.50 6 Trips 1.00 7 Lubr. Rig 0.50 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 11 Wireline Log 12 Run Csg/Cmt
BITS
SURVEYS No. 1- m Size - mm 155 m Type ST MF156 m
S.N. LM 1396 m Jets - mm Open m
Wt. - daN 2-3000 m r/min 65 m Out - m In
PUMP
In - m 3499
Liner Length
Metres 33
No. mm mm Hours 4.50
140 235 Condition
140 235
DRILLING MUD ADDITIVES USED: PP kPa
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
23 WO Cdn Air 22.00 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Waiting on mechanic. Installed iniector pump, driver refused to start. Tore out air in the system, found two small pieces and a few fine pieces of raa that had been pulled through the turbochargers. They had been there for sometime. Nothing in system to stop driver from running. Found two leaking valves. Pulled heads off driver and sent to Quebec City for repair. Ordered replacement low pressure compressor from Quebec City. ETA on location was supoosed to be 19:00. did not show up until 02:30. Spotted and tied compressor Into circulating system. Tripping in at report time to begin drilling.
Shut in well to measure flow. SICP built to 35 kPa in 9.50 hours. Unable to measure flow. TSTM. Number of people who showed up at security gate during the past 24 hours: 6 (The security people are doing a good lob.) Took number gas sample while well was shut in. Sent same to the University at Trois Rivieres for analysis
Approximately 130 hours down time due to compressor/booster failure. Hole drag at liner shoe: 8 - 10 000 daN up
ESTIMATED COSTS: DAILY $ 50 357 CUMULATIVE $ 7 398 645 SUPERVISOR
R. Genest/D. Gaboury
Page No. 200
18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm
J
ESTIMATED COSTS: DAILY $ 32 906 CUMULATIVE $ 7 431 551 SUPERVISOR R. Genest/D. Gaboury
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 7 °C Road Good Date 97 05 23
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 178
Depth 3549 m Progress 17 m Hole Size 155 mm Status Surveying
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. 19 m
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9 10
RU & RD Size - mm 155 m Drill Actual 4.00 Type ST MF56 m Reaming S.N. LM 1396 m 0 Coring Jets - mm Open m ° Cond. Hole
Wt. - daN 2 - 3 000 m Trips 10.25 r/min 65 m Lubr. Rig 0.50 Out - m In PUMP
SPM
Repair Rig In - m 3 499 Liner Length Cut Off D.L. Metres No. mm mm Dev. Survey 9.25 Hours 1 140 235 11 Wireline Log
Condition 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Continued to trip in bit 19, rotated and blew hole while tripping in. Recovered string float every third stand. Serviced ria. Well dry after reaching bottom. dusting. Drilled to 3539 m KB, well making good dust. Ran directional surveys at_3530 m KB. Ran five surveys, three misruns and two with the following results: 1.25°. S5OW (230°) and +20.0°, no direction. Serviced rig. Drilled to 3549 m KB, well making good dust. Ran three deviation surveys: +20.9°, N58E (58°). misrun and +20.0°, S2E (178°). Contacted Sperry-Sun to discuss operation of single shot directional tools. Directional man with replacement single shot equipment is travelling to location from North Bay, Ontario. Plan to run directional survey at ±3505 m KB (deviation is known at this death) before proceeding.
Number of people who showed up at the security gate in the past 24 hours: 7
Air Circulation Rate: 58.0 m3/min at 2345 kPa ROP When Drilling: ±6.0 m/h
Page No. 201
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
Good Date 97 05 24 Weather Cloudy Temp 8 °C Road
ESTIMATED COSTS: DAILY $ 32 390 CUMULATIVE $ 7 463 941 SUPERVISOR R. Genest/D. Gaboury
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 179
Depth 3549 m Progress 0 m Hole Size 155 mm Status Surveying
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. 19 3521 m 20+ °S2E
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9
10
RU & RD
Size - mm 155 3503 m 20+ °S60E Drill Actual
Type STC MF156 3503 m 20+ °S32E Reaming
S.N. LM 1396 3503 m Misrun Coring
Jets - mm Open 3503 m Misrun Cond. Hole
Wt. - daN 2 - 3 000 3478 m Misrun ° Trips 0.25
r/min 65 m ° Lubr. Rig 0.25
Out - m In PUMP
SPM
Repair Rig
In - m 3 499 Liner Length Cut Off D.L.
Metres 5_ No. mm mm Dev. Survey 23.50
Hours 8.50 1 140 235 11 Wireline Log
Condition Run 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST 2344 58 m'/ 17 Plug Back
min 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Pulled drill string to 3508 m KB. Ran two single shot directional surveys, both misruns. Contacted Sperry-Sun, reviewed and discussed the operation of the survey eauuipment. Sent single shotdirectional survey equipment to Montreal from North Bay. Sperry-Sun directional man began from North Bay to location with inclination only (IOU surveyeauipment. Picked up survey equipment at Montreal and travelled to the location. Ran directional survey at 3521 m KB and two surveys at 3503 m KB. All surveys indicated wellbore drift in excess of 20° inclination and would not repeat on azimuth. Serviced rig. Ran two directional surveys with 90° clock, both surveys came out blank. Pulled and positioned Totco ring at 3478 m KB. (Last MWD survey depth when drilling 216 mm hole.) Ran 90° clock with IOL survey equipment. Survey came out blank (no logical explanation for this occupance.) Running IOL equipment with 20° clock at report time. Held BOP drill and safety meetings with crews. Air Circulation Rate: 58.0 m'/min at 2344 kPa Held tight hole status meeting with all rig site personnel, M, Durette chaired the meeting. Number of people who showed up at the security nate in the past 24 hours: 7 Preliminary gas analysis indicated: ±98% methane Hole Draa: 8 - 10 000 daN up 6 - 8 000 daN down
Page No. 202
DAILY DRILLING REPORT C BISSETT RESOURCE CONSULTANTS LTD.
ESTIMATED COSTS: DAILY $ 33 607 CUMULATIVE $ 7 497 548 SUPERVISOR R. Genest/D. Gaboury
Weather Rainina Temp 10 °C Road Good Date 97 05 25
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 180
Depth 3558 m Progress 9 m Hole Size 155 mm Status Survevina
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 19 3484 m 10 1/2 ° 1 RU & RD Size - mm 155 3513 m 10 1/8 2 Drill Actual 1.50 Type STC MF156 3542 m 10 /18 3 Reaming S.N. LM 1396 m 4 Coring Jets - mm Open m ° 5 Cond. Hole 1.75 Wt. - daN 2 - 3 000 m ° 6 Trips 2.00 r/min 65Z_ m 7 Lubr. Rig 0.50 Out - m In PUMP 8 Repair Rig In - m 3 499 Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey 18.25 Hours 1 140 235 _ 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Ran IOL (inclination only) equipment to obtain wellbore angle. Ran one survey with 20° compass, offscale (+20° inclination), two with 90° compass - both misruns, no picture. Ran a survey using 90° compass and 20° compass at ±100 m KB - same results as above. Ran 6° compass at #400 m KB. Obtained good survey. 4.50°. Ran 6° compass and surveyed at 3521 m KB, offscale. Ran 6° compass and surveyed at 3548 m KB. offscale. NOTE: ordered Totco survey equipment from Nisku, sent viaAir Freight to Montreal. Sperry-Sun technician on-site is uncertain why the survey instruments are not functioning properly. Broke circulation and drilled to 3558 m KB, Blew well and pulled bit 19 into drilling liner. Ran check on 6° compass in d9ahouse at 45° angle, same results as downhole - offscale. Waiting on Totco equipment. Riaaed up Totco equipment and ran drift surveys at 3484 m, 3513 m and 3542 m KB. Rigged out survey equipment at report time. Plan to begin drilling operations.
Hole Draa: 20 000 daN up Hole Drag: 10 000 daN down String Weight: 109 000 daN Torque: 7 00 to 14 250 N•m at 60 RPM
Page No. 203
J
DAILY DRILLING REPORT
BISSETT RESOURCE CONSULTANTS LTD. irr
ESTIMATED COSTS: DAILY $ 35 567 CUMULATIVE $ 7 533 115 SUPERVISOR C. Abel, R. Genest
Raining Temp 7 °C Road GENOIL et al ST. LEONARD NO. 1
Date 97 05 26 Rig Ralex, 1 Day No. 181
Weather Well
Good
Depth 3606 m Progress 48 m Hole Size 155 mm Status Tripping
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 19 3560 m 10 3/4 1 RU & RD Size - mm 155 3569 m 10 1/8 2 Drill Actual 7.00
Type STC MF156 3579 m 10 ° 3 Reaming 0.50
S.N. LM 1396 3589 m 10 4 Coring
Jets - mm Open m 5 Cond. Hole 1.00
Wt. - daN 2 - 3 000 m 6 Trips 8.00 r/min 65 m 7 Lubr. Rig 0.50
Out - m 3 606 PUMP 8 Repair Rig In - m 3 499 Liner Length 9 Cut Off D.L. Metres 107 No. mm mm SPM 10 Dev. Survey 4.75 Hours 17 1 140 235 11 Wireline Log Condition 2-4-I 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 2.25 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Broke circulation, blew hole and cleaned to bottom. Drilling, hole making good dust. Drilled to 3586 m KB. Surveyed and serviced rig. Drilling. Drilled to 3606 m KB. Hole making good dust. Blew hole, Tripped out rotary drilling assembly. Preparing to run bit 2 and air hammer at report time.
Average Air Circulation Rate/Pressure: 58.0 m'/min at 2344 kPa
Page No. 204
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp -2 °C Road Good Date 97 05 27
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 182
Depth 3606 m Progress 0 m Hole Size 155 mm Status Tripping
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
No. 20
BITS SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
Size - mm 155 m 2 Drill Actual Type H45R4S2 m 3 Reaming
S.N. KJ7083 m 4 Coring
Jets - mm m ° 5 Cond. Hole
Wt. - daN m 6 Trips 17.00 r/min m 7 Lubr. Rig 0.50 Out - m PUMP 8 Repair Rig In - m 3 606 Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey 0.50 Hours 1 140 235 11 Wireline Log Condition 2 140 235 , 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 4.00 22 Clean to Btm 23 Respool Line 2.00 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Ran bit 20 and air hammer drilling assembly. Ran Sperry-Sun 45.0 mm OD survey barrel to check for clearance in bottomhole assembly. Crew ran barrel too fast, hit bottom hard and had backlash on the wireline drum. Had to respool the survey line on spool. Tripped out bit 20. Checked bottomhole assembly and retoraued bit. Replaced Totco ring. Ran bit 2 and air hammer drilling assembly. Picked up remaining 89 mm OD drillpipe on trip in. Ran in to 2812 m KB. Ran Sperry-Sun 45 mm OD survey barrel with ESI tool to check Tool performance. When running in. noticed splice in survey line (±500 m). Instructed the crew to stop running in and to retrieve the survey barrel (planned to slip and cut 500 m of wireline). The survey barrel was almost out of the hole when the line failed and dropped the survey barrel down the drill string. Tripped out bit 20. Retrieved damaged survey barrel. Repaired fire stop and hammer. Made up and ran bit 20 and air hammer. Tested air hammer, okay. Tripping in at report time.
