ENERGOPROJEKT OPREMA Project : Flash smelter Ref No.: 504311 FIRE EVACUATION DRILL RECORD Rev No.: Page: 1 of 2 Department: SAP Type of alarm system: Hand horn Section: Type of back-up system: None Area In charge: Milorad Vukasinovic Fire brigade called by: Aleksandar Velickovic EPV Number of employees: 33 Roll call taken by: Aleksandar Velickovic EPV Date & time of drill: 13.06.2013. Time taken to evacuate: 10 min CHECKLIST ITEM YES NO Are employee’s aware of alarm sound? X Was the alarm audible? X Are employee’s aware of escape routes? X Are employee’s aware of assembly points? X Are all persons accounted for? X Was a search/rescue carried out? X Was fire fighting carried out? X DRILL SUMMARY Horn was sounded at 13:10 with two short beeps repeatedly. Because horn is not so laud, many people complained that they didn’t hear it. Hearing the signal, workers stopped with their job, turned off the machines and started exiting the site towards the place of assembly. Evacuated employees gathered at Assembly Point no.3 and supervisors of all subcontractors were with their workers, with the list of attendees of toolbox meeting. When person in charge asked about presence of workers, everybody was accounted for. Horn sounded with one long beep for the end of drill.

20130424 SAP Evacuation Drill Record Sheet Var01

Embed Size (px)

DESCRIPTION

evacuation drill record

Citation preview

DEPARTMENT

ENERGOPROJEKT OPREMAProject:Flash smelter

Ref No.:504311

FIRE EVACUATION DRILL RECORDRev No.:

Page:1 of 1

Department: SAPType of alarm system: Hand horn

Section:Type of back-up system: None

Area In charge: Milorad VukasinovicFire brigade called by: Aleksandar Velickovic EPV

Number of employees: 33Roll call taken by: Aleksandar Velickovic EPV

Date & time of drill: 13.06.2013.Time taken to evacuate: 10 min

DRILL SUMMARYHorn was sounded at 13:10 with two short beeps repeatedly. Because horn is not so laud, many people complained that they didnt hear it. Hearing the signal, workers stopped with their job, turned off the machines and started exiting the site towards the place of assembly. Evacuated employees gathered at Assembly Point no.3 and supervisors of all subcontractors were with their workers, with the list of attendees of toolbox meeting. When person in charge asked about presence of workers, everybody was accounted for. Horn sounded with one long beep for the end of drill.

CHECKLIST

ITEMYESNO

Are employees aware of alarm sound?X

Was the alarm audible?X

Are employees aware of escape routes?X

Are employees aware of assembly points?X

Are all persons accounted for?X

Was a search/rescue carried out?X

Was fire fighting carried out?X

Was power supply isolated?X

Were all machines switched off?X

Were vehicles removed where applicable?X

Were doors, windows closed?X

Actions / Recommendations

Get better and louder sirens.

Area In charge signatureHSE representative signature