METROPOLITAN MANILA DEVELOPMENT
AUTHORITY
ESTERO BLITZPresented to the Pasig River Forum
General Manager Corazon T. JimenezApril 24, 2012
Asian Development Bank, Manila
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 2/19
DRAINAGE SYSTEM IN METRO MANILA
Composed of 897 kilometers of drainage laterals,59 kilometers of drainage mains and interceptors,and 659 kilometers of open waterwayscomposed of esteros/creeks and rivers.
Any hindrance within the network of drainagesystems may cause the disruption in the flow ofwater when not properly addressed and will
eventually result to flooding.
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 3/19
ESTEROS IN METRO MANILA
Majority of the esteros are located in the city ofManila.
These discharge into the Pasig River or directly toManila Bay.
The easement of most esteros are encroached by
informal settlers. In severe cases, the informalsettlers are along the watercourse itself therebyleaving no space for water to flow.
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 4/19
ESTERO BLITZ
Objectives
To perform intensified cleanup operations of majoresteros, creeks, and rivers in Metro Manila incompliance with the Supreme court order to clean up
waterways leading to Manila Bay
To enjoin the communities’ involvement in the dredging,
removal and hauling of garbage, spoils, slits and otherdebris along waterways
To conduct medical missions and teach-ins/seminars onsolid waste management, health and sanitationpromotion in the barangays
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 5/19
ESTERO BLITZ I
August 8 – September 8, 2011
Accomplishments Figures
Volume of Garbage Collected (in cu.m) 7,383
No. of Clients Served during Medical Mission 3,069
No. of Participants during Community Teach-ins/Seminars
11,926
Total Length of Esteros Cleaned (km.) 75
Number of Esteros 45
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 6/19
ESTERO BLITZ I
Helped prevent floodings and inundations whentyphoons Pedring and Quiel hit the country lateSeptember in 2011.
Of the eight flood prone areas, only two wereflooded. This, however, was due to the water’s
high tide and rapidly subsided.
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 7/19
ESTERO BLITZ I
BEFORE AFTER
Estero de Quiapo
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 8/19
ESTERO BLITZ I
DURINGBEFORE AFTER
Lapu-Lapu Avenue Spine, MalabonCity
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 9/19
ESTERO BLITZ I
BEFORE AFTERDURING
Estero de KabulusanTondo, Manila
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 10/19
ESTERO BLITZ I
BEFORE AFTERDURING
Brgy. TonsuyaMalabon City
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 11/19
ESTERO BLITZ I
DURINGAFTER
PNR CreekValenzuela
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 12/19
ESTERO BLITZ II
February 6 - March 30, 2012
Accomplishments Figures
Volume of Garbage Collected (in cu.m) 6,016
No. of Clients Served during Medical Mission 3,440
No. of Participants during Community Teach-ins/Seminars 5,772
Total Length of Esteros Cleaned (km.) 78
Number of Esteros 38
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 13/19
ESTERO BLITZ IIEstero de Kabulusan
Tondo, Manila
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 14/19
ESTERO BLITZ IIEstero de Quiapo
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 15/19
ESTERO BLITZ IIEstero de ValenciaSta. Mesa, Manila
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 16/19
ESTERO BLITZ IIEstero de VitasTondo, Manila
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 17/19
CHALLENGES
• Sustainability of the clean-up programs for rivers,esteros and creeks
• Commitment of the Resident Communities and
LGUs/Barangays
• Active participation of other government agencies
• Involvement of the private sectors, civic groups,etc.
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 18/19
WAY FORWARD
• Operations of the MMDA Flood ControlInformation Center (FCIC)
• MMDA-DPWH joint responsibility and initiatives in
the implementation of flood control projects
• Inter-agency approach coupled with partnershipswith the private sector in riverfront redevelopment
such as the PRRC Pasig River RehabilitationProgram 2011-2016
8/2/2019 2012PRF S4G2 Estero Blitz for Pasig River Clean Up Drive by Corazon T. Jimenez,
http://slidepdf.com/reader/full/2012prf-s4g2-estero-blitz-for-pasig-river-clean-up-drive-by-corazon-t-jimenez 19/19
Maraming salamat po!