    TM5-684/NAVFACMO-200/AFJMAN 32-1082

    REPRODUCTION AUTHORIZATION/RESTRICTIONS

    This manual has been prepared by and for the Government and,except to the extent indicated below, is public property and not sub-

    ject to copyright.

    Copyrighted material included in the manual has been used with theknowledge and permission of the proprietors and is acknowledged as

    such at point of use. Anyone wishing to make further use of anycopyrighted material, by itself and apart from this text, should seeknecessary permission directly from the proprietors.

    Reprints or republication of this manual should include a credit sub-stantially as follows: J oint Departments of the Army, the Navy andthe Air Force, TM 5-864/NAVFAC MO-200/AFJ MAN32-1082.

    If the reprint or republication includes copyrighted material, the

    credit should also state: Anyone wishing to make further use ofcopyrighted material, by itself and apart from this text, should seeknecessary permission directly from the proprietor.

    Tables 13-l and 16-1 are reprinted from table 2 of IEEE Std 18-1992and table 11.1 of IEEE Std 519-1992 respectively.

    Copyright 1993 by the Institute of Electrical and Electronics Engi-neers, Inc. The IEEE disclaims any responsibility or liability resulting

    from the placement and use in this publication. Information is re-printed with the permission of the IEEE.

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    3/201

    TM 5-684/NAVFACMO-200/AFJMAN32-1082

    HEADQUARTERS

    TECHNICAL MANUAL No. 5-684

    DEPARTMENTS OF THE ARMY,

    NAVYPUBLICATION NAVFAC MO-200 THE NAVY , AND THE AIR FORCE

    AIR FORCEJ OINT MANUAL No. AFJ MAN 32-1082 WASHINGTON , D.C.29 N ovember 1996

    ELECTRICAL EXTERIOR FACILITIES

    CHAPTER 1. INTRODUCTION

    SECTION I-PRIMARY CONSIDERATIONSPurpose and scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Application of codes and publications. .....................................................

    Standardsofmaintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Maintenance responsibilities. .............................................................

    Maintenance records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Priority and scheduling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION II-SAFETYMinimizinghazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Qualification of electric workers. ..........................................................

    Certification of electric workers ...........................................................

    Publicsafety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Personnelsafety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Live-linemaintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION III-AVOIDING PROBLEMSOperating conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Detecting potential trouble ...............................................................Electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 2. INSPECTION AND TESTS

    SECTION I-PERFORMANCEDetermining equipment condition .........................................................

    Reasons for inspections and tests .........................................................

    Associated test guidance and records. .....................................................

    SECTION I I -REQUIREMENTSElectric workers, instruments, and reportsFrequencyofinspection.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 3. TRANSMISSION AND DISTRIBUTION SUBSTATIONS

    SECTION I-GOVERNING CONSIDERATIONSTypeofsubstationscovered . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Electrical system relationships. ...........................................................Substation safetyconcern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Substation security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Periodic inspections of substations ........................................................

    Visual inspections of substations ..........................................................

    Infrared inspections of substations ........................................................

    SECTION II-STRUCTURE MAINTENANCEImportanceofmaintenance..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Galvanized steelstructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Painted steel structures.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Aluminumstructures.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Wood structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Concrete for structure foundations ........................................................

    Structure connections and joints ..........................................................

    SECTION III-SUBSTATION YARDS

    Provisionofyards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Fences for yards.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Warningsignsatyards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Substationyards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Paragraph Page

    l - l

    l-2

    l-3

    l-4

    l-5

    l-6

    l-7

    l - l

    l - l

    l - l

    l - l

    l - l

    l-2

    l-2

    l-8

    l-9

    l-10

    l-11

    1-12

    1-13

    l-3

    l-3

    l-3

    l-3

    l-3

    l-3

    1-14 l-4

    1-15 l-4

    1-16 l-4

    2-l 2- l

    2-2 2- l

    2-3 2- l

    2-4 2-2

    2-5 2-2

    3-l 3-l

    3-2 3-l

    3-3 3- l

    3-4 3- l

    3-5 3- l

    3-6 3- l

    3-7 3- l

    3-8 3- 2

    3-9 3-2

    3-10 3-3

    3-11 3-3

    3-12 3-3

    3-13 3-3

    3-14 3-3

    3-15 3-3

    3-16 3-3

    3-17 3-3

    3-18 3-3

    This manual supersedes TM 5-684/NAVF AC MO-200/AFM 91-3, dated 20 April 1979

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    4/201

    TM5-684/NAVFAC MO-200/AFJMAN 32-1082

    SECTION IV-INSULATORSFunction ofinsulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Testsofinsulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Inspection and repair of insulators........................................................Cleaningofinsulators . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . .

    SECTION V-BUS STRUCTURESDefinitionofbus structures . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . .

    Maintenance of bus structures . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . ..Cleaningofbus structures . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . .

    Testingofbus structures . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . .

    SECTION VI-INSTRUMENT TRANSFORMERSDefinitions of instrument transformers....................................................Short-circuiting dangers. .................................................................Maintenanceofinstrumenttransformers.. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . .

    Tests of instrument transformers . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .

    SECTION VII-BUSHINGSDefinition ofbushing . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . .

    Type of bushings covered . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . .

    Maintenanceofbushings . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . .

    Bushingpowerfactortests . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . .

    Bushing insulation resistance test.........................................................

    CHAPTER 4. OVERHEAD DISTRIBUTION

    SECTION I-ASSOCIATED OVERHEAD DISTRIBUTION GUIDANCERelevant overhead distribution guidance...................................................General construction guidance . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. .

    SECTION II-DEFINING VOLTAGE NOMENCLATUREVoltage terminology . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . .Voltagelevelclassification . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . .

    Voltagedeliveryusage . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . .

    Voltage origination point ..................................................................Voltage terminology usage in this manual .................................................

    SECTION III-TYPES OF MAINTENANCE

    Componentlinemaintenance . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. .Other types of line maintenance . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .

    SECTION IV-WOOD POLESL ifespanofwoodpoles . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . .

    Supplementary data on wood poles. .......................................................

    Wood pole record keeping and inspections .................................................Wood pole maintenance crew instructions..................................................Wood pole spot inspection procedures......................................................

    Wood pole-by-pole inspection procedure. ...................................................Determination of wood pole adequacy .....................................................Woodpolereplacement . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . .

    Woodpolereinforcement . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . .

    SECTION V-CROSSARMS, BRACES, AND PLATFORMS

    Polecrossarms . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . .Pole braces . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . .

    Pole platforms . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . ..

    SECTION VI-MAINTENANCE WOOD PRESERVATION

    Initialwoodtreatment . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . .

    In-place wood treatment above ground ....................................................

    Wood pole treatment at or below the ground line. ..........................................

    SECTION VII-METAL POLES

    Metalpoleusage . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .

    Distribution line metal poles..............................................................

    Transmission line metal towers ...........................................................

