7 May 2012
ANDERSON ROAD SITES A AND B PHASES 1 AND 2
Team Queries / Advisory
1. CKL: Green roof to covered walkways and low-rise structures.
2. CKL: Lightweight tensile structure of min. 350m2 at POS B (central plaza).
3. AECOM/BSE: Is irrigation specialist required?
4. AECOM/BSE: Innovation recycled grey water to reduce fresh water usage
by 5%.
5. AECOM/BSE: Reduce sewage by 20%.
6. AECOM/Environmental: Wind and daylight studies are required for
landscape design.
8/12/2019 20120507_Landscape
2/4
Landscape Area Requirements
1. 30% of gross Site area to be soft landscape (DCMBI No. P02/11).
2. POS A including 50% community play area (CPA).
3. POS B including min. 1,500m2 multi-functional plaza.
4. Entrance forecourt min. 500m2 at Site B PTI (also at Site A?).
5. Site B central courtyard min. 3,000m2 near entrance forecourt.
6. Tai chi court in Site B central courtyard, min. 200m2.
7. Kindergarten open entrance area min. 25% of indoor play area.
8. Kindergarten fenced-off outdoor play area (ref. wind speed calculation).
9. Plant nursery 30 80m2.
10. Community farm 50m2.
11. Community play areas 400m2 per 5,000 population.
12. 5 designated smoking areas, approx. 5m2
each.
13. Heritage trail, 500m2 main gallery and 13 smaller 6m2 areas at POS A & POS B, Site A & B entrance
forecourts, block entrances.
7 May 2012
ANDERSON ROAD SITES A AND B PHASES 1 AND 2
8/12/2019 20120507_Landscape
3/4
Landscape Design Requirements
1. Theme: Sustainable Community for Green and Healthy Living.
2. New trees to be semi-mature with minimum 3,000mm clear stem.
3. 1 tree per 15 flats.
4. Grass paving system where possible.
5. No ponds.
6. Native, butterfly and bird attracting species.
7. Local Open Space requirement: 1m2 per person.
7 May 2012
ANDERSON ROAD SITES A AND B PHASES 1 AND 2
8/12/2019 20120507_Landscape
4/4
7 May 2012
ANDERSON ROAD SITES A AND B PHASES 1 AND 2
Tender Queries
1. PRE.B8: Additional drawing required: KL02&03/BASE/SITE/L/LO-01 shows
location of existing trees (if any).
2. DCG-E-CF-113 Clause 32: PTI landscape construction, water supply and
maintenance handed over to HyD design by HyD or Tenderer?
3. Page CR/A/18: Clause 2.4.1 soft landscape of POS A and POS B excluded from
green coverage calculation. Are POS A and POS B included in gross Site area?
4. Page CR/A/46: Clause 5.1.5 Please provide DCMBI No. P02/11 (greening
coverage calculation).
5. Page CR.A/48: Clause 5.3.2 POS B entrance shall provide control, fence wall
and gates for estate management use. Is fence wall intended to surround POS
only (to separate POS from Estate), or Site B as a whole?
6. POS requirement for Sites A, B and C is 7,800m2 in Planning Brief Appendix 1.
What is POS requirement for Sites A & B?