Data Teknis
γ Beton = 2300 kg/m3
Berat Keramik = 17 Kg/m2
Berat Spesi = 21 kg/m2
Tebal Spesi = 0,02 m
Tebal Pelat = 0,15 m
Beban Plafon = 7 kg/m2
Beban Tembok = 250 kg/m2
Beban Guna =250 kg/m2
Rencana Dimensi = Balok Anak = 20/40 cm
Rumusbebanekivalen
Bebansegitiga
Tinjausetengahbentang :
Q = ½ ½L q = ¼ q L
RA= ¼ q L
Mmax (a)= RA.½ L – ½ .½ L.q 1/3.½ L
=1/12 q L2
Mmax (b)= 1/8 qek L2
Mmax(a) = Mmax(b)
1/12 q L2 = 1/8 qek L2
qek=
23q
Perhitungan Pembebanan:
1. Pembebanan Balok Anak A
qek Segitiga:
qek atas = 2/3 q
qek bawah = 2/3 q
Bebanmati (qD)
Bebanpelat = 2 x (2/3 x 0.15 x 2300 x 1.5) = 690
kg/m
Bebanplafon = 2 x (2/3 x 7 x 1.5 ) = 14
kg/m
Berat Spesi (2cm) = 2 x (2/3 x 0.02 x 21 x 1.5) = 0.84
kg/m
Keramik (per cm) = 2 x (2/3 x 17 x 1.5 ) = 34
kg/m
Bebanbalok = 0.2 x (0.4-0.15) x 2300 = 115
kg/m
Total BebanMati = 853,840 kg/m
Bebanhidup
Bebanguna = 2 x (2/3 x 250 x 1.5) = 500
kg/m
2. Pembebanan Balok Anak B
qek Segitiga:
qek atas = 2/3 q
qek bawah = 2/3 q
Bebanmati (qD)
Bebanpelat = 2 x (2/3 x 0.15 x 2300 x 2 ) = 920
kg/m
Bebanplafon = 2 x (2/3 x 7 x 2 ) = 18.67 kg/m
Berat Spesi (2cm) = 2 x (2/3 x 0.02 x 21 x 2) = 1.12
kg/m
Keramik (per cm) = 2 x (2/3 x 17 x 2 ) = 45.33
kg/m
Bebanbalok = 0.2 x (0.4-0.15) x 2300 = 115
kg/m
Total BebanMati = 1100.12 kg/m
Bebanhidup
Bebanguna = 2 x (2/3 x 250 x 2) = 666.67
kg/m
PEMBEBANAN BALOK ANAK
Bentang 1 ( ) BebanKombinasi 1.2 D + 1.6 L
Balok A1.2 x 853,840 + 1.6 x 500 = 1824,608 kg/m
Balok B
1.2 x 1100.12 + 1.6 x 666.67 = 2386,816 kg/m
Gambar Pembebanan
DIAGRAM MOMEN
DIAGRAM GAYA LINTANG
DISPLACEMENT
Bentang 2 ( ) BebanKombinasi 1.2 D + 1.6 L
Balok B1.2 x 1100.12 + 1.6 x 666.67 = 2386,816 kg/m
Gambar Pembebanan
DIAGRAM MOMEN
DIAGRAM GAYA LINTANG
DISPLACEMENT
1. Penulangan
Momen-momenmaksimumdidapatdaribalok yang berwarnamerah
MUTump = 4071.281 kg m
MULap = 3049.672 kg m
f’c = 23MPa
fy = 230 MPa
Dimensibalok = 400 x 200 mm
Selimutbeton = 50 mm
Bentangbalok = 4000 mm
AnalisaTulangan :
-Cekperilakubalokapakahbalokberperilakusebagaibalok T
murniatau T persegi (Istimawan 79)
MR (momentahanan ) = × 0,85 × fc’× be × hf × (d - hf /
2)
Keterangan :
Jika MR> Mu, maka tinggi a sebenarnya adalah <hf dan
flens mampu menahan tekan seluruhnya. Ini berarti
balok berperilaku sebagai balok T persegi.
Jika MR< Mu, maka tinggi a sebenarnya adalah <hf dan
flens tidak mampu menahan tekan seluruhnya. Ini
berarti balok berperilaku sebagai balok T murni.