    Pole-linemetalhardware. . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . .

    Paintingofmetalpoles . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . .

    Para gr aph Page

    3-19

    3-203-21

    3-22

    3-4

    3-4

    3-4

    3-5

    3-23 3-7

    3-24 3-73-25 3-7

    3-26 3-7

    3-27 3-7

    3-28 3-7

    3-29 3-7

    3-30 3-8

    3-31 3-8

    3-32 3-8

    3-33 3-8

    3-34 3-10

    3-35 3-12

    4-1

    4-2

    4- 34- 4

    4-54- 64-7

    4- 84- 9

    4-44-4

    4-10 4-44-11 4-4

    4-12 4-4

    4-13 4-6

    4-14 4-6

    4-15 4-7

    4-16 4-9

    4-17 4-10

    4-18 4-10

    4-19 4-114-20 4-12

    4-2 1 4-12

    4-22 4-13

    4-23 4-13

    4-24 4-13

    4-25 4-14

    4-26 4-15

    4-27 4-15

    4-28 4-15

    4-29 4-15

    ii

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    5/201

    TM 5-684/NAVFACMO-200/AFJMAN 32-1082

    Paragraph

    SECTION VIII-CONCRETE POLES

    Concrete pole overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Concrete pole foundations ................................................................

    SECTION IX-OVERHEAD OPEN WIRE CONDUCTORSOverhead conductor construction.

    .........................................................

    Overheadconductormaterial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overhead conductor covering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overheadconductorsag . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overheadconductordamage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overheadconductorrepairs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION X-OVERHEAD CABLEOverhead cable construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overhead cable repair requirements. ......................................................

    SECTION XI-CONDUCTOR CONNECTIONSOverhead line conductor requirements.

    ....................................................

    Overhead line conductor splices. ..........................................................

    Overhead line connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overheadline armor rods _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .SECTION XII-POLE-LINE INSULATORS

    Pole-line insulator related material. .......................................................

    Insulator operating performance.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Types of pole-line insulators... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Pole-line insulator class requirements

    .....................................................

    SECTION XII I -GUYSGuy functional requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Guy strand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Anchor assemblies.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Guy attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Guystraininsulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION XIV-TREE TRIMMINGTree trimming objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Treetrimming clearances and climbing space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Tree trimmingtool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Typesoftreetrimming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Tree trimming instructions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Treating a tree trimming wound

    ..........................................................

    Treeremovalmethods......, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Tree kill ing chemicals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Poisonousplant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION XV-LIVE-LINE MAINTENANCELive-line maintenance requirements.

    ......................................................

    Categories of energized-line maintenance..................................................

    Energized-linemethods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Live-line operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION XVI-AERIAL LIFT REQUIREMENTSAerial lift construction

    ...................................................................

    Aerial lift specifics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .CHAPTER 5. UNDERGROUND AND SUBMARIK E CABLES

    SECTION I-ASSOCIATED GUIDANCE

    Relevant cable guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    General construction guidance ............................................................

    SECTION II-SAFETY PRECAUTIONSCablesafety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Structure safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION III-INSPECTIONFrequency of underground system inspections.

    .............................................

    Structureinspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Cableinspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Underground equipment inspections

    ......................................................

    4-304-31

    4-15

    4-15

    4-32 4-16

    4-33 4-16

    4-34 4-16

    4-35 4-16

    4-36 4-17

    4-37 4-18

    4-38 4-184-39 4-18

    4-40 4-184-41 4-194-42 4-204-43 4-22

    4-44 4-22

    4-45 4-224-46 4-224-47 4-24

    4-48 4-254-49 4-254-50 4-254-51 4-264-52 4-27

    4-53 4-294-54 4-304-55 4-31

    4-56 4-314-57 4-324-58 4-32

    4-59 4-324-60 4-33

    4-61 4-33

    4-62 4-33

    4-63 4-33

    4-64 4-34

    4-65 4-34

    4-66 4-35

    4-67 4-35

    5-l 5-l

    5-2 5- l

    5-3 5-2

    5-4 5-2

    5-5

    5-6

    5-7

    5-8

    5-3

    5-3

    5-3

    5-3

    . . .

    111

    Page

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    6/201

    TM 5-684/NAVFAC MO-2OO/AFJMAN32-1082

    SECTION IV-MAINTENANCE AND REPAIR OF DUCT SYSTEMS

    Structure maintenance and repair ........................................................

    Duct line maintenance and repair.........................................................

    SECTION V-CABLE FAULTS AND FAULT LOCATIONSCable faults.. . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .

    Visual methods of cable fault locating.....................................................

    Determining type of cable fault ...........................................................

    Cable fault locating test methods .........................................................Simplifying cable fault locating...........................................................

    Cable fault locating equipment............................................................

    Tracing the cable fault signal.............................................................

    Selecting cable fault locating methods.....................................................

    SECTION VI-CABLE REPAIRUndergroundcablerepairs . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. .

    Submarinecablerepai rs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Cablerepairsafety . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .

    Makingcablerepairs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Solid dielectric cable repairs..............................................................

    Other cable insulation and covering repairs. ...............................................

    Othercablecomponentrepairs . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .

    SECTION VII-CABLE TESTINGCabletests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Cable insulation resistance tests..........................................................

    Cable overvoltagetests . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .. . . . . . . .Cable power factortests . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .. . . . .Cablemoisturetests . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . .

    Cabletestrecords . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION IX-UNDERGROUND CORROSION CONTROLImportanceofcorrosioncontrol . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .

    Types of corrosion . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .

    Prevention of corrosion . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . .

    CHAPTER 6. OUTDOOR LIGHTING

    SECTION I-LIGHTING AND CIRCUIT TYPES

    Outdoorlightinguse . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .. . . . . . . .Types of lighting circuits..................................................................

    SECTION II-MULTIPLE TYPE LIGHTINGMultiple type lighting system components .................................................

    Luminaires . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Lamptypes. . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .Luminaire components.. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . .

    Luminairemaintenance . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . .

    Multiple type lighting controls............................................................

    SECTION III-LIGHT DISTRIBUTION

    Light distribution standards..............................................................

    Roadway lighting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Floodlighting . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . .

    Airfield l ighting. . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .

    SECTION IV-SERIES TYPE AIRFIELD LIGHTINGSeries type lighting system components ...................................................

    Series type lighting control and protection .................................................

    Series type lighting power supply equipment...............................................

    Maintenance and troubleshooting series type lighting. ......................................

    CHAPTER 7. TRANSFORMERS AND REGULATORS

    SECTION I-CONSIDERATIONS

    Voltage provisions covered..................................................~ . . . . . . . . . . . . .

    Defining transformer and regulator characteristics.........................................

