1.1 S.M. Environmental Technologies (P) Ltd.
a) Plant Description S M Environmental Technologies (P) Ltd. is 8.0 MW biomass based power plant and is
located at Village Pachhar, Chhipabarod, Baran District. The plant was commissioned on 11th
March, 2010. The plant has been stopped since 15th Sept., 2010 because of heavy vibrations in
TG set and the rotor has been sent for repair. As per discussion with plant head, the plant was
recommissioned on 18th Feb., 2011. The specifications of major equipments of the power plant
are as following:
Table 1: Power Plant Details1
Parameters Units Value
Capacity of the plant MW 8.0
Boiler capacity TPH 40
Boiler Steam Pressure kg/cm2(g) 45
Boiler Steam Temperature Deg. C 420
Boiler Make Cheema
TG Set Make STC (Chinese Make)
TG Set RPM 3000
Tariff Rs./kWh 4.10
b) Type of Biomass Used
The power plant is using mustard crop residue. c) Biomass Procurement Strategy The plant is procuring the maximum biomass from single trader and has 3 nos. collection
centers to purchase the biomass from farmers and trader. The traders also bring the biomass
collection centers. 1 Source: Power plant data
Biomass Procurement
Collection Centre (3 No.) Trader
Strategy I
Strategy II
1348 1346 1350
1599
1151
475
0
200
400
600
800
1000
1200
1400
1600
1800
April May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Rs.
/MT
d) Quantity Procured & Landed Cost at Factory Gate The total biomass procured in FY 2010-11 is around 26364 MT as shown in the table below.
The average landed cost at factory gate for FY 2010-11 is around Rs. 1426/MT.
Table 2: Quantity procured & Landed Cost at Factory Gate 2
Year Months Quantity Procured
(MT)
Total Amount Paid till
Factory Gate (including
transportation) (Rs.)
2010-11
April 16507 22252064
May 1444 1943482
Jun 97 131490
Jul 0 0
Aug 8273 13225245
Sep 0 0
Oct 25 28771
Nov 18 8552
Dec 0 0
Grand Total
26364 37589604
Average Landed Cost at Factory Gate (Rs./MT) 1426
Figure 1: Seasonal Trend of Biomass Landed Cost at Factory Gate
2 Source: Power plant data
995
42,701
26,364
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
2008-09 2009-10 2010-11
MT
Year
It can be seen from the figure above that seasonal landed cost of biomass varies from Rs. 1348/MT to Rs. 1350/MT while off –season landed cost of biomass varies from Rs. 1150/MT to as high as Rs. 1600/MT. (landed cost is very low in November as biomass quantity has to be adjusted due to physical audit being carried out).
e) Trend of Landed Cost It can be seen from the table below that landed cost of biomass has gone up from Rs.
500/MT in FY 2008-09 to as high as Rs. 1426/MT in FY 2010-11. The % increase in landed cost in
FY 2010-11 with respect to previous year is around 27%.
Table 3: Trend of Landed Cost at Factory Gate3
Figure 2: Biomass Quantity Procured
3 Source: Power plant data
Quantity Procured
Year
Total Quantity Procured
(MT )
Total Amount Paid (Rs.)
Average Landed Cost
at Factory Gate
(Rs./MT)
% Increase in Price with respect to Previous Year (%)
