Kedarnath redevelopment/restoration projectDRAFT MEMORANDUM OF INFORMATION PACKAGE
AN INITIATIVE BY JSW, PREPARED FOR CSR CAUSE & FUNDING OF THE PROJECT
12th January, 2018Prepared byPrepared for
11. houses for tirth purohits (Balenced 70 houses)
KEDAR VALLEY PROJECTS:1. Maun Gufa / Meditation Caves along the Tirth yatra route (5 nos.)
2. Smriti-van Memorial at foothills
3. Road widening and Construction of Rambara to Garudchatti (5.25km Long - 1.9km Existing , 3.9km New)
4. Road widening and Construction of GarudChatti to Kedartown (3.6 km)
5. Saraswati Ghats & Retaining wall (JSW funded Project )
6. Mandakini Ghats & Retaining Wall (Government Funded Project)
7. Kedarpuri Central Approach Street widening & Grading (ONGC Funded Project)
8. Shri Shankaracharya Samadhi/Virtual Museum (JSW funded Project)
9. Guest Houses (8 nos.) on Saraswati & Mandakini River-banks
10. Kedarpuri Infrastructure Project : Storm Water, Solid Waste Management, Water Supply, Electrification,
Lane Cabling & other Sustainable Solutions.
11. Balance 70 Houses for Tirth Purohits in Kedarpuri
12. Laser/Light and Sound show on mountain slopes
KEDARNATHState: UttarakhandDistrict: RudraprayagTehsil: UkhimathLocation: 217 km from Rishikesh, 14 km from GaurikundRiver: MandakiniGlacier: ChorabariHeight: 3583m/ 11755ft from sea levelMountain: Kedar Dome (6831m/22411ft High)Demographics: (Census’11)Population: 612 people (609 M, 3 F, None below 6 years)Literacy: 599 M, 2 FGovernance: Village Nagar PanchayatThe Opening and Closing Date of the shrine:November to April: Closed for 6 months;deities are brought and worshiped at UkhimathMay to October: The deities are reinstated at KedarnathTemple reopens: 1st week of May
KEDARNATH
NAINITAL
NEW DELHI
NEW DELHI
HARIDWAR
24 km
78 km
19 km 105 km
46 km
31km
56 km
302km
207 km34 km
103 km
30 km41 km
54 km
RISHIKESH
BARKOT
SRINAGAR
RUDRAPRAYAG
GAURIKUNDPHATA
KARNAPRAYAG
52 km
DEHRADUN
UKHIMATH27 km
Motorable Route from Rudraprayag to Gaurikund
Pedestrian Route from Rudraprayag to Gaurikund
Helicopter RouteMotorable Route
RAMBARA
30 km
GAURIKUND
PHATA
UKHIMATH
27 km
14 km
15 km
KEDARNATH
RUDRAPRAYAG
34 km
Background
BEFORE
AFTERAFTER
Kedarnath,one of the twelve jyotirlings, is an important hindu pilgrimage. Kedarnath temple is believed to have been constructed in the 8th century. Before disaster, kedarpuri was densly built leading to haphazard development and narrow streets near temple. The extents of kedarpuri were wide.
In June 2013, Kedarnath valley was hit by flash floods. Majority of the area was completely washed away.This lead to the formation of a natural visual access towards the temple.Loss of infrastructure and land lead to the decrease in the extents of kedarpuri.Yet the temple stands strong, giving us a chance to restore it in a better way.
Background
175m
175m
150m
500m
150m
350m
Narrow congested access Creation of a wider access and open space around the temple
AFTER DISASTER IN 2013 AFTER DISASTER IN 2013BEFORE DISASTER IN 2013 BEFORE DISASTER IN 2013
CHANGE IN TEMPLE ACCESS
21 acres of settlement 13 acres of settlement
CHANGE IN THE TOPOGRAPHY
Background
In 1860’s Before Disaster (2013) After Disaster (2013)• Temple Visible from Afar• No permenant human settlements
• Temple Visibility reduced due to dense development
•Cramped with human settlements leading to narrow street leading towards the temple
•Natural Visual access created in front of Temple
• Few buildings damaged and most buildings washed away leading to wider paths
Background
There is greater vision of development of Kedar valley with multiple interventions along with the development of Kedarpuri.
As per the need, 70 more houses in addition to the recently constructed houses for the citizens (Pandits) are required with proper allotment and master plan vision guideline.
11. Identified 70 Houses
91
PROJECT DESCRIPTION : The project will include the construction of 70 residential modules for the residents of kedarpuri who lost their houses during thefloods.Theredevelopmentofthehouses will be done in two phases, Accordingtothesufficiencyoftimeandcost allocations.Thesehouseswillbesufficientforthetotal footfall of Kedarpuri, according to the latest survey reports. The Design of the houses will be done to rejuvenate the old Architectural style of the Kedarpuri Town to its full glory .
LOCATION :The houses will be located in kedarpuri
SUGGESTED COMPONENTS :1. Rooms with attached services, pantry
and wardrobe storage2. Infrastructure and Services
APPROX. COST ESTIMATES :25 Cr
* Cost Includes 5 Years of Operation and Maintenance.
11. House for Tirth PurohitsTo Fit 70 Houses Modules in Kedarpuri
11. House for Tirth PurohitsTo Fit 70 Houses Modules in Kedarpuri
* Precedent images are for reference only
Rooms with Attached Services, Pantry abd Wardrobe StorageArea: 390 SF per Module 187 Modules are integrated in Houses to Match the requiementCost: 1969 Lacs (19.69 Cr)
Infrastructure & ServicesCost: 3 Cr
Name Location ComponentsArea (SF)
Remark
Approx. Total Cost including Transportation
(In RS)
Funding & CSR Initiative by
Kedarpuri PrecinctRooms with Attached Services, Pantry and Wardrobe Storage
390 x 187 Modules187 Modules are integrated in Houses to match the Requirement
19,69,11,000
Infrastructure and Services 3,00,00,000 5 Years of O&M 2,26,91,100
24,96,02,100 Total Approx. Cost of 70 Houses Modules & Related Development Projects
11 JSW Group
Houses for Tirth Purohits (to fit 70 Houses Modules) in Kedarpuri