    Transformerclassification.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Paragraph Page

    5-95-10

    5-11

    5-12

    5-13

    5-145-15

    5-16

    5-175-18

    5-19 5-105-20 5-105-2 1 5-11

    5-22 5-11

    5-23 5-12

    5-24 5-12

    5-25 5-13

    5-26 5-145-27 5-14

    5-28 5-155-29 5-165-30 5-17

    5-31 5-17

    5-32 5-185-33 5-185-34 5-18

    6-16-2

    6- l6- l

    6-3 6- l6-4 6- l6-5 6-l

    6-6 6-2

    6-7 6-26-8 6-3

    6-9

    6-106-11

    6-12

    6-136-14

    6-15

    6-16

    6-6

    6-6

    6-7

    7-1

    7-2

    7-3

    7-l

    7-l

    7-l

    iv

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    7/201

    TM 5-684/NAVFACMO-200/AFJMAN324082

    SECTION I I -MAINTENANCETransformer inspection and maintenance frequencies. ......................................

    Transformer inspectionss . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Transformer testing guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Solid (winding) insulation tests ...........................................................

    Transformer insulation liquids. ...........................................................

    CHAPTER 8.OVERCURRENT PROTECTIVE AND SWITCHI NG DEVICES

    SECTION I-CONSIDERATIONSCircuit interrupting devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Location of protective and switching devices ...............................................

    Protective and switching device instruction manuals .......................................

    Protective and switching device records. ...................................................

    SECTION I I -FUSESFuseusage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Fuse operating safety considerations ......................................................

    Fuse replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Fuse maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION III-SWITCHESSwitchusage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Operationofswitches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Switch maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION IV-CIRCUIT BREAKERSCircuitbreakerusage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Frequency of circuit breaker maintenance .................................................

    Maintenance of nonmetalclad switchgear circuit breakers. ..................................

    Maintenance of metalclad circuit breakers .................................................

    Maintenance of low-voltage power circuit breakers .........................................

    Repairofcircuitbreakers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION V-MISCELLANEOUS DEVICESCircuit switchers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Automaticcircuitreclosers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 9. OVERVOLTAGE PROTECTION

    SECTION I-CONSIDERATIONS

    Overvoltage protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Lightning-induced voltage surges .........................................................System operating voltage disturbances ....................................................

    Surge limiting protective device requirements. .............................................

    SECTION II-SURGE (LIGHTNING) ARRESTERSDefinition of a surge arrester .............................................................

    Typesofsurgearresters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Classification of surge arresters. ..........................................................

    Maintenance of surge arresters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION III-OTHER DEVICES

    Surgeshieldingdevices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Surge capacitors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Surgeprotectivegaps.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Surgebypassresistors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 10. GROUNDING

    SECTION I-CONSIDERATIONSBasic principles of grounding .............................................................

    Groundingprovisions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION I I -MAINTENANCEGroundingmaintenancesafety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Visual inspection of grounds ..............................................................

    Galvanic corrosion of grounds. ............................................................

    SECTION I I I -TESTINGGround resistance tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Groundvaluemeasurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Paragraph Page

    7-4 7-2

    7-5 7-3

    7-6 7-6

    7-7 7-6

    7-8 7-7

    8- l

    8-28-3

    8-4

    8-1

    8-1

    8-18-1

    8-5

    8-7

    8-8

    8-18-28-28-3

    8-9

    8-108-11

    8-3

    8-128-13

    8-l48-l58-16

    8-l7

    8-68-68-7

    8-108-12

    8-12

    8-18 8-14

    8-l9 8-14

    9- l9-29-39-4

    9-5

    9-79-8

    9-9

    9-109-11

    9-12

    10-l

    10-2

    10-310-4

    10-5

    10-6

    10-7

    9-l9-19- l

    9- l

    9- l

    9- l9-29-2

    9-2

    9-3

    9-3

    9-3

    10-l

    10-l

    10-l10-l

    10-2

    10-2

    10-2

    V

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    8/201

    TM 5-684/NAVFAC MO-200/AFJMAN32-1082

    Methods of measuring ground resistances..................................................Methods of reducing ground resistances

    ...................................................

    CHAPTER 11. RELAYS AND CONTROLS

    SECTION I--RELAYS, ELECTRIC POWER APPARATUSRelayfunctions. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .Relayfundamentals . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . .Relayconstruction . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . .Relaymaintenanceperiods . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . .

    Relaygeneralfieldinspection . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . .Relay performance tests . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . .

    Common electromechanical relay tests.....................................................Relaytestequipment . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . .

    Relay repairs . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. .

    SECTION II-CONTROLS

    Control functions.. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . .

    Preventive maintenance and inspections of controls ........................................Troubleshootingcontrols . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . .

    CHAPTER 12. INSTRUMENTS AND METERS

    SECTION I-CONSIDERATIONSElectrical Instruments....................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Electricalmeters . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .

    Validity of electrical measurements........................................................Fixed installations of instruments and meters. .............................................

    Portable instruments and meters .........................................................Inspections of instruments and meters

    ....................................................

    Tests of instruments and meters ..........................................................

    SECTION II-PREVENTIVE MAINTENANCE

    Mounting of instruments and meters ......................................................Installation of instruments and meters

    ....................................................

    Maintenance of instruments and meters...................................................

    SECTION III -CALIBRATION AND ADJ USTMENTAccuracy check of instruments and meters .................................................Adjustment of instruments and meters

    ...................................................

    SECTION IV-REPAIRS

    Paragraph Page

    10-8 10-210-9 10-4

    11-l 11-l

    11-2 11-l

    11-3 11-l

    11-4. 11-211-5 11-211-6 11-311-7 11-3

    11-8 11-4

    11-9 11-5

    11-10 11-6

    11-11 11-711-12 11-8

    12-l 12-1

    12-2 12-1

    12-3 12-112-4 12-1

    12-5 12-1

    12-6 12-1

    12-7 12-1

    12-8

    12-912-10

    12-2

    12-212-2

    12-11

    12-12

    12-2

    12-2

    Field repairs of instruments and meters...................................................

    Shop repairs of instruments and meters...................................................

    SECTION V-TROUBLESHOOTINGTemperature influence on instruments and meters .........................................Stray-field influence on instruments and meters ...........................................Calibration of instruments and meters

    ....................................................

    Other instrument and meter considerations ................................................

    CHAPTER 13. POWER CAPACITORS

    SECTION I-CONSIDERATIONSDescription of power capacitors

    ...........................................................

    Types of power capacitors . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . .

    Application of power capacitors...........................................................

    Permissible power capacitors dielectrics...................................................

    SECTION II-MAINTENANCE AND INSPECTIONEnsuring safe capacitor deenergizing ......................................................Power capacitor inspection schedule

    .......................................................

    Ventilation of power capacitors............................................................

    Temperature influence on power capacitors................................................

    Exposure influence on power capacitors ...................................................

    Voltage influence on power capacitors.....................................................

    Fusesforpowercapacitors . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . .

    SECTION I I I -TESTS

    12-13 12-412-14 12-4

    12-15 12-5

    12-16 12-5

    12-17 12-6

    12-18 12-6

    13-l 13-1

    13-2 13-1

    13-3 13-1

    13-4 13-1

    13-5 13-1

    13-6 13-1

    13-7 13-1

    13-8 13-2

    13-9 13-2

    13-10 13-2

    13-11 13-2

    Field tests for power capacitors........................................................... 13-12 13-2

    Terminal tests of power capacitors........................................................ 13-13 13-3

    Leak tests of power capacitors............................................................

    13-14 13-3

    Vi

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    9/201

    TM 5-684/NAVFAC MO-200/AFJMAN32-1082

    CHAPTER 14. STORAGE BATTERI ES

    SECTION I-CONSIDERATIONSBattery usage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Battery types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Batterysafety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .General battery maintenance procedures

    ..................................................

    SECTION II-FLOODED LEAD-ACID BATTERY MAINTENANCE

    Visual inspections of batteries ............................................................Measurements of battery condition.

    .......................................................

    Battery maintenance specifics .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..Testingofbatteries. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION III-FLOODED LEAD-ACID BATTERY CHARGINGBattery charging precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Battery charging considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Normal floating battery charge .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Equal izing battery charge .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION IV-VALVE-REGULATED LEAD-ACID CELL BATTERIESValve-regulated cell differences

    ...........................................................

    Charging or valve-regulated cells .........................................................

    Temperature compensation for valve regulated cells ........................................

    SECTION V-Nickel-cadmium cell batteriesDescription of nickel-cadmium batteries

    ...................................................

    Requirements for nickel-cadmium batteries ................................................

    SECTION VI-CHECKS AND TROUBLESHOOTINGInspectionsofbatteries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Troubleshooting batteries. ................................................................

    SECTION VII-BATTERY CHARGING EQUIPMENTBatterychargingrequirement .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

    Rectifier type battery chargers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Accessories for battery chargers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Maintenanceofbatterychargers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION VIII-PLACING A NEW BATTERY IN SERVICE

    Placing lead-acid batteries in service ......................................................Placing nickel-cadmium batteries in service.

    ...............................................

    Connections for batteries .................................................................

    SECTION IX-PUTTING A BATTERY IN STORAGE

    Batterystorageprocedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Periodic check of a stored battery .........................................................

    SECTION X-REPLACEMENT AND DISPOSALReplacementofa battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    D isposal of batter ies.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 15. TOOLS AND EQUIPMENT

    SECTION I -USEElectrical tools and equipment standards

    ..................................................

    Tools and equipment classification ........................................................

    Tools and equipment safeuse . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    SECTION II-HAZARDOUS MATERIAL PROCEDURESHazardous substances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Asbestos containing materials .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

    Polycholorinated biphenyl (PCB)insulated equipment ......................................

    Sulfur hexifluoride (SF,) insulated equipment. .............................................

    Chemicals used for outside maintenance. ..................................................

    SECTION III-PROTECTIVE EQUIPMENT

    Protective electrical rubber goods .........................................................

    Helmets for electrical work ...............................................................

    Barrier protection for electrical work ......................................................

    Visual warnings for electrical work. .......................................................

    Protective grounding of deenergized lines. .................................................

    Paragraph Page

    14-1

    14-2

    14-3

    14-4

    14-1

    14-1

    14-3

    14-4

    14-5 14-414-6 14-6

    14-7 14-7

    14-8 14-8

    14-914-10

    14-11

    14-12

    14-9

    14-9

    14-10

    14-10

    14-13

    14-14

    14-15

    14-11

    14-11

    14-11

    14-16 14-1214-17 14-12

    14-18 14-14

    14-19 14-14

    14-20 14-14

    14-21 14-15

    14-22 14-15

    14-23 14-15

    14-24 14-1614-25 14-16

    14-26 14-16

    14-27 14-17

    14-28 14-17

    14-29

    14-30

    14-17

    14-17

    15-1 15-1

    15-2 15-115-3 15-1

    15-4 15-1

    15-5 15-1

    15-6 15-2

    15-7 15-2

    15-8 15-2

    15-9 15-2

    15-10 15-3

    15-11 15-3

    15-12 15-3

    15-13 15-3

    vii

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    10/201

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    11/201

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    12/201

    TM 5-684/NAVFACMO-200/AFJMAN 32-1082

    7-2.

    7-3.

    8-l .8-2.

    11-l.

    11-2.

    12-l.

    12-2.

    13-1.13-2.

    14-1.

    14-2.14-3.

    14-4.

    15-1.16-1.17-l.

    Insulation resistance conversion factors to 20C ......................................................

    Satisfactorypowerfactors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Troubleshooting chart for oil problems. ..............................................................

    Troubleshooting chart for power circuit breakers .....................................................

    Typical laboratory relay test equipment .............................................................

    Troubleshooting chart for general control equipment. .................................................

    Troubleshooting chart for indicating instruments. ....................................................

    Troubleshooting chart for recording instruments and meters ..........................................

    Maximum ambient temperatures for continuous operation ............................................Capacitor bank oil switch maintenance ..............................................................

    Battery room warning notice. .......................................................................

    Suggested test accessory list for battery maintenance. ................................................

    Equalizingcharge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Charging of nickel-cadmium batteries ...............................................................

    Suggested list of minimum facility-wide field test equipment. .........................................

    Harmonic distortion limits. .........................................................................

    Maintenancefrequencie . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Page

    7-67-8

    8-12

    8-1311-6

    11-812-6

    12-6

    13-213-3

    14-214-9

    14-11

    14-13

    15-1116-517-l

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    13/201

    TM 5-684/NAVFACMO-200/AFJMAN 32-1082

    CHAPTER 1

    INTRODUCTION

    Section I - PRIMARY CONSIDERATIONS

    1-1. Purpose and scope.

    This manual provides guidance for the maintenanceand repair of exterior electrical distribution sys-tems. New construction of exterior electrical facil-ities, even when funded from maintenance appro-priations, should comply with the appropriatedesign criteria. These systems include substations,overhead and underground electrical distributionsystems, exterior lighting systems, and electricalapparatus and components. Guidance for genera-tors and interior electrical systems (600 volts andless) are covered in the following publications:

    a. TM 5-683/NAVFAC MO-ll6/AF J MAN32-1083.

    b. TM 5-685/NAVFAC MO-912.

    c. MIL-HDBK-1003A/ll.

    1-2.References.

    Appendix A contains a list of references used in thismanual.

    1-3.Application of codes and publications.

    The information in this manual should not super-sede equipment manufacturers instructions and re-quirements. When conflicts exist the most rigorousrequirement should be followed. A11 maintenanceand repair of electrical systems should be performedin such a manner that the completed work willconform to the publications listed below to the de-gree indicated.

    a. Cod es.The l isted codes and standard containrules (both mandatory and advisory) for the safeinstallation, maintenance, and operation of electri-cal systems and equipment.