Perhitunganlebarefektif (be) :
Berdasarkan SK SNI 03-2847-2002 pasal10.10 :
Lebar efektif balok T tidak lebih besar dan diambil nilai
terkecil dari :
bw + 1/12 × bentangbalok = 200 + (1/12 × 4000)
= 533.33 mm
bw + 6 × hf = 200 + (6 × 150) =
1100 mm
bw + ½ jarak bersih antar balok = 200 + (0,5 x
(4000-200) = 2100 mm
Maka diambil lebar efektif ( be ) yang terkecil yaitu =
533.33 mm
Keterangan :
Untuk perhitungan analisa tulangan digunakan :
- be = bw = 200 mm jika balok berperilaku sebagai balok
T- persegi
- be = 533.33 mm jika balok berperilaku sebagai balok
T- murni
Tinggi efektif balok :
d = Tinggi Balok – Selimut Beton
= 400 – 50
= 350 mm
Analisa Tulangan Tumpuan
Nilai Mu diambil yang terbesar antara momen tumpuan positif
dan negative.
Mu = 4071.281 kg m
MR (momentahanan ) = × 0,85 × fc’× be × hf × (d - hf / 2)
= 0,8 x 0,85 x 23 x 533,33 x 150 x (350-
150/2)
= 344077849,5 Nmm
= 34407,78495 kgm
MR > MuTump
34407,78495 kgm > 4071.281 kg m → MR > MuTump T-
Persegi
min =1,4fy =
1,4230
=0,006087
max = 0,75 b
= 0,75×
( 0,85 × β1× fc')
fy ×600600 + fy
= 0,75× (0,85×0,85×23)230
× 600600+230
= 0,039172
Rn =
Muφ×be× d2
=4071.281x102
0,8×20×352 = 20,772 kg/cm2 = 2,0772 MPa
m = fy
0,85×fc'
= 2300,85×23,5
=11,514
= 1m [1−√1−
2×m×Rnfy ]
= 111,514 [1−√1−
2×11,514×2,0772230 ]
= 0,00957
min < < max ,dipakai
As= be d = 0,00957 x 200 x 350 = 669,9 mm2
As’= 0,2 x As= 0,2 x 669,9= 133,98 mm2
Dari nilai As dan As’ yang diperoleh maka dapat ditentukan
jumlah tulangan atas dan tulangan bawah yang diperoleh dari
tabel tulangan :
Tulangan tarik : 2 D 22( 767 mm2 /m )
Tulangan tekan : 2 D 13( 265 mm2 / m )
Gambar penulangan
Kontrol Momen Kapasitas Penampang (momen tumpuan)
Diketahui :
~Tulangan tarik :2 D 22 ( 767 mm2 /m )
~Tulangan tekan : 2 D 13 ( 265 mm2 /m )
~ f’c = 23 Mpa
~ fy = 230 Mpa
~ εs = 0,003
~ Es = 2.105 MPa
~ Ukuran Balok = 20/40 cm
~ d = 350 mm
~ d’ = 50 mm
Perhitungan :
Asumsi : (Tulangan Lemah)
Tulangan tarik (As) sudah leleh ⇒ fs ≥ fy
Tulangan tekan (As’) sudah leleh ⇒ fs’ ≥ fy
T = As x fy = 2x 1/4 π (222) x 230 =
174772,4 N
Cs = As’ x fy = 2 x 1/4 π (132) x 230 = 61025,9 N
Cc = 0,85 f’c x be x a = 0,85 x 23 x 200 x a = 3910 a Kesetimbangan gaya :
Cc + Cs = T
3910 a + 61025,9 = 174772,4
a = 29,09 mm
c = aβ=29,090,85
=34,224 = < d’
Gambar Diagram Regangan-Tegangan
KontrolTegangan :
Tulangan Tarik
fs = εs x Es
= 0,003 x (d−cc ) x 2 x 105
= 0,003 x (350−34,22434,224 ) x 2 x 105
= 5536,045 MPa > fy = 230 MPa (sesuai asumsi)
Tulangan Tekan
Fs’ = εs’ x Es
= 0,003 x (d'−cc ) x 2 x 105
= 0,003 x (50−34,22434,224 ) x 2 x 105
= 276,577 MPa > fy = 230 MPa (sesuai asumsi)
Mn = Cc (d – a /2)+ Cs.(d-d’)
= 0.85 x f’c x b x a (d – a /2)+As’f’s(d-d’)
= 0.85 x 23 x 200 x 29,09 x (350 – 29,09/2) + 265 x
276,577 (350 - 50)
= 60143160,56 Nmm > Mu = 4071.281 kg m
= 6014,316056 kgm> Mu = 4071.281 kg m ………….OK!!!