NOTE: Canadian Air Drilling crew was filling fuel tank on rental compressor. Due to inattention, approximately 725 litres of diesel fuel was spilled onto the location and farmer's ditch. Environmental crew cleaned up the spill.
Number of people that showed up at the security gate during the past 24 hours: 14
ESTIMATED COSTS: DAILY $
38 978 CUMULATIVE $ 7 572 093 SUPERVISOR C. Abel/R. Genest
Page No. 205
DAILY DRILLING REPORT
8 °C Road Good Date 97 05 28
aBISSETT RESOURCE CONSULTANTS LTD.
Clear Temp Weather 183 Rig Ralex, 1 Day No.
mm Status Repairing air booster 1 m Hole Size 155 LEONARD NO. 1
PV mPa.s YP Pa Gels
mm Salt mg/L Cal. kg/m' Rate
kg/m' Rate kg/m'
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt.
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt.
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt.
s/L W.L. cm3 pH % Filter Cake
GENOIL et al ST. Well
Depth 3607 m Progress
Mud: Wt Air kg/m' Visc.
Methyl Blue Solids
ESTIMATED COSTS: DAILY $ 34 579 CUMULATIVE $ 7 606 672 SUPERVISOR C. Abel/R. Genest
HYDRAULIC PP Output AV kPa Umin r-min
DRILLING MUD ADDITIVES USED:
TIME DISTRIBUTION Code/Operation Hours 1 RU&RD 2 Drill Actual 0.50 3 Reaming 4 Coring 5 Cond. Hole 6 Trips 16.50 7 Lubr. Rig 0.50
8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 11 Wireline Log 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 1.50 22 Clean to Btm 1.00 23 Cge Rubbers 0.25 24 Repair Air Leak 0.75 25 Blew Hole 3.00
No. 20 Size - mm 155 Type H45R4S2 S.N. KJ7083 Jets - mm Wt. - daN r/min Out - m 3 607 In - m 3606 Metres 1 Hours 0.50 Condition New
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
SURVEYS m m m m m m m
PUMP Liner Length
No. mm mm 1 140 235 2 140 235
3 607
BITS 21 155 F37D LJ8474 Open
Page No. 206
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping in with bit 20. Broke circulation and blew hole clean. Serviced rig. Changed rotating head rubber. Drilling. Drilled to 3607 m KB, drill string packed off. Unable to break circulation. Tripped out bit 20. Found air hammer plugged off with drillpipe scale and graphite. Ran bit 21. Tripped into 2300 m 1KB. Broke circulation with air, blew drillpipe. Finished tripping in with bit 21. Tagged total depth. Broke circulation with air. Booster compressor developed air leak. Repairing air leak on booster compressor and changing drilling head element at report time.
Number of people who showed up at the security gate during the past 24 hours: 15
Air Circulation Rate: 49.0 m'/min at 2346 kPa
I
Pa mg/L Umin Umin
ESTIMATED COSTS: DAILY $ 38 379 CUMULATIVE $ 7 645 051 SUPERVISOR C. Abel/R. Genest
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Clear Temp 7 °C Road Good Date 97 05 29 Weather Well GENOIL_et al ST. LEONARD NO. 1
Depth 3614 m Progress 7 m Hole Size
Mud: Wt Air kg/m' Visc. s/L W.L.
Methyl Blue Solids % Filter Cake
Desilter Underflow Wt. kg/m' Rate
Desilter Overflow Wt. kg/m' Rate Centrifuge Underflow Wt. kg/m'
Rig Ralex. 1 Day No. 184 155 mm Status WO repairs
cm' pH PV mPa.s YP Pa Gels Pa mm Salt mg/L Cal. mg/L Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m'
No. 21 BITS SURVEYS
m
TIME DISTRIBUTION Code/Operation Hours 1 RU&RD
Size - mm 155 m ° 2 Drill Actual 2.00
Type F37D m ° 3 Reaming
S.N. LJ8474__ m 4 Coring
Jets - mm Open _ m 5 Cond. Hole 1.25
Wt. - daN 2 - 3 000 m 6 Trips 3.00
r/min 50 - 55 _ m 7 Lubr. Rig 0.25
Out - m 3614 PUMP 8 Repair Rig
In -m 3607 Liner Length 9 Cut Off D.L.
Metres 7 No. mm mm SPM 10 Dev. Survey
Hours 2.00 1 140 235 11 Wireline Log
Condition In 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Repair 24 Booster 17.50 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished changing rotating head element. Broke circulation and blew hole clean. Drilling. Cuttings are damp and hole is not making good dust. Drilled to 3614 m KB. Air equipment not deliverina_reauired air. Air circulation rate: ±47.0 m3/min at 2346 m KB (require ±58.0 m3/min). Pulled three stands drillpipe. Checked air equipment. Pulled bit 21 up into the 177.8 mm OD drilling liner. Waiting on parts to arrive from Nisku to repair booster compressor. Booster compressor shipped from Nisku should arrive on location 95 05 29, ±17:00 hours.
Number of visitors who showed up at the security gate durina the past 24 hours: 10
Page No. 207
I
DAILY DRILLING REPORT C BISSETT RESOURCE CONSULTANTS LTD.
ESTIMATED COSTS: DAILY $ 33 886 CUMULATIVE $ 7 678 937 SUPERVISOR C. Abel/R. Genest
Weather Overcast Temp 15 °C Road Good Date 97 05 30 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 185 Depth 3633 m Progress 19 m Hole Size 155 mm Status Surveying Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt._ kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. 21 3617 m 10
TIME DISTRIBUTION Code/Operation Hours 1 2 3
4 5 6 7 8 9 10
RU&RD Size - mm 155 3 630 m 9.50 Drill Actual 4.75 Type F37D m Reaming
S.N. LJ8474 m Coring Jets - mm Open m Cond. Hole 3.50
Wt. - daN 3 000 m 0 Trips 7.25
r/min 50 - 55 m Lubr. Rig
Out - m 3 PUMP ...02._.
SPM
Repair Rig
In - m 3 607 Liner Length Cut Off D.L.
Metres 26 No. mm mm Dev. Survey 2.00
Hours 6.75 1 140 235 11 Wireline Log
Condition In 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Repairs 4.00 24 Change Out 25 Line 2.50
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Waited on parts for the booster compressor to arrive from Nisku. Tripped out 89 mm OD drillpipe cleaned scale and thread compound out of tool joints. Ran bit 21 to drilling liner shoe. Repaired and tested booster compressor. Tripped into total depth, no fill. Broke circulation with air and blew hole clean. Drilling. Drilled to 3620 m KB, ran deviation survey, Changed out survey line. Drilling, hole making good dust. Drilled to 3633 m KB, blew hole clean. Ran deviation survey. Surveying at report time.
Air Circulation Rate: 61.0 m3/min at 3102 kPa Hole Drag: 22 000 daN up
18 000 daN down Number of visitors who showed up at the security gate during the oast 24 hours: 15
Page No. 208
I
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
PV mPa.s YP Pa Gels Pa
mm Salt mg/L Cal. mg/L Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m'
Weather Cloudy Temp 12
Well GENOIL_et al ST. LEONARD NO. 1
Depth 3657 m Progress 24 m Hole Size 155
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH
Methyl Blue Solids % Filter Cake Desilter Underflow Wt. kg/m' Rate Desilter Overflow Wt._ kg/m' Rate Centrifuge Underflow Wt. kg/m'
REMARKS: (Include cores, spud or rig release, casing, plugs, Drilling. Serviced rig and changed out rotatina head element. Tripped out bit 21. Ran 155 mm air hammer and drill collars. and blew drillpipe. Finished tripping in. Broke circulation with ROP: 10.0 m/h.
logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilled to 3641 m KB. ROP started decreasing and torque began increasing. Slipped and cut line. Finished tripping in 89 mm OD drillpipe. Broke circulation air, reamed from 3627 m to 3641 m KB. Drilling. Drilling at report time
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 21 22 m 1 RU & RD
Size - mm 155 155 m 2 Drill Actual 5.75
Type F37D H45R4S2 m 3 Reaming 2.00
S.N. HJ8474 KJ083 m Coring 4
Jets - mm Open m 5 Cond. Hole 1.25
Wt. - daN 3 000 2 000 m 6 Trips 12.25
r/min 50 - 55 45 m 7 Lubr. Rig 0.25
Out - m 3641 3 657 PUMP 8 Repair Rig
In - m 3607 3 641 . Liner Length 9 Cut Off D.L. 1.00
Metres 44 16 No. mm mm SPM 10 Dev. Survey
Hours 10.25 2.25 1 140 235 11 Wireline Log
Condition 1-1-In In 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 1.00 22 Clean to Btm 23 Change 24 Rubbers 0.25 25
Hole Draa: 18 000 daN up 18 000 daN down
String Weight: 100 000 daN Air Circulation Rate: 57 m'/min at 3792 kPa Number of visitors who showed up at the security gate during the past 24 hour: 7
ESTIMATED COSTS: DAILY $ 36 999 CUMULATIVE $ 7 715 936 SUPERVISOR C. Abel/R. Genest
Page No. 209
1'
°C Road Good Date 97 05 31 Rig Ralex, 1 Day No. 186
mm Status Drilling
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
Cloudy Temp
GENOIL et al ST. LEONARD NO. 1 °C Road Good
Ralex, 1 Weather Well Rig
Depth 3667 m Progress Mud: Wt Air kg/n3 Visc. s/L W.L. Methyl Blue Solids % Filter Cake Desilter Underflow Wt. kg/m' Rate
Desilter Overflow Wt. kg/m' Rate
Centrifuge Underflow Wt. kg/m'
cm3 pH PV mPa.s YP Pa Gels Pa
mm Salt mg/L Cal. mg/L Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 20 (RR) 3648 m 6.25 1 RU&RD Size - mm 155 3 658 m 6.125 2 Drill Actual 2.25 Type H45R4S2 m 3 Reaming
S.N. KJ083 m 4 Coring Jets - mm m 5 Cond. Hole 1.00
Wt. - daN 2000-7000 m 6 Trips 17.75 r/min 45 m 7 Lubr. Rig 0.50 Out - m 3 667 PUMP 8 Repair Rig In - m 36_ Liner Length 9 Cut Off D.L.
Metres 26 No. mm mm SPM 10 Dev. Survey 2.00 Hours 4.50 11 Wireline Log
Condition 1-1-In__ 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 0.50 22 Clean to Btm 23 Change 24 Rubbers 0.25 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling. Blew hole clean, serviced rig. Rigged in accelerometer to swivel. Drilling. Drilled to 3667 m KB. Air hammer quit working. Blew hole clean. Serviced rig. Tripped out bit 20 (RR) and air hammer. Ran 22 stands 89 mm OD drillpipe. Laid down same to clean scale out of interior. Serviced air hammer. Ran bit 20 and air hammer. Tripping in at report time. picking up 89 mm OD drillpipe (20 joints remaining).