2,008 995 4,97,331 500
2,009 42,701 4,79,74,339 1,123 125%
2,010 26,364 3,75,89,604 1,426 27%
500
1,123
1,426
400
600
800
1,000
1,200
1,400
1,600
2008-09 2009-10 2010-11
Rs/
MT
Figure 3: Trend of Landed Cost at factory Gate
1.2 Surya Chambal Power Ltd.
a) Plant Description Surya Chambal Power Ltd. plant is of 7.5 MW capacity and is located in Kota district and the
plant was commissioned in April 2006. The specifications of major equipments of the power
plant are as following:
Table 4: Power Plant Details4
4 Source: Power plant data
Parameters Units Value
Capacity of the plant MW 7.5
Boiler capacity TPH 38
Boiler Steam Pressure kg/cm2(g) 63
Boiler Steam Temperature Deg. C 450
Boiler Make Sitson
TG Set Make Triveni
TG Set RPM 7500/1500
Gearbox Make Triveni
Tariff Rs./kWh 4.93
b) Type of Biomass Used The power plant is using mustard crop residue and soyabean crop residue. c) Biomass Procurement Strategy
The plant is procuring the biomass from both traders and farmers at the factory gate. The power
is having one collection center at Khatoli started in 2010 and is also procuring biomass at the
collection center. The maximum quantity of fuel is being procured from farmers and traders at
the factory gate.
Biomass Procurement
Collection Centre (1 No.) Trader
Strategy I
Strategy II
d) Quantity Procured & Landed Cost at Factory Gate The table below shows the biomass quantity procured and the average landed cost of
biomass for FY 2010-11. The average landed cost at factory gate is around Rs. 1902/MT.
Table 5: Quantity procured and landed cost of biomass for FY 2010-115
Months Biomass
Procured (MT)
Total Amount Paid till Factory Gate (including charges of
Lease, Security, Transportation, Dozzer Expenses, Travelling
Expenses, Tarpaulin Expenses etc.) (Rs.)
April 15,529.1 2,33,73,258
May 4,733.9 75,33,549
June 25.0 1,58,405
July 46.2 2,90,655
August 71.8 15,93,460
September 116.7 14,10,742
October 8,785.2 1,72,39,126
November 3,713.3 82,64,799
December 1,165.3 21,58,128
January 1,158.3 20,84,859
February 3,048.8 69,00,291
March 3,495.1 86,44,129
Grand Total 41,889 7,96,51,401
Average Landed Cost at Factory Gate (Rs./MT)
1,902
5 Source: Power plant data
1,505 1,591
1,962
2,226
1,852 1,800
2,263 2,473
-
500
1,000
1,500
2,000
2,500
3,000
Rs.
/MT
Figure 4: Trend of Seasonal Landed Cost of Biomass at Factory Gate It is clear from the above table that landed cost of biomass at factory gate is varying from Rs.
1505 MT to Rs. 2473 in various months of FY 2010-11 (note that landed cost for months of June, July,
August and September has not been considered as purchase quantum has been very low in these
months but high transportation cost from collection center to power plant has made overall cost of
biomass purchase very high in these months).
e) Trend of Landed Cost of Biomass at Factory Gate The table below shows the total biomass quantity procured for last 3 financial years and
average landed cost of biomass at factory gate. It can be seen from the table below that average
landed cost of biomass has increased from Rs. 1255/MT in FY 2008-09 to around Rs. 1902/MT in
FY 2010-11.
Table 6: Quantity procured for last 3 years and average landed cost of biomass6
Quantity Procured & Average Landed Cost at Factory Gate
Year
Total Quantity Procured
(MT )
Total Amount Paid (Rs.)
Average Landed Cost
at Factory Gate
(Rs./MT)
% Change in Average
Landed Cost with
respect to Previous Year (%)
2,008 77,178 9,68,60,872 1255
2,009 62,832 8,83,25,296 1406 12%
2,010 41,889 7,96,51,401 1902 35%
6 Source: Power plant data
77,178
62,832
41,889
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
2,008 2,009 2,010
MT
1,255
1,406
1,902
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700
1,800
1,900
2,000
2,008 2,009 2,010
Rs.
/ M
T
Figure 5: Biomass Quantity Procured
Figure 6: Trend of Landed Cost of Biomass
1.3 Kalpataru Power Transmission Ltd. (Uniara)
a) Plant description Kalpataru Power Transmission Ltd. (Uniara) plant 8.0 MW capacity power plant located in
Uniara district and plant was commissioned on 10th November, 2006. The specifications of
major equipments of the power plant are as following:
Table 7: Power Plant Details7
b) Type of biomass used
The plant is using mustard residue as fuel. c) Biomass procurement strategy
The power plant is procuring biomass both at factory gate and at 8 Nos. collection centers.