Analisa t ulangan lapangan
MU Lapangan = 3049.672 kg m
MR (momen tahanan ) = × 0,85 × fc’× be × hf × (d - hf /
2)
= 0,8 x 0,85 x 23 x 533.33 x 150 x (350-
150/2)
= 344077849,5 Nmm
= 34407,78495 kgmMR>Mulap → T-Persegi
min =1,4fy =
1,4230
=0,0058
max = 0,75 b
= 0,75×
( 0,85 × β1× fc')
fy ×600600 + fy
= 0,75× (0,85×0,85×23)230
× 600600+230
= 0,039172
Rn =
Muφ×be× d2
=3049,672×102
0,8×20×352 = 15,556kg/cm2 = 1,5556 MPa
m = fy
0,85×fc'
= 2300,85×23
=11,764
= 1m [1−√1−
2×m×Rnfy ]
= 111,764 [1−√1−
2×11,764×1,5556230 ]
= 0,007056
min < < max ,dipakai
As= be d = 0,007056 x 200 x 350 = 493,945 mm2
As’= 0,2 x As= 0,2 x 469,7= 98,79mm2
Dari nilai As dan As’ yang diperoleh maka dapat ditentukan
jumlah tulangan atas dan tulangan bawah yang diperoleh dari
tabel tulangan :
Tulangan tarik : 2 D 19( 567mm2 /m )
Tulangan tekan : 1 D 13( 133 mm2 / m )
Gambar penulangan
Kontrol Momen Kapasitas Penampang (momen tumpuan)
Diketahui :
~ Tulangan tarik = 2 D 19 ( 567 mm2 /m )
~ Tulangan tekan = 1 D 13 ( 133 mm2 /m )
~ f’c = 23 Mpa
~ fy = 230 Mpa
~ εs = 0,003
~ Es = 2.105 MPa
~ Ukuran Balok = 20/40 cm
~ d = 350 mm
~ d’ = 50 mm
Perhitungan :
Asumsi : (Tulangan Lemah)
Tulangan tarik (As) sudah leleh ⇒ fs ≥ fy
Tulangan tekan (As’) sudah leleh ⇒ fs’ ≥ fy
T = As x fy = 2x 1/4 π (192) x 230 =
130357,1 N
Cs = As’ x fy = 1 x 1/4 π (132) x 230 = 30512,95 N
Cc = 0,85 f’c x be x a = 0,85 x 23 x 200 x a = 3910 a
Kesetimbangan gaya :
Cc + Cs = T
3910 a + 30512,95 = 130357,1
a = 25,533 mm
c = aβ=25,5330,85
=30,041 = < d’
Gambar Diagram Regangan-Tegangan
KontrolTegangan :
Tulangan Tarik
fs = εs x Es
= 0,003 x (d−cc ) x 2 x 105
= 0,003 x (350−30,04130,041 ) x 2 x 105
=6390,4464 MPa > fy = 230 MPa (sesuai asumsi)
Tulangan Tekan
Fs’ = εs’ x Es
= 0,003 x (d'−cc ) x 2 x 105
= 0,003 x (50−30,04130,041 ) x 2 x 105
= 398,635 MPa > fy = 230 MPa (sesuai asumsi)
Mn = Cc (d – a/2)+ Cs.(d-d’)
= 0.85 x f’c x b x a (d – a/2)+As’f’s(d-d’)
= 0.85 x 23 x 200 x 25,533 x (350 – 25,533/2) + 253 x
398,635 (350 - 50)
= 63666156,10 Nmm > Mu = 3049.672
= 6366,615610 kgm > Mu = 4071.281 kg m ………….OK!!!