Hole Drag: 18 000 daN up 18 000 daN down
String Weight: 99 000 daN Air Circulation Rate: 580 m'/min at 3103 kPa Number of visitors who showed up at the security gate during the oast 24 hours: 19
ESTIMATED COSTS: DAILY $ 36 769 CUMULATIVE $ 7 752 705 SUPERVISOR C. Abel/R. Genest
Page No. 210
Day No. 187
12 Date 97 06 01
10 m Hole Size 155 mm Status Tripping
DAILY DRILLING REPORT aBISSETT RESOURCE CONSULTANTS LTD.
Depth 3695 m Progress 28 m Hole Size 155 mm Status Tripping
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 22 3 668 m 5 7/8 1 RU & RD
Size - mm 155 m 2 Drill Actual 8.50 Type H45R4S2 m 3 Reaming
S.N. KJ7076 m Coring 4 Jets - mm - m 5 Cond. Hole 5.25
Wt. - daN 1 000 - 2 000 m 6 Trips 8.00 r/min 50 m 7 Lubr. Rig 0.25 Out - m 3 695 PUMP 8 Repair Rig In - m 3 667 Liner Length 9 Cut Off D.L. Metres 28 No. mm mm SPM 10 Dev. Survey 1.00 Hours 8.50 11 Wireline Log Condition In 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 0.75 23 Change 24 Rubbers 0.25 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished picking up 89 mm OD drillpipe. Blew 89 mm drillppe. Finished tripping in. Broke circulation and blew hole clean. Changed out rotating head element. Broke circulation. Hole is damp. Blew hole to drv, worked tight hole. Drilling with good dust. Drilling. Drilled to 3 696 m KB. Hole tight. Worked tight hole while circulating with air. Lost ±8 000 daN string-weight and ±690 kPa air pressure, possible twist off. Blew hole clean. Tripping out to check bottomhole assembly at report time.
Air Circulation Rate: 60.6 m3/min at 3 723 kPa Hole Drag: 9 000 daN up
6 000 daN down String Weight: 101 000 daN Torgue: 13 000 to 19 900 N•m Number of visitors who showed uo at the security gate during oast 24 hours: 11
NOTE: Gas flow to surface increased to 3 to 4 m flare at ±3 695 m KB.
ESTIMATED COSTS: DAILY $ 42 989 CUMULATIVE $ 7 795 694 SUPERVISOR C. Abel/R. Genest
Page No. 211
J
Temp 8 °C Road
GENOIL et al ST. LEONARD NO. 1 Date 97 06 02
Rig Ralex, 1 Day No. 188 Weather
Well
Good Clear
ESTIMATED COSTS: DAILY $ 49 130 CUMULATIVE $ 7 844 824 SUPERVISOR C. Abel/R. Genest
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp 6 °C Road Good Date 97 06 03
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 189
Depth 3695 m Progress 0 m Hole Size 155 mm Status WO DC inspection
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 22 m 1 RU & RD Size - mm 155 m 2 Drill Actual
Type H45R4S2 m 3 Reaming
S.N. KJ7076 m Coring 4
Jets - mm - m 5 Cond. Hole
Wt. - daN 1 000 - 2 000 m 6 Trips 14.25
r/min 50 m 7 Lubr. Rig 0.25
Out - m 3 695 PUMP 8 Repair Rig
In - m 3 667 _ Liner Length 9 Cut Off D.L.
Metres 28 No. mm mm SPM 10 Dev. Survey Hours 8.50 _ 1 140 235 11 Wireline Log
Condition 8-8-Out (5mm) 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing 1.00
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 4.00 22 Clean to Btm 23 Waiting on 24 DC Inspec. 4.50 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping out. Found 114 mm OD HWDP twisted off at 13550 m KB. Made up and ran 146 mm OD overshot. iars and 121 mm OD drill collars. Tagged top of fish at 3550 m KB. Latched onto fish. Worked and iarred fish free in 1 hour using 167 000 daN maximum force. Tripped out and recovered fish. Laid down hammer and fishing string. Waiting on drill collar inspection equipment and operator to arrive from Nova Scotia. ETA is 09:00. Found rounded formation cuttings on top of Totco ring ranging in size from 12 mm to 25 mm in diameter.
Number of visitors who showed up at the security gate during the past 24 hours: 24
Plan to inspect 114 mm OD HWDP and 121 mm OD DC before resuming drilling operations.
Page No. 212
J
ESTIMATED COSTS: DAILY $ 48 414 CUMULATIVE $ 7 883 238 SUPERVISOR C. Abel / R. Genest
CI BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp 8 °C Road Good Date 97 06 04
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 190
Depth 3 698 m Progress 3 m Hole Size 155 mm Status Drilling
Mud: Wt Air kg/m3 Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 21 RR 3 687 m 4 1/4 1 RU & RD Size - mm Type S.N.
155 m ° 2 Drill Actual 2.00 F37D m 3 Reaming LJ8474 m 4 Coring
Jets - mm Open m 5 Cond. Hole 1.00 Wt. - daN 2 000 - 2 500 06 Trips 4.50 r/min 40-45 m ° 7 Lubr. Rig Out - m In PUMP 8 Repair Rig In - m 3 695 Liner Length 9 Cut Off D.L. Metres 3 No. mm mm SPM 10 Dev. Survey 1.25 Hours 2 1 140 235 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 1.50 23 Change Rubber 0.25 24 Wart D/C Inspection 7.00 25 Torque 1.00 26 Inspect BRA 5.50
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Wait on inspection equipment and technician to arrive from Nova Scotia. Inspected 120 mm DCs and 114 mm HWDP. Laid down 3 x 120 mm Drill Collars. Ran bit #21 RR to 3 450 m KB. Ran base line torque. Trip into 3 650 m KB. Broke circulation with air. Ream from 3 650 m to 3 695 m KB. Circulated hole clean. Ran drift survey. Changed out rotating head element. Broke circulation with air. Drilling. Drilling at report time.
Air Circulation Rate: 62.0 m3/min at 3 102 kPa Hole Drag: 18 000 daN up
8 000 daN down Torque: 10 550 to 13 980 N.m Gas Flow: TSTM
Number of visitors at security pate during last 24 hours: 11
Page No. 213
J
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp 5 'C Road Good Date 97 06 05 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 191 Depth 3 704 m Progress 3 m Hole Size 155 mm Status Drilling Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS No. 21 RR 22
SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
Size - mm 155 155 m 2 Drill Actual 2.75 Type F37D H45R452 m ° 3 Reaming S.N. LJ8474 KJ7081 m 4 Coring Jets - mm Open Open m 5 Cond. Hole 1.25 Wt. - daN 2 000 3 000 1 000 - 1 500 m 6 Trips 18.00 r/min 40-45 20 - 25 m 7 Lubr. Rig 0.25 Out - m 3 701 In PUMP 8 Repair Rig In - m 3 695 3 701 Liner Length 9 Cut Off D.L. 0.75 Metres 6 3 No. mm mm SPM 10 Dev. Survey Hours 4.00 0.75 1 140 235 11 Wireline Log Condition 1-1-1 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa I./min m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 1.00 23 24 25 26
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling, drilled to 3 701 m KB. Blew hole clean. Tripped out to top of drilling liner (NOTE: Hole drag 35 000 - 42 000 daN over string weight for first 8 stands with pipe rotating). Serviced rig, Slipped and cut line. Tripped back to bottom to check for fill. No fill. Blew hole clean. Tripped out bit 21 RR. Made up and ran bit 22 and hammer drill. Tripped into 3 685 m KB. Broke circulation with air and worked bit to bottom. Drilling. Drilling at report time, ROP: 5.0 m/min. Hole making good dust.
Air Circulation Rate: 62.0 m3/min at 3 792 kPa String Weight: 107 000 daN Hole Drag: 18 000 daN up
10 000 daN down Rotary Torque: 15 600 to 17 890 N.m Gas Flow: TSTM, no change
Number of visitors at security gate during last 24 hours: 8
ESTIMATED COSTS: DAILY $ 43 836 CUMULATIVE $ 7 927 074 SUPERVISOR C. Abel / R. Genest
Page No. 214
Good Weather Date 97 06 06 Clear Temp 8 ̀C Road
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 192 Depth 3 754 m Progress 50 m Hole Size 155 mm Status Check BHA Mud: Wt Air kg/m3 Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m3 Rate Umin Desilter Overflow Wt._ kg/m3 Rate Umin Desander Overflow Wt. kg/m3 Rate Umin Centrifuge Underflow Wt. kg/m3 Centrifuge Overflow Wt. kg/m3
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 22 3 727 m 5 7/8 1 RU & RD Size - mm 155 m 2 Drill Actual 13.25 Type H45R452 m o 3 Reaming S.N. KJ7081 m ° 4 Coring Jets - mm Open m ° 5 Cond. Hole Wt. - daN 1 000 - 1 500 m 6 Trips 6.25 r/min 20 - 25 m 7 Lubr. Rig 0.50 Out - m 3 754 PUMP 8 Repair Rig In - m 3 701 Liner Length 9 Cut Off D.L. Metres 53 No. mm mm SPM 10 Dev. Survey 1.50 Hours 14 1 140 235 11 Wireline Log Condition 1-1-In (1 insert broke offt 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 2.00 22 Clean to Btm 23 Attempt to 24 circulate 0.50 25 26
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling. Drilled to 3 710 m KB. Serviced rig. Drilled to 3 728 m KB. Serviced rig. Drilled to 3 733 m KB, blew hole clean. Ran drift survey. Drilling. Drilled to 3 754 m KB, air pressure increased to 5 860 kPa very rapidly. Bled off pressure and pulled bit 22 into the drilling liner. Attempted unsuccessfully to break circulation. Pulled bit 22 to check BHA for plugging. Breaking down BHA at report time.
Air Circulation Rate: 62.0 m3/min at 4 482 kPa String Weight: 107 000 daN Hole Drag: 20 000 - 30 000 daN up
15 000 daN down Rotary Torque: 1 789 to 2 246 daN.m Gas Flow: TSTM, slight increased observed.
Number of visitors at security gate during last 24 hours: 6
ESTIMATED COSTS: DAILY $ 36 289 CUMULATIVE $ 7 948 213 SUPERVISOR C. Abel / R. Genest
Page No. 215
J
GENOIL et al ST. LEONARD NO. 1 Weather Well
Clear Temp 8 'C Road Good Date 97 06 07 Rig Ralex, 1 Day No. 193
Depth 3 805 m Progress Mud: Wt Air kg/m3 Visc. Methyl Blue Solids Desilter Underflow Wt.
