Powered by POeT Solvers Limited Estimate Activity Resources Presented by Dipo Tepede, PMP, SSBB, MBA PM tutor Empowering Excellence

PM tutor - pmtutor.org

Embed Size (px)

Citation preview

Powered by POeT Solvers Limited

 

Estimate Activity Resources

Presented by

Dipo Tepede, PMP, SSBB, MBA

PM tutorEmpowering Excellence

This presentation is copyright © 2009 by POeT Solvers Limited. All rights reserved.

This presentation is protected by the Nigerian Copyright law and may not be reproduced,

distributed, transmitted, displayed, published or broadcast without the prior written permission

of POeT Solvers Limited. You may not alter or remove any trademark, copyright or other

notices. PMP®, CAPM®, PMI®, PMBOK® Guide are

registered marks of Project Management Institute, Inc.

Powered by POeT Solvers Limited

•  Be able to describe the resource breakdown structure

•  Be able to list factors that influence activity resource estimating

•  Be able to explain why bottom-up estimating is used in Estimating Activity Resources

•  Be able to define the difference between activity list and activity attribute

Powered by POeT Solvers Limited

At the end of this training, our goal is for you to:

Powered by POeT Solvers Limited

Project Time Management

Timely Completion

Time

Powered by POeT Solvers Limited

Time Processes Process Group

Define Activities

Sequence Activities

Estimate Activity Resources

Estimate Activity Durations

Develop Schedule

Control Schedule M & C

PLAN

PLAN

PLAN

PLAN

PLAN

•  Define Activities – Identify actions to produce the project

deliverables •  Sequence Activities – Identify activity relationships to

document predecessor and successor •  Estimate Activity Resources – Estimate type & quantities of resources

needed per activity

Powered by POeT Solvers Limited

Time Processes

•  Estimate Activity Durations

– Estimate an approximate duration for each activity

•  Develop Schedule

– Analyze all of the above to create the project schedule

•  Control Schedule – Monitor the project status to manage

schedule baseline changes Powered by POeT Solvers Limited

Time Processes

Powered by POeT Solvers Limited

Main Concept

Time Estimation

Who is going to perform the

activity

Powered by POeT Solvers Limited

Types of Resources

Estimate Activity Resources

People

Equipment

Goods

Material

•  To dig a hole 40 X 40 X 40 cm in size

Powered by POeT Solvers Limited

Resource determines Duration

You

6 yr old girl 1 – 2 hours

10 secs Excavating Machine

10 – 20 mins

Powered by POeT Solvers Limited

Three Factors Complexity of activity and skill level of resource

Organization’s history in doing similar activities

Availability of required resources

Powered by POeT Solvers Limited

Cost Perspective

Know how and experience

Trainings for resources

Hire external resources

To determine resources

Powered by POeT Solvers Limited

Schedule

Consider Schedule

Powered by POeT Solvers Limited

Estimate Act. Resources Input

Required Inputs

Resource Calendars

Activity Attributes

Ent. Env. Factors

Activity List Org. Process

Assets

Powered by POeT Solvers Limited

Estimate Act. Resources T&T

Expert Judgment Alternative

Analysis

Published Estimating Data

Bottom-up Estimating

Project Management Software

Powered by POeT Solvers Limited

Answer Two Questions

Who will execute our activities?

How will they execute our activities?

Powered by POeT Solvers Limited

Who?

Experts Opinion on who should

do it

How else to do the

job Who can do it

Powered by POeT Solvers Limited

Published Estimating Data

Time Estimation Cost for

Resources

Allow to take cost into account while

estimating resources

Powered by POeT Solvers Limited

HOW?

Expert

Data

Alternatives

• Gives various ways of how to perform an activity

• Cost of various alternatives

• Analyzes which alternative is better, faster

Powered by POeT Solvers Limited

Project Management Software

•  Resource breakdown structures • Resource calendars • Rates and cost • Material label

• Schedule Activities • Res. Availability • Schedule Alternatives

Benefits of all these in one software

Latest generation software includes

Powered by POeT Solvers Limited

Bottom-Up Estimating Break activities into smaller, more manageable

activities

Assign people, equipment, material and goods

Estimate resource for each activity

Powered by POeT Solvers Limited

Why Bottom-Up Estimating?

Type of resources required

We are not doing bottom-up estimating to estimate how LONG

the activities will take

Number of resources required

Powered by POeT Solvers Limited

Estimate Act. Resources Output

Activity Resource Requirements

Tracking Systems Resource Breakdown

Structure

Project Document Updates

Powered by POeT Solvers Limited

Activity Resources Requirements

• Number & type of resources for each activity is known

• Irrespective of when we will need to them.

• Only consider that we need them for completion of activities

Project

Welding Transportation Plumbing

Powered by POeT Solvers Limited

Resource Breakdown Structure

Master Welders

Apprentice Welders

Forklift Operators

Truck Drivers

Crane Operators

Pipelayers

Plumbers

Pipefitters

Steamfitters

Powered by POeT Solvers Limited

Activity List & Attributes

Activity List

Activity Attributes

• Comprehensive list of all activities

• Characteristics of schedule activities

Powered by POeT Solvers Limited

Resource Calendars

Update Resource specific calendars

This ensure resource is available when required

•  Sample questions in sample tests online or in books

– None

– Activity resource estimating process is one of the more obscure processes

•  Understand the concepts, inputs, T&T and outputs

Powered by POeT Solvers Limited

Sample Questions

•  Take activities and resources

•  Apply expert judgment and alternative analysis

•  Define the resources

•  Document this as Activity resource requirements and in the activity attributes

•  Create a Resource Breakdown Structure

Powered by POeT Solvers Limited

Review (1)

•  Without knowing the type of resources, we will not be able to estimate the activity duration.

•  Estimate Activity Duration is the next process in Project Time Management

Powered by POeT Solvers Limited

Review (2)

•  Work together with a study partner

– Set 2 hours every weekend to meet

– Ask each other sample questions – Helps you greatly in understanding the

reasoning behind them

•  If you can’t find another PM to work with you, ask your husband, wife, brother or sister or work colleague.

Powered by POeT Solvers Limited

Exam Tip