The plant has purchased 4 Nos. trucks which are used to transport material from collection
7 Source: Power plant data
Parameters Units Value
Capacity of the plant MW 8.0
Boiler capacity TPH 38
Boiler Steam Pressure kg/cm2(g) 42
Boiler Steam Temperature Deg. C 410
Boiler Make Sitson
TG Set Make Hangzhou (Chinese Make)
TG Set RPM 3000/3000
Tariff Rs./kWh 4.93
Biomass Procurement
8 Nos. Collection Centre Trader/Farmers
Strategy I
Strategy II
center to the power plant. The maximum quantity of biomass is being procured from the
collection centers.
d) Quantity procured & landed cost of biomass at factory gate The table below shows that average landed cost of biomass at factory gate in FY 2010-11 is
around Rs. 1850/MT. Table 8: Biomass Quantity Procured & Average Landed Cost of Biomass at factory Gate8
Year Months Quantity procured
(MT)
Amount paid (Rs)
2010-11
April 20123 30152534
May 9387 16806615
June 4256 8376098
July 1297 2538642
August 0 0
September 0 0
October 1986 3750260
November 1254 2659229
December 3016 5832457
Sub total 41319 70115836
Other expenses (transportation cost from Collection Centers to Power Plant) 6320681
Grand Total 41319 76436517
Average Landed Cost at Factory Gate (Rs./MT) 1850
8 Source: Power plant data
1498
1790
1968 19571889
2121
1934
0
500
1000
1500
2000
2500
Rs.
/MT
Figure 7: Seasonal Trend of Landed Cost of Biomass
It is clear from the above figure that in season, price is varying from Rs. 1498/MT to Rs. 1790 in
season and from Rs. 1889/MT to Rs. 2121 /MT in off –season.
e) Trend of average landed cost of biomass at factory gate It can be seen from the table below that % increase in average landed cost of biomass at
factory gate over previous year is around 3.07% in FY 2009-10 and around 54.9% in FY 2010-11.
Table 9: Biomass Quantity Procured & Average Landed Cost of Biomass at factory Gate9
Year
Quantity procured
(MT) Amount paid
(Rs)
Average landed cost at factory
gate (Rs/MT)
% Increase in Landed Cost over Last Year
(%)
2008-09 140475 162772125 1159
2009-10 88352 105522067 1194 3.07%
2010-11 41319 76436517 1850 54.89%
Figure 8: Biomass Quantity Procured
9 Source: Power plant data
140475
88352
41319
0
20000
40000
60000
80000
100000
120000
140000
160000
2008 2009 2010
MT
FY
Figure 9: Trend of landed cost of biomass
1.4 Kalpataru Power Transmission Ltd. (Ganganagar)
a) Plant description Kalpataru Power Transmission Ltd. (Ganganagar) plant is 7.8 MW capacity power plant
located in Sri Ganganagar district and was commissioned in August 2003. The
specifications of major equipments of the power plant are as following:
Table 10: Power Plant Details10
b) Types of biomass used The plant is using mustard residue and cotton crop residue.
10
Source: Power plant data
1159
1194
1850
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2008 2009 2010
Rs/
MT
FY
Parameters Units Value
Capacity of the plant MW 7.8
Boiler capacity TPH 35
Boiler Steam Pressure kg/cm2(g) 66
Boiler Steam Temperature Deg. C 490
Boiler Make Thermax
TG Set Make Shin Nippon
TG Set RPM 9696/1500
Gearbox Make Shin Nippon
Tariff Rs./kWh 4.94
c) Biomass procurement strategy
The power plant is procuring biomass both through around 19 Nos. collection centers and
factory gate. The maximum quantity of biomass is being procured at factory gate.
d) Quantity of biomass procured & landed cost at factory gate The table below shows that average landed cost of biomass at factory gate will be around
Rs. 2132/MT.
