Bioenergy AustraliaBiogas Workshop

Biogass Renewables – Australia’s AD Development Company Seeking Australian Industry Partners

July 2016

Joseph Oliver, General Manager

Page 2: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

About Biogass Renewables

¤ Biogass Renewables Pty Ltd (Biogass) (www.biogass.com.au) is an Australian private company specializing in the design, construction, commissioning and long-term support of anaerobic digestion (AD) plants and associated energy recovery projects.

¤ Biogass’s focus is on stable, mature-technology, in-vessel biological processes converting organic materials and wastes into energy and biofertiliser.

¤ Biogass has the capacity to build turnkey solutions for the delivery of electricity, heat, biogas, bio methane (to mains natural gas standards), and compressed natural gas.

Page 3: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Anaerobic Digestion Process

Organic Waste

Page 4: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Typical Plant Layout

Page 5: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Alternative Outputs Biogass AD plants can be configured to produce:

¤ power (biogas generator)

¤ heat (biogas boiler, CHP, direct biogas – 65% methane)

¤ natural gas (97% methane)

¤ Compressed Natural Gas (drop-in fuel – legacy generators or transport fuel)

¤ or a combination of all of these.

Page 6: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Alternative Outputs (Example)

50,000 tonnes per annum of food waste at 150m3/tonne of biogas has the capacity to produce a mix of:

1. Biogas to power a 600KW genset 24/7 (as well as 660KW of thermal output) to power a large commercial site, plus

2. 324m3/hour of Natural Gas (CH4) for compression to CNGwhich could displace the equivalent of $3M/year in diesel if used in static engines or a transport fleet.

Page 7: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

AD Golden Triangle

AD

Take Organic Waste or

Produce Waste

Use or Dispose of BiofertilserDigestate

Use or Sell Power, Heat

Or Gas

• Food manufacturers • Abattoirs/Hatcheries• Supermarkets• Cold Storage• Composters• Wastewater Treatment• Municipal FOGO• Breweries• Agriculture• Food/Agri Precincts

Page 8: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Industry Partnership Opportunity

Equity/Debt

Owns

Develops, Operates and Maintains

Biogass Projects Waste and Energy Agreements

Page 9: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Case Study: Snapshot

¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products.

¤ Biogass Renewables is the project developer.

¤ Commissioned 2015.

¤ Designed to produce over 2MWe capacity electricity –1.7MWe to the grid.

¤ Sub – 4 year payback on capital (before grants etc).

Page 10: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Co-Funding and Finance

¤ Biogass Renewables coordinated: ¤ WA State Government grant funding ¤ Australian Government Clean Technology Investment

Program and ¤ Finance through the Clean Energy Finance Corporation

(CEFC).

Page 11: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Jandakot Bioenergy Project

Page 12: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Accepting Liquid Commercial Organic Waste

Page 13: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Accepting Solid Commercial Organic Waste

Page 14: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Accepting Commercial Packaged Waste

Page 15: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Feedstock Pre-Processor and Depackager Standing By

Page 16: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Feedstock Pre-Processing

Page 17: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Processed AD Feedstock

Page 18: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Page 19: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Clean Dry Recyclables Fetching Premium Prices

Page 20: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Reception Hall and Tank Array from Digesters

Page 21: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Feed and Digestate Tanks

Page 22: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Digesters Use Parasitic Heat for Warming

Page 23: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Digesters, Gas Train and First 1.2MW Genset

Page 24: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Vacant Location Ready for Second 1.2MW Genset

Page 25: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Page 26: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Page 27: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

Biogass Proprietary AD Plant Control System

Page 28: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Timeline for the Renewable Project from Concept

2011 Richgro European trip

Oct 2015 Grid connection for export

Sept 2014 Grid connection for Import

Nov 2014 Construction Complete

Mar 2015 Site Operational

2011 20152012 2013 2014 2016

Sept 2013 construction start

Jan 2015 Started to take waste and seeded the process

Funding Applied for

Environmental approval

Environmental submission to the DER

3rd Party Quotes for AD solutions

Page 29: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Project Numbers Based on 35,000TPA

¤ Total capital spend $8Million

¤ Gate fees average $70/tonne - $2,450,000/annum

¤ Electricity saving of $600,000/annum

¤ Electricity export and LGC’s to total $0.11c/KW -$800,000

Page 30: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Biogass Capability

¤ Biogass can deliver AD projects under the following contractual models:¤ Turnkey engineer, procure and construct (EPC)¤ Build, own, operate, transfer (BOOT)¤ Build Own Operate Manage (BOOM) under a joint

venture or special purpose vehicle arrangement.¤ Full operation and maintenance (O&M) support

Page 31: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Feedstock Testing

¤ Biogass Renewables maintains an organic laboratory for the testing and pre-testing of feedstocks to determine biomethane potential to assits in feedstock selection, blending for improved biogas yield and for sizing and scaling projects based on actual feedstock samples.

Page 32: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Inviting Conversations

Equity/Debt

Owns

Develops, Operates and Maintains

Biogass Projects Waste and Energy Agreements

Page 33: 160724 Biogass Bioenergy Australia Workshop · Case Study: Snapshot ¤ 35,000- 50,000 tonne per annum foodwaste anaerobic digestion plant at Richgro Garden Products. ¤ Biogass Renewables

Contact

¤ Hamish Jolly – Managing Director¤ [email protected]¤ 0417 849 199

¤ Joe Oliver– General Manager¤ [email protected]¤ 0412 378 018

¤ www.biogass.com.au

¤ Biogass Renewables Pty Ltd, 203 Acourt Road Jandakot WA