    (1) The National Electrical Code (NEC), NFPA

    70.(2) The National Electrical Safety Code

    (NESC), ANSI C2.

    (3) Occupational Safety and Health (OSHA),General Industry Standards, 29 CFR 1910.

    b. Nongovernment publications. Other nongov-ernment publications referenced in this manual ex-pand guidance in line with recognized industrystandards. The most extended coverage on recom-mended practices for electrical equipment mainte-nance, and one that should be used in conjunction

    with both the NEC and the NESC, is NFPA 70B.Publication NFPA 70B is recommended as a useful

    reference in preparing contract requirements for

    maintenance to be done by outside service agencies.

    1-4. Standards of maintenance.

    Electrical systems will be regularly maintained toensure continued compliance with the codes andpublications referred to in appendix A. Such main-tenance will prevent system and equipment failuresand ensure maximum safety and efficiency in theutilization of the facilities. At each installation, aprogram for proper maintenance should be estab-lished and effectively followed. This program shouldinclude the scope of work, intervals of performance,

    and methods of application including safety require-ments, practices and procedures. When a number ofitems require servicing or renewal over a period ofyears, a proportionate number should be main-tained each year. For instance, if there are 100transformers on the system, requiring maintenanceat 5-year intervals, the work should be performedon 20 transformers each year.a. Pr edi cti ve mai nt enan ce. A predictive mainte-

    nance program is more desirable than routine re-curring maintenance. Predictive testing should oc-cur periodically but actual maintenance or

    replacement should take place only when necessary.An automated testing and record management sys-tem should be utilized where available. Where sucha system is not available, its acquisition is recom-mended.

    b. Sample testing formats. Testing formats forcable, circuit breakers, switchgear, and transform-ers are provided in NFPA 70B. These formats can berevised as needed for local requirements.

    1-5. Maintenance responsibilities.

    Anadequate supply of dependable electrical energyis essential for the accomplishment of the installa-tion mission. Adherence to a well planned and wellorganized maintenance program, including the es-tablishment of specific goals and follow-up proce-dures will ensure the proper functioning of theequipment in the electrical distribution system.

    a. E l ectr i cal super visor . As used in this manual,the title electrical supervisor indicates the indi-vidual assigned the responsibility for maintenanceof electrical distribution systems and equipment.

    The maintenance of electrical distribution systems

    is the responsibility of the installations commanderand a specific duty of an Army director of public

    1-1

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    14/201

    TM 5-684/NAVFACMO-200/AFJMAN32-1082

    works, a Navy public works officer, or an Air Forcebase engineer. Operation and maintenance are asingle staff responsibility, and frequently the same

    personnel will perform both functions.

    b. El ectri cal super visor

    trical supervisor will:responsibil i t ies. The elec-

    (1)Initiate positive action to remove, or reduce

    to a minimum, the cause of recurrent maintenanceproblems.

    (2) Carry out maintenance inspections and ser-vices so there is a minimum of interference withuser activities.

    (3) Provide for the accomplishment of as muchwork as possible during each maintenance visit, andensure that spot checks, inspections, and repairsare made on all components of the electrical facil-ities.

    (4) Ensure that an adequate set of up-to-daterecords are maintained for each major component ofall systems.

    (5) Develop standard operating procedureswhich are in compliance with applicable safety re-quirements.

    (6) Train maintenance personnel to improvetheir efficiency and to observe safety requirements.

    1-6. Maintenance records.

    One of the most important sources of informationfor aiding inspections, maintenance, or tests is acomprehensive file of equipment and service

    records. In addition to indicating basic informationrequired for proper inspection of the equipment,these records will indicate where trouble has beenexperienced and where special procedures may bewarranted.

    a. Equi pment docum ent s. There are a variety ofdocuments which indicate the equipment providedand how to keep it operating properly. These docu-ments should be provided when new facilities arebuilt, or existing facilities modified. These recordsshould be obtained from the construction agency assoon as possible, preferably before the electrical su-pervisor accepts maintenance responsibility. Thesedocuments should address any warranty provisionsapplicable to the equipment. Equipment documentsdetermine maintenance practices and should be in-cluded as a part of the maintenance records of thefacility. The most common documents are listed be-low.

    (1)I ns t ruc t ion l ea f lets and m anua l s. Eachpiece of major electrical equipment purchased

    should be accompanied by an instruction leaflet ormanual outlining the desired methods of installa-

    tion, operation, and maintenance. These instruc-tions contain valuable information on maintenance

    practices, part designations, and ordering proce-

    dures. Spare parts lists are a vital part of these

    records.

    (2) In sta l l a t ion draw ings. Maintenance is often

    affected by the manner in which the equipment isinstalled. For convenience, and as a means of expe-diting maintenance, as-built installation drawings

    should be readily accessible to maintenance andinspection personnel.

    (3) Wir ing diagram s. Adequate and up-to-datewiring diagrams are important for proper mainte-nance. Diagrams facilitate locating troubles, whichotherwise may require extensive probing and test-ing procedures. Such diagrams should be readilyavailable to maintenance personnel.

    (4) Di str i but ion m aps. Maps showing locationsof distribution lines, wire sizes, transformer sizes,pole numbers, voltage classes, and sectionalizingdevices are vital. Up-to-date distribution mapsmounted on the maintenance or electrical shop wallare very useful.

    b. Ser vi ce r ecor ds. Service records constitute ahistory of all work performed on each item of equip-ment and are helpful in determining the overallcondition and reliability of the electrical facilities.Service records should show type of work (visualinspection, routine maintenance, tests, repair), testresults (load, voltage, amperes, temperature), andany other remarks deemed suitable. It is highlyrecommended that service records should include a

    log of incidents and emergency operating proce-dures.

    (1) L ogs of in cident s. Logs of incidents, such aspower failures, surges, low voltage, or other systemdisturbances are very useful in planning and justi-fying corrective action.

    (2) Emergency operating instructions. Emer-gency work on electrical facilities is safer andquicker when instructions are prepared and postedin advance. Instructions should be prepared foreach general type of anticipated emergency, statingwhat each employee will do, setting up alternatives

    for key personnel, and establishing follow-up proce-dures. Instructions should be posted in the electri-cal shop, security guard office, substations, operat-ing areas, and such other locations as theresponsible supervisor deems advisable. Employeesshould be 1isted by name, title, and official tele-phone number. These instructions should empha-size safety under conditions of stress, power inter-ruptions, and similar emergencies.

    1-7. Priority and scheduling.

    a. Pri ori ty. In regard to the support of the instal-lation physical plant, it is the policy of the military

    l -2

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    15/201

    TM 5-684/NAVFACMO-200/AFJMAN 32-1082

    departments that, in order of priority, maintenance manders to meet local requirements. Service in-should be second only to operations. It must be tervals may be lengthened only when justified bysystematic, and it must be timely. extenuating circumstances. Whenever service inter-b. Scheduling. The following chapters provide vals or other guidance in this manual differs from

    data on service intervals, procedures, and practices. information supplied by the manufacturer, the more

    Modifications may be made by installation com- stringent procedure should be followed.Section II - SAFETY

    1-8. Minimizing hazards.