51 m Hole Size 155.6 mm Status Drilling s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa % Filter Cake mm Salt mg/L Cal. mg/L
kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin kg/m' Rate Umin Desander Overflow Wt. kg/m3 Rate Umin
kg/m' Centrifuge Overflow Wt. kg/m'
ESTIMATED COSTS: DAILY $ 39 846 CUMULATIVE $ 7 988 059 SUPERVISOR C. Abel / R. Genest
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 22 3 794 m 4 1 RU&RD Size - mm 155.6 m 2 Drill Actual 13.75 Type H45R452 m 3 Reaming S.N. KJ7081 m 4 Coring Jets - mm Open m 5 Cond. Hole 3.00 Wt. - daN 1 000 - 1 500 m 6 Trips 5.25 r/min 20 - 25 m 7 Lubr. Rig 0.50 Out - m 3 805 PUMP 8 Repair Rig In - m 3701 Liner Length 9 Cut Off D.L. Metres 104 No. mm mm SPM 10 Dev. Survey 1.00 Hours 27.75 1 140 235 11 Wireline Log Condition In 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 0.50 22 Clean to Btm 23 24 25 26
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Located plugging problem, repaired and serviced fire stop float. Run in hole. Break circulation with air and cleaned out to bottom. Serviced rig. Circulated with air and dried hole. Drilling. Drilled from 3 754 m to 3 800 m KB. Circulated hole clean with air. Hoisted 2 stands and recovered string float. Serviced rig and function hydril. Survey at 3 794 m KB - 4°. Drilling. Drilled from 3 800 m to 3 805 m KB. Air Circulation Rate: 67.5 m3/min at 4 750 kPa String Weight: 109 000 daN Hole Drag: 25 000 daN up, peaks at 42 000 daN
20 000 daN down Rotary Torque: 1 789 daN to 2 296 daN Gas Flow: TSTM BHA: Bit-Hammer-Float Sub PinUp-Bit Sub-Fire Stop-12 Dcs-Jars-3DCs-8 HWDP, BHA length - 218.66 m
Number of visitors at security gate during last 24 hours: 3
Page No. 216
Desilter Overflow Wt. Centrifuge Underflow Wt.
J
CI BISSETT RESOURCE CONSULTANTS LTD.
J
DAILY DRILLING REPORT
Weather Clear Temp 10 °C Road Good Date 97 06 08
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 194
Depth 3 888 m Progress 83 m Hole Size 155.6 mm Status Circulating hole clean with air.
Mud: Wt Air kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate L/min Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 22 RR m 0 1 RU & RD Size - mm 155.6 m 2 Drill Actual 23.00 Type H45R452 m 0 3 Reaming S.N. KJ7081 m 0 4 Coring Jets - mm Open m 5 Cond. Hole 0.50 Wt. - daN 1 000 - 2 000 m 6 Trips r/min 20 - 25 m 7 Lubr. Rig 0.50 Out - m 3 888 PUMP 8 Repair Rig In - m 3 701 Liner Length 9 Cut Off D.L. Metres 187 No. mm mm SPM 10 Dev. Survey Hours 50.75 11 Wireline Log Condition In 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25 26
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling. Drilled from 3 805 m to 3 824 m KB. Serviced rip. Drilling. Drilled form 3 824 m to 3 883 m KB. Serviced rig. Drilling. Drilled from 3 883 m to 3 888 m KB. Circulated hole clean prior to survey. Held safety meeting, informed crew to be aware of high pressure gas consequences and to be alert stripping out may be required at higher gas rates.
Air Circulation Rate: 68.0 m'/min at 3 725 kPa String Weight: 110 000 daN Hole Drag: 25 000 daN up
18 000 daN down Rotary Torque: 1 560 daN to 1 900 daN Gas Flow: TSTM BHA: Bit-Hammer-Float Sub PinUp-Bit Sub-Fire Stop-12 Dcs-Jars-3DCs-8 HWDP, BHA length - 218.66 m
Number of visitors at security gate during last 24 hours: 11
ESTIMATED COSTS: DAILY $ 35 879 CUMULATIVE $ 8 023 938 SUPERVISOR C. Abel / R. Genest
Page No. 217
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp 10 °C Road Good Date 97 06 09
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 195 Depth 3 889 m Progress 1 m Hole Size 155.6 mm Status Working stuck pipe. Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 22 RR 24 3 880 m 3 3/4 1 RU & RD Size - mm 155.6 155.6 m ° 2 Drill Actual 2.50 Type H45R452 H55R6S2 m ° 3 Reaming S.N. KJ7081 KJ7084 m 4 Coring Jets - mm Open Open m 5 Cond. Hole 2.50 Wt. - daN 1 000 - 2 000 1 000 - 2 000 m ° 6 Trips 12.25 r/min 20 - 25 20 - 25 m 7 Lubr. Rig 0.50 Out - m 3 888 3 889 PUMP 8 Repair Rig In - m 3 701 3 888 Liner Length 9 Cut Off D.L. Metres 187 1 No. mm mm SPM 10 Dev. Survey 1.25 Hours 50.75 2.50 1 140 235 11 Wireline Log Condition T-4 6-In In 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 3.50 22 Clean to Btm 23 Work stuck pipe 1.50 24 25 26
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Hoisted 2 stands and recovered float sub. Surveyed. Circulated. Pulled out of hole, first two stands very tight, 40 000 daN drag. Serviced rig. Slipped and cut line. Finished pulling out of hole. Blew air through BOP and function. Removed fire stop float, bit sub floats, checked and repaired. Inspected and serviced hammer and changed bit. Ran in hole to 3 880 m KB. Broke circulation. Circulated hole clean and cleaned out to 3 888 m KB. Attempted to drill ahead from 3 888 m to 3 889 m KB. Worked stuck pipe.
Air Circulation Rate: 62.0 m'/min at 4 860 kPa String Weight: 114 000 daN Hole Drag: 24 000 daN up, peaks above 45 000 daN
18 000 daN down Rotary Torque: 1 560 daN to 1 903 daN Gas Flow: TSTM BHA: Bit-Hammer-Float Sub PinUp-Bit Sub-Fire Stop-12 Dcs-Jars-3DCs-8 HWDP, BHA length - 218.66 m
Number of visitors at security gate during last 24 hours: 11
ESTIMATED COSTS: DAILY $ 45 035 CUMULATIVE $ 8 068 973 SUPERVISOR C. Abel / R. Genest
Page No. 218
BISSETT RESOURCE CONSULTANTS LTD. Cli
DAILY DRILLING REPORT
Weather Overcast /Showers Temp 16 °C Road Good Date 97 06 10 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 196 Depth 3 896 m Progress 7 m Hole Size 155.6 mm Status Drilling Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS No. 24 25
SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 RU 8 RD
Size - mm 155.6 155.6 m 0 2 Drill Actual 3.00 Type H55R6S2 F-5 m 3 Reaming 7.00 S.N. KJ7084 LV8473 m 4 Coring Jets - mm 3 x 12.7 m ° 5 Cond. Hole Wt. - daN 2 000 4 000 m 6 Trips 11.50 r/min 25 40 - 45 m 7 Lubr. Rig 0.25 Out - m 3 890 3 896 PUMP 8 Repair Rig In - m 3 888 3 890 Liner Length 9 Cut Off D.L. Metres 2 6 No. mm mm SPM 10 Dev. Survey Hours 3.25 2.25 1 140 235 11 Wireline Log Condition Damaged In 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Work stuck pipe 2.00 24 Break Circ. 0.25 25 26
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Pipe freed. Reamed tight hole back to bottom. Attempted to drill ahead from 3 889 m to 3 890 m KB, no success. Worked pipe and reamed out tight spots. Hammer problems. Pulled out of hole. Checked and laid out hammer and jars. Replaced tri cone bit and jars. Ran in hole. Serviced rig. Broke circulation. Reamed and cleaned to bottom from 3 795 m to 3 890 m KB. Drilling. Drilled from 3 890 m to 3 896 m KB.
Air Circulation Rate: 62.0 m3/min at 3 500 kPa String Weight: 118 000 daN Hole Drag: 20 000 daN up
17 000 daN down Rotary Torque: 1 055 daN to 1 740 daN Gas Flow: TSTM BHA: Bit-Pin Up Float Sub-Bit Sub-Fire Stop-9 DCs-Jars-6DCs-8 HWDP, BHA length - 217.61 m Current ROP: 2.5 m/h Number of visitors at security gate during last 24 hours: 8
ESTIMATED COSTS: DAILY $ 40 680 CUMULATIVE $ 8 109 653 SUPERVISOR C. Abel / R. Genest
Page No. 219
DAILY DRILLING REPORT 41I BISSETT RESOURCE CONSULTANTS LTD.
ESTIMATED COSTS: DAILY $ 33 195 CUMULATIVE $ 8 142 848 SUPERVISOR C. Abel/D. Gaboury
Weather Overcast Temp 18 °C Road Good Date 97 06 11 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 197 Depth 3992 m Progress 96 m Hole Size 155 mm Status
Drilling
Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours No. 25 m ° 1 RU & RD Size - mm 155.6 m 2 Drill Actual 21.50 Type F-5 m 3 Reaming S.N. LV8473 m 4 Coring Jets - mm _3_),U11 m 5 Cond. Hole 1.50 Wt. - daN 4 - 8 000 m 6 Trips r/min 50 - 55 m 7 Lubr. Rig 0.50
Out - m 3 992 PUMP 8 Repair Rig In - m 3 $90 Liner Length 9 Cut Off D.L. Metres 102 No. mm mm SPM 10 Dev. Survey Hours 23.75 1 140 235 11 Wireline Log Condition In 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Change 24 Rotate 25 Rubbers 0.50
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling. Drilled to 3938 m KB. Serviced rig, blew hole clean and changed out rotating head element. Broke circulation drilling. Drilled to 3968 m KB. Serviced rig. worked pipe and blew hole clean. Drilling. Drilling at reo rt time, ROP: ±4.0 m/h.
String Weight: 119 000 daN Hole Drag - Up: 25 - 27 000 daN
- Down: 15 - 16 000 daN Rotary Torque: 9 590 - 17 580 N•m at 50 - 55 RPM Gas Flow: TSTM Air Circulation Rate: 60.5 m'/min at 3 150 kPa
Number of visitors at security gate during the past 24 hours: 13
Page No. 220
J
DRILLING MUD ADDITIVES USED:
13 Wait on Cmt
HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
ESTIMATED COSTS: DAILY $ 37 668 CUMULATIVE $ 8 180 516 SUPERVISOR C. Abel/D. Gaboury
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather
Well GENOIL et al ST. LEONARD NO. 1
Depth 4037 m Progress 45 m Hole Size
Mud: Wt Air kg/m' Visc. s/L W.L.
Methyl Blue Solids % Filter Cake Desilter Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m3
Rig Ralex, 1 Day No. 198 155.6 mm Status Tripping
cm3 pH PV mPa.s YP Pa Gels Pa
mm Salt mg/L Cal. mg/L Desander Underflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 25 4030 m 7 1 RU & RD
Size - mm 155.6 m 2 Drill Actual 11.00
Type F-5 m 3 Reaming
LV8473 m 4 Coring S.N. Jets - mm 3 x 12.7 m 5 Cond. Hole 3.50 Wt. - daN 4-8000 m 6 Trips 4.50 r/min 50 - 55 m 7 Lubr. Rig 0.50
Out - m 4 037 PUMP 8 Repair Rig In - m 3890 Liner Length 9 Cut Off D.L. Metres 147 No. mm mm SPM 10 Dev. Survey 4.50
Hours 34.75 1 140 235 11 Wireline Log
Condition In 2 140 235 12 Run Csg/Cmt
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Drilling. Drilled to 4000 m KB. Blew hole and worked drill string. Drillina. Drilled to 4024 m KB. Pulled 8 stands, recovered string float. Drillina. Drilled to 4025 m KB. torque began to increase while ROP was slowing. Ran deviatiortsurvevs. Two misruns. Decided to drill ahead to FTD (until bit stops drilling). Drilled to 4037 m KB. Blew hole clean. Ran two deviation surveys, one misrun. Pulled 7 stands, hole tight. Pulled 35 - 42 000 daN over string weiahtwhile rotating. Plan to pull bit to 3843 m KB. shut in well and record pressure buildup. If possible. the small gas flow will be measured.
