15
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration DESY, 7 March 2005

1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

Embed Size (px)

Citation preview

Page 1: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

1Albrecht Wagner

DESY and the ILC

• DESY today• DESY strategy and funding 2005-2009• DESY and the ILC• Funding from the European Union• KEK/DESY Collaboration

DESY, 7 March 2005

Page 2: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

2Albrecht Wagner

Deutsches Elektronen-SynchrotronMember of the Helmholtz Association

Mission: Development, construction, operation and scientific exploitation of accelerators

Provide access for national and international users

Internationally used, nationally funded Research Institute

Budget: 165 MEuro (2002)

Staff: 1560 in Hamburg and Zeuthen

Users: 3000 (1500 from abroad)

Accelerator development

Photon ResearchSR & FEL

Exp. & Theor. Particle Physics

Page 3: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

3Albrecht Wagner

Main Elements of Future of DESY

• Particle Physics– HERA until June 2006– ILC– During transition participation in external experiment

• Photon Science– DORIS– VUV-FEL– PETRA III– XFEL

Page 4: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

4Albrecht Wagner

Budget: Request and Allocation

Request (blue)

Allocation (violet)

Beantragteund bewilligte Ausgaben

150152154156158

160162164166168

2004 2005 2006 2007 2008 2009

Jahr

M€ Beantragt

Bewilligt

Base budget, without funding for new projects (PETRA, XFEL …)

Base budget has three parts:ResearchFacilitiesGeneral infrastructure (~35%)

Page 5: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

5Albrecht Wagner

Particle Physics

Research Facilities

(accelerators, experiments)

Page 6: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

6Albrecht Wagner

Photons

Research Facilities

(accelerators, experiments)

Page 7: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

7Albrecht Wagner

VUV-FEL Program for 2005

The 2005 operation time is divided in different blocks. Under the assumption of no unexpected shut downs, all requests can be full-filled.

Some reserve is within the individual operation periods.

Page 8: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

8Albrecht Wagner

European XFEL

German government in Feb. 2003 gave go-ahead for XFEL as European project, incl. funding 50% of total 684 M€ (year 2000) project cost, + contribution from Länder HH & Schleswig-Holstein. ~ 40% required from European Partners.

• Project currently being organised at European Level (scientific/tech. & admin./financial) ongoing - to be completed by 2005.

• Until Jan 2005, 10 European countries have signed the MoU for the project preparation phase (CH, D, DK, ES, F, GR, I, PL, UK, S)

• Discussions in Russia, Netherlands, Hungary, China• Goal:

– Until mid 2006 finish all preparations for an agreement on Government level for construction and operation of EU XFEL

– Start of operation in 2012

Page 9: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

9Albrecht Wagner

ILC XFEL Synergy

• Qualification of vendors (EU, US and J)

• Industrial studies & prototypes for klystron/tunnel installation

• Involve industry in string & module assembly: 3 industrial studies

• Industrial studies for RF coupler fabrication (IN2P3/Orsay)

• Improvement of tuner design ( CEA/Saclay)

• Further experience with EP treatment, improve statistics for cavities

• Build up module test stand (1st test candidate will be Module#6 with 35MV/m cavities)

• Further Synergy by operating VUV-FEL, XFEL commissioning etc

Page 10: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

10Albrecht Wagner

accelerator modules

module test / magnets / cryogenics

linac components

(injector, bunch compressors, diagnostics, dumps)

Photons

FEL concepts

Controls / Operability

Infrastructure

(site, civil construction, survey, tunnel layout, utilities)

Safety

Organisation

Synergy LC and XFEL

Note synergy!

Page 11: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

11Albrecht Wagner

European Design Study

(27 institutions, including CERN and DESY)

With top marks (score: 4.8/5), EU funding: ~9 M€

Kick-off meeting 1.11.2004

EU: Stefano Fontana

Structured and integrated European area in the field of accelerator research and related R&D.

Funds SC RF development.

European Funding for ILC R&D

Page 12: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

12Albrecht Wagner

EU and the Global ILC Project

• The evaluators of the ILC design study EUROTeV emphasised the importance of the project

• EUROTeV plays the role of a focus and nucleus for the European part of the global activities which are just starting

• Europe must maintain its leading role in the SC RF technology

• Global projects represent a new challenge for European science coordination

• The ILC is one of the possible domains for the strategic road map

Page 13: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

13Albrecht Wagner

• Several major projects, such as the XFEL or the ILC, are based on the use of SC RF technology

• The responsibility for projects lies in the hands of the respective project organisations

• The mission of the TESLA collaboration is as follows:

TESLA Collaboration and its relation to major construction projects

Page 14: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

14Albrecht Wagner

• The role of the collaboration is to advance SC RF technology research and development and related accelerator aspects across the broad diversity of scientific applications, and to keep open and provide a bridge for communication and sharing of ideas, developments, and testing across projects.

• To this end TTF and module test stands will continue to be used as a test bed for new developments and experiments in SRF technology, beam and light physics, and associated developments such as instrumentation and diagnostics.

• The collaboration will support and encourage free and open exchange of knowledge, expertise, engineering designs, and equipment.

TESLA Collaboration Mission Statement

Page 15: 1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration

15Albrecht Wagner

Comments about KEK/DESY Collaboration

• DESY would very much like to strengthen the collaboration further

• In work on SC test facilities need to – carefully synchronise and coordinate R&D– Define precisely all interfaces to guarantee exchange

of components etc.• In ATF related work interested to

– test of fast kicker and pulser at ATF.– To make the collaboration as efficient as possible try

to do as much as possible remotely• DESY and KEK have just signed an agreement on

exchange of scientific personnel. We should fill the agreement with life.

• KEK participation in efforts related to ILC and FEL here at DESY are highly welcome.