Republic of the Philippines
Department of Public Works and Highways
Manila
Pasig-Marikina River Channel Improvement
Project (PMRCIP)
24 April 2012
PASIG RIVER FORUM
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 29
Marikina River water level rapidly rose 46 m in 6 hours at
Marikina Bridge on September 26 2009 due to
approximately 400 mm rainfall in 6 hoursAlso Laguna Lake water level rose from Elev 1290 m at
900 AM on September 26 2009 to Elev 1384 m in 24
hours
5000
4150
3500
3000
500
1200
Inflow
7000m3 s
Sierra Madre Mountains
Flood in Pasig-Marikina-Laguna Lake Basin by ldquoOndoyrdquo (Unit m3s)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 39
1450m3s
Flood Flow Distribution due to ldquoOndoyrdquo
500
4150
3000
3500
650
1900 1100
800
500
Flood Discharge During ldquoOndoyrdquo Unit m3s
Taytay Taguig
Cainta
Pasig
1500
2400
4001200 500
Flow
Capacity
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 49
Overall Pasig-Marikina River Channel Improvement Project
Phase I - Detailed Design for the entire project (Delpan
Bridge to Marikina Bridge) (Completed)
Phase II - Channel Improvement Works for Pasig River
(Delpan Bridge to Napindan Channel)
(On-going Project)
Phase III - Channel Improvement Works for LowerMarikina River including the Remaining
Portions in Pasig River (Delpan Bridge to the
immediate vicinity of Mangahan Floodway)
(Proposed Project)
Phase IV - Channel Improvement Works for Upper
Marikina River including the Marikina Control
Gate Structure (MCGS) (Mangahan Floodway to
Marikina Bridge) (Future Project)
Phase II Project Phase III Project Phase IV Project
Subject for
Future FundingOn-going
Construction
Proposed for
Implementation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 59
Phase II (Pasig River Channel Improvement)
bull Covers 131 km (both banks) of revetmentsparapet walls and excavation from Delpan
Bridge to the immediate vicinity of Napindan
Hydraulic Control Structure (NHCS)
bull Under Japan International Cooperation
Agency-Special Term for Economic
Partnership (JICA-STEP) Loan No PH-P239
bull Accomplishment 9512 as of 16 Apr 2012
bull Start amp Completion July 2009 amp June 2012
Napindan River
Marikina River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 69
Phase III (Pasig River Channel Improvement)
Remaining Sections (Potential Areas) of PMRCIP
(Phase II) to be included in the PMRCIP (Phase III)
Napindan River
Marikina River
bull Covers 99 km (both banks) of revetments
parapet walls and excavation from Delpan
Bridge to the immediate vicinity of
Napindan Hydraulic Control Structure
(NHCS)
bull Under Japan International Cooperation
Agency-Special Term for EconomicPartnership (JICA-STEP) Loan No PH-P252
bull Start amp Completion Sept 2013 amp Aug 2016
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 79
Dredging WorksActivities (540 km = 612000 m3 )
DikeParapet Wall Construction (4 sites = 215 km in total)
Phase III (Lower Marikina River Channel Improvement)
Pasig River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 89
TYPICAL CROSS SECTION OF UPPER MARIKINA RIVER IMPROVEMENT
Concrete Ditch
Existing Ground Level
Steel Sheet Pile
GeotextileSheet
Concrete Block for foot-protection
DredgingExcavation
Coping Concrete
Revetment
HWL
Existing Riverbed
Old C
A p p r o x
( F r e e b o a r d )
Design RiverbedLeve l
Grass SoddingEmbankment
Pavement New Center Line
L
Approx 140m
Approx 100m
Approx 100m
1 0 m
1 2 m
5m
5m 3m 3 5m 5m
Dike Channel Dike
- DredgingExcavation of Riverbed
- Earth Dike
- Concrete River Wall
- Boundary Bank
Rosario Weir
M8 Marikina Br
ario Br
M5 Manalo Br
M6 MRT Br
P A C K A G E
N o
6 1
K m
SEDS
C O N T R A C T
B
3
M7 Marcos Br
Phase IV (Upper Marikina River Channel Improvement
and Marikina Control Gate Structure)
bullTo be implemented at alater period subject to a
separate funding request
Upper Marikina River Channel Improvement Marikina Control Gate Structure (MCGS)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 99
End of Presentation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 29
Marikina River water level rapidly rose 46 m in 6 hours at
Marikina Bridge on September 26 2009 due to