String Weight: 120 000 daN Hole Drag - Up: 35 - 42 000 daN (rotating)
- Down: 18 - 20 000 daN Rotary Torque: 16 440 to 17 580 N•m Gas Flow: TSTM Air Circulation Rate: 62.0 m'/min at 3450 kPa Number of visitors at the security gate during the past 24 hours: 10
Page No. 221
16 °C Road Good Overcast/Showers Temp Date 97 06 12
J
DAILY DRILLING REPORT aBISSETT RESOIJRCE CONSULTANTS LTD.
ESTIMATED COSTS: DAILY $ 30 588 CUMULATIVE $ 8 211 104 SUPERVISOR C. Abel/D. Gaboury
Weather Overcast Temp 16 °C Road Good Date 97 06 13 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 199 Depth 4037 FTD m Progress 0 m Hole Size 155.6 mm Status Displacing Mud: Wt Air kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 25 21 RR m 1 RU & RD
Size - mm 155.6 155.6 m 2 Drill Actual
Type F-5 F-37D m 3 Reaming
S.N. LV8473 LJ8474 m 4 Coring
Jets - mm 3 x 12.7 Open m 5 Cond. Hole 2.25
Wt. - daN 4 - 8 000 m 6 Trips 11.00 r/min 50 - 55 m 7 Lubr. Rig 0.50 Out - m 4 037 Cleanout PUMP 8 Repair Rig In - m 3 890 Trip Liner Length 9 Cut Off D.L. 1.50
Metres 147 No. mm mm SPM 10 Dev. Survey Hours 34.75 1 140 235 11 Wireline Log
Condition 8-2-4 2 140 235 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Repair Too 0.50 24 Drive 25 Purge Line 0.75 26 Flow Test 7.50
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Pulled bit to 3843 m KB. Shut in well in and recorded pressure buildup. Shut-in surface pressure built to 572 kPa in 3.5 hours. Installed 3.18 mm in 50.8 mm flow prover. Well oraducino_982 m'/d and pressure continued to build. Installed 6.35 mm orifice. Well producing 4029 m3/d at 585 kPa. Flowing pressure declining. Installed 4.76 mm orifice. Flow rate was 2255 m3/d and the flowing pressure was climbing. Installed 6.35 mm orifice inflow prover. Flow rate declined from 4176 to 3941 m'/d. Flowino_pressure: 610 to 570 kPa in 1.75 hours. Flow rate was not stabilized at end of test period.. Terminated testing operation and blew hole clean. Tripped out bit 25. Serviced rig, slipped and cut line. Ran bit 21 (RR). Shut down to repair to drive. Tripped in to 3843 m KB. Displaced 8.0 m' drilling mud. Pulled bit to 3650 m KB. Pumped 8.0 m' drilling mud. Pulled bit to 3449 m KB. Displacing wellbore with drilling fluid at report time.
Number of visitors at security gate during the oast 24 hours: 15
Page No. 222
1
DAILY DRILLING REPORT C BISSETT RESOURCE CONSULTANTS LTD.
ESTIMATED COSTS: DAILY $ 40 736 CUMULATIVE $ 8 251 840 SUPERVISOR C. Abel/D. Gaboury
J
Weather Clear Temp 10 °C Road Good Date 97 06 14 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 200 Depth 4037 FTD m Progress 0 m Hole Size 155.6 mm Status Circulating Mud: Wt 1200 kg/m' Visc. 110 s/L W.L. 7.0 cm3 pH 9.0 PV 67 mPa.s YP 17.5 Pa Gels 5/11 Pa
Methyl Blue 70 Solids 7.4 % Filter Cake 1.0 mm Salt - mg/L Cal. 40 mg/L Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS
No. 21 (RR) m
TIME DISTRIBUTION Code/Operation Hours 1 2 3 4 5 6 7 8 9 10
RU & RD
Size - mm 155.6 m Drill Actual
Type F37D m Reaming
S.N. LJ8474 m Coring Jets - mm Open m Cond. Hole 11.25
Wt. - daN m Trips 3.75 r/min m Lubr. Rig 0.25 Out - m Clean PUMP
SPM
Repair Rig In - m Out Liner Length Cut Off D.L.
Metres Trip No. mm mm Dev. Survey Hours 1 140 235 60 11 Wireline Log
Condition 2 140 235 , 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
319 sxs Barite 3 sxs Zanvis PP Output AV Power 15 Test BOP
40 sxs Gel 5 sxs Caustic kPa Umin m/min kW 16 DST 4 sxs Drispac 9000 660 85 100 17 Plug Back
4 sxs Lignite 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 3.50 23 Mix Mud 5.25 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Displaced 93.0 m' drilling fluid into wellbore. Shut down to build volume. Finished displacing wellbore to drilling fluid. Circulated to condition mud. Tripped in, reamed and cleaned from 3494 m to 4037 m KB. Worked drill string, circulated to condition mud and hole. Made dummy trip to 3450 m KB. Hole is in good condition, no tight soots or bridges encountered during dummy trip. Circulating at report time while waiting on loggers.
String Weight: 10 000 daN Hole Drag - Up: 14 000 daN
- Down: 16 000 daN
Security gate personnel and air drilling men and equipment have been released.
Page No. 223
DAILY DRILLING REPORT
BISSETT RESOURCE CONSULTANTS LTD. Cit..
Good Date 97 06 15 Weather Clear Temp 7 °C Road
ESTIMATED COSTS: DAILY $ 27 281 CUMULATIVE $ 8 279 121 SUPERVISOR C. Abel/D. Gaboury
J
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 201
Depth 4037 FTD m Progress 0 m Hole Size 155.6 mm Status Tripping Mud: Wt kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. 21 (RR) m 1 RU & RD Size - mm 155.6 m 2 Drill Actual Type F37D m 3 Reaming
S.N. LJ8474 m 4 Coring Jets - mm Open m 5 Cond. Hole 1.75
Wt. - daN m 6 Trips 12.00 r/min m 7 Lubr. Rig 0.25 Out - m Clean PUMP 8 Repair Rig In - m Out Liner Length 9 Cut Off D.L.
Metres Trip No. mm mm SPM 10 Dev. Survey
Hours 11 Wireline Log
Condition 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 S/B Repair 24 Gen. 7.25 25 Flow Nipple 2.00 26 Break Circ, 0.75
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated to condition mud and hole while waiting onioaaers. Tripped out bit_21 (RR). Rigged in loggers. Generator failed on lamina unit, unable to repair and unable to run open hole logs. Waiting on replacement generator. Tore out drilling head and blouie line. Refrabricated and installed flow nipple. Serviced ria. Ran bit 21 (RR) while waiting on Generator. Broke circulation at 2030 m KB. Tri pins in at report time. ETA Generator: 16:00. 97 06 15.
Page No. 224
Hours Code/Operation m
• 1 RU & RD
m o 2 Drill Actual
m o 3 Reaming
m ° 4 Coring
m • 5 Cond. Hole 7.50
m • 6 Trips 7.50 m • 7 Lubr. Rig
PUMP
8 Repair Rig
Liner Length
9 Cut Off D.L.
No. mm mm
SPM 10 Dev. Survey
1 140 235 , 60 11 Wireline Log 3.00
2 140 235
12 Run Csg/Cmt 13 Wait on Cmt
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Clear Temp
10 °C Road Good
Date 97 06 16 Well GENOIL et al ST. LEONARD NO. 1
Rig Ralex, 1
Day No. 202
Depth 4037 FTD m Progress
0 m Hole Size 155.6 mm Status Logging
Mud: Wt 1215 kg/m' Visc. 100 s/L W.L. 8.0 cm' pH 9.0 PV 50 mPa.s YP 9.0 Pa Gels 2/5 Pa
Methyl Blue 64.0 Solids 7.5 % Filter Cake
1.0 mm Salt - mg/L Cal. 40 mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m'
Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION
SURVEYS
No. 21 (RR)
Size - mm 155.6 Type F37D
S.N. LJ8474
Jets - mm ODen
Wt. - daN r/min Out - m Clean
In - m Out
Metres Trip
Hours Condition
BITS
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up 25 sxs Gel PP Output AV Power 15 Test BOP
1 sx Xanvis kPa Umin m/min kW 16 DST 105 sxs Barite 9000 660 85 100 17 Plug Back
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Repair Logging
24 Unit 6.00 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) WO logging unit generator to arrive on the location. Circulated to condition mud and hole. Tripped out bit 21 (RR). Strapped drill string out
of hole, -2.93 m difference, no correction made vet. Generator arrived on location. Rigged to run open hole logs. Worked on generator
and logging computers. Ready to begin lamina at 03:00. 97 06 16. Ran DLL and DSI logging tools in tandem (length: 31.0 m). Logging tools huna uo at 2260 m KB (top 177.8 mm OD liner at 2228 m KB). Pulled 670 daN over tool weight to pull tools out of the liner. Pulling
logging tools at report time, Plan to run two knuckle ioints on next attempt.
NOTE: Dowell informed us yesterday a cement truck may not be available when needed. Communicating with Dowell and other companies.
ESTIMATED COSTS: DAILY $
26 144 CUMULATIVE $ 8 305 265 SUPERVISOR C. Abel/D. Gaboury
Page No. 225
~. J
ESTIMATED COSTS: DAILY $ 28 025 CUMULATIVE $ 8 333 290 SUPERVISOR C. Abel/D. Gaboury
CrISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Overcast, rain Temp 15 °C Road Good Date 97 06 17 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 203 Depth 4037 FTD m Progress 0 m Hole Size 155.6 mm Status Waiting on fisherman Mud: Wt kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids %Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
TIME DISTRIBUTION Code/Operation Hours 1 RU&RD 2 Drill Actual 3 Reaming 4 Coring 5 Cond. Hole 6 Trips 7 Lubr. Rig 8 Repair Rig 9 Cut Off D.L.
SPM 10 Dev. Survey 11 Wireline Log 13.00 12 Run Csg/Cmt 13 Wait on Cmt 14 Nipple Up
Power 15 Test BOP kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing 20 Directional 21 Handle Tool 22 Clean to Btm 23 Sidewall Core 3.00 24 Worked Stuck 25 Tool 5.00 26 Waiting on 27 Fisherman 3.00
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping out logging tools. Added knuckle ioints to logging tool string. Ran logging tools to bottom without incident. Ran DLL from 4028 m to 3489 m KB DSI from 4008 m to 2450 m KB and ONL-LDT from 4036 m to 2981 m KB. Pulled and laid down logging tools. Made up and ran sidewall core (explosive) tool. Took nine sidewall samples at: 3972 m (2). 3971 m (2). 3970 m (2). 3969 m (2) and 3968 m KB. Unable to move sidewall core tool after ninth sample. Worked tool to maximum allowable pull. 1600 daN overpull. Tool refuses to come free. Fisherman mobilized from Nisku (ETA: *24:00. 97 06 17). Waiting on fisherman at report time.