Table 11: Biomass procured11
Month Quantity
procured (MT) Total Amount
Paid (Rs.)
January 0 0
February 0 0
March 0 0
April 50735 121181672
May 14224 31106765
June 778 1574485
July 202 377699
August 365 671966
September 967 1720160
October 13046 21344803
November 10656 12076683
December 2681 2768736
Sub total 93653 192822969
Other expenses (transportation expenses from Collection Centers to Power Plant)
6832215
Total 93653 199655184
Average landed cost (Rs./MT) 2132
11
Source: Power plant data
Biomass Procurement
19 Nos. Collection Centre Trader/Farmers
Strategy I
Strategy II
Figure 10: Seasonal Trend of landed Cost of Biomass at Factory Gate It can be seen from above figure that the landed cost at factory gate is varying from as high as
Rs. 2389/MT to as low as Rs. 1033/MT. The cost of biomass is very low in the months of
December and November due to the procurement of cotton sticks in these months.
23892187
20241869 1843 1779
1636
1133 1033
0
500
1000
1500
2000
2500
3000R
s./M
T
80489
98493
93653
0
20000
40000
60000
80000
100000
120000
2008-09 2009-10 2010-11
MT
e) Trend of landed cost of biomass at factory gate It can be seen from the table below that % increase in average landed cost over previous
year in FY 2009-10 is 4.93% and 58.41% in FY 2010-11.
Table 12: Trend of Average Landed Cost of Biomass12
Year
Biomass procured
(MT) Amount paid (Rs)
Average biomass
landed cost (Rs/MT)
% Increase in Price
over Last Year (%)
2008-09 80489 103237617 1283
2009-10 98493 132553346 1346 4.93%
2010-11 93653 199655184 2132 58.41%
Figure 11: Biomass Quantity Procured
12
Source: Power plant data
1283
1346
2132
0
500
1000
1500
2000
2500
2008-09 2009-10 2010-11
Rs.
/ M
T
Figure 12: Trend of Landed Cost of Biomass at Factory Gate
1.5 Sambhav Energy Ltd.
a) Plant Description
Sambhav Energy Ltd. is 20 MW biomass based power plant located in Sirohi District and was
commissioned in 18th Feb., 2010. The plant has been stopped since 30th November, 2010
because of fuel problem. The specifications of major equipments of the power plant are as
following:
Table 13: Power Plant Details13
13
Source: Power plant data
Parameters Units Value
Capacity of the plant MW 20
Boiler capacity TPH 90
Boiler Steam Pressure kg/cm2(g) 86
Boiler Steam Temperature Deg. C 515
Boiler Make Walchand Nagar
TG Set Make Quing Jiehang (Chinese Make)
TG Set RPM 3000/3000
Tariff Rs./kWh 4.49
b) Type of Biomass Used The various biomasses used by power plant are Arendi, cotton sticks, wood chips,
mustard husk and Juliflora. In addition to biomass, the power plant is also using the coal
which is being procured from the traders.
c) Biomass Procurement Strategy Biomass is only procured through local traders and farmers at factory gate. Power plant also
helps the farmers in uprooting of Juliflora. d) Quantity Procured & Landed Cost at Factory Gate The table below shows the total biomass procured in FY 2010-11 was around 15085 MT and
the average landed cost of biomass at the factory gate was around Rs. 2358/MT. In addition to
biomass, the plant also used around 3000 MT of imported coal at an average rate of around Rs.
3300/MT.
Table 14: Biomass procured & Average Landed Cost of Biomass at factory Gate14
Year Months
Biomass Quantity Procured
(MT)
Total Amount
Paid (Rs.)
