1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Delivery of Rural Services and Infrastructure Critical to the Critical to the Millennium Development Goals Millennium Development Goals 18 th June 2004

1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

Embed Size (px)

DESCRIPTION

3 National Rural Road Development Committee Report- Findings India has about 5.89 lakh villages of various population sizes, inhabited by about 75 % of its population. Water tankers cannot reach several thousands drought prone villages leading to migration of rural population in total despair. A large number of cattle die in veterinary epidemics especially during the rainy season because timely help cannot reach them. Daily 300 pregnant women die, as they cannot reach the health centre in time from their villages. The public distribution system fails to penetrate to thousands of villages leading to malnutrition and infant morality. Perishable agricultural crops cannot reach the market in time leading to heavy loss to the farmers. Lakhs of rural children cannot reach the schools during rainy season.

Citation preview

Page 1: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

1

Pradhan Mantri Gram Sadak Yojana Rural Roads Programme

Delivery of Rural Services and InfrastructureDelivery of Rural Services and InfrastructureCritical to the Critical to the

Millennium Development GoalsMillennium Development Goals

18th June 2004

Page 2: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

2

Page 3: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

3

National Rural Road Development Committee Report-Findings

• India has about 5.89 lakh villages of various population sizes, inhabited by about 75 % of its population.

• Water tankers cannot reach several thousands drought prone villages leading to migration of rural population in total despair.

• A large number of cattle die in veterinary epidemics especially during the rainy season because timely help cannot reach them.

• Daily 300 pregnant women die, as they cannot reach the health centre in time from their villages.

• The public distribution system fails to penetrate to thousands of villages leading to malnutrition and infant morality.

• Perishable agricultural crops cannot reach the market in time leading to heavy loss to the farmers.

• Lakhs of rural children cannot reach the schools during rainy season.

Page 4: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

4

Rural Connectivity - an Effective Poverty Reduction Strategy

•Increase in agricultural production •improvement in cropping pattern•Better prices for the agricultural produce•Reduction in transport costs •Cheaper and more assured availability of essential items•Creation of new employment in off-farm sector•Better climate for setting up cottage and Agro-Industries•Increase in production of dairy products

•Better medical care •Higher attendance in schools/colleges •Better access to public services like Post Offices, Banks, Administrative offices •Increased penetration of Development Programmes•Quick response to calamities (epidemics, droughts, floods, fire, crime etc)•Access to better quality consumer items and durables

Social ImpactsEconomic benefits

Page 5: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

5

Linkage between Poverty & Unconnectivity (Poorer / more unconnected ranks lower)

10 Core States Unconnectivity rank(Road length required in Km)

Rural Poverty Rank (%) 1999-2000

Orissa 23rd - (31527) 25th – (48.01)

Bihar 25th - (33350) 24th – (44.30)

Jharkhand 21st - (21445) Included in Bihar

Assam 20th - (18987) 17th – (40.04)

Madhya Pradesh 28th - (60264) 15th – (37.06)

Chattisgarh 26th - (37556) Included in M.P

West Bengal 22nd - (23651) 14th - (31.85)

Uttar Pradesh 27th - (38725) 13th - (31.22)

Rajasthan 24th - (31947) 9th - (13.17)

Himachal Pradesh 19th - (12832) 4th - (7.94)

Page 6: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

6

Pradhan Mantri Gram Sadak YojanaProgramme launched on 25th Dec. 2000

The Objectives:• All 500+ Unconnected Habitations to be connected by

2007• For Hill, NE States, Desert and Tribal Areas 250+

unconnected habitations also to be connected.• All weather roads are to be constructed

Length of Roads to be Constructed : 3,69,000 Km

Eligible Habitations to be covered : 1.70 lakh

Page 7: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

7

PMGSY-The SchemePMGSY-The Scheme

The spirit and the objective of PMGSY is to The spirit and the objective of PMGSY is to

provide good provide good All-Weather Road Connectivity

to the to the UnconnectedUnconnected Habitations..