approximately 400 mm rainfall in 6 hoursAlso Laguna Lake water level rose from Elev 1290 m at
900 AM on September 26 2009 to Elev 1384 m in 24
hours
5000
4150
3500
3000
500
1200
Inflow
7000m3 s
Sierra Madre Mountains
Flood in Pasig-Marikina-Laguna Lake Basin by ldquoOndoyrdquo (Unit m3s)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 39
1450m3s
Flood Flow Distribution due to ldquoOndoyrdquo
500
4150
3000
3500
650
1900 1100
800
500
Flood Discharge During ldquoOndoyrdquo Unit m3s
Taytay Taguig
Cainta
Pasig
1500
2400
4001200 500
Flow
Capacity
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 49
Overall Pasig-Marikina River Channel Improvement Project
Phase I - Detailed Design for the entire project (Delpan
Bridge to Marikina Bridge) (Completed)
Phase II - Channel Improvement Works for Pasig River
(Delpan Bridge to Napindan Channel)
(On-going Project)
Phase III - Channel Improvement Works for LowerMarikina River including the Remaining
Portions in Pasig River (Delpan Bridge to the
immediate vicinity of Mangahan Floodway)
(Proposed Project)
Phase IV - Channel Improvement Works for Upper
Marikina River including the Marikina Control
Gate Structure (MCGS) (Mangahan Floodway to
Marikina Bridge) (Future Project)
Phase II Project Phase III Project Phase IV Project
Subject for
Future FundingOn-going
Construction
Proposed for
Implementation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 59
Phase II (Pasig River Channel Improvement)
bull Covers 131 km (both banks) of revetmentsparapet walls and excavation from Delpan
Bridge to the immediate vicinity of Napindan
Hydraulic Control Structure (NHCS)
bull Under Japan International Cooperation
Agency-Special Term for Economic
Partnership (JICA-STEP) Loan No PH-P239
bull Accomplishment 9512 as of 16 Apr 2012
bull Start amp Completion July 2009 amp June 2012
Napindan River
Marikina River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 69
Phase III (Pasig River Channel Improvement)
Remaining Sections (Potential Areas) of PMRCIP
(Phase II) to be included in the PMRCIP (Phase III)
Napindan River
Marikina River
bull Covers 99 km (both banks) of revetments
parapet walls and excavation from Delpan
Bridge to the immediate vicinity of
Napindan Hydraulic Control Structure
(NHCS)
bull Under Japan International Cooperation
Agency-Special Term for EconomicPartnership (JICA-STEP) Loan No PH-P252
bull Start amp Completion Sept 2013 amp Aug 2016
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 79
Dredging WorksActivities (540 km = 612000 m3 )
DikeParapet Wall Construction (4 sites = 215 km in total)
Phase III (Lower Marikina River Channel Improvement)
Pasig River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 89
TYPICAL CROSS SECTION OF UPPER MARIKINA RIVER IMPROVEMENT
Concrete Ditch
Existing Ground Level
Steel Sheet Pile
GeotextileSheet
Concrete Block for foot-protection
DredgingExcavation
Coping Concrete
Revetment
HWL
Existing Riverbed
Old C
A p p r o x
( F r e e b o a r d )
Design RiverbedLeve l
Grass SoddingEmbankment
Pavement New Center Line
L
Approx 140m
Approx 100m
Approx 100m
1 0 m
1 2 m
5m
5m 3m 3 5m 5m
Dike Channel Dike
- DredgingExcavation of Riverbed
- Earth Dike
- Concrete River Wall
- Boundary Bank
Rosario Weir
M8 Marikina Br
ario Br
M5 Manalo Br
M6 MRT Br
P A C K A G E
N o
6 1
K m
SEDS
C O N T R A C T
B
3
M7 Marcos Br
Phase IV (Upper Marikina River Channel Improvement
and Marikina Control Gate Structure)
bullTo be implemented at alater period subject to a
separate funding request
Upper Marikina River Channel Improvement Marikina Control Gate Structure (MCGS)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 99
End of Presentation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 39
1450m3s
Flood Flow Distribution due to ldquoOndoyrdquo
500
4150
3000
3500
650
1900 1100
800
500
Flood Discharge During ldquoOndoyrdquo Unit m3s
Taytay Taguig
Cainta
Pasig
1500
2400
4001200 500
Flow
Capacity
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 49
Overall Pasig-Marikina River Channel Improvement Project
Phase I - Detailed Design for the entire project (Delpan
Bridge to Marikina Bridge) (Completed)
Phase II - Channel Improvement Works for Pasig River