Sidewall core tool: 58.7 mm OD fishing neck. 82.6 mm OD x 4.7 m length. Top tool at:±3961 m. bottom at *3965.7 m KB.
NOTE: Attached is a Summary of Flow Prover Volume Calculations detailing open hole flow test details.
Page No. 226
BITS SURVEYS
No. m
Size - mm m
Type m
S.N. m
Jets - mm m
Wt. - daN m
r/min m
Out - m PUMP
In - m Liner Length
Metres No. mm mm Hours 1 140 235
Condition 140 , 235
DRILLING MUD ADDITIVES USED: HYDRAULIC PPOutput AV kPa Umin m/min
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable)
DAILY DRILLING REPORT CBISSETT RESOURCE CONSULTANTS LTD. 6$*
Good Date 97 06 18 Weather Clear Temp 10 °C Road
ESTIMATED COSTS: DAILY $ 87 414 CUMULATIVE $ 8 420 704 SUPERVISOR C. Abel/D. Gaboury
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 204
Depth 4037 FTD m Progress 0 m Hole Size 155.6 mm Status Tripping
Mud: Wt kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m 1 RU & RD
Size - mm m 2 Drill Actual Type m 3 Reaming S.N. m 4 Coring Jets - mm m 5 Cond. Hole 5.00 Wt. - daN m 6 Trips 0.25 r/min m 7 Lubr. Rig Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 1 140 235 11 Wireline Log Condition 2 140 235 12 Run Csg/Cmt
13 Wait on Cmt DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 1.75 22 Clean to Btm 23 WO Fisherman 13.00 24 Worked Stuck 25 Tool 4.00
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Waiting on fisherman. Continued to work stuck tools. Tool string carne free with 1 800 daN overoull. Tripped out and recovered sidewall coring tool. Had three formation samroles out of eight shots. Rigged out and released wireline unit. Laid down 8 - 89 mm OD HWDP and 15 - 121 mm OD drill collars. Tripping in open ended drilloipe at report time to start abandonment operations.
NOTE: Attached is the pressure buildup data obtained before the flow test was conducted on 97 0 6 12.
Page No. 227
J
BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Overcast Temp 15 °C Road Good Date 97 06 19 Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 205
Depth 4037 FTD m Progress 0 m Hole Size 155.6 mm Status Waitina on cement
Mud: Wt 1195 kg/m' Visc. 75 s/L W.L. cm3 pH 8.5 PV 44 mPa.s YP 7 Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt._ kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt._ kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
No.
BITS SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD
Size - mm m 2 Drill Actual
Type m 3 Reaming
S.N. m 4 Coring
Jets - mm m 5 Cond. Hole 9.75
Wt. - daN m 6 Trips 3.50
r/min m 7 Lubr. Rig
Out - m PUMP 8 Repair Rig
In - m Liner Length 9 Cut Off D.L.
Metres No. mm mm SPM 10 Dev. Survey
Hours 11 Wireline Log
Condition 12 Run Csg/Cmt 13 Wait on Cmt 9.50
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up
2 sxs Caustic PP Output AV Power 15 Test BOP
10 sxs Bicarb kPa Umin m/min kW 16 DST
2 sxs Spersene 17 Plug Back 1.25 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Finished tripping with open ended drillpipe. Broke circulation and washed 2.0 m to bottom. Circulated to condition mud and hole. Rigged in cementers. Pressure tested surface equipment to 15 009 kPa. Circulated and WOO. Held safety meeting. Ran Plua 1, 4037 m to 3930 m KB (drillpipe landed at 4034.0 m KB) with 4.8 tonnes (3.6 m3) Class "G" + 0.7% D-160 + 0.5% D-65 + 9 Utonne D-81. Slurry density: 1900 ka_/m3. Plug down at 19:20, 97 06 18. Pulled 12 stands drillpipe, first four very slowly. Reverse circulated two bottoms up, recovered 1.0 m3 cement contaminated drilling fluid on bottoms up. Circulatinalona_wav at report time while waiting on cement. Plan to taa Plug 1 at 07:20. 97 06 19.
ESTIMATED COSTS: DAILY $
31 841 CUMULATIVE $ 8 452 545 SUPERVISOR C. Abel/D. Gaboury
Page No. 228
C BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Clear Temp 12 °C Road GENOIL et al ST. LEONARD NO. 1
Date 97 06 20 Rig Ralex, 1 Day No. 206
Weather Well
Good
Depth 4037 FTD m Progress 0 m Hole Size 155.6 mm Status Waiting on cement
Mud: Wt kg/m' Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m 0 1 RU & RD
Size - mm m 2 Drill Actual
Type m 3 Reaming
S.N. m 4 Coring
Jets - mm m ° 5 Cond. Hole
Wt. - daN m 0 6 Trips 3.50 r/min m ° 7 Lubr. Rig
Out - m PUMP 8 Repair Rig
In - m Liner Length 9 Cut Off D.L.
Metres No. mm mm SPM 10 Dev. Survey
Hours 11 Wireline Log
Condition 12 Run Csg/Cmt 13 Wait on Cmt 16.25
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 1.25 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Safety Mtg 0.50 24 Reverse Circ. 2.50 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated while waiting on cement. Ran open ended drillpipe. Tagged top Plug 1 at 3931 m KB with 1800 daN string weight at 07:20 97 06 19. Tripped out, landed open ended drillpipe at 3544 m KB. Held safety meeting. Ran Plug 2. 3544 m to 3444 m KB with 5.3 tonnes (4.0 m') Class "G" + 0.5% D-65 + 0.7% D-160 + 5.0 Utonne D-81 at 1900 kg/m' slurry density. Plug down at 09:20. 97 06 19. Pulled 12 stands drillpipe to 3200 m KB. Reverse circulated two bottoms up. Recovered 1.6 m' cement contaminated drilling fluid. Circulated long way while waiting_on cement. Laid down 51 joints 127 mm OD drillpipe. Circulated while waiting on cement. Ran open ended drillpipe, tagged too of cement Plug 2 at 3420 m KB with 18 - 2000 daN string weight at2120, 97 06 19. Tripped out, landed open ended drillpipe at 2275 m KB. Held safety meeting. Ran Plug 3.2275 m to 2175 m KB with 4.6 tonnes (3.5 m3) Class "G" + 0.5% D-65 + 2.0 Utonne D-81 at 1900 kg/m' slurry density. Plug down at 23:35. 97 06 19. Pulled 12 stands drillpipe to 1935 m KB. Reverse circulated two bottoms up. recovered 1.0 m' cement contaminated drilling mud. Circulating long way at report time while waiting on cement.
ESTIMATED COSTS: DAILY $
47 962 CUMULATIVE $ 8 500 507 SUPERVISOR C. Abel/D. Gaboury
Page No. 229
I
Good Date 97 06 21 °C Road Rig Day No. 207 Ralex. 1
ESTIMATED COSTS: DAILY $ 26 632 CUMULATIVE $ 8 527 139 SUPERVISOR D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Well
Clear Temp 18 GENOIL et al ST. LEONARD NO. 1
Depth 4037 FTD m Progress 0 m Hole Size
Mud: Wt kg/m' Visc. s/L W.L.
Methyl Blue Solids % Filter Cake
Desilter Underflow Wt._ kg/m' Rate
Desilter Overflow Wt. kg/m' Rate
Centrifuge Underfow Wt. kg/m'
155.6 mm Status Waiting on cernent cm3 pH PV mPa.s YP Pa Gels Pa mm Salt mg/L Cal. mg/L Umin Desander Underflow Wt. kg/m' Rate Umin Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m 1 RU & RD
Size - mm m 2 Drill Actual
Type m 3 Reaming
S.N. m Coring 4
Jets - mm m 5 Cond. Hole
Wt. - daN m 6 Trips 4.75
rlmin m 7 Lubr. Rig
Out - m PUMP 8 Repair Rig In - m Liner Length 9 Cut Off D.L. Metres No. mm mm SPM 10 Dev. Survey Hours 11 Wireline Log
Condition 12 Run Csg/Cmt 1.50 13 Wait on Cmt 17.50
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Safety Mta 0.25 24 25
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Circulated and waited on cement. Laid down excess drillpipe. Ran open ended drillpipe and tagged Plua 3 at 2165 m KB with 2 000 daN strina weight at 12:00, 97 06 20. Tripped out, landed open ended drilloipe at 650 m KB. Held safety meeting. Ran Plug 4 650 m to 600 m KB with 3.2 tonnes (2.4 m3) Class "G" + 1.0% CaCI, + 0.5% D-65 at 1900 ka/m3 slurry density. Plug down at 14:30, 97 06 20. Pulled 11 stands drilloipe to 340 m KB. Reverse circulated two bottoms uo. recovered t0.3 m3 cement contaminated drilling fluid. Circulated lona way while waitina on cement. Laid down excess drillpipe. Ran open ended drillpipe and tagged Plug 4 at 600 m KB with 2000 daN string weight at 22:40. 97 06 20. Tripped out, landed open ended drillpipe at t19 rn KB, Headed up and displaced casing to fresh water. Ran Plua 5. 19 m to 10 m KB with 0.5 tonnes (0.4 m3) Class "G" + 1.0% CaCI, at 1900 kg/m3 slurry density. Plug down at 01:00. 97 06 21. Pulled and laid down drillpipe. WOC. Began tearing out well control equipment and cleaning mud tanks.
Page No. 230
1
ESTIMATED COSTS: DAILY $ 84 778 CUMULATIVE $ 8 611 917 SUPERVISOR D. Gaboury
aBISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Raining Temp 19 °C Road Good Date 97 06 22
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex, 1 Day No. 208
Depth 4037 FTD m Progress 0 m Hole Size 155.6 mm Status Welding on cap
Mud: Wt kg/rn3 Visc. s/L W.L. cm3 pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt._ kg/m' Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m' Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS SURVEYS TIME DISTRIBUTION
Code/Operation Hours
No. m 1 RU & RD 3.00
Size - mm m 2 Drill Actual
Type m 3 Reaming
S.N. m 4 Coring
Jets - mm m 5 Cond. Hole
Wt. - daN m 6 Trips r/min m 7 Lubr. Rig
Out - m PUMP 8 Repair Rig
In - m Liner Length 9 Cut Off D.L.
Metres No. mm mm SPM 10 Dev. Survey Hours 11 Wireline Log
Condition 12 Run Csg/Cmt 1.00 13 Wait on Cmt 3.00
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 Tesco Unit 12.00 24 Clean Out 25 Collars & 26 Weld Caps 5.00
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) While waiting on Plug 5 to yield, finished tearing out well control equipment. Cleaned mud tanks. Rough cut casing bowl. Tore out and laid down too drive unit. Drained and flushed mud Dumps. Dug cellar to 1.5 m below around level. Cut off 508.0 mm OD conductor pipe, 339.7 mm OD surface casino and 244.5 mm OD intermediate 1.5 m below surface. NOTE: Plug 5 has yielded fully. Welded steel plate onto 224.5 mm OD and 339.7 mm OD casings. Continuing to do out and clean up drilling rig. Loading out rental equipment at report time.