Page 8: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

8

Prioritisation under PMGSYPrioritisation under PMGSY

The The District Rural Roads Plan and the Core Network would be the basis of all roads selected under PMGSY.

In drawing up the list of the road works, the In drawing up the list of the road works, the following Order of Priority is followed. following Order of Priority is followed.

1.1. Providing New connectivity to Unconnected Providing New connectivity to Unconnected Habitations serving a population Habitations serving a population

2.2. Upgradation of Through Routes in the Core network Upgradation of Through Routes in the Core network 3.3. Upgradation of Link RoutesUpgradation of Link Routes

Page 9: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

9

0

10000

20000

30000

40000

50000

60000

70000

No. of Eligible Habitations

Length of Roads to be constructed (in Kms)

Number of Habitations and Length of Roads to be Covered under PMGSY

Page 10: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

10

Number of Habitations and Length of Roads to be Covered under PMGSY*

*As per Core Network Survey

Name of State  No. of Eligible

HabitationsLength of Roads to be constructed (in Kms)

Madhya Pradesh

Core States

18492 60264.12

Uttar Pradesh 24284 38725.00

Chattisgarh 12561 37556.05

Bihar 17920 33350.67

Rajasthan 11015 31947.75

Orissa 12597 31527.23

West Bengal 25288 23651.54

Jharkhand 10402 21445.00

Assam 13144 18987.00

Himachal Pradesh 3494 12832.00

Total for Core States 149197 (88%) 310286.36 (84%)

Other (Non Core) States   21483 (12%) 59044.19 (16%)

Total   170680 369330.55

Page 11: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

11

PMGSY: Investment and Funding

Total Investment Requirement •New Connectivity : Rs 76,000 crore•Upgradation : Rs. 56,000 crore

: Rs. 1,32,000 crore

Funding tied up through •Central Road Fund •External and Internal borrowings.

100% Centrally Sponsored Scheme

Page 12: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

12

Employment GenerationEmployment Generation• At present investment levels of Rs. 2000-2500 crores At present investment levels of Rs. 2000-2500 crores

per annumper annum,, 6.50 crore mandays (unskilled)6.50 crore mandays (unskilled) 0.56 crore mandays (skilled) 0.56 crore mandays (skilled)

are generated are generated per annumper annum, on road construction, on road construction

• 27-30% of cost of roadwork is the labour component27-30% of cost of roadwork is the labour component

• New farm and non-farm employment opportunities New farm and non-farm employment opportunities created as a result of the ‘farm-to-market’ all weather created as a result of the ‘farm-to-market’ all weather connectivity are major benefits.connectivity are major benefits.

Page 14: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

14

Unconnected Habitation

An Unconnected Habitation is one with a population of designated size located at a distance of at least 500 meters or more (1.5 km of path distance in case of Hills) from an All-weather road or a connected Habitation.

Page 15: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

15

ConnectivityConnectivity

The Unconnected Habitations are to be connected to nearby Habitations already connected by an All-weather road or to another existing All-weather road so that services (educational, health, marketing facilities etc.), which are not available in the unconnected Habitation, become available to the residents.

Page 16: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

16

HabitationHabitation

The unit for this Programme is a Habitation.

A Habitation is a cluster of population, living in an area, the location of which does not change over time.

(Desam, Dhanis, Tolas, Majras, hamlets etc. are commonly used terminology to describe the Habitations.)

A Revenue village / Gram Panchayat may comprise of one or several Habitations.

Page 17: 1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18

17

District Rural Road Plan and Core Network District Rural Road Plan and Core Network

The District Rural Roads Plan indicates the existing road network system in the District and identifies the proposed roads for providing connectivity to Unconnected Habitations, in an economic and efficient manner

The Core Network identifies the roads required to assure each eligible Habitation with a Basic Access to essential social and economic services.