(Delpan Bridge to Napindan Channel)
(On-going Project)
Phase III - Channel Improvement Works for LowerMarikina River including the Remaining
Portions in Pasig River (Delpan Bridge to the
immediate vicinity of Mangahan Floodway)
(Proposed Project)
Phase IV - Channel Improvement Works for Upper
Marikina River including the Marikina Control
Gate Structure (MCGS) (Mangahan Floodway to
Marikina Bridge) (Future Project)
Phase II Project Phase III Project Phase IV Project
Subject for
Future FundingOn-going
Construction
Proposed for
Implementation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 59
Phase II (Pasig River Channel Improvement)
bull Covers 131 km (both banks) of revetmentsparapet walls and excavation from Delpan
Bridge to the immediate vicinity of Napindan
Hydraulic Control Structure (NHCS)
bull Under Japan International Cooperation
Agency-Special Term for Economic
Partnership (JICA-STEP) Loan No PH-P239
bull Accomplishment 9512 as of 16 Apr 2012
bull Start amp Completion July 2009 amp June 2012
Napindan River
Marikina River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 69
Phase III (Pasig River Channel Improvement)
Remaining Sections (Potential Areas) of PMRCIP
(Phase II) to be included in the PMRCIP (Phase III)
Napindan River
Marikina River
bull Covers 99 km (both banks) of revetments
parapet walls and excavation from Delpan
Bridge to the immediate vicinity of
Napindan Hydraulic Control Structure
(NHCS)
bull Under Japan International Cooperation
Agency-Special Term for EconomicPartnership (JICA-STEP) Loan No PH-P252
bull Start amp Completion Sept 2013 amp Aug 2016
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 79
Dredging WorksActivities (540 km = 612000 m3 )
DikeParapet Wall Construction (4 sites = 215 km in total)
Phase III (Lower Marikina River Channel Improvement)
Pasig River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 89
TYPICAL CROSS SECTION OF UPPER MARIKINA RIVER IMPROVEMENT
Concrete Ditch
Existing Ground Level
Steel Sheet Pile
GeotextileSheet
Concrete Block for foot-protection
DredgingExcavation
Coping Concrete
Revetment
HWL
Existing Riverbed
Old C
A p p r o x
( F r e e b o a r d )
Design RiverbedLeve l
Grass SoddingEmbankment
Pavement New Center Line
L
Approx 140m
Approx 100m
Approx 100m
1 0 m
1 2 m
5m
5m 3m 3 5m 5m
Dike Channel Dike
- DredgingExcavation of Riverbed
- Earth Dike
- Concrete River Wall
- Boundary Bank
Rosario Weir
M8 Marikina Br
ario Br
M5 Manalo Br
M6 MRT Br
P A C K A G E
N o
6 1
K m
SEDS
C O N T R A C T
B
3
M7 Marcos Br
Phase IV (Upper Marikina River Channel Improvement
and Marikina Control Gate Structure)
bullTo be implemented at alater period subject to a
separate funding request
Upper Marikina River Channel Improvement Marikina Control Gate Structure (MCGS)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 99
End of Presentation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 49
Overall Pasig-Marikina River Channel Improvement Project
Phase I - Detailed Design for the entire project (Delpan
Bridge to Marikina Bridge) (Completed)
Phase II - Channel Improvement Works for Pasig River
(Delpan Bridge to Napindan Channel)
(On-going Project)
Phase III - Channel Improvement Works for LowerMarikina River including the Remaining
Portions in Pasig River (Delpan Bridge to the
immediate vicinity of Mangahan Floodway)
(Proposed Project)
Phase IV - Channel Improvement Works for Upper
Marikina River including the Marikina Control
Gate Structure (MCGS) (Mangahan Floodway to
Marikina Bridge) (Future Project)
Phase II Project Phase III Project Phase IV Project
Subject for
Future FundingOn-going
Construction
Proposed for
Implementation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 59
Phase II (Pasig River Channel Improvement)
bull Covers 131 km (both banks) of revetmentsparapet walls and excavation from Delpan
Bridge to the immediate vicinity of Napindan
Hydraulic Control Structure (NHCS)
bull Under Japan International Cooperation
Agency-Special Term for Economic
Partnership (JICA-STEP) Loan No PH-P239
bull Accomplishment 9512 as of 16 Apr 2012
bull Start amp Completion July 2009 amp June 2012
Napindan River