    Material specifications, construction criteria, instal-lation standards, and safe working procedures havebeen developed to minimize hazards. All work andmaterials should conform to the latest accepted pro-cedures and standards, as defined in publicationslisted or referred to in this manual.

    1-9. Qualification of electrical workers.

    Due to the inherent hazards encountered in themaintenance of electrical distribution systems and

    equipment, it is essential that all electrical workersbe thoroughly trained and be familiar with theequipment and procedures to be followed.

    1-10. Certification of electric workers.

    Properly trained electric workers will be certified inaccordance with applicable publications.

    1-11. Public safety.

    All necessary precautions will be taken to warn thepublic of electrical hazards or other conditions

    which may constitute a danger. This is especiallytrue of temporary hazards due to work in progress.

    1-12. Personnel safety.

    Any work on or close to electrical equipment of anykind should be considered dangerous and propersafety precautions will be taken. All personnel whoperform work of any kind on or near electricalequipment must be familiar with and observe allsafety precautions.

    a. Safety fi r st. Tw o safety rules are mandatory asfollows:

    (1) Consider all electrical equipment to be en-ergized until it is known positively (as by the pres-ence of grounding clamps) that it is not energized.Comply with regulations and safety instructionscontained in NEC and NESC, the applicable depart-mental publications, and special publications issuedby the local command.

    (2) Work may be done on energized lines andequipment only by personnel qualified by their jobdescriptions for that voltage level. J ob descriptionsshould require actual hands-on work service periods

    which meet local uti lity and the InternationalBrotherhood of Electrical Workers approval. All

    tools and equipment must be maintained in proper

    operating order, be suitable for the maximum volt-

    age level involved, and should be periodically tested

    for compliance with all safety requirements. De-partmental publications should be consulted for

    specific requirements in each voltage level.

    b. Ser vi ce safety m anua l s.This manual addresses

    some safety requirements, but users should also be

    familiar with the service safety manuals TM 5-682,NAVFAC P-1060, and AFMAN 32-1078.

    c.Per sonal pr otective temporar y ground in g. Thisis temporary grounding installed to protect workersengaged in de-energized line maintenance. Thegrounds are provided to limit the voltage differencebetween any two accessible points at the work siteto a safe value. An expanded discussion of protectivegrounding principles and practices is contained inIEEE 1048, NF PA 70B and The Linemans andCablemans Handbook.

    1-13. Live-line maintenance.

    Aerial live lines are energized lines that are being

    tested, repaired, and maintained more and more byelectrical utilities to reduce the number of outagesor service interruptions. The use of such procedureson DOD installations requires that good practice befollowed and that there is no conflict with localfacility rules.

    a. Good pr acti ce. Personnel doing live-line workshould have satisfactorily completed a formal train-ing course of instruction and be examined periodi-cally. Live-line maintenance usually means anymaintenance activity performed on energized elec-trical conductors or equipment with a phase-to-

    phase voltage exceeding 600 volts. I t usually doesnot include such activities as switching, hardwaretightening, climbing, hole digging, pole setting, con-ductor stringing, etc. The performance of this workrequires equipment and tools that meet applicableindustry standards for energized-line maintenance.

    b. L oca l facil it y rul es.Two considerations affectfacility rules on the type and extent of live-linemaintenance permitted: availability of qualified fa-cility personnel and equipment versus the facilitysrequirement for uninterrupted operation. I f local

    missions prevent electrical power shutdowns andlocal facilities are not qualified to perform live-line

    l-3

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    16/201

    TM 5-684/NAVFACMO-200/AFJMAN 32-1082

    work, then a live-line contractor may need to be and are not intended to substitute for training orhired on a scheduled and/or a nonscheduled basis. operating procedures; for meeting specific industryGeneral energized-line maintenance practices cov- guidelines; or for meeting federal, state, local, orered in chapter 4, section VI , serve only as a guide facility regulations and rules.

    Section III - AVOIDING PROBLEMS

    1-14.Operating conditions.

    Always observe the four cardinal rules of electricalmaintenance.

    a.Keep the equipment clean.b. Keep the equipment dry or lubricated as ap-

    propriate to the part.c.Keep screwed parts tight.d.Prevent friction on moving parts.

    1-15. Detecting potential trouble.

    Diagnostic devices, where available, allow checkingthe system for potential trouble before it occurs.Potential problems may also be detected by the use

    of four of our five senses: see, hear, touch, and smell.a. See. Many abnormal conditions can be de-

    tected by visual inspection: some of the patternsidentifiable by sight are cleanliness, distortion,color, misalignment, size, and position.

    b. Hear . Changes in the intensity of noise, pitch,or frequency are significant clues to operationalchanges and possible malfunctions. Some of thesound patterns that may indicate malfunctioningare squeaking, rattling, knocking, and whistling.c. T ouch. Among the damaging characteristics

    which may be identified by touch are vibration, wet-ness, and heat. Caution should be exercised intouching components which are normally hotenough to burn personnel on contact or live partswith hazardous potentials.

    d. S m el l . Burning insulation and battery fumesprovide distinctive odors which signal component

    deterioration.

    1-16. Electrical connections.

    Connections are an essential part of any electriccircuit. Good electrical contact is essential. Dirt isthe enemy of good contact. Whenever an electricalconnection is to be made, extreme care must betaken to ensure all dirt, rust, corrosion, insulation,oil, and other contaminants are removed. The con-tact surfaces should be bright, clean metal. Thisrequirement applies to connections made by solder-ing, clamps, twisted sleeves, compression fittings, orany other method.a.A l um i n um . Connections of aluminum items

    should always include the application of a joint com-

    pound which will ensure metallic contact by dissolv-ing the aluminum oxide which is always present onaluminum and aluminum alloy surfaces in air. Thecontact surfaces of aluminum conductors and con-nectors should first be vigorously cleaned with astainless steel wire brush to a bright finish andthen immediately coated with the aluminum-oxideinhibiting compound.

    b. Copper. Copper contact surfaces should becleaned, but not connector barrels. The barrelsshould be cleaned on the inside.c.Di ssim i l ar metals. Only connectors designed

    for the purpose should be used to connect aluminumand copper items.

    d .Testi ng. Accessible connections may be testedusing an infrared detector only if the connection isunder load as covered in chapter 3, section I.

    l-4

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    17/201

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    18/201

    TM 5-684/NAVFACMO-200/AFJMAN 32-1082

    Section II - REQUIREMENTS

    2-4. Electric workers, instruments, and re-

    ports.