Page No. 231
1
Cat.BISSETT RESOURCE CONSULTANTS LTD.
DAILY DRILLING REPORT
Weather Cloudy Temp 15 °C Road Good Date 97 06 23
Well GENOIL et al ST. LEONARD NO. 1 Rig Ralex. 1 Day No. 209
Depth m Progress m Hole Size mm Status Rig released
Mud: Wt kg/m' Visc. s/L W.L. cm' pH PV mPa.s YP Pa Gels Pa
Methyl Blue Solids % Filter Cake mm Salt mg/L Cal. mg/L
Desilter Underflow Wt. kg/m3 Rate Umin Desander Underflow Wt. kg/m' Rate Umin
Desilter Overflow Wt. kg/m3 Rate Umin Desander Overflow Wt. kg/m' Rate Umin
Centrifuge Underflow Wt. kg/m' Centrifuge Overflow Wt. kg/m'
BITS
No.
SURVEYS m
TIME DISTRIBUTION Code/Operation Hours 1 RU & RD 6.00
Size - mm m 2 Drill Actual
Type m 3 Reaming
S.N. m o4 Coring
Jets - mm m ° 5 Cond. Hole
Wt. - daN m 6 Trips
r/min m 7 Lubr. Rig
Out - m PUMP 8 Repair Rig
In - m Liner Length 9 Cut Off D.L.
Metres No. mm mm SPM 10 Dev. Survey
Hours 11 Wireline Log
Condition 12 Run Csg/Cmt 13 Wait on Cmt
DRILLING MUD ADDITIVES USED: HYDRAULIC 14 Nipple Up PP Output AV Power 15 Test BOP kPa Umin m/min kW 16 DST
17 Plug Back 18 Squeeze Cmt 19 Fishing
GEOLOGICAL SUMMARY: (Include formation tops, lithology and mud gas, if applicable) 20 Directional 21 Handle Tool 22 Clean to Btm 23 24 25 26
REMARKS: (Include cores, spud or rig release, casing, plugs, logs, hole problems, KB to GL, KB to CF, description of drill string, etc.) Coordinated loading trucks returning rental equipment. Finished tearing out and welding on abandonment plates on casings. Rig released at 12:00. 97 06 22,
Final Report STATUS: Dry and Abandoned
NOTE: At report time, there are approximately seven truck loads of rental equipment remaining to be shipped.
ESTIMATED COSTS: DAILY $ 11 690 CUMULATIVE $ 8 623 607 SUPERVISOR D. Gaboury
Page No. 232
MATERIALS USED:
WEATHER Clear TEMP 15 °C ROAD Good DATE 97 07 05 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-01 CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Backhoe 8.00 $60/hr $480 D3 Tractor 7.00 50/hr 350 Supervision - 525
TOTAL $1 355
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Moved on equipment. Began stripping and hauling gravel off the location. NOTE: Contractor agreed to salvage
gravel for ownership of gravel at no cost to Genoil. Undercut and restored flare pit area. Started cleaning gravel out of the landowner's ditch. Shut down for the night.
Estimated Costs: Daily $ 1 355 Cumulative $ 8 624 477 Supervisor: M. Durette
Page No. 233
i
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
MATERIALS USED:
WEATHER Clear TEMP 14 °C ROAD Good DATE 97 07 06 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-02 CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Backhoe 9.00 $60/hr $540 D3 Tractor 9.00 50/hr 450 Supervision 525
TOTAL $1 515
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued stripping and hauling gravel off the location. Dug a ditch from sump "A" to landowners drainage ditch to drain the fluid. Scraped sand off location and pushed into the flare pit. Mixed fluid in flare pit with sand. Shut down for the night.
Estimated Costs: Daily $ 1 515 Cumulative $ 8 626 317 Supervisor: M. Durette
Page No. 234
DAILY CONSTRUCTION REPORT
BISSETT RESOURCE CONSULTANTS LTDCI
f
MATERIALS USED:
WEATHER Clear TEMP 15 °C ROAD Good DATE 97 07 07
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-03
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Backhoe 7.00 $60/hr $420 D3 Tractor 6.00 50/hr 300 Supervision 600
TOTAL $1 320
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued strippinq and hauling gravel off location. Fluid remaining in flare pit mixed with dry material and spread on location to dry. Flare pit backfilled with dry clay. Continued to strip sand off the location and stockpiled near sump. Shut down for the night.
Estimated Costs: Daily $ 1 320 Cumulative $ 8 627 637 Supervisor: M. Durette
Page No. 235
i
DAILY CONSTRUCTION REPORT 0.BISSETT RESOURCE CONSULTANTS LTD.
CONTRACTOR Excavation Claude Morin STATUS Restoring location
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Cloudy TEMP 14 °C ROAD Good DATE 97 07 08
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-04
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 9.00 $60/hr $540
D3 Tractor 4.00 50/hr 200
Welding
Supervision
MATERIALS USED:
1.0 d - 800
1.0 d - 600
TOTAL $2 140
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued stripping and hauling gravel off the location. Pulled and recovered mouse and
rat hole casings. Filled rat hole and mouse hole with sand and clay. Continued to strip and pile sand near the sumps. Well capping and lease restoration progress was inspected and approved by Ministere des Ressources Nauterelles. Began mixing wet material in Sump 3 with the dry sand. Shut down for the night.
Estimated Costs: Daily $ 2 140 Cumulative $ 8 629 777 Supervisor: M. Durette
Page No. 236
Supervision
MATERIALS USED:
1.0 d 600
BISSETT RESOURCE CONSULTANTS LTD.
DAILY CONSTRUCTION REPORT
WEATHER Clear TEMP 18 °C ROAD Good DATE 97 07 09
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-05
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 10.00 $60/hr $600 D3 Tractor 8.00 50/hr 400
TOTAL $1 600
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued to strip and haul gravel off the location. Continued to strip and pile sand near the sumps. Continued mixing sand with wet material in Sump 3. Shut down for the night.
Estimated Costs: Daily $ 1 600 Cumulative $ 8 631 377 Supervisor: M. Durette
Page No. 237
Supervision
MATERIALS USED:
1.0 d 600
WEATHER Clear TEMP 16 °C ROAD Good DATE 97 07 10
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-06
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Excavator 312 10.00 $60/hr $600
Excavator 312B 10.00 60/hr 600
TOTAL $1 800
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued mixing dry sand with wet material in Sump 3. Shut down for the night.
Estimated Costs: Daily $ 1 800 Cumulative $ 8 633 177 Supervisor: M. Durette
Page No. 238
i
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
Supervision
MATERIALS USED:
1.O d 600
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP 17 °C ROAD Good DATE 97 07 11
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-07
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 11.00 $60/hr $660
Excavator 312B 10.00 60/hr 600
TOTAL $1 860
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced the equipment. Continued mixing dry sand with wet material in Sump 3. Restoration is about 30% complete. Shut down for the night.
Estimated Costs: Daily $ 1 860 Cumulative $ 8 635 037 Supervisor: M. Durette
Page No. 239
WEATHER Cloudy TEMP 12 °C ROAD Good DATE 97 07 12
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-08 CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Backhoe 11.00 $60/hr $660 Excavator 312B 11.00 60/hr 660 Supervision
MATERIALS USED:
1.0 d 600
TOTAL $1 920
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced the equipment. Continued mixing dry sand with wet material in Sump 3. Spread mixture onto the location to dry. Started mixing dry sand with wet material in Sump 2. Shut down for the night.
Estimated Costs: Daily $ 1 920 Cumulative $ 8 636 957 Supervisor: M. Durette
Page No. 240
DAILY CONSTRUCTION REPORT
Cit,BISSETT RESOURCE CONSULTANTS LTD.
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP 20 °C ROAD Good DATE 97 07 14
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-09
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 11.00 $60/hr $660
Backhoe 11.00 60/hr 660
D3 Tractor 6.00 50/hr 300
Gravel truck 10-wheeler 7.00 90/hr 630
Supervision 1.0 d 600
MATERIALS USED:
TOTAL $2 850
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued mixing dry sand with wet material in Sump 2. Sump 3 is finished and backfilled. Continued to strip and pile sand near Sump 2. Shut down for the night.
Estimated Costs: Daily $ 2 850 Cumulative $ 8 639 807 Supervisor: M. Durette
Page No. 241
J
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Cloudy TEMP 19 °C ROAD Good DATE 97 07 15
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-10
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 11.00 $60/hr $660
Backhoe 11.00 60/hr 660
D3 Tractor 5.00 50/hr 250
Two Gravel trucks (10-wheeler) 6.00 45/hr 540 Supervision 1.0 d - 600
MATERIALS USED
TOTAL $2 710
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued mixing dry sand with wet material in Sump 2. Continued to strip and pile dry sand near Sump 2. Shut down for the night.
NOTE: Received lab analysis from fluid in Sump 1. Fluid is not toxic and suitable for pumping off.
Estimated Costs: Daily $ 2 710 Cumulative $ 8 642 517 Supervisor: M. Durette
Page No. 242
J
DAILY CONSTRUCTION REPORT C BISSETT RESOURCE CONSULTANTS LTD.
WEATHER Cloudy TEMP 22 °C ROAD Good DATE 97 07 16
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-11
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 11.00 $60/hr $660
Backhoe 11.00 60/hr 660 Two Gravel Trucks (10-wheeler) 9.00 45/hr 810 Supervision 1.0 d - 600
MATERIALS USED:
TOTAL $2 730
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Finished mixing dry sand with wet material in Sump 2. Started mixing dry sand with wet
material in Sump 1. Estimate restoration is approximately 60% complete. Shut down for the night.
Estimated Costs: Daily $ 2 730 Cumulative $ 8 645 247 Supervisor: M. Durette
Page No. 243
DAILY CONSTRUCTION REPORT
BISSETT RESOURCE CONSULTANTS LTD. CI
WEATHER Clear TEMP 19 °C ROAD Good DATE 97 07 17
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-12
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 11.00 $60/hr $660
Backhoe 11.00 60/hr 660 D3 Tractor 5.00 50/hr 250 Two Gravel Trucks (10-wheeler) 9.00 45/hr 810 Supervision 1.0 d 600
MATERIALS USED:
TOTAL $2 980
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued mixing dry sand with wet material in Sump 1. Continued to strip sand from the wellsite and pushed into piles near Sump 1. Shut down for the night.
Estimated Costs: Daily $ 2 980 Cumulative $ 8 648 227 Supervisor: M. Durette
Page No. 244
I
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP 10 °C ROAD Good DATE 97 07 19
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-13
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 11.00 $60/hr $660
Backhoe 11.00 60/hr 660
D3 Tractor 5.00 50/hr 250
Two Gravel Trucks (10-wheeler) 10.00 45/hr 900
Supervision 1.0 d 600
MATERIALS USED:
TOTAL $3 070
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued to mix dry sand and subsoil with wet material in Sump 1. Continued stripping
sand and subsoil near Sump 1 for mixing purposes. Shut down for the night.