2010-11
April 3165 7793315
May 1214 2834631
June 811 1886479
July 697 1733661
August 58 144706
September 464 1024304
October 6915 16013747
November 1698 3992350
December 64 153366
Grand Total
15085 35576561
Average Landed Cost at Factory Gate (Rs./MT)
2358
14
Source: Power plant data
Biomass Procurement
Trader
2462
2336 2326
2488 2497
2207
23162351
2396
2050
2100
2150
2200
2250
2300
2350
2400
2450
2500
2550
Rs.
/MT
Figure 13: Trend of Seasonal landed Cost of Biomass at Factory Gate
From the figure above, it is clear that the landed cost of biomass is varying from as low as Rs.
2207/MT to as high as Rs. 2497/MT in various months of the year. The cost was highest in
month of August as the proportion of procurement of firewood (weighted average cost of
procurement of firewood is Rs. 2500/MT in month of August) was highest in month of August
while the landed cost was lowest in month of September as proportion of procurement was in
the month of September (weighted average cost of wood chips in the month of September is Rs.
2082/MT in month of September).
13,603
15,085
12,500
13,000
13,500
14,000
14,500
15,000
15,500
2009-10 2010-11
MT
Year
e) Trend of Landed Cost of Biomass at Factory Gate The table below shows the trend of average landed cost of biomass at the factory gate. The
landed cost of biomass in FY 2009-10 and FY 2010-11 was around Rs. 2282/MT and Rs. 2358/MT
respectively. There is annual escalation of around 3.0% in the landed cost of biomass from FY
2009-10 to FY 2010-11. In FY 2009-10, around 1000 MT of imported coal was procured at an
average cost of around Rs. 3000/MT.
Table 15: Trend of Average Landed Cost of Biomass at factory Gate15
Quantity Procured
Year
Total Quantity Procured
(MT )
Total Amount Paid (Rs.)
Average Landed Cost
at Factory Gate
(Rs./MT)
% Increase in Price with respect to Previous Year (%)
2,009 13,603 31040176 2,282
2,010 15,085 35576561 2,358 3.33%
Figure 14: Biomass procured
15
Source: Power plant data
2,282
2,358
2,240
2,260
2,280
2,300
2,320
2,340
2,360
2,380
2009-10 2010-11
Rs.
/MT
Year
Figure 15: Trend of landed cost of biomass at factory gate
1.6 Sathyam Power Pvt. Ltd.
a) Plant Description
Sathyam Power Pvt. Ltd. is 10 MW biomass based power plant located at Nagaur District and
the plant is expected to be commissioned by March, 2011. The specifications of major
equipments of the power plant are as following:
Table 16: Power Plant Details16
b) Type of Biomass Used
The plant is proposing to use Mustard husk, Jeera residue, Sindhisuva, Cotton Residue and Asalyia as fuel for the power plant.
16
Source: Power plant data
Parameters Units Value
Capacity of the plant MW 10
Boiler capacity TPH 50
Boiler Steam Pressure kg/cm2(g) 67
Boiler Steam Temperature Deg. C 465
Boiler Make Walchand Nagar
TG Set Make Siemens
Tariff Rs./kWh 4.59
c) Biomass Procurement Strategy
The plant is having no collection center as on date and they have procured through farmers
at the factory gate. d) Quantity of Biomass Procured and Average Landed Cost at Factory Gate
Table below shows that average landed cost of biomass at factory gate was around Rs. 1944/MT.
Table 17: Biomass Quantity Procured and Average Landed Cost at Factory Gate17
Months Fuel Procured
(MT)
Total Amount Paid till Factory Gate
(Rs.)
April 10,349.9 1,91,55,847
May 4,724.1 1,01,49,545
June 0.0 0
July 0.0 0
August 0.0 0
September 0.0 0
October 0.0 0
November 0.0 0
December 0.0 0
January 1.2 1,612
February 0.0 0
March 0.0 0
Grand Total 15,075 2,93,07,004
Average Landed Cost at Factory Gate (Rs./MT)
1,944
17
Source: Power plant data
Biomass Procurement
Farmers at Factory Gate
1851
2148
1300
0
500
1000
1500
2000
2500
Rs.