    Tests of electrical equipment should be performedunder the supervision of qualified electric workers.I f in-house personnel are not available for these

    tests, the services of a qualified electrical testing

    agency may be used.a. Test ing agency qual i f icat ions. The testing

    agency should submit proof that it is a corporatelyindependent testing organization which can func-tion as an unbiased testing authority, professionally

    independent of the manufacturers, suppliers, andinstallers of equipment or systems evaluated by thetesting firm. The testing agency should meet OSHAcriteria for accreditation of testing laboratories,

    Title 29, Part 1910-7; or be a full member companyof the InterNational Electrical Testing Association(NETA) and be regularly engaged in the testing of

    electrical equipment devices, installations, and sys-tems. The lead technical agency member on-siteshould be currently certified by NETA or the Na-tional Institute for Certi fication in EngineeringTechnologies (NICET) in electrical power distribu-tion system testing.b. Test instrument calibrations. I nstruments

    should have been calibrated within the last 12months except that analog instruments should have

    been calibrated within the last 6 months. Calibra-tion should provide the full-scale accuracy based on

    the manufacturers data, usually 1 percent forswitchboard instruments and 0.25 percent for por-table instruments. Dated calibration labels shouldbe visible and up-to-date calibration records, in-structions, and procedures should be maintained foreach instrument which should have had a calibrat-

    ing standard of higher accuracy than that of the testinstrument.

    c.Test r eport s. A dated test report should include,as a minimum, the following data:

    (1) Summary of project findings and recom-mendations, if required for additional work.

    (2) Description of equipment tested.(3) Description of test.

    (4) Test results.

    2-5. Frequency of inspection.

    The intervals given in this manual and/or by manu-facturers maintenance recommendations should beconsidered an initial interval for normal conditions.Intervals should be shortened where adverse condi-

    tions exist and may be lengthened only where expe-rience under better-than-normal conditions show

    this can be done safely. The frequency of inspectionmay vary for similar equipment operating underdifferent conditions. Critical equipment, heavilyloaded apparatus, operator handled, and intermit-

    tently operated units are examples of different op-erating conditions.

    2-2

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    19/201

    TM 5-684/NAVFAC MO-200/AFJMAN 32-1082

    CHAPTER 3

    TRANSMISSION AND DISTRIBUTION SUBSTATIONS

    Section I - GOVERNING CONSIDERATIONS

    3-1. Type of substations covered.

    This chapter includes a transmission and distribu-tion substation which is an assemblage of equip-

    ment for purposes other than generation or utiliza-tion, through which electrical energy in bulk is

    passed for the purpose of switching or modifying its

    characteristics.

    3-2. Electrical system relationship.

    A substation is an integral and vital part of anelectrical system. I t does not exist independently of

    the rest of the system, though it is usually designed

    so that a failure of a single component will notinterrupt loads, except for switching times. Such

    interruption may force greater than normal loads tobe carried by other components of the station whilerepairs are being made. Most substations are de-

    signed so they do not require attendant personnelon a continuous basis. Supervisory control and data

    acquisition (SCADA) systems, where provided, al-low monitoring at a central point.

    3-3. Substation safety concerns.

    Substations present a potential safety hazard, ow-

    ing to the large amount of energized conductor sur-face concentrated in a relatively small area. In gen-eral, only portions of an entire substation can bede-energized, although scheduled outages may berequired for equipment which can not be bypassedor worked on while energized. All inspecting andrepairing personnel must be thoroughly trained.The following requirements are minimum:

    a. Familiarity with operating procedures, protec-tive and interlocking schemes, and the equipmentcapabilities at the specific substation.

    b. Knowledge of the proper use of safety equip-ment, first aid procedures and equipment, andequipment grounding techniques.

    c.Access to safeguards such as danger signs, tem-

    porary barriers, protective clothing, tools and pro-tective equipment, and all safety manuals andrules. Procedures should clearly indicate insulatingrequirements and working clearances for any cat-egory of energized-line maintenance employed.

    d. Keeping proper inspection records and check-lists so that observed defects or improper conditions

    not immediately repairable will be promptly cor-rected.

    3-4. Substation security.

    In addition to the personnel safety hazards men-tioned above, an electrical substation presents an

    attraction to would-be vandals, dissidents, or other

    belligerents. For these reasons, good security is a

    basic requirement. All means of access to substa-tions, including buildings and yards, will be kept

    locked when unoccupied and secure when occupied

    by authorized personnel.

    3-5. Periodic inspections of substations.

    Aninspection checklist, tailored to a specific substa-

    tion and containing all items to be checked, is rec-ommended. Monthly visual and yearly infrared in-spections of the entire substation are recommended.

    3-6. Visual inspections of substations.

    Visual inspections should include the total substa-tion area including the site, the control house, and

    all equipment and structures. The energized sub-station should be inspected from ground level, to

    ensure adequate safety clearances from energized

    parts. Binoculars should be used to view buses andother equipment located on structures. Special care

    should be used when ground connections arechecked, since a high voltage could develop across

    any gap created between a ground cable and a piece

    of equipment, particularly under fault conditions.For this reason, ground connections shall not be

    removed for any reason while the substation is en-ergized.

    3-7. Infrared inspections of substations.

    All matter emits infrared rays in proportion to its

    temperature.

    a. Method. An infrared detecting device can beused to determine loose connections, overloading of

    conductors, localized overheating in equipment, or

    similar conditions before they become serious. Some

    equipment is sensitive to a fraction of a degree.Infrared inspection can be done from a distance,since contact with the item being measured is notrequired. Substation equipment, such as bare bus,disconnect switches, and connections, can bechecked without being de-energized. The inspectionis made by aiming the infrared detector at various

    areas of the substation and noting where the hotspots are.

    3- l

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    20/201

    TM 5-684/NAVFACMO-200/AFJMAN32-1082

    b. Equi pment. Several types of infrared detectorsare available. These vary from a simple hand-heldinstrument similar to a gun, through which the op-

    erator can detect hot spots and note their locations,to complex equipment requiring qualified operators

    and product photographs as a permanent record of

    the area being checked. The simpler detectors areusually sold outright, while the complex items are

    usually used by infrared detection services whichcontract to do the work. Having an instrumentreadily available can be justified for a large instal-lation with several substations, while a contract tohave a survey performed would probably be betterfor a small installation. However, as a low cost al-ternative, a camera with infrared sensitive filmmay be used, or a self-calibrating portable indicat-ing unit can be coordinated with a Polaroid camera.

    c. Su r veys. When infrared (thermographic) sur-veys are made, the equipment to be scanned mustbe identified. Scanning should be made after visual

    and mechanical conditions have been observed. Re-port all areas scanned.

    (1)Reports. I f hot spots are found the reportshould locate the problem area and the temperature

    rise above a reference 30 degrees C. The cause of

    the heat rise should be identified such as phase

    unbalance, overload, poor connections, or other heat

    producing conditions.

    (2) Test parameters. Equipment must detect

    emitted radiation and convert to a visual signal. A

    detection ability of a one degree C rise between the

    hot spot area and the 30 degree reference area isrequired.

