Estimate Activity Resources
Presented by
Dipo Tepede, PMP, SSBB, MBA
PM tutorEmpowering Excellence
This presentation is copyright © 2009 by POeT Solvers Limited. All rights reserved.
This presentation is protected by the Nigerian Copyright law and may not be reproduced,
distributed, transmitted, displayed, published or broadcast without the prior written permission
of POeT Solvers Limited. You may not alter or remove any trademark, copyright or other
notices. PMP®, CAPM®, PMI®, PMBOK® Guide are
registered marks of Project Management Institute, Inc.
Powered by POeT Solvers Limited
• Be able to describe the resource breakdown structure
• Be able to list factors that influence activity resource estimating
• Be able to explain why bottom-up estimating is used in Estimating Activity Resources
• Be able to define the difference between activity list and activity attribute
Powered by POeT Solvers Limited
At the end of this training, our goal is for you to:
Powered by POeT Solvers Limited
Time Processes Process Group
Define Activities
Sequence Activities
Estimate Activity Resources
Estimate Activity Durations
Develop Schedule
Control Schedule M & C
PLAN
PLAN
PLAN
PLAN
PLAN
• Define Activities – Identify actions to produce the project
deliverables • Sequence Activities – Identify activity relationships to
document predecessor and successor • Estimate Activity Resources – Estimate type & quantities of resources
needed per activity
Powered by POeT Solvers Limited
Time Processes
• Estimate Activity Durations
– Estimate an approximate duration for each activity
• Develop Schedule
– Analyze all of the above to create the project schedule
• Control Schedule – Monitor the project status to manage
schedule baseline changes Powered by POeT Solvers Limited
Time Processes
Powered by POeT Solvers Limited
Types of Resources
Estimate Activity Resources
People
Equipment
Goods
Material
• To dig a hole 40 X 40 X 40 cm in size
Powered by POeT Solvers Limited
Resource determines Duration
You
6 yr old girl 1 – 2 hours
10 secs Excavating Machine
10 – 20 mins
Powered by POeT Solvers Limited
Three Factors Complexity of activity and skill level of resource
Organization’s history in doing similar activities
Availability of required resources
Powered by POeT Solvers Limited
Cost Perspective
Know how and experience
Trainings for resources
Hire external resources
Powered by POeT Solvers Limited
Estimate Act. Resources Input
Required Inputs
Resource Calendars
Activity Attributes
Ent. Env. Factors
Activity List Org. Process
Assets
Powered by POeT Solvers Limited
Estimate Act. Resources T&T
Expert Judgment Alternative
Analysis
Published Estimating Data
Bottom-up Estimating
Project Management Software
Powered by POeT Solvers Limited
Answer Two Questions
Who will execute our activities?
How will they execute our activities?
Powered by POeT Solvers Limited
Who?
Experts Opinion on who should
do it
How else to do the
job Who can do it
Powered by POeT Solvers Limited
Published Estimating Data
Time Estimation Cost for
Resources
Allow to take cost into account while
estimating resources
Powered by POeT Solvers Limited
HOW?
Expert
Data
Alternatives
• Gives various ways of how to perform an activity
• Cost of various alternatives
• Analyzes which alternative is better, faster
Powered by POeT Solvers Limited
Project Management Software
• Resource breakdown structures • Resource calendars • Rates and cost • Material label
• Schedule Activities • Res. Availability • Schedule Alternatives
Benefits of all these in one software
Latest generation software includes
Powered by POeT Solvers Limited
Bottom-Up Estimating Break activities into smaller, more manageable
activities
Assign people, equipment, material and goods
Estimate resource for each activity
Powered by POeT Solvers Limited
Why Bottom-Up Estimating?
Type of resources required
We are not doing bottom-up estimating to estimate how LONG
the activities will take
Number of resources required
Powered by POeT Solvers Limited
Estimate Act. Resources Output
Activity Resource Requirements
Tracking Systems Resource Breakdown
Structure
Project Document Updates
Powered by POeT Solvers Limited
Activity Resources Requirements
• Number & type of resources for each activity is known
• Irrespective of when we will need to them.
• Only consider that we need them for completion of activities
Project
Welding Transportation Plumbing
Powered by POeT Solvers Limited
Resource Breakdown Structure
Master Welders
Apprentice Welders
Forklift Operators
Truck Drivers
Crane Operators
Pipelayers
Plumbers
Pipefitters
Steamfitters
Powered by POeT Solvers Limited
Activity List & Attributes
Activity List
Activity Attributes
• Comprehensive list of all activities
• Characteristics of schedule activities
Powered by POeT Solvers Limited
Resource Calendars
Update Resource specific calendars
This ensure resource is available when required
• Sample questions in sample tests online or in books
– None
– Activity resource estimating process is one of the more obscure processes
• Understand the concepts, inputs, T&T and outputs
Powered by POeT Solvers Limited
Sample Questions
• Take activities and resources
• Apply expert judgment and alternative analysis
• Define the resources
• Document this as Activity resource requirements and in the activity attributes
• Create a Resource Breakdown Structure
Powered by POeT Solvers Limited
Review (1)
• Without knowing the type of resources, we will not be able to estimate the activity duration.
• Estimate Activity Duration is the next process in Project Time Management
Powered by POeT Solvers Limited
Review (2)
• Work together with a study partner
– Set 2 hours every weekend to meet
– Ask each other sample questions – Helps you greatly in understanding the
reasoning behind them
• If you can’t find another PM to work with you, ask your husband, wife, brother or sister or work colleague.
Powered by POeT Solvers Limited
Exam Tip