Nargis Hurzuk, Senior Engineer- Statnett SGTech- Europe 26th of March 2019, Amsterdam Successful implementation of Digital Substation Statnett FoU

2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Nargis Hurzuk, Senior Engineer-StatnettSGTech- Europe 26th of March 2019, Amsterdam

Successfulimplementationof Digital Substation

Statnett FoU

Page 2: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Content

• Pilot installation- Design• Testing Experiences• Operational Experiences• Further activities in Project• Further plans- Statnett

Fremtiden er elektrisk

Page 3: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Smart, Effective and Secure

Digital Substation- Challenges todays philosophy?Cost

FunctionalityTime

Safety

Page 4: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Goals for the R&D project• Develope next generation control systems• Digital substations including PB, GOOSE, SV and

LPIT.• Build Competance.• Gain experience and verify maturity of technology• Interoperability

Page 5: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Pilot installation – compact designMultivendorRing topologiPRP-REDBOXVLANFAST GOOSEPriorityPTP

Page 6: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Time Synchronisation

• Importance• Cooperation with COSEC Time project

Fremtiden er elektrisk

LAN1

LAN2

PTPO

SC

GP

S

PT

P

PT

P

GP

S

OS

C

SyncEover

DWDM-kanal

Cesium 1

PTP

Cesium 2

SyncEover

DWDM-kanal

Page 7: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

IT Security • Firewall on gateway- only IP traffic from trusted IP and

MAC adress on SB and PB. • RBAC- Role Based Access Control• Sticky MAC address• Unused ports are closed by the firewall• TAP-Terminal Access Point- V Broker 110-NettScout

Fremtiden er elektrisk

Page 8: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Testing Experiences

• Logical device approach• Different implementation of test and

simulation mode.

Planning for GOOSE• Test terminals• Predefining of the test GOOSE

Fremtiden er elektrisk

Test and simulation functionalities

Page 9: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Testing Experiences (cont……)

Monitoring and fault finding• Alarms not affecting the grid operation• Response matrix• Close cooperation of control system with the network

design

Documentation• Need of documenting logics,

function and the flow of GOOSE

Testing and commissioning of the network component• Communication network as the central

part of design• Firmware upgrade and security patches

Fremtiden er elektrisk

Page 10: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Testing with Omicron- DANEO• System verification• Fault finding and analysing• Timesync. and BMCA

Fremtiden er elektrisk

Page 11: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Operation Experiences

Fremtiden er elektrisk

Heat issue• No effect on the performance• Affects the lifetime of the components

Continual Comparison of current and Voltage

• MU and SAMU outputs• MU and Conv. Analog• SAMU and Conv. Analog

Page 12: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Operation Experiences (cont…….)

Fremtiden er elektrisk

• Start of Distance protection

• Transformer fault in the neighbouring station:• Current L3 and V3 (SAMU, MU og "normal"

overlapping):

Page 13: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Operation Experiences (cont…..)

Fremtiden er elektrisk

MU internal failure- alarm and the quality bit.

Page 14: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Operation Experiences (cont….)

Fremtiden er elektrisk

Energy meter• Comparison of values• Good quality of the measurements• Accreditation- Primary control in the factory together

with the better balance control?

Page 15: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Co-operation with Synaptec

Fremtiden er elektrisk

Page 16: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Design of bay cabinet- Challenges

• EMP protection• Climatic condition• Optimal Maintenance• Cyber security

Cyber Security and Network

Fremtiden er elektrisk

Page 17: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Statnett digitalisations planOne green field substation in Oslo area for 420KV GIS and one brownfield refurbishment AIS substation…timeline 2021-22

Fremtiden er elektrisk

Page 18: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Specification Phase

• Co-operation with other TSO• Co-operation with DSO• Co-operation with vendors• Co-operation with Universities

and research institute• Architecture: protocols,

level of redundancy, control functionality

• Qualification of LPIT together with MU• Qualification of protection and Control IEDs

Fremtiden er elektrisk

Page 19: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Fremtiden er elektrisk

Publications

Publication 2018• DPSP- Testing• PAC World- Operational experience• Cigre- Experience med multivendor digital stasjon

Publications planned for 2019• Busbar protection scheme with sensor data-

PAC world- Synaptec• Time synchronisation-

Cigre B5 Colloquium-Norway

Page 20: 2. SGTech Europe 2019 - Substation - Nargis Hurzuk, Statnett · Statnett digitalisations plan One green field substation in Oslo area for 420KV GIS and one brownfield refurbishmentAIS

Åpen informasjon / Public information

Digitalisation progressing in full speed !