    (3) H ot spot i nd icati ons. NETA-MTS indicates

    that temperature gradients as shown in table 3-l

    will require the following actions.

    Tabl e 3-l. Infr ared hot spot grad ients1

    Temperature

    gradient

    0 to 3C

    4 to 3C

    16C and above

    Deficiency ActionPossible Investigate

    Probable Repair as time permits

    Major Repair immediately

    1Consider providing photographs an&or thermograms as seen onthe imaging system in reports where appropriate to the size and

    criticality of the equipment examined.

    Section II - STRUCTURE MAINTENANCE

    3-8. Importance of maintenance.

    The useful l ife of a substation structure is directlydependent upon the care it receives. Surface preser-vation is of prime importance.

    3-9.Galvanized steel structures.The protective coating produced by the galvanizingprocess normally has a long life; however, the coat-ing will eventually fail and rust will appear. The lifeof the coating on structural steel used in substa-tions should generally be longer than 12 years ex-cept possibly for the upper flat surfaces of horizon-tal members. Any failure of the coating will usuallyoccur in spots rather than over an entire surface.Refer to chapter 4, section VI I for self-weathering

    steel requirements.

    a.Cleaning.Clean the surface with a wire brushor by other mechanical means to remove rust anddirt. I f the surface is contaminated with grease oroil, a solvent should be used to remove those con-taminants. Mineral spirits or one ounce (28.4

    grams) of trisodium phosphate in one gallon (3.8liters) of warm water can be used as the solvent. I fit is uneconomical or impractical to remove all rust,

    a reasonably satisfactory job can be obtained bydeactivating the rust through chemical treatment. Aweak solution of phosphoric acid is suggested fordeactivating rust. Use proper skin and eye protec-

    tion.

    3-2

    b. Pain ti ng. I f required spot painting covers more

    than 5 percent of the visible surfaces, the entire

    structure probably should be painted.

    (1) Pri mi ng coat. Apply a priming coat to the

    clean dry surface using a good zinc dust/zinc oxide

    paint. Allow ample time for the paint to dry before

    applying the finish coats.

    (2) Fi ni sh coats. Two finish coats should be ap-

    plied using the same type paint used for priming.

    Ample drying time should be allowed between fin-

    ish coats. Only one finish coat is needed for areas on

    which the galvanized coating remains intact. Other

    paints normally used as final coats for metal (such

    as aluminum paint) may be used as the final coat inplace of the zinc dust/zinc oxide paint.

    (3) Temperature. Painting of outdoor metalwork is recommended only when the temperature is

    above 45 degrees F (7 degrees C) and when the

    relative humidity is below 80 percent.

    (4) Durab i l i t y . The durability of a paint coat-ing depends on thickness, cohesion, and contin-

    uity. Generally, 5 mils or 0.005 inch (0.125 milli-

    meters) is an adequate thickness. The thickness

    should be uniform, and paint should not be

    easily scraped off the metal. Welds, edges, and other

    hard-to-coat areas should be given particular at-

    tention.

    WWW.SURVIVALEBOOKS.COM

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    21/201

  • 8/13/2019 1996 Us Army Facilities Engineering Electrical Exterior Facilities 201p

    22/201

    TM5-684/NAVFACMO-200/AFJMAN 32-1082

    fill are usual coverings. For very large substationssome areas may be seeded for grass.a. Ground treatment. Removal of vegetation,

    elimination of low spots in the yard, and control ofgrassed areas is necessary. I f grass is permitted,careful maintenance is necessary both for estheticsand safety reasons. I f allowed to grow uncontrolled,weeds, grass, or other plants create fire hazards,are unsightly, impede free action, and may grow tallenough to contact live parts and cause flashovers.Low spots collect debris and stagnant water. Where

    chemical application for removal of vegetation isrequired, it should meet environmental require-ments.b. H ousekeepi ng. Miscellaneous storage should

    not be permitted except in specific areas reservedfor this purpose. Storage should not interfere withoperations and should be in a protected, tidy, andaccessible manner. Birds may cause problems re-

    quiring removal of nests and possible provision ofbird repellant controls such as tape, images, orsound systems.

    Section IV - INSULATORS

    3-19.Function of insulators.

    The function of an insulator is to support a conduc-tor or conducting device safely. An insulator, beingof a nonconductive material, physically and electri-cally separates the supported item from anygrounded or energized conductors or devices.a. Composit ion and problems. I nsulators are

    composed of porcelain, glass, fiberglass, or a com-posite compound. Maintenance is necessary to pre-serve their insulating ability which can be degradedby contamination or other damaging actions. Mostnsulator damage will result from gun shots; light-ning, surge, or contamination flashovers; and winddamage. Defective insulators can also cause visiblecorona or interference voltage propagation.

    b. Relat ed mat er ial . Apparatus type insulatorsare provided in substations to support devices and

    heavy lines. See chapter 4, section XI I , which pro-vides a discussion of insulation levels.

    3-20.Tests of insulators.

    Radio interference conditions may be detected byusing instruments designed for this purpose. Other-wise, maintenance tests on insulators are normallyimited to occasional power factor measurements atthe more important installations, where the loss ofthe facilities must be kept to an absolute minimum.Bus and switch insulators should be power-factortested in conjunction with similar testing of other

    apparatus within the substation. Power factor testsare described in section VI I .

    3-21. Inspection and repair of insulators.

    Switch-and-bus apparatus type insulators are themost intricate type and require the highest degreeof reliability in service. This is because the several

    pieces of porcelain and hardware, assembled in asingle unit, are usually located at key positions inthe systems, where failure is extremely serious.Switch-and-bus insulator failures occur when porce-ain is thrown in tension by any thermal movementbetween nested parts, which can cause cracking andallow the entrance of moisture. An accumulation of

    3-4

    foreign deposits, and mechanical damage from ex-

    ternal sources also cause deterioration. Evidence of

    such impairments may cause a flashover punctureaccompanied by a destruction of insulator parts.Workers should be CAUTIONED that equipmentmust be de-energized unless the procedure in chap-

    ter 4, section XV is authorized.a. Ceramic insulators. Ceramic insulators are

    made of wet-process porcelain or toughened glass.

    (1) Construction.

    (a) Porcela inin sul ators. Porcelain insulatorsare manufactured from special clays to produce aplastic-like compound which is molded, oven dried,dipped in a colored glazing solution, and fired in akiln. The glossy surface of the glaze makes the in-sulator surface self-cleaning. Large porcelain insu-lators are made up of several shapes cemented to-

    gether. A chemical reaction on the metal parts fromimproper cementing can result in a cement growthwhich can be sufficiently stressful to crack the por-celain.

    (b)Glass insulators.. Glass insulators aremade from a mixture of sand, soda ash, and limewhich is mixed and melted in an oven, then molded,cooled, and annealed.

    (2)Inspection.

    (a)Look for fractures, chips, deposits of dirt,sa