Estimated Costs: Daily $ 3 070 Cumulative $ 8 651 297 Supervisor: M. Durette
Page No. 245
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP 15 °C ROAD Good DATE 97 07 20 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-14 CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Backhoe 11.00 $60/hr $660 Backhoe 11.00 60/hr 660 D3 Tractor 5.00 50/hr 250 Two Gravel Trucks (10-wheeler) 7.00 45/hr 630 Supervision 1.0 d 600
MATERIALS USED:
TOTAL $2 800
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Finished mixing dry sand with wet material in Sump 1. Backfilled and capped Sump 1. Covered and landscaped Sumps 1, 2 and 3 area using subsoil. Suspended restoration operations until August 17, 1997. Landowner has been advised that operations have been shut down. Will finish restoration work beginning the week of August 18, 1997.
Estimated Costs: Daily $ 2 800 Cumulative $ 8 653 097 Supervisor: M. Durette
Page No. 246
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP 12 °C ROAD Good DATE 97 08 19 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-15 CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Backhoe 192.00 $60/hr $11 520 D3 Tractor 19.00 50/hr 950 Gravel Trucks (10-wheeler) 83.00 45/hr 3 735 Supervision 2.0 d 1 200
MATERIALS USED: 145 loads of sand Cad $18.00 per load 2 610
TOTAL $20 015
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Period: July 24 through August 18, 1997
Continued to m ix sand with wet material and spread over lease to dry. Sump 2 area became soft because of
fluid content. Undercut and mixed with dry sand. Estimate lease reclamation is ±80% complete. Shut down for the night.
Estimated Costs: Daily $ 20 015 Cumulative $ 8 673 112 Supervisor: M. Durette
Page No. 247
DAILY CONSTRUCTION REPORT
BISSETT RESOURCE CONSULTANTS LTD. Cil
WEATHER Clear TEMP 12 °C ROAD Good DATE 97 08 20
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-16
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 10.00 $60/hr $600
Gravel Truck (10-wheeler) 10.00 45/hr 450
Supervision 1.0 d 600
MATERIALS USED:
20 loads of sand at $18 per load 360
TOTAL $2 010
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued to mix sand with wet material and spread over lease to dry. Shut down for the night.
Estimated Costs: Daily $ 2 010 Cumulative $ 8 675 122 Supervisor: M. Durette
Page No. 248
J
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Cloudy TEMP 17 °C ROAD Good DATE 97 08 21
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-17
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
Backhoe 10.00 $60/h $600 D3 Tractor 1.50 50/h 75 Gravel Truck (10-wheeler) 10.00 45/h 450 Supervision 1.0 d 600
MATERIALS USED:
21 loads of sand at $18 per load 378
TOTAL $2103
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued to mix dry sand with wet material and spread over the location to dry. Shut down for the night.
Estimated Costs: Daily $ 2 103 Cumulative $ 8 677 225 Supervisor: M. Durette
Page No. 249
DAILY CONSTRUCTION REPORT
BISSETT RESOURCE CONSULTANTS LTD. CI
WEATHER Cloudy TEMP 14 °C ROAD Good DATE 97 08 22
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-18
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Backhoe 10.00 $60/h $600 Backhoe 10.00 60/h 600 Trucking (10-wheeler) 5.00 45/h 225 Supervision 1.0 d 600
MATERIALS USED:
10 loads of sand at $18 per load 180
TOTAL $2 205
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued mixing dry sand with wet material from the sump and spread over the location to dry. Hauled an additional 18 loads of sand onto the location for mixing purposes. Shut down for the night.
Estimated Costs: Daily $ 2 205 Cumulative $ 8 679 430 Supervisor: M. Durette
Page No. 250
1
MATERIALS USED:
WEATHER Cloudy TEMP 16 °C ROAD Good DATE 97 08 23 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-19 CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) Backhoe 5.00 $60/h $300 Loader 5.00 50/h 250 Supervision 1.0 d 600
TOTAL $1 150
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued to mix wet drilling fluid saturated subsoil with dry sand and spread over location to dry. Shut down at 12:00, due to rain.
Estimated Costs: Daily $ 1 150 Cumulative $ 8 678 375 Supervisor: M. Durette
Page No. 251
J
DAILY CONSTRUCTION REPORT
BISSETT RESOURCE CONSULTANTS LTD. Cli
WEATHER Cloudy TEMP 14 °C ROAD Good DATE 97 08 24 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-20 CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) 312 Backhoe 10.00 $60/h $600 312B Backhoe 10.00 60/h 600 3 Gravel Trucks (10 wheeler) 30.00 45/h 1 350 Supervision 1.0 d 600
MATERIALS USED: 65 loads dry sand at $18 per load 1 170
TOTAL $4 320
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued to mix wet drilling fluid saturated subsoil with dry sand and spread mixture over the location to dry. Hauled 65 loads of sand and dumped on wellsite for mixing purposes. Shut down for the night.
Estimated Costs: Daily $ 4 320 Cumulative $ 8 682 695 Supervisor: M. Durette
Page No. 252
J
DAILY CONSTRUCTION REPORT CII BISSETT RESOURCE CONSULTANTS LTD.
CONTRACTOR Excavation Claude Morin STATUS Restoring location
Supervision 1.O d 600
WEATHER Clear TEMP 14 °C ROAD Good DATE 97 08 25 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-21
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) 312 Backhoe 10.00 $60/h $600 312B Backhoe 10.00 60/h 600 3 Gravel Trucks (10 wheeler) 30.00 45/h 1 350
MATERIALS USED: 55 loads dry sand at $18 per load 990
TOTAL $4140
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued to mix wet drilling fluid saturated subsoil with dry sand and spread mixture over the location to dry. Hauled 55 loads of sand and dumped on wellsite for mixing purposes. Shut down for the night.
Estimated Costs: Daily $ 4 140 Cumulative $ 8 686 835 Supervisor: M. Durette
Page No. 253
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP 12 °C ROAD Good DATE 97 08 26 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-22 CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) 312 Backhoe 12.00 $60/h $720 312B Backhoe 10.00 60/h 600 Gravel Truck (10 wheeler) 6.00 45/h 270 Supervision 1.0 d 600
MATERIALS USED: 10 loads sand at $18 per load 180
TOTAL $2 370
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued mixing drilling fluid saturated subsoil with dry sand and spread over the location to dry. Hauled additional dry sand onto the location for mixing purposes. Shut down for the night.
Estimated Costs: Daily $ 2 370 Cumulative $ 8 689 205 Supervisor: M. Durette
Page No. 254
1
DAILY CONSTRUCTION REPORT
BISSETT RESOURCE CONSULTANTS LTDCI
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP 17 °C ROAD Good DATE 97 08 27 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-23 CONTRACTOR Excavation Claude Morin STATUS Restoring location
Estimated Costs: Daily $ 2 730 Cumulative $ 8 691 935 Supervisor: M. Durette
Page No. 255
MATERIALS USED:
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) 312 Backhoe 13.00 $60/h $780 312B Backhoe 7.00 60/h 420 D3 Tractor 6.00 50/h 300 2 Gravel Trucks (10 wheeler) 7.00 45/h 630 Supervision 1.0 d 600
TOTAL $2 730
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Finished mixing wet subsoil contaminated with drilling fluid with dry sand. Spread same over the location to dry. Started spreading topsoil over the wellsite. Shut down for the night.
MATERIALS USED:
WEATHER Cloudy TEMP 16 °C ROAD Good DATE 97 08 28 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-24 CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) 312 Backhoe 10.00 $60/h $600 D3 Tractor 10.00 50/h 500 3 - Gravel Trucks (10 wheeler) 30.00 45/h 1 350 Supervision 1.O d - 600
TOTAL $3 050
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued spreading topsoil over the location. Shut down for the night.
Estimated Costs: Daily $ 3 050 Cumulative $ 8 694 985 Supervisor: M. Durette
Page No. 256
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Cloudy TEMP 14 °C ROAD Good DATE 97 08 29 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-25 CONTRACTOR Excavation Claude Morin STATUS Restoring location
MATERIALS USED:
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) 312 Backhoe 10.00 $60/h $600 D3 Tractor 10.00 50/h 500 3 - Gravel Trucks (10 wheeler) 27.00 45/h 1 210 Supervision 1.O d - 600
TOTAL $2 910
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.)
Serviced equipment. Continued spreading topsoil over the location. Shut down for the night.
Estimated Costs: Daily $ 2 910 Cumulative $ 8 697 895 Supervisor: M. Durette
Page No. 257
J
DAILY CONSTRUCTION REPORT 0.BISSETT RESOURCE CONSULTANTS LTD.
MATERIALS USED:
WEATHER Cloudy TEMP 15 °C ROAD Good DATE 97 08 30
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-26
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) 312 Backhoe 10.00 $60/h $600 312B Backhoe 10.00 60/h 600 D3 Tractor 11.00 50/h 550 3 - Gravel Trucks (10 wheeler) 30.00 45/h 1 350 Supervision 1.0 d 600
TOTAL $3 700
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued spreading topsoil over the location. Approximately 99% complete. Shut down for the night.
Estimated Costs: Daily $ 3 700 Cumulative $ 8 701 595 Supervisor: M. Durette
Page No. 258
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Cloudy TEMP 13 °C ROAD Good DATE 97 08 31
PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-27
CONTRACTOR Excavation Claude Morin STATUS Restoring location
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($)
312 Backhoe 12.50 $60/h $750
312B Backhoe 12.50 60/h 750 D3 Tractor 11.50 50/h 575 2 - Gravel Trucks (10 wheeler) 23.00 45/h 1 035 Supervision 1.O d - 600
MATERIALS USED:
TOTAL $3 710
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Continued spreading topsoil over the location. Shut down for the niqht.
Estimated Costs: Daily $ 3 710 Cumulative $ 8 805 305 Supervisor: M. Durette
Page No. 259
DAILY CONSTRUCTION REPORT aBISSETT RESOURCE CONSULTANTS LTD.
WEATHER Clear TEMP 14 °C ROAD Good DATE 97 09 01 PROJECT NAME GENOIL et al ST. LEONARD NO. 1 DAY NO. CU-28 CONTRACTOR Excavation Claude Morin STATUS Equipment released
Estimated Costs: Daily $ 2 900 Cumulative $ 8 808 205 Supervisor: M. Durette
Page No. 260
MATERIALS USED:
EQUIPMENT ON LOCATION:
Type/Model/Identification Hours Worked Rate Cost ($) 312 Backhoe 9.00 $60/h $540 312B Backhoe 9.00 60/h 540 D3 Tractor 10.00 50/h 500 2 - Gravel Trucks (10 wheeler) 16.00 45/h 720 Supervision 1.0 d 600
TOTAL $2 900
REMARKS: (Include last 24 hours progress, unusual condition, downtime, problems, etc.) Serviced equipment. Finished spreadinq topsoil. Levelled and landscaped location. Relocated culverts as requested by the landowner. Moved equipment off the location.
Reclamation Complete Final Report