Marikina River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 69
Phase III (Pasig River Channel Improvement)
Remaining Sections (Potential Areas) of PMRCIP
(Phase II) to be included in the PMRCIP (Phase III)
Napindan River
Marikina River
bull Covers 99 km (both banks) of revetments
parapet walls and excavation from Delpan
Bridge to the immediate vicinity of
Napindan Hydraulic Control Structure
(NHCS)
bull Under Japan International Cooperation
Agency-Special Term for EconomicPartnership (JICA-STEP) Loan No PH-P252
bull Start amp Completion Sept 2013 amp Aug 2016
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 79
Dredging WorksActivities (540 km = 612000 m3 )
DikeParapet Wall Construction (4 sites = 215 km in total)
Phase III (Lower Marikina River Channel Improvement)
Pasig River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 89
TYPICAL CROSS SECTION OF UPPER MARIKINA RIVER IMPROVEMENT
Concrete Ditch
Existing Ground Level
Steel Sheet Pile
GeotextileSheet
Concrete Block for foot-protection
DredgingExcavation
Coping Concrete
Revetment
HWL
Existing Riverbed
Old C
A p p r o x
( F r e e b o a r d )
Design RiverbedLeve l
Grass SoddingEmbankment
Pavement New Center Line
L
Approx 140m
Approx 100m
Approx 100m
1 0 m
1 2 m
5m
5m 3m 3 5m 5m
Dike Channel Dike
- DredgingExcavation of Riverbed
- Earth Dike
- Concrete River Wall
- Boundary Bank
Rosario Weir
M8 Marikina Br
ario Br
M5 Manalo Br
M6 MRT Br
P A C K A G E
N o
6 1
K m
SEDS
C O N T R A C T
B
3
M7 Marcos Br
Phase IV (Upper Marikina River Channel Improvement
and Marikina Control Gate Structure)
bullTo be implemented at alater period subject to a
separate funding request
Upper Marikina River Channel Improvement Marikina Control Gate Structure (MCGS)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 99
End of Presentation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 59
Phase II (Pasig River Channel Improvement)
bull Covers 131 km (both banks) of revetmentsparapet walls and excavation from Delpan
Bridge to the immediate vicinity of Napindan
Hydraulic Control Structure (NHCS)
bull Under Japan International Cooperation
Agency-Special Term for Economic
Partnership (JICA-STEP) Loan No PH-P239
bull Accomplishment 9512 as of 16 Apr 2012
bull Start amp Completion July 2009 amp June 2012
Napindan River
Marikina River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 69
Phase III (Pasig River Channel Improvement)
Remaining Sections (Potential Areas) of PMRCIP
(Phase II) to be included in the PMRCIP (Phase III)
Napindan River
Marikina River
bull Covers 99 km (both banks) of revetments
parapet walls and excavation from Delpan
Bridge to the immediate vicinity of
Napindan Hydraulic Control Structure
(NHCS)
bull Under Japan International Cooperation
Agency-Special Term for EconomicPartnership (JICA-STEP) Loan No PH-P252
bull Start amp Completion Sept 2013 amp Aug 2016
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 79
Dredging WorksActivities (540 km = 612000 m3 )
DikeParapet Wall Construction (4 sites = 215 km in total)
Phase III (Lower Marikina River Channel Improvement)
Pasig River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 89
TYPICAL CROSS SECTION OF UPPER MARIKINA RIVER IMPROVEMENT
Concrete Ditch
Existing Ground Level
Steel Sheet Pile
GeotextileSheet
Concrete Block for foot-protection
DredgingExcavation
Coping Concrete
Revetment
HWL
Existing Riverbed
Old C
A p p r o x
( F r e e b o a r d )
Design RiverbedLeve l
Grass SoddingEmbankment
Pavement New Center Line
L
Approx 140m
Approx 100m
Approx 100m
1 0 m
1 2 m
5m
5m 3m 3 5m 5m
Dike Channel Dike
- DredgingExcavation of Riverbed
- Earth Dike
- Concrete River Wall
- Boundary Bank
Rosario Weir
M8 Marikina Br
ario Br
M5 Manalo Br
M6 MRT Br
P A C K A G E
N o
6 1
K m
SEDS
C O N T R A C T
B
3
M7 Marcos Br
Phase IV (Upper Marikina River Channel Improvement
and Marikina Control Gate Structure)
bullTo be implemented at alater period subject to a
separate funding request
Upper Marikina River Channel Improvement Marikina Control Gate Structure (MCGS)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 99
End of Presentation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 69