Tulangan geser tumpuan
Vu maksimum = 5773,556 kg
Pemeriksaan kebutuhan tulangan geser
Syarat kebutuhan tulangan geser :
Vn > Vc
Didapat :
Vc = 16 . √fc' . bw. d = 1
6 x √23 .x200 x 350 = 55951,368 N=5595,1368kg
= 0,6 ( Faktor reduksi untuk geser )
Vn =Vuφ
=5773,556
0,6=9622,59kg
Vn = 9622,59 kg > Vc = 5375,872 kgPerlu Tulangan Geser
Vs = Vn – Vc = 9622,59 – 5375,872
= 4246,721 kg
Sesuai dengan SK SNI-1991 pasal 3.4.5 ( 6 (2)) bila digunakantulangan geser yang tegak lurus terhadap sumbu aksialkomponen struktur maka :
Vs=Av.Fy.dS
⇒S=Av.Fy.dVs
Dimana Av adalah luas tulangan geser yang berada dalamrentang jarak S
X2200
=VcVn
X2200
=5375,872 9622,59
X2=111,73cmX1=88,27cm
Vs = 4246,721 kg
X1 = 88,27 cm
Digunakan sengkang 8 mm Av = 1,01 cm2
S1=Av⋅fy⋅d
Vs=1,01⋅2300⋅354246,721
=19,145cm
digunakan tulangan geser 8 – 100
X2 = 111,73 cm
Digunakan sengkang 8 mm Av = 1,01 cm2
digunakan tulangan geser 8 – 100
Untuk semua balok memanjang digunakan tulangan sbb :
TULANGAN TUMPUAN
Tulangan tarik : 2 D 22( 767 mm2 /m )
Tulangan tekan : 2 D 13( 265 mm2 / m )
TULANGAN LAPANGAN
Tulangan tarik : 2 D 19( 567mm2 /m )
Tulangan tekan : 1 D 13( 133 mm2 / m )
Tulangan Geser Tumpuan : 8 – 100
PEMBEBANAN BALOK ANAK (Memanjang)
Data Teknis
γ Beton = 2300 kg/m3
Berat Keramik = 17 Kg/m2
Berat Spesi = 21 kg/m2
Tebal Spesi = 0,02 m
Tebal Pelat = 0,15 m
Beban Plafon = 7 kg/m2
Beban Tembok = 250 kg/m2
Beban Guna =250 kg/m2
Rencana Dimensi = Balok Anak = 20/40 cm
Rumusbebanekivalen
Bebansegitiga
Tinjausetengahbentang :
Q = ½ ½L q = ¼ q L
RA= ¼ q L
Mmax (a)= RA.½ L – ½ .½ L.q 1/3.½ L
=1/12 q L2
Mmax (b)= 1/8 qek L2
Mmax(a) = Mmax(b)
1/12 q L2 = 1/8 qek L2
qek=
23q
Beban trapesium
Tinjau setengah bentang :
Q1 = ½ a q
Q2 = ½ (L -2a) q
RA = Q1 + Q2
= ½ a q + ½ (L -2a) q
= ½ q (L - a )
Mmax(a) = RA.½L–½aq{1/3a+1/2(L2a)-1/2q(L-2a)1/4(L-2a)
= 1/24 q ( 3L2 -4a2)
Mmax (b) = 1/8 qek L2
Mmax(a) = Mmax (b)
1/24 q ( 3L2 -4a2 ) = 1/8 qek
1. Pembebanan A
qek Trapesium
qek =
q (3x4,52−4x1,52 )3x4,52
= 0,852 q
Beban mati (qD)
Beban plat : (0,12 x 2300 x 1 x 0,852) =
235,152 kg/m
Beban plafon : (7 x 1 x 0,852) =
5,964 kg/m
Berat spesi (2 cm) : (0,02 x 21 x 1 x 0,852)
= 0,357 kg/m
Berat keramik : (17 x 1 x 0,852) =
14,484 kg/m
Beban balok : 0,15 x (0,4-0,15) x 2300 =
86,25 kg/m
Beban tembok : 250 x 4 x 80% =
800 kg/m
qD = 1142,207
kg/m
Beban hidup (qL)
Beban guna : (250 x 1 x 0,852) =
213 kg/m
qL = 213
kg/m
2. Pembebanan B
qek Segitiga:
qek atas = 2/3 q
qek bawah = 2/3 q
Bebanmati (qD)
Bebanpelat = (2/3 x 0.15 x 2300 x 1.75) = 402,5
kg/m
Bebanplafon = (2/3 x 7 x 1.75 ) = 8,17
kg/m
Berat Spesi (2cm) = (2/3 x 0.02 x 21 x 1.75) = 0,49
kg/m
Keramik (per cm) = (2/3 x 17 x 1.75 ) = 19,83
kg/m
Bebanbalok = 0.2 x (0.4-0.15) x 2300 = 115
kg/m