/MT
Figure 16: Seasonal Trend of Landed Cost of Biomass From the above figure, it is clear that landed cost of biomass at factory gate is varying between
Rs. 1343/Mt to Rs. 2148/MT. The cost of procurement is lowest in month of January due to
procurement of cotton residue at an average rate of around Rs. 1300/MT.
2,026
15,075
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
2,009 2,010
MT
e) Trend of Average Landed Cost of Biomass at Factory Gate
It can be seen from the table below that there is increase of around 16% in average landed
cost of biomass at factory gate from FY 2009-10 to FY 2010-11.
Table 18: Trend of Average Landed Cost at Factory Gate18
Quantity Procured & Average Landed Cost at Factory Gate
Year Total Quantity
Procured (MT )
Total Amount Paid (Rs.)
Average Landed Cost at Factory
Gate (Rs./MT)
% Change in Average Landed
Cost with respect to Previous Year
(%)
2,009 2,026 34,10,274 1683
2,010 15,075 2,93,07,004 1,944 16%
Figure 17: Biomass Quantity Procured
18
Source: Power plant data
1683
1,944
1550
1600
1650
1700
1750
1800
1850
1900
1950
2000
2,009 2,010
Rs.
/MT
Figure 18: Trend of Average Landed Cost of Biomass at Factory Gate
1.7 Transtech Green Power Pvt. Ltd.
a) Plant Description
Transtech Green Power Pvt. Ltd. is 12 MW biomass based power plant located at Sanchor
Tehsil, Jalore District. The plant was commissioned on 28th July, 2010. The specifications of
major equipments of the power plant are as following:
Table 19: Power Plant Details19
b) Type of Biomass Used
The power plant is using Juliflora, groundnut shell and saw dust. Plant has also procured the
coal from traders and RSSM.
19
Source: Power plant data
Parameters Units Value
Capacity of the plant MW 12
Boiler capacity TPH 60
Boiler Steam Pressure kg/cm2(g) 66
Boiler Steam Temperature Deg. C 485
Boiler Make Thermodyne
TG Set Make Triveni
Tariff Rs./kWh 4.52
c) Biomass Procurement Strategy
The power plant is having around 7 Nos. of collection centers. The power plant is also having
Forest Land on lease for uprooting of Juliflora for which they pay royalty of Rs. 730/MT to the
forest department. The power plant is also procuring biomass both at factory gate and
collection center from local farmers and franchise traders.
d) Quantity Procured & Landed Cost at Factory Gate
The biomass procured in FY 2010-11 is around 29, 271 MT and average landed cost at factory gate is around Rs. 2373/MT.
Table 20: Biomass quantity procured and average landed cost at factory gate20
FY
Month Total Biomass
Procured (MT)
Total Amount
Paid (Rs.)
2010-11
Apr-10 7,078 1,47,64,315
May-10 5,642 1,33,20,046
Jun-10 2,504 59,48,409
Jul-10 3,497 81,16,311
Aug-10 2,064 47,69,287
Sep-10 1,274 29,72,946
Oct-10 1,106 29,12,588
Nov-10 2,779 77,05,939
Dec-10 3,326 89,48,610
Grand Total 29,271 6,94,58,452
Average Landed Cost at Factory Gate (Rs./MT) 2,373
In addition to the biomass, power plant has procured around 3884 MT of coal at an average
rate of around Rs. 2506/MT.
20
Source: Power plant data
Biomass Procurement
Collection Centre (7 Nos.) Trader
Strategy I
Strategy II
2,086
2,361 2,375 2,321 2,311 2,334
2,634 2,773 2,690
-
500
1,000
1,500
2,000
2,500
3,000
Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10
Rs.
