1/7
Hng mc/Item: Tng 1 Ct Cp pha/Level 1 Column - Formwork
1. i tng nghim thu/Objective:
STT
No.
i tng
Elements
V tr
Location
Bn v tham chiu s
Reference Drawing No.
Ghi ch
Remarks
01 Cp pha Ct C6 tng 1 t 2
Formwork of Column C6 level 1
Batch 2
Trc (T5a/A)
Axis (T5a/A)
S-T4051; S-T0912
S-T1001; S-T4001
2. Thnh phn tham gia nghim thu/Parties involved in inspection and Acceptance:
i din Ch u t/ Representative of Client:
ng/ Mr: Chc v/ Position: .....
i din T vn giam sat / Representative of Consultant:
ng/ Mr: Chc v/ Position: .....
i din Nh thu/ Representative of Contractor:
ng/ Mr: Chc v/ Position: .....
3. Thi gian nghim thu/Acceptance time:
Bt u/ Begin: . ngy/date thang/month nm/year
Kt thc/Finish: . ngy/date thang/month nm/year
4. nh gi cng vic thc hin/Evaluation of construction works done
a. V ti liu lm cn c nghim thu/On supporting documents for inspection:
Phiu yu cu nghim thu ca Nh thu thi cng xy dng s:/Request for inspection of Contractor
No.: ...
H s bn v thit k, bn v chi tit thi cng c Ch u t, T vn giam sat ph duyt v nhng
thay i thit k c chp nhn(nu c)
Design drawings, Shop drawing for construction approved by the Project Owner, Consultant and the
approved changes (if any);
Tiu chun xy dng c ap dng: BS-EN;
2/7
Standard applying to construction: BS-EN;
Ti liu ch dn k thut km theo hp ng xy dng;
Technical specifications attached in the Contract;
Bin php thi cng c duyt;
Approved Method statement;
Cc kt qu kim tra, th nghim cht lng vt liu, thit b c thc hin trong qu trnh xy dng;
Material and Equipment testing results;
Nht k thi cng, nht k gim st ca ch u t v cc vn bn khc c lin quan n i tng
nghim thu
Construction diary, supervision diary of the owner and other documents related with the objects
inspected;
Bin bn nghim thu ni b s:/ Internal inspection Minutes No.:
SSO1-HBC-C&S-IIR-L1-COL-FOR-013b
Phiu yu cu nghim thu cng vic xy dng s:/Request for Inspection of Construction work No.:
SSO1-HBC-C&S-RFI-L1-COL-FOR-013b
Quy trnh kim tra, giam sat, nghim thu c thng nht gia Ch u t v Nh thu;
Checking, supervision, inspection procedure has been agreed between Owner and Contractor;