Phase III (Pasig River Channel Improvement)
Remaining Sections (Potential Areas) of PMRCIP
(Phase II) to be included in the PMRCIP (Phase III)
Napindan River
Marikina River
bull Covers 99 km (both banks) of revetments
parapet walls and excavation from Delpan
Bridge to the immediate vicinity of
Napindan Hydraulic Control Structure
(NHCS)
bull Under Japan International Cooperation
Agency-Special Term for EconomicPartnership (JICA-STEP) Loan No PH-P252
bull Start amp Completion Sept 2013 amp Aug 2016
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 79
Dredging WorksActivities (540 km = 612000 m3 )
DikeParapet Wall Construction (4 sites = 215 km in total)
Phase III (Lower Marikina River Channel Improvement)
Pasig River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 89
TYPICAL CROSS SECTION OF UPPER MARIKINA RIVER IMPROVEMENT
Concrete Ditch
Existing Ground Level
Steel Sheet Pile
GeotextileSheet
Concrete Block for foot-protection
DredgingExcavation
Coping Concrete
Revetment
HWL
Existing Riverbed
Old C
A p p r o x
( F r e e b o a r d )
Design RiverbedLeve l
Grass SoddingEmbankment
Pavement New Center Line
L
Approx 140m
Approx 100m
Approx 100m
1 0 m
1 2 m
5m
5m 3m 3 5m 5m
Dike Channel Dike
- DredgingExcavation of Riverbed
- Earth Dike
- Concrete River Wall
- Boundary Bank
Rosario Weir
M8 Marikina Br
ario Br
M5 Manalo Br
M6 MRT Br
P A C K A G E
N o
6 1
K m
SEDS
C O N T R A C T
B
3
M7 Marcos Br
Phase IV (Upper Marikina River Channel Improvement
and Marikina Control Gate Structure)
bullTo be implemented at alater period subject to a
separate funding request
Upper Marikina River Channel Improvement Marikina Control Gate Structure (MCGS)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 99
End of Presentation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 79
Dredging WorksActivities (540 km = 612000 m3 )
DikeParapet Wall Construction (4 sites = 215 km in total)
Phase III (Lower Marikina River Channel Improvement)
Pasig River
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 89
TYPICAL CROSS SECTION OF UPPER MARIKINA RIVER IMPROVEMENT
Concrete Ditch
Existing Ground Level
Steel Sheet Pile
GeotextileSheet
Concrete Block for foot-protection
DredgingExcavation
Coping Concrete
Revetment
HWL
Existing Riverbed
Old C
A p p r o x
( F r e e b o a r d )
Design RiverbedLeve l
Grass SoddingEmbankment
Pavement New Center Line
L
Approx 140m
Approx 100m
Approx 100m
1 0 m
1 2 m
5m
5m 3m 3 5m 5m
Dike Channel Dike
- DredgingExcavation of Riverbed
- Earth Dike
- Concrete River Wall
- Boundary Bank
Rosario Weir
M8 Marikina Br
ario Br
M5 Manalo Br
M6 MRT Br
P A C K A G E
N o
6 1
K m
SEDS
C O N T R A C T
B
3
M7 Marcos Br
Phase IV (Upper Marikina River Channel Improvement
and Marikina Control Gate Structure)
bullTo be implemented at alater period subject to a
separate funding request
Upper Marikina River Channel Improvement Marikina Control Gate Structure (MCGS)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 99
End of Presentation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 89
TYPICAL CROSS SECTION OF UPPER MARIKINA RIVER IMPROVEMENT
Concrete Ditch
Existing Ground Level
Steel Sheet Pile
GeotextileSheet
Concrete Block for foot-protection
DredgingExcavation
Coping Concrete
Revetment
HWL
Existing Riverbed
Old C
A p p r o x
( F r e e b o a r d )
Design RiverbedLeve l
Grass SoddingEmbankment
Pavement New Center Line
L
Approx 140m
Approx 100m
Approx 100m
1 0 m
1 2 m
5m
5m 3m 3 5m 5m
Dike Channel Dike
- DredgingExcavation of Riverbed
- Earth Dike
- Concrete River Wall
- Boundary Bank
Rosario Weir
M8 Marikina Br
ario Br
M5 Manalo Br
M6 MRT Br
P A C K A G E
N o
6 1
K m
SEDS
C O N T R A C T
B
3
M7 Marcos Br
Phase IV (Upper Marikina River Channel Improvement
and Marikina Control Gate Structure)
bullTo be implemented at alater period subject to a
separate funding request
Upper Marikina River Channel Improvement Marikina Control Gate Structure (MCGS)
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 99
End of Presentation
822019 2012PRF S4G3 Pasig-Marikina River Channel Improvement by Patrick Gatan
httpslidepdfcomreaderfull2012prf-s4g3-pasig-marikina-river-channel-improvement-by-patrick-gatan 99
End of Presentation