/MT
Figure 19: Seasonal Trend of Landed Cost of Biomass It can be seen from the figure above that landed cost of biomass at factory gate is varying
from Rs. 2086 /MT to Rs. 2773/MT in various months.
e) Trend of Landed Cost of Biomass at Factory Gate
The power plant has started the biomass procurement from FY 2009-10. From the table
given below, it is clear that there is around 23% increase in the landed cost of biomass from FY
2009-10 to FY 2010-11.
Table 21: Trend of Landed Cost of Biomass at Factory Gate21
Year Total
procurement (MT)
Landed Cost of Biomass at factory
Gate (Rs./MT)
% Change with Respect to Previous
Year
2009-10 4,987 1,927
2010-11 29,271 2,373 23%
21
Source: Power plant data
4,987
29,271
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
2009-10 2010-11
MT
1,927
2,373
1,500
1,600
1,700
1,800
1,900
2,000
2,100
2,200
2,300
2,400
2,500
2009-10 2010-11
Rs.
/MT
Figure 20: Biomass quantity procured
Figure 21: Trend of landed cost of biomass
1.8 Amrit Environmental Technologies Pvt. Ltd.
a) Plant Description
Amrit Environmental Technologies Pvt. Ltd. is 8 MW power plant located at Kotputli Tehsil,
Jaipur District. The plant was commissioned on 1st October, 2006. Due to inability of plant to
procure the fuel due to high fuel prices, the plant is under shutdown since 23rd Feb, 2011. The
specifications of major equipments of the power plant are as following:
Table 22: Power Plant Details22
b) Biomass Used The power plant is using mustard husk, wood chips, sarkanda, rice husk and cotton sticks
as fuel.
c) Biomass Procurement Strategy The power plant is having no collection center and is procuring biomass directly from traders
and farmers at the factory gate. The maximum quantity of biomass is being procured through
traders.
d) Quantity Procured & Average Landed Cost of Biomass at Factory Gate
From the table below, it is clear that the power plant has procured around 37900 MT of
biomass in FY 2010-11 and the average landed cost of biomass at factory gate was around Rs.
2629/MT.
22
Source: Power plant data
Parameters Units Value
Capacity of the plant MW 8
Boiler capacity TPH 40
Boiler Steam Pressure kg/cm2(g) 64
Boiler Steam Temperature Deg. C 485
Boiler Make Cheema
TG Set Make Triveni
TG Set RPM 7200/1500
Tariff Rs./kWh 4.94
2415 24162290 2405 2462
30502881
2175
27062860
0
500
1000
1500
2000
2500
3000
3500
Rs.
./M
T
Table 23: Biomass procured and average landed cost of biomass in FY 2010-1123
Months
Quantity of Biomass
Procured (MT) Total Amount
Paid (Rs.)
April 3448 8329017
May 6182 14933595
June 561 1284765
July 4905 11799752
August 588 1447837
September 6432 19617448
October 4430 12763663
November 3392 7375932
December 4519 12229473
January 3474 9938707
Grand Total 37932 99720189
Average Landed Cost at Factory Gate (Rs./MT) 2629
Figure 22: Seasonal Trend of Landed Cost of Biomass
It is clear from the above figure that landed cost of biomass is varying from Rs. 2175/MT to as
high as Rs. 3050/MT in various months of FY 2010-11.
23
Source: Power plant data
61,400
33,585
37,932
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2008-09 2009-10 2010-11
MT
e) Trend of Landed Cost of Biomass at Factory Gate Table 24: Biomass procured24
Year
Total Biomass
Procurement (MT)
Total Amount
Paid (Rs.)
Landed Cost of Biomass at factory
Gate (Rs./MT)
% Change with
Respect to Previous
Year
2008-09 61,400 12,47,80,100 2,032
2009-10 33,585 7,28,33,760 2,169 7%
2010-11 37,932 9,97,20,189 2,629 21%
Figure 23: Biomass Quantity Procured
24
Source: Power plant data
20322169
2629
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
2008-09 2009-10 2010-11
Rs.
/ M
T
Figure 24: Trend of Landed Cost at Factory Gate