Total BebanMati = 545,99 kg/m
Bebanhidup
Bebanguna = (2/3 x 250 x 1.75) = 290,67 kg/m
Total BebanHidup = 290,67 kg/m
PEMBEBANAN BALOK ANAK
Bentang 1 ( ) BebanKombinasi 1.2 D + 1.6 L
Balok A1.2 x 1142,207 + 1.6 x 213 = 1711,4484 kg/m
Gambar Pembebanan
DIAGRAM MOMEN
DIAGRAM GAYA LINTANG
DISPLACEMENT
Bentang 2 ( ) BebanKombinasi 1.2 D + 1.6 L
Balok B1.2 x 545,99 + 1.6 x 290,67 = 1120,26 kg/m
Gambar Pembebanan
DIAGRAM MOMEN
DIAGRAM GAYA LINTANG
DISPLACEMENT
2. Penulangan
Momen-momenmaksimumdidapatdaribalok yang berwarnamerah
MUTump = 4071.281 kg m
MULap = 3049.672 kg m
f’c = 23MPa
fy = 230 MPa
Dimensibalok = 400 x 200 mm
Selimutbeton = 50 mm
Bentangbalok = 4000 mm
AnalisaTulangan :
-Cekperilakubalokapakahbalokberperilakusebagaibalok T
murniatau T persegi (Istimawan 79)
MR (momentahanan ) = × 0,85 × fc’× be × hf × (d - hf /
2)
Keterangan :
Jika MR> Mu, maka tinggi a sebenarnya adalah <hf dan
flens mampu menahan tekan seluruhnya. Ini berarti
balok berperilaku sebagai balok T persegi.
Jika MR< Mu, maka tinggi a sebenarnya adalah <hf dan
flens tidak mampu menahan tekan seluruhnya. Ini
berarti balok berperilaku sebagai balok T murni.
Perhitunganlebarefektif (be) :
Berdasarkan SK SNI 03-2847-2002 pasal10.10 :
Lebar efektif balok T tidak lebih besar dan diambil nilai
terkecil dari :
bw + 1/12 × bentangbalok = 200 + (1/12 × 4000)
= 533.33 mm
bw + 6 × hf = 200 + (6 × 150) =
1100 mm
bw + ½ jarak bersih antar balok = 200 + (0,5 x
(4000-200) = 2100 mm
Maka diambil lebar efektif ( be ) yang terkecil yaitu =
533.33 mm
Keterangan :
Untuk perhitungan analisa tulangan digunakan :
- be = bw = 200 mm jika balok berperilaku sebagai balok
T- persegi
- be = 533.33 mm jika balok berperilaku sebagai balok
T- murni
Tinggi efektif balok :
d = Tinggi Balok – Selimut Beton
= 400 – 50
= 350 mm
Analisa Tulangan Tumpuan
Nilai Mu diambil yang terbesar antara momen tumpuan positif
dan negative.
Mu = 4071.281 kg m
MR (momentahanan ) = × 0,85 × fc’× be × hf × (d - hf / 2)
= 0,8 x 0,85 x 23 x 533,33 x 150 x (350-
150/2)
= 344077849,5 Nmm
= 34407,78495 kgm
MR > MuTump
34407,78495 kgm > 4071.281 kg m → MR > MuTump T-
Persegi
min =1,4fy =
1,4230
=0,006087
max = 0,75 b
= 0,75×
( 0,85 × β1× fc')
fy ×600600 + fy
= 0,75× (0,85×0,85×23)230
× 600600+230
= 0,039172
Rn =
Muφ×be× d2
=4071.281x102
0,8×20×352 = 20,772 kg/cm2 = 2,0772 MPa
m = fy
0,85×fc'
= 2300,85×23,5
=11,514
= 1m [1−√1−
2×m×Rnfy ]
= 111,514 [1−√1−
2×11,514×2,0772230 ]
= 0,00957
min < < max ,dipakai
As= be d = 0,00957 x 200 x 350 = 669,9 mm2
As’= 0,2 x As= 0,2 x 669,9= 133,98 mm2
Dari nilai As dan As’ yang diperoleh maka dapat ditentukan
jumlah tulangan atas dan tulangan bawah yang diperoleh dari
tabel tulangan :
Tulangan tarik : 2 D 22( 767 mm2 /m )
Tulangan tekan : 2 D 13( 265 mm2 / m )